Abstract For the past few decades, many attempts have been made in order to
develop infrastructure asset management models which simulate and optimize asset
elements’ condition and maintenance plan. Organizations owning/operating hotels
and resorts are of great need of asset management models to develop plans that
efficiently manage their valuable asset to keep it in good conditions and achieve
customer satisfaction. In addition, these plans should be within a certain budget
and can accurately predict future deterioration/conditions of the different elements
in the hotel/resort to keep on providing the required services. Several studies show
that coastal structures have the highest deterioration rates due to harsh environmental
exposure. In this research, an attempt has been made to develop an infrastructure asset
management model for the Coastal Hotels and Resorts that can improve resource
management and the overall condition of the asset. This model was built considering
different factors that might affect the user cost or the required condition of the asset
such as: star rating, occupancy. Elements’ qualities and types are used as input factors
that predict the deterioration behavior of elements based on data acquired form
literature and data collected from the field in form of surveys and inspection histories.
The deterioration behaviors for the elements were determined by using different
approaches; some were estimated using deterministic prediction models, while others
were predicted using Markov chain or linear method. The model was applied on a
case study and run for two scenarios: the first scenario was to minimize the total cost
for the following 24 months while achieving a minimum overall condition; and the
second was to maximize the overall condition with constrained budget. Finally, a life
cycle cost analysis was conducted for the asset over a 10-year period to investigate
the impact of the different material types and quality used in construction on the total
life cycle cost.
Coastal structures are exposed to harsh environment; therefore, they require high
quality of execution. This extreme weather condition includes high variability of
temperature, air humidity accompanied with high air salinity saturation. This envi-
ronmental condition causes severe damages to buildings’ structure and envelopes.
According to Edirisinghe et al. [6], the building closer to the sea has a higher dete-
rioration rates than buildings located away from the coastline. Costal hospitality
building, like hotels, are dynamic, complicated, and very costly to operate. Coastal
hotels entail high operational and maintenance measures to ensure Guest’s satisfac-
tion [4]. For instance, having less functionality or failure of HVAC is unacceptable
as it will affect the client’s comfort and their overall assessment of the hotel. Thus,
the hotel management should have an effective asset management system to closely
monitor the deterioration of the building and maintain the high performance of the
hotel. Ghazi [7] has studied the maintenance management practices and efficiency
in hotels through conducting a survey. A questionnaire was distributed to 34 hotel’s
maintenance managers around Egypt to get data about main factors affecting main-
tenance process in coastal/hotel projects. Analysis of the questionnaire indicates
that having a standardized maintenance management plan, computer-based informa-
tion system to organize the maintenance work, and allocating sufficient fund are the
main factors that influence the maintenance efficiency in hotels. Therefore, the hotel
management needs a tool to assist them in keeping track of the repair/maintenance
plan and determining the appropriate repair decision based on the condition perfor-
mance of each element. However, there is rare research done in this area, and most
of the past contributions attempted to analyze the maintenance procedures in hotels
and the factors affecting renovation frequency [10].
3 Model Development
In the input module, the user has to input certain data related to the asset, as
elements quantities, duration since last repair, occupancy rate, and capital cost of
some elements as in Fig. 2. This model considers 14 elements for 25 facilities as
shown in Fig. 3. The element qualities are defined by the characteristics of the compo-
nents used and detailed properties of each element. For instance, the columns quality
is characterized by the water–cement ratio, cement content, and mixture admixture
used within the execution of asset. The occupancy rates are divided into three cate-
gories: low, medium, or high. Also, the capital cost of lighting of each facility is
added.
Facilies Elements
Recepon Columns Slabs&Beams L.B.Walls Walls Doors Windows Paint Flooring GRC Lighng Furniture - - -
Restaurant Columns Slabs&Beams L.B.Walls Walls Doors Windows Paint Flooring GRC Lighng Furniture - - -
20 Guest Room Columns Slabs&Beams L.B.Walls Walls Doors Windows Paint Flooring GRC Lighng Furniture - - -
Adminstrave Columns Slabs&Beams L.B.Walls Walls Doors Windows Paint Flooring GRC Lighng Furniture - - -
Beach Seang - - - - - - - - - - - Beach Seang Umbrellas -
MEP - - - - - - - - - - - - - HVAC
The condition assessment uses a numerical rating system which ranges from nine
to three. Nine was considered as the best condition, whereas three was taken as the
worst condition. The star rating in this model, which varies from three to five stars,
affects both the overall acceptable condition of the asset and the user cost.
The deterioration behavior for the elements was determined by different approaches,
some were done using deterministic approach, and others were done using Markov
or linear method. According to Marteinsson [14], the factor method, a deterministic
approach, takes into account the variability of element quality, outdoor environmental
factors, and other factors on the service life of individual or entire building elements.
Consequently, the deterioration method of each element adopted is shown in Fig. 4.
