Professional Documents
Culture Documents
00
50
254
PROPOSED BUILDING
2500
3000
MASTER PLAN
4 4
WC WC WC WC
WORKSHOP FOR PROCESS STORE ROOM FOR SPARES & GENT'S WASH ROOM LADES
WASH ROOM
AUTOMATION SYSTEM
MAINTENANCE ACTIVITIES
CONSUMABLES
+450 3a
+450 +300 +300
UP
3 3
CORRIDOR CORRIDOR CORRIDOR CORRIDOR +450 DN +150 UP
X' 0.0
X
2 2
CUSTOM DESIGN SOFA / COFFEE TABLE
FCS -01
ENTRANCE
+450
UPS PANEL
1 UP
1
N
WORK STATION / BACK CUPBOARD
GUEST CHAIRS / EXECUTIVE CHAIR
F E D C B A
Y
GROUND FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
WORK STATION / BACK CUPBOARD CUSTOM DESIGN SOFA
GUEST CHAIRS / EXECUTIVE CHAIR / COFFEE TABLE
F G H2 H I1 Y' I J K A
CUSTOM DESIGN SOFA
BOOK SHELF
/ COFFEE TABLE
DINING TABLE
WITH CHAIRS
TV UNIT
4 4
WC WC WC WC
DN
3 3
UTILITY
CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR ROOM
X' X
2 2
CCETV ES 1 ES 2 OS 1 OS 2 A3
SYSTEM PRINTER
1 1
N
WALL MOUNTED MULTI MEDIA
UNIT / DISPLAY CUPBOARD
F E H1 I1 Y A
FIRST FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F G H Y' I J K A
25450
1500
1500
1500
1500
2775
WC WC WC WC
1000
WORKSHOP FOR PROCESS STORE ROOM FOR SPARES & GENT'S WASH ROOM LADES
5100
5100
WASH ROOM
5325
5325
MAINTENANCE ACTIVITIES +450
+450 +300 +300
2550
2000 1500 2050
UP
3 3
22375
1500
1725
1725
CORRIDOR CORRIDOR CORRIDOR CORRIDOR +450 DN +150 UP
X' X
13800
0.0
2 2
13800
POWER SUPPLY ROOM
8338
6300
6300
6525
6825
+450
5700 4000 5000 3825
ENTRANCE
1 1
UP
0.0
N
6025 5925 4225 5225 3825
25225
F E D C B A
Y GROUND FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F G H2 H I1 I J K A
Y'
25450
1500
1500
1500
1500
2775
WC WC WC WC
1000
GENT'S WASH ROOM LADES
STAFF REST ROOM
5100
5100
5100
5100
WASH ROOM
5325
3a
3550
6825
MANAGER'S ROOM
2550
STAFF LUNCH
ROOM
1500
1500
1725
CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR ROOM
X' X
2 2
1300
13800
1500
LED SCREEN UPS PANEL
2450
CONTROL ROOM
6413
6525
6300
6300
MEETING ROOM SERVER ROOM
800
3688
CCETV ES 1 ES 2 OS 1 OS 2 A3
SYSTEM PRINTER
2412
N
5859 3850 4225 11125
F E H1 I1 Y A
FIRST FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
4 3a 3 2 1
4703
1800
1800
3000
3000
900 900
7484
3600
1800
2400
900 450
+450 +450 G.L
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F H J K A
2400
2400
2400
WINDOW DOOR DOOR
3600
2400
2400
2400
2400
450
+450 +450 G.L
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F E D H J K A
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
4 3a 3 2 1
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
A K J D H E F
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD