N-50

N-45
N-49

NOTES:
1. THE PROJECTED CHANNEL SLOPE HAS TO BE ALIGNED WITH THE TERRAIN NATURAL SLOPE,
TO ALLOW THE FLOW OF WATER TO THE WEST.

2. THE PROJECTED CHANNEL TRENCH SECTIONS IS SHOWN IN DETAIL A.

3. CHANNEL LENGTH:
- CHANNEL 1 LENGTH 230 m.
PROJECT : MAP :
MAX DEPTH OF DRAINEGE AREA: 0.50 m. IN CASE OF FLOODINGS. SEE HYDROLOGY STUDY SAN EDUARDO. HYDROLOGY STUDY
1
SAN EDUARDO PHOTOVOLTAIC SYSTEM PARK
PRINT :
4. DIMENSIONS, ELEVATIONS AND COORDINATES IN METERS 1
MAP : SCALE : REV
NAME DATE NAME DATE B 11/11/2022
5. UTM COORDINATE SYSTEM, DATUM WGS84, HUSO 18S SURFACE DRAINAGE LAYOUT
DREW : R.C.A 11/11/2022 REVIEWED: M.C.V. 11/11/2022 A 05/11/2022
INDICATED B
PROJECT : M.C.V. 11/11/2022 APPROVED : M.C.V. 11/11/2022 REVIEW DATE