1 March 2005
PROCUREMENT DOCUMENTS
FOR
BOOK 1 OF 2
ISSUED BY:
Page/s
COVER PAGE
PROCUREMENT DOCUMENTS 1 page
CONTENTS PAGE
CONTENTS 1 page
THE CONTRACT
PART C1 : AGREEMENTS AND CONTRACT DATA
C1.1 FORM OF OFFER AND ACCEPTANCE 3 pages
C1.2 CONTRACT DATA 13 pages
C1.3 CONSTRUCTION GUARANTEE 4 pages
Contents Page 1 of 3
JBCC Edition 4.1 March 2005
Contents Page 2 of 3
JBCC Edition 4.1 March 2005
ANNEXURES
A - ARCHITECTURE SPECIFICATIONS AND TENDER DRAWINGS(BOOK 2) 11 pages
B - ELECTRICAL SPECIFICATION AND TENDER DRAWINGS (BOOK 2) 122 pages
C - MECHANICAL SPECIFICATION AND TENDER DRAWINGS (BOOK 2) 37 pages
D - CIVIL & STRUCTURAL SPECIFICATION AND TENDER DRAWINGS (BOOK 2) 74 pages
E - HEALTH AND SAFETY SPECIFICATION ( BOOK 2) 75 pages
F - DECANTING SPECIFICATION AND TENDER DRAWINGS (BOOK 2) 6 Pages
Contents Page 3 of 3
DID NUMBER: DID 17/08/2021
INVITATION TO TENDER
Johannesburg
No
Yes
X
No
Yes X
Bidders who fail to submit a valid B-BBEE Certificate or Sworn Affidavit will be
regarded as non-responsive bidders and be disqualified .
N.B Should the bidder submit both BBB-EE certificate and sworn
affidadavit with different levels, the bidder will be disqualified
No
Yes X
Compulsory Subcontracting
requirements:
A tenderer subcontracting a minimum of 30% of the value of the contract to one
or more of the following-
an EME or QSE which is at least 51% owned by black people
Failure to submit / meet or comply with the following requirements constitute automatic disqualification of tender offer.
Required items are marked with {X}
Attendance of site briefing session is non- compulsory, bidders must sign both
attendance register and submit the non-compulsory site briefing certificate with the X
tender document.
Only tenderers having a valid CIDB grade 9GB will be considered (CIDB certificate or
X
CRS number must be provided)
Tenderers must submit proof of subcontracting agreement between the main tenderer
and the subcontractor. The bidder must submit BBB-EE level of contribution certificate X
or affidavit for intended subcontractors.
Declaration Certificate for Local Production and Content for Designated Sectors (SBD
X
6.2)
Local Content Declaration Templates (Annex C, D and E, which can be obtained /
downloaded from the following DTI website:
http://www.dti.gov.za/industrial_development/ip.jsp
Submit CSD Registration Report as proof of registration with CSD (Central Supplier
X
Database).
Bidders must submit their CSD "MAAA" Number and SARS TCS PIN number with their
bid in order that the bidder's Tax Compliance Status can be verified. Should a bidder
not be Tax Compliant at the time of verification, the bidder will be notified in writing of
their non-compliant tax status and be requested to remediate their tax status within X
seven (7) working days. Failure to provide written proof of tax status remediation, within
seven (7) working days of notification, will result in the rejection of the bid submitted by
the Bidder.
No
Yes X
Only tenderers that meet the minimum stipulated CIDB grading will be
evaluated.
No
Yes X
Only tenderers that meet the minimum stipulated local production and content
threshold requirements will be evaluated.
Item Minimum threshold
Local production and content
threshold requirements: 1. Electrical and Telecom Cables 90%
Yes X
If “yes” this tender will be evaluated against functionality and only tenderers that
obtain the required minimum score indicated in the Tender documents will be
further evaluated.
Functionality Criteria:
The Department will be applying the 90/10 preference point system in accordance with Regulation 7 of the Preferential Procurement Regulations, effective from 1 April
2017.
Zanele Zola
Enquiries technical: zanele.zola@gauteng.gov.za
0769429369
Mojalefa Monyela
Enquiries general:
mojalefa.monyela@gauteng.gov.za
JBCC Edition 4.1 March 2005
It is estimated that tenderers should have a CIDB contractor grading designation of 9GB
The successful tenderer will be required to subcontract a minimum of 30% of the value of the contract to exempted micro
enterprises (EME's) and/or qualifying small business enterprise (QSE's), in accordance with the preferential
Procurement Regulations, 2017
Only tenderers who can demonstrate that they will have in their employ staff which satisfy EPWP requirements during the
contract validity are eligible to submit tenders
The tender documents will be available on E-Tender portal of National Treasury (www.treasury.gov.za)
A non-compulsory clarification meeting with representatives of the employer will take place as per the Tender
advertisement.
The closing date and time for receipt of proposals is 11h00am on the closing date as per Tender
advertisement.
Telegraphic, telephonic, telex, facsimile, electronic and / or late proposals will not be accepted.
Requirements for sealing, addressing, delivery, opening and assessment of proposals are stated in the
Tender Data.
The conditions of the Tender are the Standard Conditions of Tender as contained in Annexure F of the CIDB
Standard of Uniformity in Engineering and Construction works contracts dated (August 2019) and as amended from time to time.
(See www.cidb.org.za).
The Standard Conditions of the Tender make several references to the Tender Data for details that apply
specifically to this Tenders. The Tender Data shall have precedence in the interpretation of any ambiguity
or inconsistency between it and the standard conditions of tender.
Each item of data given below is cross-referenced to the clause in the Standard Conditions of Tender to
which it mainly applies.
The successful tenderer will be required to subcontract a minimum of 30% of the value of the contract to exempted micro enterprises (EMS's) and/or qualifying
small business enterprises (QSE's) in accordance with Preferential Procurement Regulations, 2017 in terms of section 5 of the Preferential Procurement Policy
Framework Ac, 2000(Act no.5 of 2000)
F.2.1 Only those tenderers who have in their employment management and supervisory staff
satisfying the requirements of the scope of work for labour-intensive competencies for
supervisory and management staff are eligible to submit Tenders.
F.2.16.3 Accept that a tender submission that has been submitted to the employer may only be
withdrawn or substituted by giving the employer's agent written notice before the closing
time for Tenders that a Tenders is to be withdrawn or substituted.
F.3.13 Accept the Tenders offer, if in the opinion of the employer, it does not present any
unacceptable commercial risk and only if the tenderer:
d) is not insolvent, in receivership, bankrupt or being wound up, has his affairs
administered by a court or a judicial officer, has suspended his business
activities, or is subject to legal proceedings in respect of any of the foregoing,
e) is able, in the opinion of the employer, to perform the contract free of conflicts
of interest.
Tender T1.2
Part T1: Tender Procedures Page 1 of 5 Tender Data
JBCC Edition 4.1 March 2005
Clause
Tender Data
number
F.1.2 The Tender Documents issued by the employer comprise the following documents:
THE CONTRACT
Name: ...............................................................................................................
Address: ...............................................................................................................
Tel: ...............................................................................................................
Fax: ...............................................................................................................
E-mail: ...............................................................................................................
Tender T1.2
Part T1: Tender Procedures Page 2 of 5 Tender Data
JBCC Edition 4.1 March 2005
F.2.1 Only those tenderers whom are registered with the CIDB, or are capable of being so prior to
the evaluation of submissions, in a contractor grading designation equal to or higher than a
contractor grading designation determined in accordance with the sum tendered, or a value
determined in accordance with Regulation 25(1B) or 25(7A) of the Construction Industry
Development Regulations, for a 9GB class of construction work, are eligible to
have their Tenders evaluated.
F.2.2 Accept that the employer will not compensate the tenderer for any costs incurred in the
preparation and submission of a Tenders offer, including the costs of any testing necessary
to demonstrate that aspects of the offer complies with requirements.
F.2.3 Check the Tenders documents on receipt for completeness and notify the employer of any
discrepancy or omission.
The arrangements for a non-compulsory clarification meeting are as stated in the Tender Notice
and Invitation.
Tenderers must sign the attendance list in the name of the proposing entity. Addenda will
only be issued to tenderers and will be received only from those proposing entities
appearing on the attendance list.
F.2.11 Do not make any alterations or additions to the tender documents, except to comply with
instructions issued by the employer, or necessary to correct errors made by the tenderer.
All signatories to the tender offer shall initial all such alterations. Erasers and the use of
masking fluid are prohibited.
F.2.13.3 Document to be submitted in the same order as it was issued , as per the contents
Tender T1.2
Part T1: Tender Procedures Page 3 of 5 Tender Data
JBCC Edition 4.1 March 2005
F.2.13.5 The employer’s details and address for delivery of offers and identification details that are to
F.2.15.1 be shown on each Tenders offer package are:
F.2.15 The closing time for submission of offers is as stated in the Tender Notice and Invitation.
F.2.18 The tenderers shall, when requested by the employer to do so, submit the names of all
management and supervisory staff that will be employed to supervise the Labour
Intensive portion of the works together with satisfactory evidence that such staff members
satisfy the eligibility requirements.
F.2.19 Access shall be provided for inspections, tests and analysis as per arrangement.
F.2.20 The tenderer is required to submit with his Tenders a letter of intent from either an
insurance company duly registered in terms of the Short-Term Insurance Act of 1998 (Act
53 of 1998) or by a bank duly registered in terms of the Banks Act of 1990 (Act 94 of 1990)
undertaking to provide the Performance Bond without any alteration or amendment of the
wording of the pro-forma indicated in Part C1.3 of this procurement document.
The central supplier database and the tax complince status PIN are the approved methods that will be utilised to
F.2.23 verify tax compliance as the South African Revenue Services does not issue Tax Clearance Certificates but has
made an online provision available, via eFiling, for the bidders to print
F.3.4 Tenders will be opened immediately after the closing time at 11h00am.
Tender T1.2
Part T1: Tender Procedures Page 4 of 5 Tender Data
JBCC Edition 4.1 March 2005
F.3.8.2 A responsive tenderer is one that conforms to all the terms, conditions, and specifications
of the tender documents without material deviation or qualification. A material deviation or
qualification is one which, in the Employer's opinion, would:
a) detrimentally affect the scope, quality, or performance of the works, services or
supply identified in the Scope of Work,
b) significantly change the Employer's or the tenderer's risks and responsibilities under
the contract, or
c) affect the competitive position of other tenderers presenting responsive Tenders if
it were to be rectified.
Reject a non-responsive tender offer, and not allow it to be subsequently made responsive
by correction or withdrawal of the non-conforming deviation or reservation.
Bidders must refer to the “Invitation to Tender” and tender documents as published and comply with all the requirements outlined in therein. These
F.3.11.3 include:
Failure to comply with these requirements will result in bidders being disqualified.
b) the tenderer or any of its directors / shareholders is not listed on the Register
of Tender Defaulters in terms of the Prevention and Combating of Corrupt
Activities Act, 2004 (Act 12 of 2004) as a person prohibited from doing
business with the public sector;
c) the tenderer has not:
i) abused the Employer’s Supply Chain Management System; or
ii) failed to perform on any previous contract and has been given a written
notice to this effect; and
d) has completed the Compulsory Enterprise Questionnaire and there are no
conflicts of interest which may impact on the tenderer’s ability to perform the
contract in the best interests of the employer or potentially compromise the
Tenders process and persons in the employ of the state are permitted to
submit Tenders or participate in the contract;
e) the tenderer is registered and in good standing with the compensation fund
or with a licensed compensation insurer;
f) the employer is reasonably satisfied that the tenderer has in terms of the
Construction Regulations, 2014, issued in terms of the Occupational Health
and Safety Act, 1993 (Act 85 of 1993) as amended by the Occupational
Health and Safety Amendment Act, 1993 (Act 181 of 1993) the necessary
competencies and resources to carry out the work safely,
g) All the listed returnable documents as listed in Part T2.1 and all as may be
stated elsewhere, are submitted.
Tender T1.2
Part T1: Tender Procedures Page 5 of 5 Tender Data
JBCC Edition 41 March 2005
The tenderer must affix the following returnable documents to Part T2.1:
Tender T2.1
Part T2: Returnable Documents Page 1 of 2 List of Returnable Documents
JBCC Edition 41 March 2005
3 Returnable forms / schedules that will be used for tender evaluation purposes and be
incorporated into the contract
The tenderer must complete the following returnable forms / schedules:
● Certified ID Copies
● Letter of good standing from Compensation Commission
● Joint Venture Agreement if JV Submission
Tender T2.1
Part T2: Returnable Documents Page 2 of 2 List of Returnable Documents
SBD1
PART A
INVITATION TO BID
YOU ARE HEREBY INVITED TO BID FOR REQUIREMENTS OF THE (NAME OF DEPARTMENT/ PUBLIC ENTITY)
BID NUMBER: DID17/08/2021 CLOSING DATE As per Advert CLOSING TIME: 11:00AM
BIDDING PROCEDURE ENQUIRIES MAY BE DIRECTED TO TECHNICAL ENQUIRIES MAY BE DIRECTED TO:
CONTACT PERSON Mojalefa Monyela CONTACT PERSON Zanele Zola
TELEPHONE NUMBER 0826195830 TELEPHONE NUMBER 0769429369
FACSIMILE NUMBER FACSIMILE NUMBER
E-MAIL ADDRESS Mojalefa.Monyela@gauteng.gov.za E-MAIL ADDRESS Zanele.Zola@gauteng.gov.za
SUPPLIER INFORMATION
NAME OF BIDDER
POSTAL ADDRESS
STREET ADDRESS
TELEPHONE NUMBER CODE NUMBER
CELLPHONE NUMBER
FACSIMILE NUMBER CODE NUMBER
E-MAIL ADDRESS
VAT REGISTRATION
NUMBER
SUPPLIER TAX CENTRAL
COMPLIANCE COMPLIANCE SUPPLIER
OR
STATUS SYSTEM PIN: DATABASE
No: MAAA
B-BBEE STATUS TICK APPLICABLE BOX] B-BBEE STATUS LEVEL SWORN [TICK APPLICABLE BOX]
LEVEL VERIFICATION AFFIDAVIT
CERTIFICATE
Yes No Yes No
[A B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE/ SWORN AFFIDAVIT (FOR EMES & QSEs) MUST BE SUBMITTED IN
ORDER TO QUALIFY FOR PREFERENCE POINTS FOR B-BBEE]
ARE YOU THE
ACCREDITED
ARE YOU A FOREIGN BASED
REPRESENTATIVE IN Yes No
SUPPLIER FOR THE GOODS
SOUTH AFRICA FOR Yes No
/SERVICES /WORKS OFFERED?
THE GOODS [IF YES, ANSWER THE
/SERVICES /WORKS [IF YES ENCLOSE PROOF] QUESTIONNAIRE BELOW ]
OFFERED?
QUESTIONNAIRE TO BIDDING FOREIGN SUPPLIERS
1
SBD1
SYSTEM PIN CODE FROM THE SOUTH AFRICAN REVENUE SERVICE (SARS) AND IF NOT REGISTER AS PER 2.3 BELOW.
PART B
TERMS AND CONDITIONS FOR BIDDING
1. BID SUBMISSION:
1.1. BIDS MUST BE DELIVERED BY THE STIPULATED TIME TO THE CORRECT ADDRESS. LATE BIDS WILL NOT BE ACCEPTED FOR
CONSIDERATION.
1.2. ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS PROVIDED–(NOT TO BE RE-TYPED) OR IN THE MANNER PRESCRIBED
IN THE BID DOCUMENT.
1.3. THIS BID IS SUBJECT TO THE PREFERENTIAL PROCUREMENT POLICY FRAMEWORK ACT, 2000 AND THE PREFERENTIAL
PROCUREMENT REGULATIONS, 2017, THE GENERAL CONDITIONS OF CONTRACT (GCC) AND, IF APPLICABLE, ANY OTHER
SPECIAL CONDITIONS OF CONTRACT.
1.4. THE SUCCESSFUL BIDDER WILL BE REQUIRED TO FILL IN AND SIGN A WRITTEN CONTRACT FORM (SBD7).
NB: FAILURE TO PROVIDE / OR COMPLY WITH ANY OF THE ABOVE PARTICULARS MAY RENDER THE BID INVALID.
DATE: …………………………………………...
2
SBD 3.1
- At: ………………………………….
…………………………………
Note: All delivery costs must be included in the bid price, for delivery at the prescribed destination.
** “all applicable taxes” includes value- added tax, pay as you earn, income tax, unemployment
insurance fund contributions and skills development levies.
DECLARATION OF INTEREST
1. Any legal person, including persons employed by the state¹, or persons having a kinship with persons
employed by the state, including a blood relationship, may make an offer or offers in terms of this
invitation to bid (includes a price quotation, advertised competitive bid, limited bid or proposal). In view
of possible allegations of favouritism, should the resulting bid, or part thereof, be awarded to persons
employed by the state, or to persons connected with or related to them, it is required that the bidder or
his/her authorised representative declare his/her position in relation to the evaluating/adjudicating
authority where-
- the legal person on whose behalf the bidding document is signed, has a relationship with
persons/a person who are/is involved in the evaluation and or adjudication of the bid(s), or where
it is known that such a relationship exists between the person or persons for or on whose behalf
the declarant acts and persons who are involved with the evaluation and or adjudication of the
bid.
2. In order to give effect to the above, the following questionnaire must be completed and
submitted with the bid.
2.6.1 The names of all directors / trustees / shareholders / members, their individual identity numbers, tax
reference numbers and, if applicable, employee / persal numbers must be indicated in paragraph 3
below.
¹“State” means –
(a) any national or provincial department, national or provincial public entity or constitutional institution within the meaning of
the Public Finance Management Act, 1999 (Act No. 1 of 1999);
(b) any municipality or municipal entity;
(c) provincial legislature;
(d) national Assembly or the national Council of provinces; or
(e) Parliament.
²”Shareholder” means a person who owns shares in the company and is actively involved in the management of the enterprise or
business and exercises control over the enterprise.
2.7 Are you or any person connected with the bidder YES / NO
presently employed by the state?
2.7.2 If you are presently employed by the state, did you obtain YES / NO
the appropriate authority to undertake remunerative
work outside employment in the public sector?
2.7.2.1 If yes, did you attached proof of such authority to the bid YES / NO
document?
…………………………………………………………………….
…………………………………………………………………….
…………………………………………………………………….
2.8 Did you or your spouse, or any of the company’s directors / YES / NO
trustees / shareholders / members or their spouses conduct
business with the state in the previous twelve months?
2.9 Do you, or any person connected with the bidder, have YES / NO
any relationship (family, friend, other) with a person
employed by the state and who may be involved with
the evaluation and or adjudication of this bid?
2.9.1If so, furnish particulars.
……………………………………………………………...
…………………………………………………………..….
………………………………………………………………
2.10 Are you, or any person connected with the bidder, YES/NO
aware of any relationship (family, friend, other) between
any other bidder and any person employed by the state
who may be involved with the evaluation and or adjudication
of this bid?
………………………………….. ..……………………………………………
Signature Date
…………………………………. ………………………………………………
Position Name of bidder
SBD 6.1
This preference form must form part of all bids invited. It contains general information and
serves as a claim form for preference points for Broad-Based Black Economic Empowerment
(B-BBEE) Status Level of Contribution
NB: BEFORE COMPLETING THIS FORM, BIDDERS MUST STUDY THE GENERAL
CONDITIONS, DEFINITIONS AND DIRECTIVES APPLICABLE IN RESPECT OF B-
BBEE, AS PRESCRIBED IN THE PREFERENTIAL PROCUREMENT
REGULATIONS, 2017.
1. GENERAL CONDITIONS
1.1 The following preference point systems are applicable to all bids:
- the 80/20 system for requirements with a Rand value of up to R50 000 000 (all
applicable taxes included);and
- the 90/10 system for requirements with a Rand value above R50 000 000 (all
applicable taxes included).
1.2
a) The value of this bid is estimated to exceed R50 000 000 (all applicable taxes
included) and therefore the …90/10… preference point system shall be applicable;
1.5 Failure on the part of a bidder to submit proof of B-BBEE Status level of contributor
together with the bid, will be interpreted to mean that preference points for B-BBEE
status level of contribution are not claimed.
1.6 The purchaser reserves the right to require of a bidder, either before a bid is
adjudicated or at any time subsequently, to substantiate any claim in regard to
preferences, in any manner required by the purchaser.
2. DEFINITIONS
(a) “B-BBEE” means broad-based black economic empowerment as defined in section
1 of the Broad-Based Black Economic Empowerment Act;
2
(b) “B-BBEE status level of contributor” means the B-BBEE status of an entity in
terms of a code of good practice on black economic empowerment, issued in terms
of section 9(1) of the Broad-Based Black Economic Empowerment Act;
(c) “bid” means a written offer in a prescribed or stipulated form in response to an
invitation by an organ of state for the provision of goods or services, through price
quotations, advertised competitive bidding processes or proposals;
(d) “Broad-Based Black Economic Empowerment Act” means the Broad-Based
Black Economic Empowerment Act, 2003 (Act No. 53 of 2003);
(e) “EME” means an Exempted Micro Enterprise in terms of a code of good practice
on black economic empowerment issued in terms of section 9 (1) of the Broad-
Based Black Economic Empowerment Act;
(f) “functionality” means the ability of a tenderer to provide goods or services in
accordance with specifications as set out in the tender documents.
(g) “prices” includes all applicable taxes less all unconditional discounts;
(h) “proof of B-BBEE status level of contributor” means:
1) B-BBEE
Status level certificate issued by an authorized body or person;
2) A sworn
affidavit as prescribed by the B-BBEE Codes of Good Practice;
3) Any other
requirement prescribed in terms of the B-BBEE Act;
(i) “QSE” means a qualifying small business enterprise in terms of a code of good
practice on black economic empowerment issued in terms of section 9 (1) of the
Broad-Based Black Economic Empowerment Act;
(j) “rand value” means the total estimated value of a contract in Rand, calculated at
the time of bid invitation, and includes all applicable taxes;
Pt − P min Pt − P min
Ps = 801 − or Ps = 901 −
P min P min
Where
Ps = Points scored for price of bid under consideration
Pt = Price of bid under consideration
Pmin = Price of lowest acceptable bid
Page 2 of 5
3
1 10 20
2 9 18
3 6 14
4 5 12
5 4 8
6 3 6
7 2 4
8 1 2
Non-compliant 0 0
contributor
5. BID DECLARATION
5.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must
complete the following:
6. B-BBEE STATUS LEVEL OF CONTRIBUTOR CLAIMED IN TERMS OF
PARAGRAPHS 1.4 AND 4.1
6.1 B-BBEE Status Level of Contributor: . = ………(maximum of 10 or 20
points)
(Points claimed in respect of paragraph 7.1 must be in accordance with the table
reflected in paragraph 4.1 and must be substantiated by relevant proof of B-BBEE
status level of contributor.
7. SUB-CONTRACTING
7.1 Will any portion of the contract be sub-contracted?
(Tick applicable box)
YES NO
Designated Group: An EME or QSE which is at last 51% owned EME QSE
by: √ √
Black people
Black people who are youth
Black people who are women
Black people with disabilities
Black people living in rural or underdeveloped areas or townships
Cooperative owned by black people
Page 3 of 5
4
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……………………………………………………………………………………………………
……..
Manufacturer
Supplier
Professional service provider
Other service providers, e.g. transporter, etc.
[TICK APPLICABLE BOX]
8.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the company/
firm, certify that the points claimed, based on the B-BBEE status level of contributor
indicated in paragraphs 1.4 and 6.1 of the foregoing certificate, qualifies the
company/ firm for the preference(s) shown and I / we acknowledge that:
Page 4 of 5
5
iv) If the B-BBEE status level of contributor has been claimed or obtained on a
fraudulent basis or any of the conditions of contract have not been fulfilled, the
purchaser may, in addition to any other remedy it may have –
WITNESSES
……………………………………….
1. …………………………………….. SIGNATURE(S) OF BIDDERS(S)
Page 5 of 5
SBD 6.2
This Standard Bidding Document (SBD) must form part of all bids invited. It contains general
information and serves as a declaration form for local content (local production and local content
are used interchangeably).
Before completing this declaration, bidders must study the General Conditions, Definitions,
Directives applicable in respect of Local Content as prescribed in the Preferential Procurement
Regulations, 2017, the South African Bureau of Standards (SABS) approved technical
specification number SATS 1286:2011 (Edition 1) and the Guidance on the Calculation of Local
Content together with the Local Content Declaration Templates [Annex C (Local Content
Declaration: Summary Schedule), D (Imported Content Declaration: Supporting Schedule to
Annex C) and E (Local Content Declaration: Supporting Schedule to Annex C)].
1. General Conditions
1.1. Preferential Procurement Regulations, 2017 (Regulation 8) make provision for the
promotion of local production and content.
1.2. Regulation 8.(2) prescribes that in the case of designated sectors, organs of state must
advertise such tenders with the specific bidding condition that only locally produced or
manufactured goods, with a stipulated minimum threshold for local production and content
will be considered.
1.3. Where necessary, for tenders referred to in paragraph 1.2 above, a two stage bidding
process may be followed, where the first stage involves a minimum threshold for local
production and content and the second stage price and B-BBEE.
1.4. A person awarded a contract in relation to a designated sector, may not sub-contract in
such a manner that the local production and content of the overall value of the contract is
reduced to below the stipulated minimum threshold.
1.5. The local content (LC) expressed as a percentage of the bid price must be calculated in
accordance with the SABS approved technical specification number SATS 1286: 2011 as
follows:
LC = [1 - x / y] * 100
Where
x is the imported content in Rand
y is the bid price in Rand excluding value added tax (VAT)
1
1.6. A bid may be disqualified if this Declaration Certificate and the Annex C (Local Content
Declaration: Summary Schedule) are not submitted as part of the bid documentation;
2. The stipulated minimum threshold(s) for local production and content (refer to
Annex A of SATS 1286:2011) for this bid is/are as follows:
3..1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as
prescribed in paragraph 1.5 of the general conditions must be the rate(s) published by
SARB for the specific currency at 12:00 on the date of advertisement of the bid.
Indicate the rate(s) of exchange against the appropriate currency in the table below
(refer to Annex A of SATS 1286:2011):
NB: Bidders must submit proof of the SARB rate (s) of exchange used.
4. Where, after the award of a bid, challenges are experienced in meeting the stipulated
minimum threshold for local content the dti must be informed accordingly in order for the dti
to verify and in consultation with the AO/AA provide directives in this regard.
2
(REFER TO ANNEX B OF SATS 1286:2011)
1 The obligation to complete, duly sign and submit this declaration cannot be
transferred to an external authorized representative, auditor or any other third party
acting on behalf of the bidder.
2 Guidance on the Calculation of Local Content together with Local Content
Declaration Templates (Annex C, D and E) is accessible on
http://www.thdti.gov.za/industrial development/ip.jsp. Bidders should first complete
Declaration D. After completing Declaration D, bidders should complete Declaration
E and then consolidate the information on Declaration C. Declaration C should be
submitted with the bid documentation at the closing date and time of the bid in
order to substantiate the declaration made in paragraph (c) below. Declarations
D and E should be kept by the bidders for verification purposes for a period of at
least 5 years. The successful bidder is required to continuously update Declarations
C, D and E with the actual values for the duration of the contract.
(a) The facts contained herein are within my own personal knowledge.
If the bid is for more than one product, the local content percentages for each
product contained in Declaration C shall be used instead of the table above.
The local content percentages for each product has been calculated using the
formula given in clause 3 of SATS 1286:2011, the rates of exchange indicated in
3
paragraph 4.1 above and the information contained in Declaration D and E.
(d) I accept that the Procurement Authority / Institution has the right to request that the
local content be verified in terms of the requirements of SATS 1286:2011.
(e) I understand that the awarding of the bid is dependent on the accuracy of the
information furnished in this application. I also understand that the submission of
incorrect data, or data that are not verifiable as described in SATS 1286:2011, may
result in the Procurement Authority / Institution imposing any or all of the remedies as
provided for in Regulation 14 of the Preferential Procurement Regulations, 2017
promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. 5
of 2000).
SATS 1286.2011
4
SATS 1286.2011
`
(D32) Total imported value by tenderer
C. Imported by a 3rd party and supplied to the Tenderer Calculation of imported content Summary
Forign
All locally
currency
Tender Rate Local value of Freight costs to incurred Total landed cost Quantity Total imported
Description of imported content Unit of measure Local supplier Overseas Supplier value as per
of Exchange imports port of entry landing costs excl VAT imported value
Commercial
& duties
Invoice
(D37xD38) (D39+D40+D41) (D42xD43)
(D33) (D34) (D35) (D36) (D37) (D38) (D39) (D40) (D41) (D42) (D43) (D44)
`
(D45) Total imported value by 3rd party
(D52) Total of foreign currency payments declared by tenderer and/or 3rd party
Signature of tenderer from Annex B
(D53) Total of imported content & foreign currency payments - (D32), (D45) & (D52) above
5
SATS 1286.2011
Local Products
(Goods, Services Description of items purchased Local suppliers Value % of LC
and Works)
(E6) (E7) (E8)
(E11) Factory overheads (Rental, depreciation & amortisation, utility costs, consumables etc.)
(E12) Administration overheads and mark-up (Marketing, insurance, financing, interest etc.)
6
SBD 8
1 This Standard Bidding Document must form part of all bids invited.
3 The bid of any bidder may be disregarded if that bidder, or any of its directors
have-
4.2 Is the bidder or any of its directors listed on the Register for Tender Defaulters in Yes No
terms of section 29 of the Prevention and Combating of Corrupt Activities Act (No 12
of 2004)?
The Register for Tender Defaulters can be accessed on the National Treasury’s
website (www.treasury.gov.za) by clicking on its link at the bottom of the home
page.
4.3 Was the bidder or any of its directors convicted by a court of law (including a court Yes No
outside of the Republic of South Africa) for fraud or corruption during the past five
years?
4.4 Was any contract between the bidder and any organ of state terminated during the past Yes No
five years on account of failure to perform on or comply with the contract?
4.4.1 If so, furnish particulars:
SBD 8
CERTIFICATION
………………………………………... …………………………..
Signature Date
………………………………………. …………………………..
Position Name of Bidder
Js365bW
SBD 9
CERTIFICATE OF INDEPENDENT BID DETERMINATION
1 This Standard Bidding Document (SBD) must form part of all bids¹ invited.
2 Section 4 (1) (b) (iii) of the Competition Act No. 89 of 1998, as amended, prohibits an
agreement between, or concerted practice by, firms, or a decision by an association of
firms, if it is between parties in a horizontal relationship and if it involves collusive
bidding (or bid rigging).² Collusive bidding is a pe se prohibition meaning that it cannot
be justified under any grounds.
3 Treasury Regulation 16A9 prescribes that accounting officers and accounting authorities
must take all reasonable steps to prevent abuse of the supply chain management
system and authorizes accounting officers and accounting authorities to:
a. disregard the bid of any bidder if that bidder, or any of its directors have abused
the institution’s supply chain management system and or committed fraud or any
other improper conduct in relation to such system.
¹ Includes price quotations, advertised competitive bids, limited bids and proposals.
² Bid rigging (or collusive bidding) occurs when businesses, that would otherwise be expected to compete, secretly conspire to raise prices or
lower the quality of goods and / or services for purchasers who wish to acquire goods and / or services through a bidding process. Bid
rigging is, therefore, an agreement between competitors not to compete.
1
SBD 9
do hereby make the following statements that I certify to be true and complete in every respect:
(a) has been requested to submit a bid in response to this bid invitation;
(b) could potentially submit a bid in response to this bid invitation, based on
their qualifications, abilities or experience; and
(c) provides the same goods and services as the bidder and/or is in the same
line of business as the bidder
2
SBD 9
6. The bidder has arrived at the accompanying bid independently from, and without
consultation, communication, agreement or arrangement with any competitor. However
communication between partners in a joint venture or consortium³ will not be construed
as collusive bidding.
7. In particular, without limiting the generality of paragraphs 6 above, there has been no
consultation, communication, agreement or arrangement with any competitor regarding:
(a) prices;
(b) geographical area where product or service will be rendered (market
allocation)
(c) methods, factors or formulas used to calculate prices;
(d) the intention or decision to submit or not to submit, a bid;
(e) the submission of a bid which does not meet the specifications and
conditions of the bid; or
(f) bidding with the intention not to win the bid.
8. In addition, there have been no consultations, communications, agreements or
arrangements with any competitor regarding the quality, quantity, specifications and
conditions or delivery particulars of the products or services to which this bid invitation
relates.
9. The terms of the accompanying bid have not been, and will not be, disclosed by the
bidder, directly or indirectly, to any competitor, prior to the date and time of the official
bid opening or of the awarding of the contract.
³ Joint venture or Consortium means an association of persons for the purpose of combining their expertise, property, capital, efforts, skill
and knowledge in an activity for the execution of a contract.
3
SBD 9
10. I am aware that, in addition and without prejudice to any other remedy provided to
combat any restrictive practices related to bids and contracts, bids that are suspicious
will be reported to the Competition Commission for investigation and possible imposition
of administrative penalties in terms of section 59 of the Competition Act No 89 of 1998
and or may be reported to the National Prosecuting Authority (NPA) for criminal
investigation and or may be restricted from conducting business with the public sector
for a period not exceeding ten (10) years in terms of the Prevention and Combating of
Corrupt Activities Act No 12 of 2004 or any other applicable legislation.
………………………………………………… …………………………………
Signature Date
…………………………………………………. …………………………………
Position Name of Bidder
Js914w 2
4
JBCC Edition 4.1 March 2005
The following particulars must be furnished. In the case of a joint venture, separate enterprise
questionnaires in respect of each partner must be completed and submitted.
Section 1: Name of enterprise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 2: VAT registration number, if any . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 3: CIDB registration number, if any . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section 4: Particulars of sole proprietors and partners in partnerships
* Complete only if sole proprietor or partnership and attach separate page if more than 3 partners
Tender T2.2
Part T2: Returnable Documents Page 1 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Status of service
Name of sole proprietor, partner, Name of institution, public office, (tick appropriate column)
director, manager, principal board or organ of state and position
shareholder or stakeholder held Current Within last 12 months
Section 7: Record of spouses, children and parents in the service of the state
Indicate by marking the relevant boxes with a cross, if any spouse, child or parent of a sole proprietor, partner
in a partnership or director, manager, principal shareholder or stakeholder in a company or close corporation
is currently or has been within the last 12 months been in the service of any of the following:
Tender T2.2
Part T2: Returnable Documents Page 2 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Status of service
Name of institution, public office, (tick appropriate column)
Name of spouse, child or
board or organ of state and position
parent
held Current Within last 12 months
The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise:
i) authorizes the employer to obtain a tax clearance certificate from the South African Revenue Services
that my / our tax matters are in order;
ii) confirms that neither the name of the enterprise or the name of any partner, manager, director or other
person, who wholly or partly exercises, or may exercise, control over the enterprise appears on the
Register of Tender Defaulters established in terms of the Prevention and Combating of Corrupt
Activities Act, 2004 (Act 12 of 2004);
iii) confirms that no partner, member, director or other person, who wholly or partly exercises, or may
exercise, control over the enterprise appears, has within the last five years been convicted of fraud
or corruption;
iv) confirms that I / we are not associated, linked or involved with any other tendering entities submitting
tender offers and have no other relationship with any of the tenderers or those responsible for
compiling the scope of work that could cause or be interpreted as a conflict of interest; and
v) confirms that the contents of this questionnaire are within my personal knowledge and are to the best of
my belief both true and correct.
Signed Date
Name Position
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 3 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
We confirm that the following communications received from the Employer before the submission of this
Tender offer, amending the Tender documents, have been taken into account in this Tender offer:
Date Title or Details
1
2
3
4
5
6
7
8
Signed Date
Name Position
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 4 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The Tenderer should record any deviations or qualifications he may wish to make to the Tender
documents in this Returnable Schedule. Alternatively, a tenderer may state such deviations and
qualifications in a covering letter to his Tender and reference such letter in this schedule.
The tenderer's attention is drawn to clause F.3.8.2 of the Standard Conditions of Tender referenced
in the Tender Data regarding the employer's handling of material deviations and qualifications.
Signed Date
Name Position
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 5 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
We, the undersigned, are submitting this Tender offer in Joint Venture and hereby authorise Mr/Mrs………..…
to sign all documents in connection with the Tender offer and any contract resulting from it on our behalf.
Lead partner
Signature ...................................
Name ..........................................
CIDB registration number: Designation ...............................
............................................................
Signature ...................................
Name ..........................................
CIDB registration number: Designation ...............................
............................................................
Signature ...................................
Name ..........................................
CIDB registration number: Designation ...............................
............................................................
Signature ...................................
Name ..........................................
CIDB registration number: Designation ...............................
............................................................
Tender T2.2
Part T2: Returnable Documents Page 6 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
We notify you that it is our intention to employ the following Subcontractors for work in this contract.
If we are awarded a contract we agree that this notification does not change the requirement for us
to submit the names of proposed Subcontractors in accordance with requirements in the contract
for such appointments.
Name and address of Description of Work to be executed Previous experience with the
proposed Subcontractor by the Subcontractor Subcontractor
Signed Date
Name Position
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 7 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
List not more than seven contracts completed in the last five years
*Completed means that a certificate has been issued in terms of a contract by the employer, signifying that the whole of the construction works have reached a state of readiness for
occupation or use for the purposes intended, although some minor work may be outstanding
Tender T2.2
Part T2: Returnable Documents Page 8 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
10
Signed Date
Name Position
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 9 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Schedule of exempted micro enterprises (SME's) and qualifying small business enterprises (QSE's)
1 MASONRY 1 - 4 GB
2 WATERPROOFING 1 - 4 SN
3 CARPENTRY AND JOINERY 1 - 4 GB
4 CEILINGS, PARTITIONS AND ACCESS FLOORING 1 - 4 GB
5 IRONMONGERY 1 - 4 GB
6 METALWORK 1 - 4 GB
7 PLASTERING 1 - 4 GB
8 TILING 1 - 4 GB
9 GLAZING 1 - 4 SG / GB
10 PAINTWORK 1 - 4 GB
EXTERNAL WORKS 9%
11 PAVING 1 - 4 GB / CE
12 FENCING 1 - 4 SQ / GB
13 PLUMBING AND DRAINAGE 1 - 4 SO / GB
14
22
Total : 30%
Any ammendments made to the above list post tender is to be approved by the employer
Tender T2.2
Part T2: Returnable Documents Page 10 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
1. Daily rate payable for unskilled labour: as per EPWP municipal rate of the area.
2. Daily rate payable for semi-skilled labour: as per the contractor's rate.
3. Daily rate payable for skilled labour: as per the contractor's rate.
4. The trades below are identified as labour intensive and the employment yield.
The number of total labourers should be 40% of the total labour of the contract as stipulated in the contract.
Any ammendments made to the above list post tender is to be aproved by the employer
Tender T2.2
Part T2: Returnable Documents Page 11 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The following are lists of major items of relevant equipment that I / we presently own or lease
and will have available for this contract or will acquire or hire for this contract if my / our
tender is accepted.
(a) Details of major equipment that is owned by and immediately available for this contract.
Tender T2.2
Part T2: Returnable Documents Page 12 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
(b) Details of major equipment that will be hired or acquired for this contract if my / our Tender is acceptable.
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 13 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The experience of the tenderer or joint venture partners in the case of an unincorporated joint venture or consortium as
apposed to the key staff members / experts in similar projects or similar areas and conditions in relation to the scope of
work over the last five years will be evaluated.
Tenderers should very briefly describe his or her experience in this regard and attach a minimum of five completion
certificates to this schedule.
The description should be put in tabular form with the following headings:
Employer, contact
person and telephone Description of work (service) Date completed
number, where available
Tender T2.2
Part T2: Returnable Documents Page 14 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Tender Rating
Functionality Criteria – Tender Rating Matrix Weighting Factor
(score 1-5)
Demonstrate a proven capacity and capability to complete works of similar nature (maintenance and refurbishment).
5 Appointment letters and 5 corresponding completion certificates (Completion certificate or Practical completion certificate or Final
completion certificate) of successfully completed works of similar nature (maintenance and refurbishment).
5 Points
Company work experience
4 Appointment letters and 4 corresponding completion certificates (Completion certificate or Practical completion certificate or Final
completion certificate) of successfully completed works of similar nature (maintenance and refurbishment).
4 Points
3 Appointment letters and 3 corresponding completion certificates (Completion certificate or Practical completion certificate or Final
40
completion certificate) of successfully completed works of similar nature (maintenance and refurbishment).
3 Points
2 Appointment letters and 2 corresponding completion certificates (Completion certificate or Practical completion certificate or Final
completion certificate) of successfully completed works of similar nature (maintenance and refurbishment).
2 Points
1 Appointment letter and 5 corresponding completion certificate (Completion certificate or Practical completion certificate or Final
completion certificate) of successfully completed works of similar nature (maintenance and refurbishment).
1 Point
No Appointment letter and corresponding Completion certificate or Practical completion certificate or Final completion certificate) of
successfully completed works of similar nature (maintenance and refurbishment).
0 Point
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 15 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The experience of assigned staff member in relation to the scope of work will be evaluated from three different points
of view:
1) General experience (total duration of professional activity), level of education and training and positions held of each
discipline specific team leader.
2) The education, training, skills and experience of the Assigned Staff in the specific sector, field, subject, etc which
is directly linked to the scope of work.
3) The key staff members’ / experts’ knowledge of issues which the proposer considers pertinent to the project e.g.
local conditions, affected communities, legislation, techniques, etc.
schedule.
Key staff (assigned personnel) in relation to the scope of infrastructure construction works. Attach CV’s, certified copies of qualifications and certified
professional registration (PR).
1 Registered Quantity Surveyor - Certified Registration with the South African Council for the Quantity Surveying Profession (SACQSP)
1 Registered Health and Safety Officer/Health and Safety Manager/ - Certified Registration with SACPCMP for Health & Safety Manager/Officers
1 Site Foreman – trade certificate as proof of competence to oversee electrical or mechanical trades. 40
1 Site Foreman - trade certificate as proof of competence to oversee general building works and related trades.
Qualification &
Registrations,
Attach CV of key site personnel with proof of certified copies of qualification and a certified copies of professional registration (PR) for the below key staff.
The certification must not be more than three months.
Note: The team must be complete as indicated above to qualify for total 40 points.
The undersigned, who warrants that he / she is duly authorised to do so on behalf of the enterprise, confirms that the
contents of this schedule are within my personal knowledge and are to the best of my belief both true and correct.
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 16 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The project plan and implementation stratergy which ensure compliance with stated employer's requirements
will be evaluated.
Tenderers should very briefly outline his or her procedures which ensure compliance with stated employer's requirements
(project plan) indicating Time allocations, Milestones and cost projections and Resources: Human and Plant in relation to
the project and attach this to this schedule.
Project Plan
Resource allocation
– Organogram (Staff allocated to the project including the alignment of key project personnel)
– Cash flow Model (realistic project projected expenditure)
– Equipment (list of plant, hired equipment and owned equipment with proof of ownership)
Project plan with Key tasks, clear critical path, and expenditure plan linked to tasks with project duration of 36 months.
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 17 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
……………………...…………………………………………
for the Gauteng Department of Infrastructure Developments, (hereinafter referred to as the "EMPLOYER"
…………….….………………………………………………..………………………………………..…………
………….……………………………………………………………………………………………. ……………
(hereinafter referred to as the "INSURER" advise that the "INSURER" undertakes to provide a
Performance Bond to the EMPLOYER to the Employer's format included in Part C1.3 of this document
within five (5) working days of the written acceptance by the employer of the contractor's Tender offer.
…………………………………………………............
Name of signatory Capacity of authorised signatory
…………………………………………………............
As witness
Tender T2.2
Part T2: Returnable Documents Page 18 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
An Original Valid Tax Clearance Certificate & Tax pin for Tenders issued by the South African Revenue
Services (S.A.R.S.) in the Name of the Proposing Entity indicating the Trading Name.
Note:
Failure to affix such certificate may result in this Tender not being further considered for the award of the
contract.
Tender T2.2
Part T2: Returnable Documents Page 19 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
An original certificate as proof of his / her registration with the CIDB in a contractor grading designation of 9GB
An original certificate as proof of his registration with the CIDB in a contractor grading for potential
emerging entities who satisfy criteria stated in the Tender Data as proof of his registration with the CIDB.
Notes:
1. Failure to affix such certificate may result in this Tender not being further considered for
the award of the contract.
Tender T2.2
Part T2: Returnable Documents Page 20 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Address ………………………………………………………………………………………………………….
………………………………………………………………………………………………………….
Electrical Contractor registration number at the Electrical Contracting Board of S.A ……………............
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 21 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Address ………………..…………………………………………………………………………………………….
…………..……...………………………………………………………………………………………….
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 22 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
Tender T2.2
Part T2: Returnable Documents Page 23 of 24 Returnable Schedules
JBCC Edition 4.1 March 2005
The tenderer shall list imported items, materials and / or equipment which shall be excluded from the Contract
Price Adjustment Provisions (if applicable) and shall be adjusted in terms of currency fluctuations only. Copies
of the supplier's quotations for the items, materials or equipment (provided that such costs shall not be higher
than the relevant contract rate as listed above) should be lodged with the Project Manager within three (3) weeks
of the starting date. No adjustment of the local VAT amount, nor the contractor's profit, discount, mark-up, handling
costs, etc shall be allowed.
A = V ( Z - 1)
Y
V = the net amount (supplier's quotation) (R) of the imported item (material or equipment)
Signed
Name
Enterprise name
Tender T2.2
Part T2: Returnable Documents Page 24 of 24 Returnable Schedules
MOGALECITY LOCAL MUNICIPALITY – STERKFONTEIN HOSPITAL OHS LIST OF SMME
DATE : 11 JUNE 2021
No Company Name MAAA No. CIDB GRADING COMPANY ADDRESS EME/QSE Contact details
1. Tsekiso Construction 1GB PE 4634 Mogorosi Street, EME tkooreketswe@gmail.com
MAAA0888589 Kagiso 2 Cell – 078-344-6711
2. Baloyis Painting and Projects MAAA0480998 2GB PE 1CE PE 8634 Mdeni Street, Kagiso 2 EME baloyispainting@hotmail.com
Cell 078-228-9924
3. Gilbert Ovana MAAA0642254 4ME PE 10730 Tshepe street kagiso EME jhb@invelaphi.com 0614294049
4. Sanele Shumi MAAA0460162 6GB 1CE 5ME 2143 THEMBA STREET QSE INFO@BLKGROUP.CO.ZA
5SO KAGISO
5. Cleomash Holdings Pty Ltd MAAA0099288 2CE, 1EP, 1SH, 101 Monala Street EME Cleomash1@icloud.com
1SO,2GB Munsievielle 0839645184
6. Shesba Trading&Projects MAAA0743957 1GB,1SO,1CE,1 92 Morare Drive Munsieville EME shesbatrading@gmail.com
EP 0671719693
7. Dynamo Duck MAAA0744546 2GB,1EP,1CE,1 3380 Reotlegile Street EME Dynamo992@gmail.com
Trading&Projects SO Mayibuye 0762894466
8. Mashmoyo Trading &Projects MAAA0099565 1EP,1SH,2GB,1 564 Mokgatle Street EME mashmoyo@gmail.com
SO,1CE Munsieville 0827242122
9. Fostertech Group MAAA0922784 1GB 61 Human Street EME Foster.fanny@gmail.com
Krugersdorp 0832473243
10. 1Select ME Engineering MAAA0089679 1GB 1759 Mafaesa Street EME Selectmeengineering13@gmail.com
0 Munsieville 0610787680
11. Mgimeti Business Investments MAAA0101150 1GB,1SH,1SO,1 4707 Ngidi Street EME brian@mggtgroup.co.za
EP,1ME,1SF Muensiville 0829362634
12. Moikanyane’s Trading MAAA0079816 5CE,1GB,1SQ,1 3579 Mpande Street Kagiso EME info@mtent.co.za
Enterprise SB,1SH 2 0766960178
13. Quva Trading Enterprise MAAA0819721 1GB 1425 Bafihlile Street EME quvasilulami@gmail.com
Munsieville Ext 4 0818743394
14. MMathabang Construction MAAA0004482 1GB PE 1EC 2611 Swaneville, Ext 1, EME mmathabothebehadi@gmail.com
Krugersdorp Cell 078-1811 858 – 078-4048 292
15. Mmanjakes Projects MAAA0214849 1 GBPE 10439 Bomeno street kagiso EME Masemayi23@gmail.com
0744 082 188
16. Mnqarhwane PTY LTD MAAA0665880 2 CE 1 GB 2279 Kingfisher street EM Matroosmnqarhwne@webmail.co.za
SWANEVILLE 084 69 61847
17. FODOYI Trading Enterprise MAAA0955952 1gb 1411 cockatoo EM nomvuyisosanqela@gmail.com
18. SGS/elecons PTY LTD MAAA0710839 1GB 2521 Tobo street EM Georgeshwayimba@gmail.com
swaneville
19. NYAKHUHU Trading and MAAA 0145466 1 GB 2357 Tsivo Street Chief EM nyakhuhut@gmail.com
Projects Mogale
20. Sourounhim Cconstruction MAAA04 05670 1 GB 1229 KADIMA STREET EM surooundhim@gmail.com
KAGISO 2
21. Wavhuid trading enterprise MAAA 0035438 1 GB 1CE 1 FE 223 CHIEF Mogale City EM Wavhuidi.t@gmail.com
22. Madlekhala Construction and MAAA 1058 109 1 GB 11144 UTLWANONG STREET EM Ngeti54@gmail.com
Projects EXT 6 kAGISO
23. DEXIOS CONSTRUCTIONS and MAAA 04 60509 1GB 1 CE 270 Allyson street Boltonia EM tshikotshimashudu@gmail.com
general services Krugersdorp
24. Three one maintenance and MAAA 04 02 1GB 9250 Hills view Kagiso 2 EM Kefilwe.mokoto@gamail.com
Projects 087
25. Till Communication cc MAAA 3GBPE 15 Lacanster street West EM Tillcomm1@gmail.com
1749
26. Lebunyane Construction N MAAA0940613 G1GB, 1 Pretorius street EME Info@lebunyaneconstructionnsupply.co.za
Supply G1CE,G1SO Westergloor Randfontein /Jeanettelebu71212@gmail.com
1759
27. TVM Nyambo Construction MAAA0084189 G1GB, G1CE 7125 Nomandi Drive Kagiso EME Mthethwavusie@gmail.com
2 Mogale City 1754
28. MATT CL AND K MAAA1016713 G1GB, G1CE 425 Osiris Street Ruimsig EME Luckykhune6364@gmail.com
Country Estate Krugersdorp
1724
29. Nkhumelemorita Trading & MAAA0235718 2GB, 2SN, 1ME 2046 Tswelelopele str Ext2 EME MMotala@nkhumelemoritaprojects.co.za
Projects & 1SO Munsieville 0791878503
30. SKK Engineering and Services MAAA0312380 6ME,PE,5SO,PE 174 Umzimhlanga str EME Motale.mamafajonas@gmail.com
,5CEPE,5GBPE, Munsieville 0769099814
31. AM Civil works and Transport- MAAA0331 5GP PE/5CE 037 Human street EME Amcivil3@gmail.com
CC PE/1EP PE/1ME Krugersdorp 0835157528
PE/1SQ PE
32. Ikabote pty MAAA0359653 G1GB,G1CE 15673 MOUNT OLIVE STR EME Ikabote01@gmail.com
EXT 12 072 135 4311
33. HlalefangSewing&multipurpos MAAA0688103 n/a 18651 Tshwane street Ext n/a Mphahluli@gmail.com
e 14 Kgagiso 0717239781
34. Mett Holdings (PTY) LTD MAAA1062152 1GB, PE, 36 Chief Mogale Kagiso 2 EME Mettholdings2021@gmail.com
Krugersdorp 0604677876
35. N-co. holdings MAAA9664510 2974 kagiso Avenue Kagiso 2 EME royalndandani@gmail.com
0812618426
36. Calvary Enterprise MAAA0266608 Grade 20A 1st Avenue ,Wesdene EME info@calvaryenterprise.co.za
7CE,3GB,1EP 2020 0731946359
37. Blaqmarquet-PTY-LTD MAAA0789668 GB1 131 Kite Street block1 EME Blaqmarket64@gmail.com
Swanneville 0716364460
38. Gomzen-civil &projects MAAA1076284 N/A 4487 Rietvalli Ext2/3 Kgagiso EME Gomadiseko02@gmail.com
0785452657
39. Placing Service delivery MAAA0446368 1GB 4751 EXTENSION 2 EME madimetjammatli@gmail.com
consulting (pty) Ltd RIETVALLEI 0796528311
40. LTO Transport Services MAAA0711131 n/a 6962 Ngavavuma street n/a bikimoetlhoa@gmail.com
&Projects Kgagiso 0718876213/0822594820
41. BKNY LOGISTICS PTY LTD MAAA0416648 1GB/ 8647 MMUSONG STREET EME Boikanyo.bkny01@gmail.com
KAGISO 2 082 684 7553
42. KPN Group MAAA0717924 1GB 364 Caucals Nest EME Mhlencumalo65@gmail.com
Krugersdorp Feather Brook 0833331334
Estate 1739
43. Construction managers in real MAAA0413654 4GB 814 Batis street Feather EME Progress@cmregroup.co.za
estates projects Brook estates 1740 0815182855
44. Mvelaphanda Carpenters and MAAA0141390 2GB/1SO PE 18713 LEHLABILE STREET EME Georgina.mvelaphanda@gmail.com
Decorators EXT14 KAGISO 0732822628
45. Chinane Construction and MAAA0141423 2GB 18713 Lehlabile street ext EME maurrynkhunwana@gmail.com
Projects 14 Kagiso 0767788256
46. 1GB PE 1EC 1352 JOKO PLACE EME Exhabarate@gmail.com
EXABARATED CONSTRUCTION MAAA0932602 1ME 1CE Munsieville Cell - 0764090851
47. Happy Homes Projects n MAAA0654169 1GB PE 1SO PE 66B Morare Drive, EME Ngesineo6@gmail.com
Services PTY Ltd 1CE PE Munsieville, Mogale City, 073 506 6665
1739
48. LETSHWENE LEGACY MAAA0526224 1GB PE 5 PETUNIA STREET EME Tshetlho06@gmail.com
ENTERPRISE BOLTONIA, KRUGERSDORP 076 346 7984
49. THEMO SOLUTIONSPTY(LTD) MAAA1076246 1GB-1 EB NO 6 PONDERS END, EME sekete@themo.co.za
HELDERKRUIN seketephoshoko37@gmail.com
ROODEPOORT 1724 0813355947
50. Ogone radira trading Maaa0811092 1GB PE 3283 PHOKOMPE STREET EME Ogonelloydpaul54@gmail.com
MUNSIEVILLE EXT 4 072 4193 560
KRUGERSDORP 1739
51. Masokolaria trading MAAA0538073 1GB PE 3279 PHOKOMPHE STREET masokolaria@gmail.com
MAIBUYE EXT4, 0720609517
MUNSEVIELLE EME
52. LEFALLO TRADING SUPPLIERS MAAA0515656 1GB PE 3497 NICNOLAS STREET EME Beta.lefallo@gmail.com
MAIBUYE EXT4 lefallo.beta@gmail.com
MUNSEVIELLE 1739 0784119863
53. BUAL TRADING ENTERPRISE MAAA0530435 1GB PE 105 MOKGATLE STREET EME butialfredm@gmail.com
MUNSEVIELLE 1739 0739352067
54. INTELECT ENGINEERING MAAA0154663 6EB,4ME 5170 MANOTSHE STREET, EME nmplans@gmail.com
RIVERSIDE KAGISO,1754 0603679020
55. TERAKON (PTY) LTD MAAA0666176 1GB,1EB,1EP 5170 MANOTSHE STREET, EME nmplans@gmail.com
RIVERSIDE KAGISO,1754 0603679020
56. THANDILUCK GENERAL MAAA0545529 1GB PE 4277 DR MARTINOS RAMIEZ EME doreen4sakala@gmail.com
TRADING (PTY) LTD DRIVE, MUNSIVILLE EXT 4, 0797148640/ 0733829580
KRUGERSDORP, 1739
57. Malesheke Trading Enterprise MAAA0675411 1GB PE 2296 Nkululeko Street EME manamelajosephine@gmail.com
Munsieville, 1739
58. MALEHO TRADING PROJECTS MAAA0787721 1GB PE 3506 REITVALLEI EXT 2 AND EME Yumnamaleho92@gmail.com
3 41ST STR KRUGERSDORRP 0794303624
59. mmolotsanemarketing MAAA0534803 1Gb PE 2225 JABULANI EME MORUPISIKEA19@GMAIL.COM
DRIVE,MUNSIEVILLE EXT2
KRUGERSDORP 1739
60. MANGENA MARKETING MAAA0071222 1GB PE 137 KOBIE KRIGE EME Mangenamarketing20@gmail.com
KRUGERSDORP 1739
61. Arenon construction and t/c 1GB 67 Hendrik boom,
maintenance (pty) ltd Witpoortjie,Rodepoort 1724 EME akmashale@gmail.com
62. Dgs contruction (pty) ltd MAAA0544236 1GB 10321 TSHEPE STR KAGISO 2 EME Dgsconstruction025@gmail.com
Ext 4 Mogale City 1754 0828896546
63. Cheap town project and Maaa1002192 1GB PE M2329 pango ville EME Ofentsesimon18@gmail.com
construction munsieville Krugersdorp 0733978317
64. Mashudu & Sons Interprise MAAA0860699 1GB PE 3113 Ext 2&3 Rietvallie EME Faithmudau79@gamil.com
(PTY) LTD Krugersdorp 1753 0786507878
65. Thekwane Engineering and MAAA0961942 5CE,1GB,1EP 53 Main Reef West QSE tenders@thekwaneholdings.com
Construction Road,Princess ext2 076 285 7443
66. Righ Holdings MAAA0881686 1CE,1GB,1SH 19 Raasblaar EME righholdings@gmail.com
Street,Rangeview, 062 181 2579 OR 076 369 4281
67. Impumelelo yaMakhosikazi MAAA0170617 3CE,1GB 13341.71 Ext 8 Kagiso QSE sibobusi@gmail.com
Trading 082 839 5536
68. Langa black trading MAAA1002068 1GB 3400 MATSAFU STREET EME langablack@gmail.com
MUNSIEVILLE EXT4 0711950835
69. Zamava Construction and MAAA0743253 1SO PE 2730 Sila Street Kagiso 2 EME zamava.construction@gmail.com
Projects (pty) ltd 1754 0656181981/0672348558
70. Marte Cetshwayo T/C 1GB PE 1318 Hawk Street EME Nomvula28cetshwayo@gmail.com
Construction & Projects Swaneville Kagiso 2, 1754 065 250 5662/ 0749533444
71. Mgabhi Geospatial,Property & MAAA0083030 1 GB CE PE 392Main Reef Road EME Dube.vusa450@gmail.com
Construction Management cc Wentworth Park 0784592993/0842945111
Krugersdorp 1739
72. Katlego Projects & MAAA0150517 1GB PE 102 Progress Road EME masego@kpradev.co.za
Development Lindhaven 1724 0827104842
73. Miafrika Business Enterprise 1GB PE Plot 33 Jennings Street EME Bella.miafrika@gmail.com
Magaliesburg, 1791 0616936694/ 0745194849
74. Bakgoni Services Supply And N/A 1058 George James Street EME sseepolle@gmail.com 0722042622
Trading(PTY) LTD MAAA0997759 Munseville Mogale City
75. Sisa Collection (Pty)Ltd MAAA0079242 10024362 35 Augusta, Commissioner EME sisa@sisacollections.co.za
2GB 1EB 1SO Str, Krugersdorp, 1739 072 750 9809
1SH 1SK
76. Mathongwana Trading and MAAA0827806 10031545 7281 Kopanong Street, EME sazisonkosi872@gmail.com
Projects 1GB PE Kagiso Swaneville Ext 5 073 228 9650
77. Beyond Measure Productions MAAA0588024 10090707 2381 Sinqobile Street EME mogwele58@gmail.com
1GB PE Munsieville, 1739 073 305 0755
78. A Bova Property Civil Works MAAA0162528 10042064 97 Burger Street, EME alexthemba@gmail.com
(Pty) Ltd 1GB PE Kurgersdorp CBD, 1739 079 538 5049
79. Mercy-Kgaugelo Trading MAAA0185328 3GB 3CE 18 Venter Street, Dan EME info@mercykgaugelo.co.za
Enterprise 1SO PE SN PE Pienaarville,Mogale City 079 983 7586
80. Twin Line Technology MAAA0486288 10000161 2153 Katlego Street, EME Twinlinetechnology@live.co.za
1ME,3EP Munsivillie 067 125 4020
81. MM Cleaning and Multi- MAAA0013238 10015051 16348 Suurburg Street, EME pgideon@gmail.com
Purpose 1GB E,4SB,5CE Kagiso Ext 12, 1754 078 504 8999
82. TXBS Construction (Pty) LTD MAAA0474030 10107341 2269 Apricot Street, EME txbsptyltd@gmail.com
1CE PE Toekomsrus, 1759 068 536 4202
83. Mphaho Mpheletshedzeni MAAA0380033 10102642 4843 Keiskama, Munsieville, EME Mphehoc161@gmail.com
Construction (Pty) Ltd 1GB PE Krugersdorp,1789
84. Best Project Solution (Pty) Ltd MAAA0581659 10261681 3207 Sipho Drive, EME Siphontuli87@gmail.com
1GB PE Kagiso2,1754 065 294 6875
85. Rospa Trading 221 MAAA0190054 10020919 32 Mocorn Street, Liwisham, EME Rospatrading221@gmail.com
2QS,1GB,1SB Mogale City,1740 082 880 5352
