You are on page 1of 15

1b

1a

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 01 of 24 1
License Engineer Employer's Representative
EL.=9.320 EL.=9.418
EL.=9.301
EL.=9.084

EL.=7.369

EL.=0.710

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 03 of 24 1
License Engineer Employer's Representative
EL.=9.320 EL.=9.418
EL.=9.301
EL.=9.084

EL.=7.369

EL.=0.710

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 07 of 24 1
License Engineer Employer's Representative
EL.=9.418
EL.=9.301 EL.=9.320
EL.=9.084

EL.=7.369

EL.=0.710

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 08 of 24 1
License Engineer Employer's Representative
EL.=7.369 EL.=7.369

EL.=0.710 EL.=0.710

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 13 of 24 1
License Engineer Employer's Representative
REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 14 of 24 1
License Engineer Employer's Representative
REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 15 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 17 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 18 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 19 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 20 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 21 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 22 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 23 of 24 1
License Engineer Employer's Representative
TYPE-1 TYPE-2 TYPE-3 TYPE-4 TYPE-5 TYPE-6 TYPE-7 TYPE-8 TYPE-9 TYPE-10 TYPE-11 TYPE-12
c e d a a c a e
a a a b c b e
f d
c
b b c b d c a b b a b d b d f
a c b
a b a e c a g

REFERENCE:
SHOP DRAWING
S2-15

PREPARED BY: CONTRACTOR REVISIONS: PROJECT TITLE: DRAWING NO.


PHILKOEI INTERNATIONAL, INC. DESIGNED: SCIC

STA. CLARA CONSULTANTS - PLANNERS - ENGINEERS NORCONSULT C O R P O R A T I O N


A METRO PACIFIC TOLLWAY COMPANY
NLEX CORPORATION REV. DATE DESCRIPTION MANILA NORTH TOLLWAYS PROJECT
INLEX SEGMENT 7 - SUBIC FREEPORT EXPRESSWAY
SCIC_SFEX_DWG_
CADD: JRC 0 3/4/2020 FIRST SUBMISSION WIDENING PROJECT (SFEX) ARG_A-03
INTERNATIONAL CORPORATION
4F HIGHWAY 54 PLAZA, 986 EDSA Cor, STANDFORD ST. CHECKED BY DESIGN REPRESENTATIVE: REVIEWED BY ICE: 1 5/20/2020 SECOND SUBISSION
CHECKED: RDV SHEET TITLE: SHEET NO. REV. NO.
WACK-WACK, MANDALUYONG CITY, PHILIPPINES
KERVY S. DATAY J. LEONIDES S. DAVID REY P. PANTINO AGUEDO L . SAHAGUN EMMANUEL C. CABIGAS NEMESIO G. CASTILLO APPROVED: KSD ARGONAUT BRIDGE
Project Manager Project Manager Design Engineer Project Manager ABUTMENT 2 WALL AND WINGWALL CUTTING LIST 24 of 24 1
License Engineer Employer's Representative