You are on page 1of 11

138

00

50
254
PROPOSED BUILDING

2500

3000

MASTER PLAN

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR


GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F G H Y' I J K A

4 4
WC WC WC WC

WORKSHOP FOR PROCESS STORE ROOM FOR SPARES & GENT'S WASH ROOM LADES
WASH ROOM
AUTOMATION SYSTEM
MAINTENANCE ACTIVITIES
CONSUMABLES
+450 3a
+450 +300 +300

UP
3 3
CORRIDOR CORRIDOR CORRIDOR CORRIDOR +450 DN +150 UP
X' 0.0
X
2 2
CUSTOM DESIGN SOFA / COFFEE TABLE

BOOK SHELF PANEL ROOM


ENTRANCE LOBBY
MAINTAINER'S ENGINEER
ROOM
POWER SUPPLY ROOM
WITH FCS -03 GENERATOR ROOM
BATTERY BACKUPS
FRONT DESK WITH HIGH CHAIR
FCS -02

FCS -01

ENTRANCE
+450
UPS PANEL

1 UP
1

N
WORK STATION / BACK CUPBOARD
GUEST CHAIRS / EXECUTIVE CHAIR

F E D C B A
Y
GROUND FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
WORK STATION / BACK CUPBOARD CUSTOM DESIGN SOFA
GUEST CHAIRS / EXECUTIVE CHAIR / COFFEE TABLE

CUSTOM DESIGN PANTRY UNIT

F G H2 H I1 Y' I J K A
CUSTOM DESIGN SOFA
BOOK SHELF
/ COFFEE TABLE
DINING TABLE
WITH CHAIRS
TV UNIT

4 4
WC WC WC WC

GENT'S WASH ROOM LADES


STAFF REST ROOM WASH ROOM
3a
MANAGER'S ROOM
STAFF LUNCH
ROOM

DN
3 3
UTILITY
CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR ROOM
X' X
2 2

LED SCREEN UPS PANEL

MEETING TABLE WITH CONTROL ROOM


CHAIRS
MEETING ROOM SERVER ROOM

CCETV ES 1 ES 2 OS 1 OS 2 A3
SYSTEM PRINTER

1 1

N
WALL MOUNTED MULTI MEDIA
UNIT / DISPLAY CUPBOARD

F E H1 I1 Y A
FIRST FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F G H Y' I J K A

25450

2625 10150 6229 2225 1725 2271


4 1200 1200 1200 1200
4
2400 9925 6000 950

1500

1500

1500

1500

2775
WC WC WC WC

1000
WORKSHOP FOR PROCESS STORE ROOM FOR SPARES & GENT'S WASH ROOM LADES

5100

5100
WASH ROOM
5325

AUTOMATION SYSTEM CONSUMABLES


3a

5325
MAINTENANCE ACTIVITIES +450
+450 +300 +300

2550
2000 1500 2050
UP
3 3
22375

1500
1725

1725
CORRIDOR CORRIDOR CORRIDOR CORRIDOR +450 DN +150 UP
X' X
13800

0.0
2 2

13800
POWER SUPPLY ROOM
8338

MAINTAINER'S ENGINEER WITH


ENTRANCE LOBBY ROOM BATTERY BACKUPS PANEL ROOM GENERATOR ROOM
6300

6300

6300

6525
6825

+450 +450 +450


+450

+450
5700 4000 5000 3825
ENTRANCE

1 1
UP
0.0

N
6025 5925 4225 5225 3825

25225

F E D C B A
Y GROUND FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F G H2 H I1 I J K A
Y'
25450

2625 6225 3925 6225 2225 1725 2275


4 1200 1200 1200 1200
4
6000 3700 6000 950

1500

1500

1500

1500

2775
WC WC WC WC

1000
GENT'S WASH ROOM LADES
STAFF REST ROOM

5100

5100

5100

5100
WASH ROOM
5325

3a

3550
6825
MANAGER'S ROOM

2550
STAFF LUNCH
ROOM

2000 1500 2050


DN
3 3
UTILITY
1725

1500

1500

1725
CORRIDOR CORRIDOR CORRIDOR CORRIDOR CORRIDOR ROOM
X' X
2 2

1300

13800
1500
LED SCREEN UPS PANEL

2450
CONTROL ROOM

6413
6525

6300

6300
MEETING ROOM SERVER ROOM
800
3688
CCETV ES 1 ES 2 OS 1 OS 2 A3
SYSTEM PRINTER
2412

9650 4000 10900


1 1

N
5859 3850 4225 11125

F E H1 I1 Y A
FIRST FLOOR
CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
4 3a 3 2 1

REFER STRUCTURAL DETAIL

4703
1800

1800
3000

3000
900 900
7484

3600
1800

2400
900 450
+450 +450 G.L

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F H J K A

DOOR DOOR DOOR

2400

2400

2400
WINDOW DOOR DOOR

3600
2400

2400

2400

2400
450
+450 +450 G.L

DRY EARTH FILLING RUBBLE


FLOOR CONCRETE FOUNDATION

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
F E D H J K A

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
4 3a 3 2 1

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD
A K J D H E F

CLIENT: CONTRACT NAME: PROJECT: REV. DESCRIPTION DATE SIGN. CONTRACTOR DRG. NO:
GREATER COLOMBO WATER & WASTEWATER
NATIONAL WATER SUPPLY DESIGN & BUILD CONTRACT FOR RELIABILITY MANAGEMENT IMPROVEMENT INVESTMENT 03 GCWWMIIP-209-03 2019/7/11 DRAWN BY : DESIGN BY : CHECKED BY : CERTIFIED BY :
ENHANCEMENT & ENERGY SAVING OF AMBATALE
& DRAINAGE BOARD PROGRAMME (PROJECT 2) SHEET NO:
PRODUCTION FACILITIES - ELECTRICAL, 02 GCWWMIIP-209-03 2019/6/10
MECHANICAL, INSTRUMENTATION .................................... .................................... .................................... ....................................
CONSULTANT: CONTRACTOR: AND CIVIL WORKS D'.MAN ENG. TM CR / PM
NATIONAL WATER SUPPLY & DRAINAGE BOARD
01 GCWWMIIP-C209 2019/5/28
CONSULTANT APPROVED BY: SCALE:
CONTRACT No: TITLE : 00 GCWWMIIP-C209-A 2019/5/6 APPROVED IN PRINCIPLE SUBJECT TO THE CONDITION THAT THE 1:100
REVIEWED BY : DESIGN & BUILD CONTRACTOR IS RESPONSIBLE FOR THE CONFORMITY
OF THE DESIGN WITH FUNCTIONAL & STRUCTURAL REQUIREMENTS.
SAFEGE CONSULTING ZHONGNAN-SZSG-JH GCWWMIIP/AFD/AMB/PLANT/ICB/05 DATE:
...................................
ENGINEERS JOINT VENTURE ....................................
TL/DTL PD/DPD

You might also like