SCHEDULE OF FLOOR BEAMS FOR GROUND AND FIRST FLOORS

3 -16 Ø TMT 5 - 16 Ø TMT 2 -16 Ø TMT + 5 - 16 Ø TMT


1 -12 Ø TMT 2 -16 Ø TMT 3 - 16 Ø TMT

1'-4 1/2"

1'-4 1/2"
1'-6"

1'-6"

1'-3"

1'-3"
8 Ø RTS @ 7" C/C 8 Ø RTS @ 5" C/C
8 Ø RTS @ 7" C/C 8 Ø RTS @ 5" C/C 8 Ø RTS @ 7" C/C 8 Ø RTS @ 5" C/C

5 - 16 Ø TMT 2 -16 Ø TMT +


9"
5 - 16 Ø TMT
9" 3 -16 Ø TMT 9" 9" 1 -12 Ø TMT 3 - 16 Ø TMT 2 -16 Ø TMT
9" 9"
AT MID SPAN AT SUPPORT
AT MID SPAN AT SUPPORT AT MID SPAN AT SUPPORT

C/S OF FLOOR BEAM - FB1 C/S OF FLOOR BEAM - FB2 C/S OF FLOOR BEAM - FB3

3 - 16 Ø RTS
3 -12 Ø TMT 4 - 12 Ø TMT
8 Ø TMT @ 6" C/C

5"
1'-3"

1'-3"

8 Ø RTS @ 7" C/C 8 Ø RTS @ 5" C/C


1'0" 3 -16 Ø RTS

4 - 12 Ø TMT 3 -12 Ø TMT


9" 9"

AT MID SPAN AT SUPPORT

C/S OF FLOOR BEAM - FB4 C/S OF CONSEALED BEAM -CB1


DRAWING TITLE :
R.C.C DETAILS OF FLOOR BEAMS
(WORKING DRAWING)
PROJECT:

ALL DIMENSIONS ARE Drg No.STR-DT-07


IN FOOT AND INCHES SCALE : 1" = 2'0"
NOTES:
1. CHECK ALL DIMENSIONS, ELEVATIONS IMMEDIATELY, REPORT ANY
DISCREPANY, CONFLICTS OR ERROR ,PRIOR TO COMMENCEMENT OF
WORK.
2.ALL DIMENSIONS ARE IN FOOT & INCHES
3.CLEAR COVER FOR :
4. RCC M20 GRADE CONCRETE WITH MINIMUM CEMENT CONTENT OF
320 Kg/cu. m AND MAXIMUM WATER CEMENT RATIO OF 0.5 TO BE
ADOPTED . BEAM - 25mm, COLUMNS 40mm, SLABS 25mm