You are on page 1of 2

List of Figures

FIGURE PAGE
FIGURE NAME
NO. NO
Fig 1.1 Pavement block 2

Fig 1.2 Side view of pavement block 2

Fig 3.1 Site Visit 7

Fig 3.2 Volume Batching 11

Fig 3.3 Mixing Material 11

Fig 3.4 Material Filling in Mould 12

Fig 3.5 Demoulding of Paver block 12

Fig 3.6 Curing of paver block 13

Fig 3.4 Compressive Testing Machine 13

IV
List of Tables

TABLE PAGE
TABLE NAME
NO. NO

Table 3.2.3 Volume Batching 2

Table 4.1.1 Compressive strength obtained in 28 days 5

Table 4.1.2 Cost Analysis 10

You might also like