Professional Documents
Culture Documents
DOCUMENT INFORMATION
Key Data Structure - For Company Code -
Title 1000 - HomeVista Decor and Furnishing Private
Limited (HomeLane)
Key words KDS – Project Systems
Author
File Name
Path
Release Date 30.06.2021
Reviewed by
Number of pages
Error: Reference source not found
________________________
__________________________
Table of Contents
1. INTRODUCTION................................................................................................................................................ 4
1.1 PURPOSE OF THIS DOCUMENT.............................................................................................................................. 4
1.2 INTENDED AUDIENCE.......................................................................................................................................... 4
1.3 RELATED DOCUMENTS........................................................................................................................................ 4
2. KDS – PROJECT SYSTEMS.................................................................................................................................. 4
2.1 PROJECT TYPE................................................................................................................................................... 4
2.2 PROJECT CODE.................................................................................................................................................. 5
2.3 PERSON RESPONSIBLE/PROJECT MANAGER.............................................................................................................. 5
2.4 STANDARD PROJECT STRUCTURE TEMPLATE............................................................................................................. 6
2.5 USER STATUS................................................................................................................................................... 6
2.6 Budget Tolerance Limit................................................................................................................................. 6
1. Introduction
Project System is one of the key modules of SAP to execute Project Orders. It helps you to manage the project
life cycle starting from structuring to planning, execution, until the project completion. Project system is closely
integrated with other SAP modules like logistics, material management, Sales and Distribution, Plant
Maintenance, and Production planning module. Project System does not have organization structure, it derives
the same from MM, FICO and other modules.
1.1 Purpose
The document in discussion describes all the Key Data Structures (KDS) for Project System, necessary for
enabling the business processes defined under the Process Definition Document for Project System and making
them operational with requisite controls and business rules.
This document will serve as reference document for system settings and configuration in Realization Stage.
The document lists out the KDS which are required to be defined or to be adopted from standard SAP process
prescribed for use in processes in the Project System module. The list however excludes those SAP standard
KDS that are not identified for specific use but may not be deleted from production client for technical or
pragmatic reasons.
Project System is not going to work stand alone. It will co exist, integrate and flow along with the other
modules.
PS, being a highly integrated module utilizes KDS of other modules like MM, SD, FICO.
2 HDS
3 Combine (Core+HDS)
4 HL Care
5 Internal Projects
0- Numerical Character
Each WBS is assigned to a responsible person. This person will be mainly the WBS Owner from each
concerned department. The person responsible for WBS is also an authorization object in SAP PS. This
matter will be used to separate access to WBS along specific parameters.
Code Description
PM1 WBS Owner 1
For Home lane We will freeze below structures for Pro and Lite which can be modified at later stage if required.
PRO Structure:
WBS
WBS Project Structure WBS Elements
Description
Project
ID - SAP Alpha India
1011001998
Sales Pvt Ltd
Order No.
- Core Core Adv 1011001998-01
Rework 1011001998-
# B2S
FG/Module KCRWM1
Rework Rework 1011001998-
&
Panel Panel1 KCRWM1P001
Rework
Rework 1011001998-
& Accessor
Accessories 1 KCRWM1A001
ies
* HDS HDS 1011001998-KH
Trading Trading
$ 1011001998-KHT
Goods Goods
1011001998-
# Appliances Appliances
KHTA1
1011001998-
# Furniture Furniture
KHTF1
Lite Structure:
Project ID
- SAP Alpha India
1011002151
Sales Pvt Ltd
Order No.
Cor
- Core 1011002151-01
e
* Woodwork Woodwork 1011002151-01WW
* Accessories Accessories 1011002151-01AC
* Rework Rework 1011002151-01RW
1011002151-
$ Woodwork Woodwork
01RWWW
Accessorie
$ Accessories 1011002151-01RWAC
s
HD
- HDS 1011002151-02
S
* Appliances Appliances 1011002151-02AP
* Furniture Furniture 1011002151-02FR
* Services Services 1011002151-02SV
Han
- dov Handover 1011002151-04
er
Project ID
- SAP Alpha India
1011002151
Sales Pvt Ltd
Order No.
Cor
- Core 1011002151-01
e
* Woodwork Woodwork 1011002151-01WW
* Accessories Accessories 1011002151-01AC
* Rework Rework 1011002151-01RW
1011002151-
$ Woodwork Woodwork
01RWWW
Accessorie
$
s Accessories 1011002151-01RWAC
HD
- HDS 1011002151-02
S
* Appliances Appliances 1011002151-02AP
* Furniture Furniture 1011002151-02FR
* Services Services 1011002151-02SV
Han
- dov Handover 1011002151-04
er
There are statuses which we can configure as per the requirement of Client as User Status and restrict/allow
certain transactions.
INIT – Initial
WIP – Work in Progress
DLP – Delivered
QAP- QA Pending
There will be budget supplement, transfer method to increase the budget whenever required.