CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

GAS TURBINE PERFORMANCE-ACCEPTANCE TEST


SPECIFICATION

□ AFC
□ FI
ENGINEER:
THIS APPROVAL OF INTERPRETATION OF THE WORK TO BE DONE

IFI  IFC □ DOES NOT RELIEVE THE CONTRACTOR OF THE CONTRACTUAL


RESPONSIBILITIES.

□ IFI IFC

IN-HOUSE REVISIONS DOCUMENT REVISIONS

A4 D

A3 C
A2 B

A1 A
Sakhaei Sakhaei
A0 First Issue Kavari Azizi Mohammadi 01.05.2022 0 First Issue Kavari Azizi Mohammadi 01.05.2022
pour pour
REV. DESCRIPTION DESG DRAWN. CHK APP. DATE REV. DESCRIPTION DESG DRAWN CHKD APP. Date
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 1 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Page Page
DOCUMENT REVISIONS Remarks IN-HOUSE REVISIONS Remarks
No. No.
0 A B C D E F G A0 A1 A2 A3 A4 A5 A6 A7

1 x 1 x
2 x 2 x
3 x 3 x
4 x 4 x
5 x 5 x
6 x 6 x
7 x 7 x
8 x 8 x
9 x 9 x
10 x 10 x
11 x 11 x
12 x 12 x
13 x 13 x
14 x 14 x
15 x 15 x
16 x 16 x
17 x 17 x
18 x 18 x
19 x 19 x
20 x 20 x
21 x 21 x
22 x 22 x
23 x 23 x
24 x 24 x
25 x 25 x
26 x 26 x
27 x 27 x
28 x 28 x
29 x 29 x
30 x 30 x
31 x 31 x
32 x 32 x
33 x 33 x
. x . x
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

. x . x
39 x 39 x

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 2 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

CONTENTS

1 REFERENCE DOCUMENT ...................................................................................................................... 4


2 GENERAL.................................................................................................................................................... 4
3 PURPOSE OF TESTS................................................................................................................................. 4
4 TEST REQUIREMENTS ........................................................................................................................... 5
5 PREPARATIONS FOR TEST ................................................................................................................... 6
6 OPERATION CONDITIONS FOR THE TEST....................................................................................... 8
7 MEASURING POINTS AND MEASURING INSTRUMENTS ............................................................. 9
8 CALCULATION OF ACCEPTANCE TEST RESULTS ...................................................................... 13
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 3 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1 Reference Document
Noise measurement procedure for gas turbine package
2 General
This description explains the tests and the performance calculation necessary fort the
verification of the contractual performance guarantees of a gas turbine generator power
plant.
The standards and the rules listed in appendix 1 are used as a guide to carry out the tests
and for the calculation of results. In cases not included within the document, the decision
will be made based on the referred standard.

3 Purpose of tests
The acceptance tests shall verify that the gas turbine generator power plant fulfills the
guaranteed performance values as written down in the contract. These performance
values include power output at the generator terminals and the efficiency of the gas
turbine under the specified operating condition and specified fuel (natural gas / fuel oil) .
These data are related to the contractually specified values for:
 barometric pressure

 air inlet temperature

 air humidity

 pressure losses at inlet duct

 pressure losses at exhaust duct

 generator efficiency at rated power factor

 turbine speed

 fuel heating value


NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 4 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

4 Test Requirements
- Main guaranteed parameters
In compliance with the Contract, the main guaranteed parameters of GTU with MGT-40
GTE should correspond to the values stated in Table 1.
Main parameters of GTU with MGT-40 GTE, stated in Table 1, are ensured at the
following operating conditions and fuel composition:
 No inlet/ exhaust Losses
 Electric generator efficiency coefficient (EC) – not less than 98 %;
 Power factor of electric generator – 0.8;
 Air temperature at GTE inlet – 43 °С;
 Relative air humidity – 18 %;
 Atmospheric air pressure – 82.7 kPa.

Standard Fuel

 Natural Gas Composition:


Composition Mole %
CH4 88.1
C2H6 3.7
C3H8 1.2
C4H10 0.2
N2 6.8
Fuel LHV= 44383 kJ/kg

 Liquid Fuel:
Component Weight
%
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

C 86.569

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 5 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

H 13.426
S 0.005
O 0
N 0
Fuel LHV= 42700 kJ/kg

Table 1: Main parameters of GTU with MGT-40 GTE

Power Output at Efficiency at


Generator Generator NOx [ppm] CO [ppm]
Type of Fuel Load
Terminals Terminals 15% O2 15% O2
[kw] [%]
Natural Gas Base Load 28320 30.5 170 25
Fuel Oil Base Load 27410 30.3 330 25

- Test acceptance criteria required for test completion:


If the test program is fulfilled in full scope and GTU parameters correspond to Table 1
requirements, the tests are considered to be accepted and GTU test is declared successful.
Decision about declaring completion and acceptance of tests should be made with both
Supplier and the Customer approval.
The tests are considered as accepted if the following conditions are met:
 Composition and location of the equipment (including Instrumentation and
Controls (I&C)) used for execution of the test program correspond to the agreed
diagram
 The requirements of this Program and Procedure are fulfilled in full scope;
 Data amount obtained during test meets the program requirements.

5 Preparations for test


NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

The gas turbine generator power plant to be tested shall be in a new and clean condition.
If more than twenty five (25) fired hours have elapsed up to the time of the performance

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 6 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

test, a qualified manufacturer's representative shall have the right to visually inspect the
gas turbine (mainly the air compressor) and duct systems to see whether or not these meet
the new and clean requirements; and if necessary to order an off line cleaning procedure.
Dimensions and technical data of plant components and measuring equipment being
of importance for the acceptance test shall be determined and recorded prior to the
tests.
In due time before the acceptance test, a fuel sample shall be taken and analyzed.
Preliminary tests may be run for the purpose of:
 Determining whether the gas turbine and associated plant equipment are in a
suitable condition for the performance of an acceptance test.

 Checking the instrumentation

 Familiarization with the test procedure

A preliminary performance test of which the calculation leads to satisfying results may be
handled as an acceptance test by agreement between the parties.
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 7 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

6 Operation conditions for the test


Every reasonable effort shall be made to run the tests as close as possible to the
reference operating conditions (specified at the time of contract agreement).
The fuel used for the performance test shall be in accordance with the contract
specifications. If this is not possible an agreement about the fuel used during test
and the interpretation of the results shall be achieved between the parties prior to
the test.
The acceptance tests shall be carried out in a steady state condition.
The turbine is assumed to be in a steady state condition when turbine wheel space
temperatures do not change for more than three degrees (3 °C) in a fifteen (15)
minutes time interval just prior to the performance point readings. During the time
of taking readings, the load shall be kept constant within ± 1 %.
Single values of variables which are read during the test period shall not vary from
the arithmetic average of the set by more than the amount shown in table 1,
without written agreement of the parties prior to the test.

Table 2 Maximum tolerances of operating conditions during a performance test


point interval.
 No.  Variable  Tolerance
 1  barometric pressure at test site  ±0.5 %
 2  temperature of air at compressor  ±2 K
inlet
 3  lower calorific value of fuel  ±2 %
 4  pressure of fuel before the gas  ±1 %
turbine
 5  temperature of fuel before the gas  ±3 K
turbine
The duration of each performance test point should last at least 20 minutes. For
reading intervals for the particular measuring instruments see table 3.
6.1 GTE adjustment to Base Load
The Temperature Control System will limit fuel flow to the gas turbine to maintain
internal operating temperatures within design limitations of turbine hot gas path
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

parts. From thermodynamic relationships, gas turbine cycle performance


calculations, and known site conditions, firing temperature can be determined as a

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 8 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

function of exhaust temperature and the pressure ratio across the turbine which is
determined from the measured compressor discharge pressure (CPD). Fig.1 is a
graphical illustration of the control set points. For the “BASE SELECT” digital
input, the turbine loads and goes to the higher CPD. The turbine remains in base
load condition until the exhaust temperature value reaches the line of Fig.1.
Exhaust Temperature

TTKn_I ISOTHERMAL

TTKn_C

Compressor discharge Pressure (CPD)

Fig1. Exhaust temperature control set points

7 Measuring points and measuring instruments


Table 3 presents the list of required parameters to be measured during test, the
instruments measuring range and their accuracy.
During the test, parameters of the signals are recorded by an automatic Data
Acquisition System(DAS).
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 9 of 39
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS


HOLDING COMPANY GHODSNIROO
POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Table 3 – List of measured parameters and set completeness of measuring range

Measuring Remar
Item Parameter Accuracy Tag Instrument Type
Range ks

1 Atmospheric air pressure (0  2) bar 0.5 mbar 96AP 1A, B. C Electron. Digital barometer

2 Relative air humidity (0 – 100) % 2% Electron. Digital hygrometer

3 Air temperature at GTE inlet (-40  60) С ±0.2 °C CT-IF-1,2,3 Thermocouple type K – Single

GT
4 Total Pressure Inlet Duct (0 40) mbar ±0.25 % 96CS-1 Differential Pressure Transmitter
sensor
Compressor Discharge GT
5 (0  500) С ±0.2 °C CT-DA-1,2 Thermocouple type K – Single
Temperature sensor
GT
6 Compressor Discharge Pressure (0  14) bar ±0.25 % 96CD-1A, B, C Pressure Transmitter
sensor
7 Fuel gas temperature (-5090)С ±0.2 °C RTD

8 Fuel gas Pressure (0  55) bar ±0.2% Pressure Transmitter

GT
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN

(016000)
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

9 Fuel gas flow rate ±0.75 % 96FM-1 Orifice Meter Flage


Nm3/h sensor

Doc. No. : MD1H4-01TG-T-31-TG0-002 Rev: 0


MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
MAPNA'S DWG No. : Based on: ZAHEDAN POWER PLANT (3 x Contract No. : Page 10 of 39
MD1H4-01TG-T-31-TG0-002 MGT40)SIMPLE CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS


HOLDING COMPANY GHODSNIROO
POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Measuring Remar
Item Parameter Accuracy Tag Instrument Type
Range ks
(015000) Turbine Type Flow meter
10 Fuel Oil Flow rate ±0.5 %
kg/h Frequency Converter
11 Fuel Oil Temperature (0-100) С ±0.2 ℃ Pressure Transmitter
GT
12 Exhaust Temperature (0  1000) С 0.25 % TT-DX-1 to 18 Thermocouple type K –MIMS
sensor
GT
13 Static Pressure Exhaust Duct (0 40) mbar ±0.25 % 96EX-1,2,3 Differential Pressure Transmitter
sensor
14 Active power at generator * 0.2% Digital Power Analyzer
terminals
Power consumed by auxiliary
15 * kW meter
equipment
NOR TRANSFERREDTO A THIRD PARTY WITHOUT PRIOR AUTHORIZATIIN
THIS DOCUMENT IS A PROPERTY OF MAPNA GROUP AND MUST NOT BE COPIED

Doc. No. : MD1H4-01TG-T-31-TG0-002 Rev: 0


MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
MAPNA'S DWG No. : Based on: ZAHEDAN POWER PLANT (3 x Contract No. : Page 11 of 39
MD1H4-01TG-T-31-TG0-002 MGT40)SIMPLE CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Fig. 2 contains the layout diagram of primary measuring transducers (PMT) employed
for measuring main parameters of GTU with MGT-40 GTE based on numbering of
Table 3.

Fig.2 – Measuring Schematic

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 12 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

8 Calculation of acceptance test results


8.1 Inlet/ outlet pressure losses
Pressure losses in air intake and exhaust flue on-site, in nominal mode of operation at
conditions mentioned in the Contract are determined by direct measuring of total
pressure loss at intake and static pressure loss at exhaust. Pressure losses at GTE
nominal power output is calculated from the formula:
𝑚𝑛𝑜𝑚 2 𝑃𝑚𝑒𝑎𝑠 𝑇𝑛𝑜𝑚
∆𝑃𝑛𝑜𝑚 = ∆𝑃𝑚𝑒𝑎𝑠 ( ) ( )( )
𝑚𝑚𝑒𝑎𝑠 𝑃𝑛𝑜𝑚 𝑇𝑚𝑒𝑎𝑠

Where :
∆𝑃𝑚𝑒𝑎𝑠 = measured pressure loss
𝑚𝑛𝑜𝑚 = mass flow rate at nominal power output
𝑚𝑚𝑒𝑎𝑠 = mass flow rate at measuring power output
𝑃𝑛𝑜𝑚 = total pressure at nominal power output
𝑃𝑚𝑒𝑎𝑠 = total pressure at measuring power output
𝑇𝑛𝑜𝑚 = total temperature at nominal power output
𝑇𝑚𝑒𝑎𝑠 = total temperature at measuring power output
8.2 Exhaust gas temperature
The turbine exhaust temperature is average of measured gas temperature from
Chromel–Alumel exhaust temperature thermocouples at nominal mode. There are 18
thermocouples which are mounted in the exhaust plenum in an axial direction,
circumferentially around the exhaust diffuser.
8.3 Exhaust gas mass flow rate
The mass flow rate of exhaust gas out of the turbine can be estimated by energy
and mass balance over the turbine (Fig.3) control volume. The calculation is
modified according to ISO 2314 guidelines. Based on clause 8.3.3 of the standard,
the flow rate of exhaust gas is defined as:
ṁ12 = ṁ1 + ṁf − ṁex
Doc. No. : MD1H4-01TG-T-31- Rev: 0
TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 13 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

The turbine energy balance is:


Q1 + Q f = Pg + Q ex + Q12 + Pml + Pgb + Q lo
Where mass flows are:
ṁ12 -turbine outlet
ṁ1 - compressor inlet
ṁf- fuel
ṁex- extraction air
Energy flows:
Q1 - compressor inlet
Qf - fuel

Pg- output at generator terminal

Qex - external bleed

Q12 - turbine outlet

Pml - mechanical losses


Pgb - gear box losses

Qlo - radiation and convection heat loss

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 14 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Fig3. Gas turbine control volume

8.4 Efficiency calculation


The GTU power and efficiency η have to convert to the conditions mentioned in
the contract. The GTU power is measured at generator terminal(Sec. 7) and the
GTU efficiency is defined as follow:

𝜂 = 𝑃⁄𝑄̇,
Where:
𝑃 is the power at generator terminal in Kj/h
𝑄̇ is fuel input energy in kJ/h which is calculated as:
𝑄̇ = 𝑉𝑓̇ × 𝜌𝑓 × 𝐻𝑙𝑜
Where:
V̇f is fuel volume flow, m3/h
𝜌𝑓 is the fuel specific gravity, kg/m3
𝐻𝑙𝑜 is the lower heat value of fuel, kJ/kg

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 15 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

To convert P and η from test conditions to contractual conditions, the manufacturer's


performance curves for the specific type of turbine are used.

8.5 GTE Parameters Corrections


Corrected value of power output (N cor, kW) at specified conditions is determined
with the following correction factors:
NCor = NMEAS CNtin CNРа CNd CNРin·CNРout CNf Cηgenerator·CLHV

Where:
NMEAS –GTU power output measured at generator terminals, kW;
CNtin – correction factor of the effect of GTE inlet air temperature on GTU power output;
CNРа – correction factor of the effect of atmospheric pressure on GTU power output;
CNd – correction factor of the effect of atmospheric air moisture content on GTU
power output;
CNРin – correction factor of the effect of total pressure losses in air intake on GTU
power output;
CNРout –correction factor of the effect of total pressure losses in the exhaust flue on
GTU power output
CNf – correction factor of the effect of turbine rotating speed on GTU power output;
Cηgenerator– correction factor of the effect of generator efficiency on GTU power output;
𝜂𝐺𝑑
Cηgenerator=
𝜂𝐺𝑠
(ηGd: Generator efficiency at design condition, ηGs: Generator efficiency at site
condition)
CLHV – correction factor of the effect of fuel heating value on GTU power output;

Power correction coefficient is determined from figures of Annex C.