86. Letshego Pele Trading MAA0294313 10123944 323 Market Street, EME letshegopele@gmail.com
1GB,1EB,1ME Krugersdorp 071 412 3693
87. R Mothwa Trading (Pty) Ltd MAAA0166014 10007299 26 Garden Lodge, Ruben EME rmothwa@gmail.com
1GB,1CE,1SO Street, Mindalore,1739 083 609 3595
88. Kwena Ya Sebele Trading MAAA0166758 233385 1435 Heron Street, Ext1, EME israel@kwenayasebele.co.za
Enterprise 2GB,1CE Rietvallei,0174 081 706 4837
89. Startes Transport Service and MAAA0415448 10045028 109 Poswayo Street,Kagiso EME Africa.md@gmail.com
Trading and Projects 1GB,1PE 1,1754 083 402 1868
90. Mtetos Construction and MAAA05091187 235465 3248 42 Street,Ext EME Mtetos.construciton.@gmail.com
Project 1GB PE 2,Rietvallei 073 410 4885
91. Mbuwa Trading MAAA0163156 218309 599 Phaladi Str,Kagiso,1754 EME Mbuwa455@gmail.com
1GB,1CE,1SO, 081 364 8361/011 762 1496
92. Catherine Construction MAAA0754267 10197760 4614 6th Str,Rietvallei, 2 and EME ttshegang@hotmail.com
Project (Pty) Ltd 1GB,1 CE 3,Mogale City,1753 072 134 1862
93. Izinala Projects MAAA0291298 10138185 3801,Ext 2 Rietvallei EME izinalaproject@gmail.com
1GB PE 078 097 9382
94. Khomanani Trading and MAAA0662329 10171086 3474 ,Ext 2,Rietvallei EME Khomanani002@gmail.com
Projects Primary CO OP 1CE,1GB 083 398 8136
95. Lebaka Electrical MAAA0207799 213237 686 Egriet Str,Swaneville, EME pmosela@gmail.com
1EP PE Mogale City 076 730 3136
96. Special Hands Trading MAAA1047395 10265697 7400 Soll Moyo Str, EME Specialhands.nh@gmail.com
Enterprise (Pty)Ltd 1GB,1CE Swaneville, Mayibuye Ext 5 076 190 8654
97. Swim Trading and Projects MAAA1012149 04 Kagiso Avenue, Ext 6, EME swmanzini@gmail.com
Kagiso 2 083 731 2910
98. Nomayini Construction MAAA0540522 10076051 302 Mfolo North, Kumede EME sgnacenkosi@gmail.com
Maintenance and Distribution 1GB,1 SO Street, 081 707 8298
99. Pantwasibo Trading and 10224352 310 Italeni Avenue, EME Mntambopat.pm@gmail.com
Investments MAAA0701047 1GB 1CE Lindhaven Roodepoort,1724 061 065 2122
100. Emuna Family (Pty) Ltd MAAA0668749 10240440 16 Golban Turn, Kilini EME chirwavuyo@yahoo.com
1GB PE Estates, Radiokop, 083 643 1200
Roodepoort North
101. Rivoningo Steel Designs MAAA0176916 10022685 Hw11 Plot 307, Farm of EME nomhle@rivoningosteel.co.za
4GB PE Herkpoort,1739 082 411 1231
102. Ukhamba Quality Skills MAAA0284429 10072149 107 Ockerse Street, EME zandile@ukhabmbaskills.co.za
1GB Krugersdorp, 1739 082 051 5634
103. Phenyo Ho Thata MAAA0191901 10171052 816 Milton Crescent, EME Nwinter.rose@yahoo.com
1GB Grobler Park, 082 736 7074
Roodepoort,1724
104. Vuselani Business Enterprise MAAA0983144 105648 3 Buuren Str, Witpoortjie, EME buyimgaga@webmail.co.za
1GB,1EP,1SO Roodepoort 072 584 1281
105. NVM Enterprise (Pty) Ltd MAAA0802337 10148130 702 Haggard Str, EME Tmaseko48@gmail.com
1GB CE Groblerspark, 1724 082 821 7881
106. 2 Hype Sells (Pty) Ltd MAAA0087598 10123938 245 Kagiso Drive, Ext 2 EME Zolilepakade@gmail.com
1GB PE 1ME PE 082 963 2014
107. Brick and Trowels (Pty) Ltd MAAA0800078 182058 789 Marlow,Groblerpark Ext EME kwandisfiso@gmail.com
1GB CE PE 71,1723 079 079 1480
108. Mpikashe Trading Enterprise MAAA1070258 10273140 2915 Silwane Str, Kagiso EME mpikashelusanda@gmail.com
082 420 8496
109. DOT I General Construction MAAA075937 109475 Hillsview Section EME summer.thabo@gmail.com
and Services (Pty) Ltd 1GB,1SL 1CE Kagiso 2 1754 076 437 1999
110. 4CE PE 3 Voortrekker road, EME mervyn@emeka.co.za
Emeka civils (Pty) Ltd MAAA0387021 Mindalore North Cell - 0835479058
111. Neminc Solutions MAAA0596352 1GBPE Plot 15, Muldersdrift, N14 EME itumeleng@neminc.co.za
Road Cell: 0713543743
112. Mk Mogale Projects and MAAA 1GBPE 416 Monlshiwa street, EME wandilegqoba@icloud.com
trading (Pty) Ltd Munsieville, 1739 Cell: 0783957957
113. Lenka &Sons Projects MAAA0203346 3GBECSQ 10821 Zambezi Crescent, Ext EME Lenkasd04@gmail.com
6 Kagiso,1754 Cell: 0735310102
114. Barney Empire Trading and MAAA 1GB CE PO 41 Market street, EME Barney.matsheole@gmail.com
projects (pty) Ltd Kocksoord, Randfontein Cell 0671015190
1759
115. Mohau &Rebotsamang MAAA0900815 1CEGBME 2312 Orinico, Rietvallei, Ext QSE rebotsamangmasina@gmail.com
2 Mogale city 1754 Cell 0780221949
116. Perry Moswane Trading MAAA0524220 1CE 18 Human Street, EME Perrymcdonald7@gmail.com
Enterprise (Pty) Ltd kocksoord, Randfontein, 0744401122
1759
117. Perry Latif Trading MAAA 1CEGB 18 Human steet, Kocksoord, EME Perrymcdonald7@gmail.com
Enterprise(Pty) Ltd Randfontein, 1759 0744401122/ 0736499595
118. JTP Enterprise (Pty) Ltd MAAA 0463993 1CE 16506 Mountfletcher Street, EME jtpenterprisegroup@gmail.com
Kagiso Ext 12, 1754 0665975376
119. ANG Construction CC MAAA 0086585 1CEGB 66 Tinus De jongh, EME angcontruction@webmail.co.za
Randfontein , Greenhills, 0637924399
1759
120. TJK Enterprise (Pty) Ltd Plot 15 Heuningklip N14, kgomoanco@gmail.com
Krugersdorp 1739 0792607803
121. PM Thusanang Projects MAAA0605274 1CEGB 1381 Oupa mpheta street, EME portiamagare@gmail.co
Tshepisong phase 6, 0733978300/0712691472
122. Tsotello General and Projects MAAA0867402 2CE 1GB 11248 umfolozi street, EME Rikho2010@gmail.com,
kagiso 2 ext 6, 1754 tsotellognp@outlook.com
0833805448/0833805866
123. Western Eagles Construction MAAA0463994 1GB 1CE 16506 Mountfletcher Street EME zachariathamage@gmail.com
and projects Kagiso Ext 12,1754 0828269020
124. Segakweng Supplies and MAAA0485275 1GB PE 1482 Mangope drive, EME segakwengss@gmail.com
Services Munsieville 0823485029
125. Cradle hands Project (Pty) Ltd MAAA0627093 1GB PE 1516 Senoamore street, QSE Ramelamapula50@gmail.com
Kagiso, 1754 0731950356
126. Multi Family Enterprise (PTY) MAAA 1759 Mafaesa Street QSE mwmasibi@gmail.com
Ltd Munsieville, 1739 0743046380
127. Enjoy Construction (Pty) Ltd MAAA0854590 1CE 5551 Moilwa Street, Kagiso, EME tshepomerakeng@gmail.com
1754 0723166383
128. Bodutu Trading enterprise MAAA0849125 1GB PE 15794 Thababosiu street, EME bodututrading@gmail.com
Kagiso ext 12, 1754 0839804735
129. Padi and Sbo Projects MAAA0598156 1GB PE 1272 Phase 2 Chief Mogale, EME pstprojects@webmail.co.za
Kagiso,1754 0733398039/0810647178
130. Baitseyanape Construction MAAA0647074 1GB PE 7352 Sinqobile street, EME omojaki@gmail.com
and projects (Pty) Ltd Rietvallei ext5, 1754 0836184294/0783503005
131. Tshiphisi (Pty) Ltd MAAA1083964 1GB PE 16537 Mara Mahlaba street, EME Sinalofaith@outlook.com
Kagiso !754 0780904984
132. KG Air Conditioning MAAA0092908 2ME PE, 1GB 3509 Mothwa Street, EME info@kgairconditioning.co.za
PE, 1EB PE Munsieville, 0835159153
133. Oceans Ahead Holdings MAAA0436972 1CEPE, 1GBPE 114 Wateredge, Florida, EME alimphehle@gmail.com
1709 0726900135
134. Thandorah Trading (Pty) Ltd MAAA0937435 1GBPE, 1CEPE 11173 umfolozi street, QSE Lera2ruthoane@gmail.com
kagiso ext, 1754 0827016906
135. Tsholo Décor and Events(pty) MAAA0592443 5GB 4SQ 5CE 6 venter street, Dan EME lmogetswe@telkomsa.net
Ltd Pienaarville, 1739 0817514602
136. Lokwalo Trading Enterprise MAAA0098864 1CE,1GB,1SO 4 palmer street ext 1 Dan EME Lokwalo.te@gmail.com
(pty) Ltd Pienaarville, 1739 0817899855
137. Luneo Trading Enterprise (pty) MAAA0824669 1GB 1509 Sebenzisa street, EME luneotrading@gmail.com
Ltd Kagiso 2 central, 1754 0639602361
138. Orane Trading Enterprise (Pty) MAAA0101015 1GB 4 palmer street ext 1 Dan EME oranetrading@gmail.com
Ltd Pienaarville, Krugersdorp 0845933490
1739
139. Eno’s Trading and projects MAAA1016648 1GB, 1EP, 1EB 1332 Ngidi Street, QSE irrampane@gmail.com
(pty) Ltd Munsieville, 1739 0726274028
140. Mashudu and Sons Interprise MAAA0860599 311 3 Rietvallei Ext 2, EME Faithmudau79@gmail.com
(PTY) Ltd Mogale city, 1754 0786507878
141. Sakhi Sizwe Renovation And MAAA0730060 1EP PE 2867 Sila Drive, Kagiso, 1754 QSE giftzengele@gmail.com
projects 0782941778
142. Dikarabo tsarona Trading MAAA1002933 1GB 283 Kelebogile street, EME dorcasmokale@gmail.com
Magaliesburg, 1939 0832803717
143. Thusiso Trading Enterprise MAAA 2294 Phatudi street, Kagiso EME collentshukudu@gmail.com
(Pty) Ltd 1754 0744565151
144. Banna Ba Mohau (Pty) Ltd MAAA
145. Thusang Bagale Construction MAAA0988378 10249274 20110 15 Drakensberg Thusangbagale@gmail.com
and Mining 1GB Street, Kagiso Ext 13 0796960157
JBCC Edition 4.1 March 2005
The tenders, identified in the offer signature block, has examined the documents listed in the tenders
data and addenda thereto as listed in the returnable schedules, and by submitting this offer has accepted
the conditions of tender.
By the representative of the tenderer, deemed to be duly authorized, signing this part of this form of offer
and acceptance, the tenderer offers to perform all of the obligations and liabilities of the contractor under
the contract including compliance with all its terms and conditions according to their true intent and
meaning for an amount to be determined in accordance with the conditions of contract identified in the
contract data.
THE OFFERED TOTAL OF THE PRICES INCLUSIVE OF VALUE ADDED TAX IS:
.......................................................................................................................... Rand (in words);
R ............................................................................................................... (in figures)
This offer may be accepted by the employer by signing the acceptance part of this form of offer and
acceptance and returning one copy of this document to the tenderer before the end of the period of validity
stated in the tender data, whereupon the tenderer becomes the party named as the contractor in the
conditions of contract identified in the contract data.
Tender C1.1
Part C1: Agreements and Contract Data Page 1 of 3 Form of Offer and Acceptance
JBCC Edition 4.1 March 2005
Acceptance
By signing this part of this form of offer and acceptance, the employer identified below accepts the
tenderer's offer. In consideration thereof, the employer shall pay the contractor the amount due in
accordance with the conditions of contract identified in the contract data. Acceptance of the tenderer's
offer shall form an agreement between the employer and the tenderer upon the terms and conditions
contained in this agreement and in the contract that is the subject of this agreement.
Part C1: Agreements and Contract Data, (which includes this agreement)
Part C2: Pricing Data
Part C3: Scope of Work
Part C4: Site Information
and drawings and documents or parts thereof, which may be incorporated by reference into Parts C1 to C4
above.
Deviations from and amendments to the documents listed in the Tender data and any addenda thereto as
listed in the Tender schedules as well as any changes to the terms of the offer agreed by the tenderer and
the employer during this process of offer and acceptance, are contained in the schedule of deviations
attached to and forming part of this agreement. No amendments to or deviations from said documents are
valid unless contained in this schedule.
The tenderer shall within one week after receiving a letter of intent to award, including the schedule of
deviations (if any), contact the employer's contracts manager (whose details are given in the letter of intent)
to arrange the delivery of any bonds, guarantees, proof of insurance and any other documentation to be
provided in terms of the conditions of contract identified in the contract data. Failure to fulfill any of these
obligations in accordance with those terms shall constitute a repudiation of this agreement.