Structural Elements
According to the acquired data from field and experts’ surveys, different deterioration
curves for the structural elements have been developed. The deterioration behavior
of the concrete structural elements including the columns, slabs and beams, and
loadbearing walls in this model was determined based on the quality factors of the
concrete such as: cement content, water–cement ratio, usage of mineral admixtures,
and cement block quality. Deterioration behavior curves were developed from the
data acquired; then using regression analysis, a function was driven with polynomial
function as shown in Fig. 5 for slabs and beams.
Coastal Hotels and Resorts: Infrastructure Asset Management System Model 921
Windows DETERMINISTIC
Doors DETERMINISTIC
Paint DETERMINISTIC
GRC LINEAR
Lighting LINEAR
Architectural Elements
The walls’ deterioration curves were determined from Markov series. The walls’
deterioration is depending up on different factors such as: the cement content of the
mortar, quality of bricks, and availability of polymers. This is also applied to flooring
and Furniture, in which deterioration behavior was predicted using Markov transition
matrix from literature. On the other hand, for Paint and Doors, the deterioration curves
are drawn from the field data and the curves have different ages according to the type
of the door or paint. For example, the doors are assumed to be two types: automatic
and manual operated, along with two different wood and coating quality. Accordingly,
four curves are formed for deterioration according door type and quality, as shown
922 A. Ghaly et al.
in Fig. 6. Moreover, the deterioration of windows was determined from the field
data. Various windows types and qualities were considered. Aluminum and wood
types were also included. Aluminum quality varies according to the frame types and
its ability to resist corrosion. Consequently, curves were developed to represent the
conditions and service life collected.
The deterioration rate for each of lighting, beach seating, and umbrellas are assumed
to be linear. The total lifetime for lighting including fixtures and switches is assumed
to be 20 years. While for the beach seating, the life span was expected to vary based
on its type: 3 years for plastic and 4 years for wood. Finally, beach umbrellas have
lifetime for wood and metal types, 4 and 5 years, respectively.
HVAC
The Heating Ventilation and Air Conditioner (HVAC) is one of the most critical
elements in the hotel as its failure or even less functionality is not acceptable as it has
a great effect on customers’ satisfaction. Therefore, it should be maintained at a higher
condition and to be checked frequently. The HVAC includes several sub-components
(Fig. 7). For instance, it comprises of cooling generating system, a heating generating
system, distribution systems, terminal and package units, control, and others HVAC
equipment. Also, it includes main components such as chillers, boiler, and other
auxiliary parts. Each of these sub systems has a different deterioration rates, so it
Coastal Hotels and Resorts: Infrastructure Asset Management System Model 923
should be calculated with a different transition matrix. However, the HVAC could be
managed at high level, so it was defined as one component and only one deterioration
rate was developed for the whole HVAC element. The transition matrix from Grussing
[9] was adopted.
In this model, each element has two levels of repair that can be applied depending
on the condition of the element, and it is assumed that the repair restores the element
to its initial condition which is 9. Each level of repair has different technique, cost,
and productivity rate (Fig. 8).
There are different levels or types of repair that could be applied to each element in
the asset; in this model, two levels of repair were used: light and heavy. For example,
for columns, the light repair includes removing the concrete cover above the corroded
reinforcement, then removing the corrosion layer with angle grinder or sandblasting
machine, along with coating the old reinforcement with protective coating, and finally
Repair Cost
* Minor haircrack injecon with bonding * major crack injecon with bonding
Walls material material
*Cleaning or ligh Repair for minor cracks * Repair for major cracks
GRC
* Raplacing minor (few) Defected or * Raplacing Major (Several) Defected or
Flooring broken Tiles broken Tiles
* Minor Scratches repainng * Major Scratches or breaking fixing &
Furniture repainng
* Minor defect repair or bulb changing * Major defect in lighng fixtures or
Lighng connecons repair
* Repainng Wooden Seang or Fixing * Repairing Broken Wooden Seang or
Beach Seang minor Plasc Crack Replacing major broken Plasc
* Repaint either wooden or Steel * Repairing Broken Wooden umbrella or
Beach Umberalla repairin a severly corroded Steel umbrella
* Changing minor parts like fans, small * Changing major parts like motor ,
HVAC
parts of the controle unit inside facilies controle unit inside facilies
Fig. 9 Repair type and corresponding repair plan for each element
replying the concrete cover using shotcreting or batching. However, for column heavy
repair, RC Jacketing is applied, with same procedure of light repair along with the
addition of new reinforcement with anchored shear connector. Figure 9 shows the
description of both light and heavy repairs applied to each of the 14-element type.
Based on the type of repair (light/heavy) and type of element, each has a different
repair costs and productivity rates, as shown in Figs. 10 and 11. Productivity rates
were determined from Gordian Group [8] “Facilities maintenance and repair cost
data” manual.
Coastal Hotels and Resorts: Infrastructure Asset Management System Model 925
The condition user cost occurs due to gradual loss of functionality of a certain element
beyond its acceptable condition. The condition user cost is affected by two factors:
occupancy rates and the condition state of each element. The occupancy is divided
into three categories: low, medium, and high with rates of less than 30%; from 30
to 70%; and more than 70% of the hotel capacity, respectively. The condition state
is grouped into two levels from 3 to 6 and from 6 to 8. The condition user cost is
calculated based on the average rooms prices as shown in Fig. 12.
The repair user cost is incurred due to applying the repair activity of certain element
which will execrate a loss to the hotel owners. The cost is calculated based on the
maximum duration of the repair activities which take place in each month for the
certain facility as shown in chart in Fig. 13.
Coastal Hotels and Resorts: Infrastructure Asset Management System Model 927
4 Optimization
5 Model Validation
For validating the model, the quantities, duration since previous repair, and defining
distinct quality factors for each element were inserted. The case study inputs are
presented in Figs. 14, 15, and 16.
5.2 Methodology
According to the input data, the current condition state of each element is calculated
based on its age and deterioration category. The age after repair is calculated linked
with the repair decision, variable, which automatically determines the condition after
repair, as in Fig. 17, and the associate repair cost. Consequently, the overall condition
state of each facility is calculated in each month based on defined weights as shown
in Fig. 18.
The condition user cost is determined based on the pervious mentioned equations
as shown in Fig. 19.
The repair duration is calculated by dividing the repair quantity by the repair
productivity rates. Then, the repair user cost is determined by calculating the
Coastal Hotels and Resorts: Infrastructure Asset Management System Model 929
Fig. 18 Overall monthly condition state of the reception and restaurant facilities
maximum repair duration per month and multiple it by the estimated loss due to
close part of the reception or a room to execute the repair activity as shown in
Fig. 20.
The total cost is calculated by adding the repair cost, condition user cost, and
repair user cost.
5.3 Results
The model was run one time for each approach, and the parameters for each approach
are represented in Fig. 22, including objective and constraints. Two approaches were
utilized to determine and summarize the short-term repair plan for the next 24 months.
The first approach was subjected to maintain the overall condition of each facility
930 A. Ghaly et al.
throughout the entire duration, higher than or equal 6 while minimizing the total
cost. While the second approach the average overall condition of the hotel for the
whole duration was minimized under a constrain on the allocated repair budget of
5.5 million, and same constraint as first approach of minimum overall condition of
6 for each facility throughout the entire duration (Fig. 21).
References
1. Aryee S (2011) Hotel maintenance management. Department of Real Estate and Construction
Management, pp 1–78
2. Beach Erosion Board Office of the Chief of Engineers (n.d.) Factors affecting durability of
concrete in coastal structures, no 96. Department of the Army
3. Bonić Z, Ćurčć GT, Davidovič N, Savič J (2015) Damage of concrete and reinforcement of
reinforced-concrete foundations caused by environmental effects. Procedia Eng 117(1):416–
423. https://doi.org/10.1016/j.proeng.2015.08.187
4. Chan KT, Lee RHK, Burnett J (2001) Maintenance performance: a case study of hospitality
engineering systems. Facilities 19:494–504. https://doi.org/10.1108/02632770110409477
5. Department of Housing and Community Development (2017) Expected lifespan guidelines,
2–5 July 2017
6. Edirisinghe R, Setunge S, Zhang G (2015) Markov model—based building deterioration predic-
tion and ISO factor analysis for building management. J Manag Eng 31(6):04015009. https://
doi.org/10.1061/(ASCE)ME.1943-5479.0000359
7. Ghazi KM (2016) Hotel Maintenance Management Practices. J Hotel Bus Manage 5:136.
https://doi.org/10.4172/2169-0286.1000136
8. Gordian Group (2008) Facilities maintenance and repair cost data. United States of America
9. Grussing MN (2015) Risk-based facility management approach for building components using
a discrete Markov process—predicting condition, reliability, and remaining service life
10. Hassanien A, Losekoot E (2002) “The application of facilities management expertise to the
hotel renovation process”, Facilities, 20(7/8), pp. 230–238
11. Ihsan B, Alshibani A (2018) Factors affecting operation and maintenance cost of hotels. Prop
Manag 36(3):296–313. https://doi.org/10.1108/PM-04-2017-0023
12. Kaewunruen S, Wu L, Goto K, Najih Y (2018) Vulnerability of structural concrete to extreme
climate variances. Climate 6(2):40. https://doi.org/10.3390/cli6020040
13. Lounis Z, Madanat SM (2002) Integrating mechanistic and statistical deterioration models
for effective bridge management. In: 7th ASCE international conference on applications of
advanced technology in transportation, pp 513–520. https://doi.org/10.1061/40632(245)65
14. Marteinsson B (2003) Durability and the factor method of ISO 15686-1. Build Res Inf
31(6):416–426. https://doi.org/10.1080/0961321032000105412