GTE corrected efficiency (Cor, %) at specified conditions is determined with the
help of the following correction factors:

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 16 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Cor =  MEAS Ctin Cd CРin CРout CNf Cηgenerator CLHV

Where:
MEAS – value of GTU EC related to power output at generator terminals determined
on the basis of measured power output and fuel flow rate, %;
Ctin – correction factor of the effect of air temperature at GTE inlet on GTU EC
(Efficiency Correction)
Cd – correction factor of the effect of atmospheric air moisture content variation on
GTU EC;
CРin – correction factor of the effect of variation of total pressure losses in air
intake on GTU EC;
CРout – correction factor of the effect of variation of total pressure losses in the
exhaust flue on GTU EC;
CNf – correction factor of the effect of turbine rotating speed on GTU EC;
Cηgenerator– correction factor of the effect of generator efficiency on GTU EC;
𝜂𝐺𝑑
Cηgenerator=
𝜂𝐺𝑠
(ηGd: Generator efficiency at design condition, ηGs: Generator efficiency at site
condition)
CLHV – correction factor of the effect of fuel heating value on GTU EC;

Efficiency correction coefficient is determined from figures of Annex C.

Corrected value of Exhaust Temperature (T Cor, °C) at specified conditions is


determined with the help of the following correction factors:
TCor = TMEAS + CTtin + CTd + CTРin+ CTРout+ CTf

Where:
TMEAS – GTU exhaust temperature measured at exhaust diffuser, °C;

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 17 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

CTtin – correction difference of the effect of GTE inlet air temperature on exhaust
temperature;
CTd – correction difference of the effect of atmospheric air moisture content on
exhaust temperature;
CTРin – correction difference of the effect of total pressure losses in air intake on
exhaust temperature;
CTРout – correction difference of the effect of total pressure losses in the exhaust flue
on exhaust temperature;
CTf – correction difference of the effect of turbine rotating speed on exhaust
temperature;
Exhaust Temperature coefficient is determined from figures of Annex C .

Corrected value of exhaust mass flow rate (mCor, kg/s) at specified conditions is
determined with the help of the following correction factors:
mCor = mCalc · Cmtin · CmРа · Cmd · CmРin. Cmf

Where
mCalc – exhaust mass flow rate calculated at nominal mode, kW;
Cmtin – correction factor of the effect of GTE inlet air temperature on exhaust mass flow
rate;
CmРа – correction factor of the effect of atmospheric pressure on exhaust mass flow rate;
Cmd – correction factor of the effect of atmospheric air moisture content on exhaust
mass flow rate;
CmРin – correction factor of the effect of total pressure losses in air intake on exhaust
mass flow rate;
Cmf – correction factor of the effect of turbine rotating speed on exhaust mass flow
rate;

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 18 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Exhaust mass flow coefficient is determined from figures of Annex C.

The calculated values have to be compared with the contractually guaranteed


values.
8.6 Tolerances of results and Test Report
On base of the mentioned measuring tolerances and with the unit’s built-in voltage
and current class 0.5 transformers, the calculated test results have the following
uncertainties. The measuring tolerances and the uncertainties of results have only
exemplary meaning. The exact determination of the tolerances and uncertainties
will be done during calculation of the test results.
Table 4, allowable tolerance
Uncertainties of Results
power output at generator terminals + 1,1
%
specific heat consumption ±2,0 %
for fuel gas operation

The preliminary results including the list of measured parameters during


performance test are presented after the test. The preliminary results shall be
approved by third party inspector and manufacturer’s test executive. The final test
report including preliminary results and correction of main parameters to reference
condition will be presented 30 working days after performance test.

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 19 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Appendix 1: List of standards and rules


1. ISO 2314 Gas turbines - Acceptance tests.
3. ISO 5167 Measurement of fluid flow by means of orifice plates, nozzles and
venture tubes inserted in circular cross-section conduits running full.