Notwithstanding anything contained herein, this agreement comes into effect on the date when the
tenderer receives one fully completed copy of the original document, including the schedule of deviations
(if any). Unless the tenderer (now contractor) within five working days of the date of such receipt notifies
the employer in writing of any reason why he cannot accept the contents of this agreement, this
agreement shall constitute a binding contract between the parties.
for the
employer Gauteng Department of Infrastructure Development
16th Floor
Corner House Building
Corner Commissioner and Sauer Streets
Marshalltown
Johannesburg
Tender C1.1
Part C1: Agreements and Contract Data Page 2 of 3 Form of Offer and Acceptance
JBCC Edition 4.1 March 2005
Schedule of Deviations
Notes
1 The extent of deviations from the tenders documents issued by the employer prior to the tenders
closing date is limited to those permitted in terms of the Conditions of tenders.
2 A tenderer's covering letter shall not be included in the final contract document. Should any matter
in such letter, which constitutes a deviation as aforesaid become the subject of agreements
reached during the process of offer and acceptance, the outcome of such agreement shall be
recorded here.
3 Any other matter arising from the process of offer and acceptance either as a confirmation,
clarification or change to the tenders documents and which it is agreed by the Parties becomes
an obligation of the contract.
4 Any change or addition to the tenders documents arising from the above agreements and recorded
here, shall also be incoporated into the final draft of the contract.
1 Subject …………………………………………………………………………………………………..
Details …………………………………………………………………………………………………..
…………………………………………………………………………………………………..
2 Subject …………………………………………………………………………………………………..
Details …………………………………………………………………………………………………..
…………………………………………………………………………………………………..
3 Subject …………………………………………………………………………………………………..
Details …………………………………………………………………………………………………..
…………………………………………………………………………………………………..
4 Subject …………………………………………………………………………………………………..
Details …………………………………………………………………………………………………..
…………………………………………………………………………………………………..
5 Subject …………………………………………………………………………………………………..
Details …………………………………………………………………………………………………..
…………………………………………………………………………………………………..
By the duly authorised representatives signing this agreement, the employer and the tenderer agree to and
accept the foregoing schedule of deviations as the only deviations from and amendments to the documents
listed in the Tender data and addenda thereto as listed in the Tender schedules, as well as any confirmation,
clarification or changes to the terms of the offer agreed by the tenderer and the employer during this
process of offer and acceptance.
It is expressly agreed that no other matter whether in writing, oral communication or implied during the
period between the issue of the Tender documents and the receipt by the tenderer of a completed signed
copy of this agreement shall have any meaning or effect in the contract between the parties arising from
this agreement.
Tender C1.1
Part C1: Agreements and Contract Data Page 3 of 3 Form of Offer and Acceptance
JBCC Edition 4.1 March 2005
The Conditions and Special Conditions of Contract for construction work are clauses 1 to 41 of the JBCC
Series 2000 Principal Building Agreement (Edition 4.1 of March 2005) published by the Joint Building
Contracts Committee with additions, deletions and alterations (SCC) as indicated in the Contract Data.
Copies of these conditions of contract may be obtained from the Association of South African Quantity
Surveyors (011-3154140), Master Builders Association (011-205-9000; 057-3526269) South African
Association of Consulting Engineers (011-4632022) or South African Institute of Architects (051-4474909;
011-4860684; 053-8312003;)
The JBCC Principal Building Agreement makes several references to the Contract Data for specific data,
which together with these conditions collectively describe the risks, liabilities and obligations of the
contracting parties and the procedures for the administration of the Contract. The Contract Data shall have
precedence in the interpretation of any ambiguity or inconsistency between it and the JBCC Principal
Building Agreement.
Each item of data given below is cross-referenced to the clause in the JBCC Principal Building Agreement
to which it mainly applies.
The additions, deletions and alterations to the JBCC Principal Agreement are:
TENDER C1.2
Part C1: Agreements and Contract Data Page 1 of 13 Contract Data
JBCC Edition 4.1 March 2005
CONTRACT DOCUMENTS means the Agreement and all documents referenced therein.
CONTRACT DRAWINGS means the drawings listed in the Scope of Work.
CONTRACT SUM means the total of prices in the Form of Offer and Acceptance.
SCHEDULE means the variables listed in the Contract Data.
CORRUPT PRACTICE means the offering, giving, receiving and soliciting of anything of value to
influence the action of a public official in the procurement process or in contract execution
FRAUDULENT PRACTICE means a mispresentation of facts in order to influence a procurement
process or the execution of a contract to the detriment of any tenderer, and includes collusive practice
among tenderers (prior to or after the tender submission) designed to establish tender prices at
artificial non-competitive levels and to deprive the tenderer of the benefits of free and open
competition.
INTEREST means the interest rates applicable to this contract, whether specifically indicated in the
relevant clauses or not, will be the rate as determined by the Minister of Finance, from time to time, in
terms of section 80(1)(b) of the Public Finance Management Act, 1999 (Act No. 1 of 1999).
SECURITY means the form of security provided by the employer or contractor, as stated in the
schedule, from which the contractor or employer may recover expense or loss.
1.6 Any notice given may be delivered by hand, sent by prepaid registered post or telefax. Notice shall be
presumed to have been duly given when:
Delete sub-clause 1.6.4
The contractor shall supply and keep a copy of the JBCC Series 2000 Principal Building Agreement
and Preliminaries applicable to this contract on the site, to which the employer, principal agent and
agents shall have access at all times.
3.10 Replace the second reference to “principal agent” with the word “employer”.
4 Clause 4.0 is deemed to be amended by the addition and omission of the following subclauses:
4.3 No clause
4.4 Where professional or other indemnity insurance is required this should form part of the procurement
document for the selected sub-contract. Appointment should be subjected to the preferred selected
sub-contractor providing the necessary insurances.
5.1.2 Under clause 41 – this claue is amended to include clauses 32.6.3; 34.3; 34.4 and 38.5.8 in terms
of which the employer has retained its authority and has not given a mandate to the principal agent and
in terms of which the employer shall sign all documents.
TENDER C1.2
Part C1: Agreements and Contract Data Page 2 of 13 Contract Data
Clause 9.0 is amended by adding sub-clause 9.1.4: JBCC Edition 4.1 March 2005
9
The contractor indemnifies and holds harmless the employer against all liability, losses, claims,
damages, penalties, actions, proceedings or judgments (collectively referred to as “Losses”) arising
from any infringement of letters, patent design, trademark, name, copyright or other protected rights in
respect of any machine, plant, work, materials, thing, system or method of using, fixing, working or
arrangement used or fixed or supplied by the contractor, but such indemnity shall not cover any use of
the equipment of part thereof otherwise than in accordance with the provisions of the specification. All
payments and royalties payable in one sum or by installments or otherwise shall be included by the
contractor in the price and shall be paid by him to those to whom they may be payable. The contractor
shall reimburse the employer for all legal and other costs and expenses, including without limitation
attorney’s fees on attorney-client scale incurred by the employer in connection with investigation,
defending or settling any Losses in connection with pending or threatening litigation in which the
employer is a party.
(a) Without any way limiting the contractor’s obligations in terms of the contract, the contractor shall
bear the full risk of damage to and/or destruction of the works by whatever cause during
construction of the works and hereby indemnifies and holds harmless the employer against any
such damage. The contractor shall take such precautions and security measures and other
steps for the protection and security of the works as the contractor may deem necessary.
(b) The contractor shall at all times proceed immediately to remove or dispose of any debris arising
from damage or destruction of the works and to rebuild, restore, replace and/or repair the works.
(c) The employer shall carry the risk of damage to or destruction of the works and materials paid for
by the employer that is the result of the expected risks as set out in sub-clause10.6.
(d) Where the employer bears the risk in terms of this contract, the contractor shall, if requested to
do so, reinstate any damage or destroyed portions of the works and the costs of such
reinstatement shall be measured and valued in terms of clause 32.0 hereof.
(a) The contractor shall be liable for and hereby indemnifies the employer against any liability, loss,
claim or proceeding whether arising in common law or by statute, consequent upon personal
injuries to or the death of any person whomsoever arising out of or in the course of or caused by
the execution of the works unless due to any act or negligence of any person for whose actions
the employer is legally liable.
(b) The contractor shall be liable for and hereby indemnifies the employer against any liability, loss,
claim or proceeding consequent upon loss of or damage or to any moveable, or immoveable
property or personal property or property contiguous to the site, whether belonging to or under the
control of the employer or any other body or person, arising out of or in the course of or by reason
of the execution of the works unless due to any act or negligence of any person for whose actions
the employer is legally liable.
TENDER C1.2
Part C1: Agreements and Contract Data Page 3 of 13 Contract Data
JBCC Edition 4.1 March 2005
10.6 (c) The contractor shall upon receiving a contract instruction from the principal agent cause the
same to be made good in a perfect and workmanlike manner at his own cost and in default thereof
the employer shall be entitled to cause it to be made good and to recover the cost therefore from
the contractor or to deduct the same from amounts due to the contractor.
(d) The contractor shall be responsible for the protection and safety of such portions of the premises
placed under his control by the employer for the purpose of executing the works until the issue of
the certificate of practical completion.
(e) Where the execution of the works involves the risk of removal of or interference with support to
adjoining properties including land or structures or any structures to be altered or added to, the
contractor shall obtain adequate insurance and will remain adequately insured or insured to the
specific limit stated in the contract against the death of or injury to persons or damage to such
property consequent on such removal or interference with the support until such portion of the
works has been completed.
(f) The contractor shall at all times proceed immediately at his own cost to remove or dispose of any
debris and to rebuild, restore, replace and / or repair such property and to execute the works.
In the event of the project being executed in a geological area classified as a “High Risk Area”, that
is an area which is subject to highly unstable subsurface conditions which might result in catastrophic
ground movement evident by sinkhole or doline formation the following will apply:
The contractor shall, from the commencement date of the works until the date of the certificate of
practical completion, bear the full risk of and hereby indemnifies and hold harmless the employer
against any damage to and/or destruction of the works consequent upon a catastrophic ground
movement as mentioned above. The contractor shall take such precautions and security measures
and other steps for the protection of the works as he may deem necessary.
When so instructed to do so by the principal agent, the contractor shall proceed immediately to
remove and/or dispose of any debris arising from damage to or destruction of the works and to rebuild,
replace and/or repair the works, at the contractor’s own costs.
The contractor shall be liable for and hereby indemnifies and holds harmless the employer against any
liability, loss, claim or proceeding arising at any time during the period of the contract whether arising
in common law or by statute, consequent upon personal injuries to or the death of any person
whomsoever resulting from, arising out of or caused by a catastrophic ground movement as mentioned
above. The contractor shall be liable for and hereby indemnifies the employer against any and all
liability, loss, claim or proceeding consequent upon loss of or damage to any moveable, or immovable
property or property contiguous to the site, whether belonging to or under the control of the employer
or any other body or person whomsoever arising out of or caused by a catastrophic ground movement,
as mentioned above, which occurred during the period of construction.
TENDER C1.2
Part C1: Agreements and Contract Data Page 4 of 13 Contract Data
JBCC Edition 4.1 March 2005
10.7.3 It is the responsibility of the contractor to ensure that he has adequate insurance to cover his risk and
liability as mentioned in 10.7.1 and 10.7.2. Without limiting the contractor’s obligations in terms of the
contract, the contractor shall, within twenty one (21) calendar days of the commencement date but
before commencement of the works submit to the employer proof of such insurance policy, if requested
to do so.
10.7.4 The employer shall be entitled to recover any and all losses and/or damages of whatever nature
suffered or incurred subsequent upon the contractor’s default of his obligations as set out in
sub-clauses10.7.1, 10.7.2 and 10.7.3. Such losses or damages may be recovered from the contractor
or by deducting the same from any amounts still due under this contract or under any other contract
presently or hereafter existing between the employer and the contractor and for this purpose all these
contracts shall be considered on indivisible whole.
14.7.1 Sub-clause 14.7.1 is deemed to be amended by the addition of the following sentence:
In the event that the value of the works (excluding adjustments in terms of the CPAP) were to increase
by an amount of 15% or more of the contract sum, upon written request from the principal agent, the
contractor shall immediately arrange to have the construction guarantee "guaranteed sum" increased
accordingly, the verified cost of which shall be added to the contract value.
An acceptable health and safety plan, required in terms of the Occupational Health and Safety Act, 1993
(Act 85 of 1993), the construction guarantee and the insurances within ten (10) calendar days and
prior to the commencement date
“Give the contractor possession of the site only after the contractor complied with the terms of subclause
15.1.4 and any other requirements as indicated in the Schedule Clause 42.2.5"
The contractor shall notify the principal agent if any encroachments of adjoining foundations,
buildings, structures, pavements, boundaries, etc. exist in order that the necessary arrangements may be made for the rectification of
any such encroachments
21 Replace sub-clauses 21.1.2 to 21.1.4 and 21.2 to 21.6 with the following:
The contractor and principal agent shall appoint a selected subcontractor in accordance with the
provisions of the Scope of Work.
