You are on page 1of 9

SCHEDULE OF EQUIPMENT GENERAL NOTES:

LEGEND :
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-101 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to SCHEDULE OF EQUIPMENT
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
GENERAL NOTES & LEGENDS
CONTRACT DOCS.
The Architect retains copyright on this drawing.
SCHEDULE OF EQUIPMENT (PROVISIONS)
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-102 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to SCHEDULE OF EQUIPMENT
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
PROVISIONS
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE
LINE
PROPERTY

LCP LCP

LCP LCP LCP

LCP
BASEMENT PARKING
(35 SLOTS)

LCP
RISER - P RISER - E LOUVER PANELS LOUVER PANELS

up E

E SEWAGE TREATMENT
PL
TOOL / STORE PLANT
RM. BELOW

LIFT LOBBY

SUMP
PIT
LC
P

PUMP
AREA
DN
1:10 GRADIENT
DRIVEWAY RAMP

PROPERTY LINE
NE
PROPERTY LI
1 BASEMENT VENTILATION PLAN
M-03
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-103 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to BASEMENT VENTILATION PLAN
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE
LINE
BIN
POINT

DRIVEWAY RAMP UP
1:12 GRADIENT
PROPERTY

MRF
HE/ POINT
SHE

LOUVER PANELS
STORE
ROOM

LPG TANK CASING

up BACK-OF-HOUSE OFFICE
E

LOUVER PANELS
STAFF MAINTENANCE
E
ROOM HE ROOM
E
ramp up
SHE
WALL
FEATURE E
PWD
KITCHEN 1 TOILET SECURITY
E

LL
E LUGGAGE OFFICE

A
ROOM

E W
E E
up COFFEE

UR

LOUVER PANELS
AT
SHOP

FE
up E
DELIVERY DOCK RECEIVING LOBBY

ICK
BR
RISER - P RISER - E
E
LOUNGE
up

LOUVER PANELS
E
CL PL TURE WALL
RESTAURANT 1 BRICK FEA
dn

LOW BRICK
ramp up
TOOL / STORE

BR
IC
E
RM. BELOW

KF
EA
TU
RE
WALL

WALL
WA
ATURE
BRICK FE

LL
E
LIFT LOBBY

ramp up
E

up up

ramp up
up
1
RESTAURANT DROP-OFF E
SIGNAGE GENSET &
BRE

up
EZE

SUBSTATION
BLO
CKS

K WALL
LOW BRIC

DN
1:10 GRADIENT
DRIVEWAY RAMP

PRIMEWATER

PROPERTY LINE
TAGAYTAY
PUMPING STATION 15
E
S I G N A G

ROAD LINE
NE
PROPERTY LI
OUTDOOR SPACE / ENTRY
BUS PARKING PYLON

OUTDOOR SPACE /
BUS PARKING
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

1 GROUND FLOOR AC, VENT. & PIPING PLAN


M-04

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB.2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-104 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to GROUND FLOOR AC, VENT.
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
& PIPING PLAN
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE
LINE
PROPERTY

BREEZE BLOCKS

SHE

FEATURE WALL

FEATURE WALL

FEATURE WALL
PREPARATION AREA

PREPARATION AREA
KITCHEN 2

HE PWD
TOILET

E E
STORE ROOM
E

PRE-FUNCTION

LOUVER PANELS
dn
E E E E E

RISER - E up
RISER - P

up
E E E E E E E
CL PL dn dn
E

RESTAURANT
E 2 LIFT LOBBY E
BREEZE BLOCKS

PROPERTY LINE
1 SECOND FLOOR AC, VENT. & PIPING PLAN PROPERTY LI
NE
M-05
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-105 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to SECOND FLOOR AC, VENT.
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
& PIPING PLAN
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE
NE LI
PROPERTY

E E E E E E E E E E E E E

E
E

BREEZE BLOCKS
BREEZE BLOCKS BREEZE BLOCKS BREEZE BLOCKS

LOUVER PANELS
BREEZE BLOCKS
E
dn
RISER - P RISER - E WATER
PLAYGROUND
up E E E E E

E E E
CL PL dn

BREEZE BLOCKS
SHOWER E
E AREA
E

E up CHAIR
LIFT BREEZE BLOCKS

E dn

BREEZE BLOCKS
BREEZE BLOCKS

COMMON CHANGING CHANGING


TOILET (SHE) (HE)
BAR

PROPERTY LINE
1 THIRD FLOOR AC, VENT. & PIPING PLAN PROPERTY LI
NE
M-06
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-106 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to THIRD FLOOR AC, VENT.
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
& PIPING PLAN
CONTRACT DOCS.
The Architect retains copyright on this drawing.
PROPERTY LINE
LINE
PROPERTY

ROOF SLAB ROOF SLAB ROOF SLAB

WATER TANK WATER TANK

SKYLIGHT ROOFING SKYLIGHT ROOFING


SKYLIGHT ROOFING

ROOF SLAB
SKYLIGHT ROOFING

WATER TANK WATER TANK

ROOF SLAB

ROOF SLAB ROOF SLAB

ROOF SLAB
SKYLIGHT ROOFING

PROPERTY LINE
K
SET BAC

NE
PROPERTY LI
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

1 ROOF DECK VENTILATION PLAN


M-07

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-107 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to ROOF DECK VENT. PLAN
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
CONTRACT DOCS.
The Architect retains copyright on this drawing.
1 2 3 REFRIGERANT PIPE SUPPORT
PIPE HANGER DETAIL PIPE PASSING THRU WALL AND FLOOR DETAIL
M-08 M-08 M-08 ALONG THE WALL

4 5 6
M-08 DUCT THRU WALL DETAIL M-08
TYPICAL DUCT THRU SLAB DETAIL M-08
FCU MOUNTING DETAIL
D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

7 FCU INSTALLATION DETAIL 8 9


ACCU MOUNTING DETAIL ACCU MOUNTING DETAIL
M-08 (WALL MOUNTED) M-08 M-08

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-108 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to MISCELLANEOUS DETAILS
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
CONTRACT DOCS.
The Architect retains copyright on this drawing.
SCHEDULE OF DUCT GAUGES AND HANGERS

1 2 3
DUCT INSULATION DETAIL DUCT HANGER DETAIL SCHEDULE OF DUCT GAUGES & HANGERS
M-09 M-09 M-09

4 TYPICAL EF & ALUM. DUCT 5 6


PROPELLER FAN MOUNTING DETAIL CENTRIFUGAL FAN (SISW) MOUNTING DETAIL
M-09 CAP MOUNTING DETAIL M-09 M-09

KITCHEN EXHAUST DUCTWORK SPECIFICATIONS:


D:\LIQUIDLABS FILES\WORK FILES\HOTEL PROJECT_TAGAYTAY\FROM CONSULTANTS\MECHANICAL\HVAC

7 8
ACCU (SIDE-BLAST)/FCU (WALL MOUNTED) INSTALLATION DETAIL KITCHEN EXHAUST DUCTWORK CONSTRUCTION
M-09 M-09

No. REVISIONS Date No. REVISIONS Date No. REVISIONS Date MECHANICAL: Client: Architect: PROJECT: Start Date : FEB. 2023 Scale: 1:100 (A1) / 1:200(A3)

00 CONTRACT DOCUMENTS 08 MAR 2023


Drawn By : PJVJ Checked By: PJVJ
4-STOREY HOTEL WITH BASEMENT Project No.: Proj. Code:
Ryan Nepomuceno Tayag AR-0020
ADAN RICHMOND R. DE BELEN Lot F-3, PSD-04-231585, Brgy. Kaybagal Central,
PRC: 0017834
PROFESSIONAL MECHANICAL ENGINEER Tagaytay City, Cavite
PRINTED ON:08.03.2023

PTR: DATE: Dwg No.: Rev:

Client Signature
M-109 R00
Contractors, vendors & consultants must verify all dimension TITLE:
on site and notify this Company any discrepancies prior to MISCELLANEOUS DETAILS
Issued for:
C carry out works. Written dimensions take precedence over
scaled dimensions.
CONTRACT DOCS.
The Architect retains copyright on this drawing.

You might also like