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 20 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

Annex 1:
Correction curves:
1.2
Correction Factor

1.15

1.1

1.05

1 Efficincy
0.95
Ex. Mass Flow
0.9

0.85 Power

0.8

0.75

0.7
-20 -15 -10 -5 0 5 10 15 20 25 30 35 40 45 50
Compressor Inlet Temperature (°C)

Figure C.1.1 – Relative change of Power, Efficiency and Exhaust Mass Flow rate
at MGT-40 GTE outlet vs. GTE inlet air temperature deviation from specified
value (15 °C) at constant relative air humidity ( = const = 60%) (for base modes
of GTE operation)

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 21 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

25
Exhaust Temperature Difference (°C)

20
15
10
5
0
-5
-10
-15
-20
-25
-20 -10 0 10 20 30 40 50
Compressor Inlet Temperatuer (°C)

Figure C.1.2 –Difference of Exhaust Temperature at MGT-40 GTE outlet vs.


GTE inlet air temperature deviation from specified value (15 °C) at constant
relative air humidity ( = const = 60%) (for base modes of GTE operation)

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 22 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1
Correction Factor

0.95
0.9
0.85
0.8
0.75
0.7
0.65
0.6
0.55
0.5
0 1000 2000 3000 4000 5000 6000 7000 8000 9000
Altitude (Feet)

Figure C.2 – Relative change of Power and exhaust mass flow rate at MGT-40 GTE
outlet vs. Altitude.

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 23 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.006
Power Correctio Factor

1.005

1.004

1.003

1.002

1.001
-5 °C
1 5 °C
15 °C
20 °C
0.999
30 °C
0.998

0.997 40 °C

0.996
0 20 40 60 80 100
Relative Humidity, %

Figure C.3.1 – Variation of Power at MGT-40 GTE outlet vs. variation of air
moisture content

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 24 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.015
Efficiency Correctio Factor

1.01

1.005

-5
1 5 °C
15 °C
20 °C
30 °C
0.995

40 °C
0.99
0 20 40 60 80 100
Relative Humidity, %

Figure C.3.2 – Variation of Efficiency at MGT-40 GTE outlet vs. variation of air
moisture content

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 25 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.02
Exhaust Flow Correctio Factor

1.015

1.01

1.005

1 -5 °C
5 °C
15 °C
20 °C
0.995
30 °C
0.99 40 °C

0.985
0 20 40 60 80 100
Relative Humidity, %

Figure C.3.3 – Variation of Mass Flow Rate at MGT-40 GTE outlet vs. variation of air
moisture content

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 26 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.5
Exhaust Temperature Differece

1 40
°C
30 °C
0.5 20 °C
15 °C
5 °C
0 -5 °C

-0.5

-1

-1.5

-2
0 20 40 60 80 100
Relative Humidity, %

Figure C.3.4 – Difference of Exhaust Temperature at MGT-40 GTE outlet vs.


variation of air moisture content

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 27 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.01
Correction Factor

1.005

0.995 Efficienc

0.99 Exhaust mass


flow
0.985

0.98 Power

0.975

0.97
0 2 4 6 8 10 12 14 16
ΔPin, mbar

Figure C.4.1 – Relative variation of power output , Efficiency and exhaust Mass Flow
Rate at MGT-40 GTE outlet vs. variation of total pressure loss in the air intake (PIN) at
nominal power mode at standard atmospheric condition

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 28 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

2.5
Exhaust Temperature Difference, °C

1.5

0.5

0
0 4 8 12 16

ΔPin, mbar

Figure C.4.2 – difference of exhaust temperature at MGT-40 GTE outlet vs. variation of
total pressure loss in the air intake (PIN) at nominal power mode at standard
atmospheric condition

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 29 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.01
Correction Factor

1.005

0.995

0.99
Efficiency & Power
0.985

0.98
0 5 10 15 20 25 30 35 40
ΔPout, mbar

Figure C.5.1 – Relative variation of Power and Efficiency at MGT-40 GTE outlet vs.
variation of total pressure losses in the exhaust flue at nominal power mode at standard
atmospheric conditions

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 30 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

