NOTES:
1. THE PROJECTED CHANNEL SLOPE HAS TO BE ALIGNED WITH THE TERRAIN NATURAL SLOPE,
TO ALLOW THE FLOW OF WATER TO THE WEST.
3. CHANNEL LENGTH:
- CHANNEL 1 LENGTH 230 m.
PROJECT : MAP :
MAX DEPTH OF DRAINEGE AREA: 0.50 m. IN CASE OF FLOODINGS. SEE HYDROLOGY STUDY SAN EDUARDO. HYDROLOGY STUDY
1
SAN EDUARDO PHOTOVOLTAIC SYSTEM PARK
PRINT :
4. DIMENSIONS, ELEVATIONS AND COORDINATES IN METERS 1
MAP : SCALE : REV
NAME DATE NAME DATE B 11/11/2022
5. UTM COORDINATE SYSTEM, DATUM WGS84, HUSO 18S SURFACE DRAINAGE LAYOUT
DREW : R.C.A 11/11/2022 REVIEWED: M.C.V. 11/11/2022 A 05/11/2022
INDICATED B
PROJECT : M.C.V. 11/11/2022 APPROVED : M.C.V. 11/11/2022 REVIEW DATE