3.5
Exhaust Temperature Difference, °C

2.5

1.5

0.5

0
0 5 10 15 20 25 30

ΔPout, mbar

Figure C.5.2 – Difference of Exhaust temperature at MGT-40 GTE outlet vs.


variation of total pressure losses in the exhaust flue at nominal power mode at
standard atmospheric conditions

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 31 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

99
Generator Efficiency, %

98.5 PF=
0.8
98

97.5

97

96.5

96

95.5

95

94.5
0.25 0.5 0.75 1
Apparent Power Output/ Rated Apparent Power Output

Figure C.6 – Generator efficiency vs. Turbine active power in different power
factors

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 32 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.04
Power Correction Factor

40 °C
1.03 30 °C
20 °C
1.02 15 °C
5 °C
1.01
-5 °C
1

0.99

0.98

0.97

0.96

0.95
0.98 0.985 0.99 0.995 1 1.005 1.01 1.015 1.02
Shaft Speed Ratio

Figure C.7.1 – Power Correction Factor vs. Shaft Speed in different ambient
Temperatures

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 33 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.015
Efficiency Correction Factor

1.01 40 °C
30 °C
1.005 20 °C
15 °C

5 °C
1
-5 °C

0.995

0.99

0.985
0.98 0.99 1 1.01 1.02
Shaft Speed Ratio

Figure C.7.2 – Efficiency Correction Factor vs. Shaft Speed in different ambient
Temperatures

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 34 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.04
Exhaust Flow Correction Factor

40 °C
1.03 30 °C
20 °C
1.02 15 °C
5 °C
-5 °C
1.01

0.99

0.98

0.97

0.96

0.95
0.98 0.99 1 1.01 1.02
Shaft Speed Ratio

Figure C.7.3 – Exhaust Mass Flow Rate Correction Factor vs. Shaft Speed in different
ambient Temperatures

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 35 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

8
Exhaust Temperature Differece, (°C)

-2
-5 °C
-4 5 °C
15 °C
-6 20 °C
30 °C
-8 40 °C
0.98 0.99 1 1.01 1.02
Shaft Speed Ratio

Figure C.7.4 – Exhaust Temperature Difference vs. Shaft Speed in different ambient
Temperatures

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 36 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.01
Power Correction Factor

1.008

1.006

1.004

1.002
C/H=2.9
1

0.998

0.996
C/H=3.4
0.994

0.992
39000 41000 43000 45000 47000 49000 51000
Fuel Gas Heating Value, kJ/kg

Figure C.8.1 – Power Correction Factor vs. Fuel Gas Heating Value

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 37 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.004
Efficiency Correction Factor

1.003

1.002

1.001
C/H=2.979

0.999 C/H=3.4

0.998

0.997
39000 41000 43000 45000 47000 49000 51000
Fuel Gas Heating Value, kJ/kg

Figure C.8.2 – Efficiency Correction Factor vs. Fuel Gas Heating Value

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 38 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT
CLIENT: CONSULTANT:

THERMAL POWER PLANTS HOLDING COMPANY GHODSNIROO


POWER ENGINEERING CONSULTANT
PROJECT: ZAHEDAN POWER PLANT (3 x MGT40)SIMPLE CYCLE POWER PLANT

1.002
Power & Efficiency Correction Factor

1.0015

1.001

1.0005

1
Efficiency

0.9995
Power
0.999

0.9985
39000 40000 41000 42000 43000 44000
Liquid Fuel Heating Value, kJ/kg

Figure C.8.3 – Power and Efficiency Correction Factor vs. Liquid Fuel Heating Value

Doc. No. : MD1H4-01TG-T-31- Rev: 0


TG0-002
MAPNA TUGA
MAPNA TURBINE
ENG. & MANUFACTURING CO File No. : Design Stage
MAPNA GROUP (MD1)
WITHOUT PRIOR AUTHORIZATIIN
ROUP AND MUST NOT BE COPIED

MAPNA'S DWG No. : Based on: ZAHEDAN POWER Contract No. : Page 39 of
MD1H4-01TG-T-31-TG0- PLANT (3 x MGT40)SIMPLE 39
002 CYCLE POWER PLANT