The contractor shall attend to defects during the works completion and defects liability periods on a
progressive basis, to the satisfaction of the principal agent and will not be permitted to wait until the end
of the works completion or defects liability period or until the amount of defects accumulate in order to
attend to a comprehensive list of defects.”
TENDER C1.2
Part C1: Agreements and Contract Data Page 5 of 13 Contract Data
JBCC Edition 4.1 March 2005
“All civil, electrical, electronic, HVAC, fire detection, gas suppression and other specialist installations
are subject to a three hundred and sixty five (365) calendar days defects liability and maintenance
period.
The contractor shall attend to defects during the works completion and defects liability periods on a
progressive basis, to the satisfaction of the principal agent and will not be permitted to wait until the end
of the works completion or defects liability period or until the amount of defects accumulate in order to
attend to a comprehensive list of defects.”
28 Clause 28:
Sub-clause 29.9
“Revision to the date for practical completion shall only be considered when work on the critical
path of the agreed programme for the works is delayed.”
Sub-clause 29.10.1
“Irrespective of whether or not the principal agent rules that the contractor is entitled to an
extension of time or a revision of the date for practical completion, the principal agent shall
nevertheless, at any time, be entitled to instruct the contractor in writing to accelerate the
progress of the remaining works to ensure that the works are completed by the original date for
practical completion or revised date as the case may be.”
Sub-clause 29.10.2
“Upon receipt of such instruction, the contractor shall take all necessary steps to ensure that the
works are completed timeously including the provision by him of additional resources, plant,
manpower, etc and the working overtime or additional overtime beyond that contemplated at the
time of tender (at all times adhering to the regulations and requirements of all authorities) and by
all other adequate and proper means and methods. The contractor shall prove that such steps
are being taken if called upon to do so.”
Sub-clause 29.10.3
“The contractor’s entitlement to compensation arising out of or in respect of any revision to the
date for practical completion that may have been granted by the principal agent or
alternatively where the principal agent has instructed the contractor to accelerate, shall be
adjudicated strictly in terms of clause 32.”
31 Notwithstanding this or any other clause, materials and goods stored off site shall not be included in the
amount authorized for payment.
TENDER C1.2
Part C1: Agreements and Contract Data Page 6 of 13 Contract Data
JBCC Edition 4.1 March 2005
31.9 The first sentence of sub-clause 31.9 is deemed to be deleted and replaced with the following:
The employer shall pay the contractor the amount certified within thirty (30) calendar days of the date
of issue of the payment certificate.
“Payment shall be subject to the employer giving the contractor a tax invoice for the amount due.”.
32.5.1 Sub-clause 32.5.1, 32.5.4 and 32.5.7 is amended by the addition of the following at the end of the
sentence:
32.6.1 Sub-clause 32.6.1 is amended by the omission of the following words at the end of the sentence "once
these can be quantified" and replaced by "within twenty (20) working days from date of receipt of
notification by the principal agent".
33.2.9 The contractor's failure or neglect to commence with the works on the dates prescribed in the
contract.
33.2.10 The contractor's failure or neglect to proceed with the works in terms of the contract.
33.2.11 The contractor's failure or neglect for any reason to complete the works in accordance with
the contract.
33.2.12 The contractor's refusal or neglect to comply strictly with any of the conditions of contract or
any contract instructions and/or orders in writing given in terms of the contract.
33.2.13 The contractor's estate being sequestrated or surrendered in terms of the Insolvency laws in
force within the Republic of South Africa."
TENDER C1.2
Part C1: Agreements and Contract Data Page 7 of 13 Contract Data
JBCC Edition 4.1 March 2005
34.10 The first sentence of Clause 34.10 is deemed to be deleted and replaced with the following:
The employer shall pay to the contractor the amount certified for payment in the final payment
certificate within thirty (30) calendar days of the date issue of the final payment certificate, subject to
the contractor giving the employer a tax invoice for the amount due.
34.13 Clause 34.13 is amended by deleting the words "subject to the employer giving the contractor a tax
invoice for the amount due". Also replace "seven (7) calendar days" with "twenty one (21) calender
days".
36.1 Add the following sub-clauses 36.1.3 to 36.1.5 under 36.1 to read as follows:
36.1.3 The contractor’s refusal or neglect to comply strictly with any of the conditions of contract.
36.1.4 The contractor’s estate being sequestrated, liquidated or surrendered in terms of the insolvency laws in
force with the Republic of South Africa.
36.1.5 The contractor, in the judgment of the employer, has engaged in corrupt or fraudulent practices in
competing for or in executing the contract.
The employer may give notice of cancellation should the contractor remain in default for ten (10)
working days after the date of of issue of such a notice of default
37.3.5 Replace “ninety (90)” with “one hundred and twenty (120)”.
39.3.5 Add the following words at the end thereof: “within one hundred and twenty (120) working days of
completion of such a report.”
41.0 Add in the Substitute Provisions (41.0 State Clauses) as clauses 36.7, 37.5 and 39.5, the following:
Notwithstanding any clause to the contrary, on cancellation of this agreement either by the employer or
the contractor, or for any reason whatsoever, the contractor shall on written instruction, discontinue with
the works on a stated date and withdraw himself from the site. The contractor shall not be entitled to
refuse to withdraw from the works on the grounds of any lien or right of retention or on the grounds of
any other right whatsoever.
40.2.2 Sub-clause 40.2.2 is amended by replacing "one (1) year "with three (3) years"
41.1 Delete in the Substitute Provisions (41.0 State Clauses) sub-clauses 40.2.1, 40.2.2, and clauses 40.3,
40.4, 40.5 and 40.6 and replace with the following:
40.3 Should either party be dissatisfied with the decision given by the adjudicator, dispute shall be
finally settled by court proceedings. Neither party shall have recourse to arbitration should they
be dissatisfied with the decision given by the adjudicator as all disputes will be decided by a
court of law.
TENDER C1.2
Part C1: Agreements and Contract Data Page 8 of 13 Contract Data
JBCC Edition 4.1 March 2005
CONTRACT VARIABLS
THE SCHEDULE
The address of the Employer is: Corner Commissioner and Pixley Ka Isaka Seme (Sauer Street) Marshalltown
42.1.2 The Principal Agent is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
41.1.3 Agent (1) is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
TENDER C1.2
Part C1: Agreements and Contract Data Page 9 of 13 Contract Data
JBCC Edition 4.1 March 2005
41.1.4 Agent (2) is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
41.1.5 Agent (3) is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
41.1.6 Agent (4) is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
TENDER C1.2
Part C1: Agreements and Contract Data Page 10 of 13 Contract Data
JBCC Edition 4.1 March 2005
41.1.7 Agent (5) is: (details to be provided after the award of tender)
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
42.2.3 The Works or installations to be undertaken by direct contractors comprises: Furniture and Fittings
(1) The interest rate as determined by the Minister of Finance, from time to time, in terms of
section 80(1)(b) of the Public Finance Management Act, 1999 (Act No 1 of 1999) will apply
(5) Extended defects liability period will apply to the following elements:
* Electrical Services
* Mechanical Services
* Wet Services
* Fire Services
* Health Technology
42.2.5 Possession of the site is to be given to the contractor within ten (10) working days of the formal signing of this agreement.
42.2.6 The period for the commencement of the works after the contractor takes possession of the site is (10) working days
The date for practical completion is : 36 months after date of site handover
The penalty per calendar day is 1c per R100 of the contract value
OR
TENDER C1.2
Part C1: Agreements and Contract Data Page 11 of 13 Contract Data
JBCC Edition 4.1 March 2005
42.2.9 The law applicable to the agreement shall be that of The Republic of South Africa
42,3 Insurances
42.3.1 Contract insurance is to be effected by the contractor.
Contract works insurance is to be effected by the contractor for a sum not less than the contract sum
plus 10% with a deductible amount of R10 000-00.
42.3.2 Supplementary insurance is required. Such insurance shall comprise a Coupon Policy for Special
Risks issued by the South African Special Risk Insurance Association.
SASRIA Insurance will be effected by the contractor to the contract sum + 10%
42.3.3 Public liability insurance to be effected by the contractor for an amount of R 10,000,000.00 with a
deductible amount of R 10,000.00
42.3.4 Support insurance to be effected by the contractor for the sum is not applicable
42,4 DOCUMENTS
42.4.1 A waiver of the contractor’s lien or right of continuing possession is required. YES
42.4.2 Two (2) copies of the construction document are to be supplied to the contractor free of charge.
42.4.3 Bills of quantities/Lump sum documents schedule of rates drawn up in accordance with : Refer to Part C2.1 Pricing Instructions
42.4.4 On acceptance of the tender the Bills of quantities/Lump sum document is to be submitted. N/A
42.4.5 JBCC Engineering General Conditions are to be included in the contract document. NO
42.4.6 The contract value is to be adjusted using CPAP indices. N/A
Where CPAP is to be used,the base month for the application of CPAP is the month of the closing of the tender and no alternative indices
are applicable
42.4.7 Details of changes made to the provisions of JBCC standard documentation: Refer to Part C1.2
TENDER C1.2
Part C1: Agreements and Contract Data Page 12 of 13 Contract Data
JBCC Edition 4.1 March 2005
Telephone: ……………………………………………………..
Facsimile: ……………………………………………………..
Physical Address: ……………………………………………………..
……………………………………………………..
……………………………………………………..
Code: ……………………………………………………..
42.5.3 The latest day of the month for the issue of an interim payment certificate is : …...............................................
42.5.6 The payment guarantee to be effected by the employer for the amount of ; ….........................................................
42.5.8 The annual building holiday period after the commencement of the construction period:
42,5 DOCUMENTS
TENDER C1.2
Part C1: Agreements and Contract Data Page 13 of 13 Contract Data
Department of Public Works
Effective Date:April 2017
Version: 3
Physical Address:
"Contractor" means:
"Works" means:
"Site" means:
Name of Signatory
"Contract" means: The Agreement made in terms of the Form of Offer and Acceptance and such
amendments or additions to the Contract as may be agreed in writing between the
parties.
"Contract Sum" means: The accepted amount inclusive of tax of: ZAR
Amount in Words:
"Guaranteed Sum" means: The maximum aggregate amount of: 10% ZAR
Of Contract Sum
Page 1 of 4
Department of Public Works
Effective Date:April 2017
Version: 3
Amount in Words:
JBCC® format Interim Payment Certificates, the Final Payment Certificate, the Certificate
Principal Agent Issues:
of Practical Completion and the Certificate of Final Completion
1.1 Where a Guarantee for Construction (Variable) in terms of the Agreement has been selected this clause 1.0 and 3.0 to 13.0 shall
apply. The Guarantor’s liability shall be limited to the diminishing amounts of the Guaranteed Sum as follows:-- ‐
ZAR
Amount in words
1.1.2 Reducing to the Guaranteed Sum (not exceeding 6.0 % of the From and including the day after the date of the aforesaid
contract sum) in the amount of: interim payment certificate and up to and including the
date of issue of the only Certificate of Practical Completion
or last Certificate of Practical
Completion where there are sections.
ZAR
Amount in words
1.1.3 Reducing to the Guaranteed Sum (not exceeding 4.0% of the From and including the day after the date of the applicable
contract sum) in the amount of: Certificate of Practical Completion and up to and including
the date of issue of the only Certificate of Final Completion
or the last Certificate of Final Completion where there are
sections.
ZAR
Amount in words
1.1.4 Reducing to the Guaranteed Sum (not exceeding 2.0% of the From and including the day after the date of the applicable
contract sum) in the amount of: Certificate of Final Completion and up to and including the
date of issue of the Final Payment Certificate where
payment is due to the Contractor, whereafter this
ZAR Guarantee for Construction shall expire. Where the Final
Payment Certificate reflects payment due to the Employer
this Guarantee for Construction shall expire upon payment
of the full amount certified.
Amount in words
1.2 The Guarantor's liability limits set out in 1.1.1 to 1.1.4 shall apply in respect of any claim received by the Guarantor during the Security
validity
Page 2 of 4
Department of Public Works
Effective Date:April 2017
Version: 3
2.1 Where a Guarantee for Construction (Fixed) in terms of the Agreement has been selected this clause 2.0 and 3.0 to 13.0 shall apply.
The Guarantor’s liability shall be limited to the amount of the Guaranteed Sum as follows:--‐
ZAR
Amount in words
3.1 Any reference in this Performance Guarantee to the Contract is made for the purpose of convenience and shall not be construed as
any intention whatsoever to create an accessory obligation or any intention whatsoever to create a suretyship;
3.2 its obligation under the Performance Guarantee is restricted to the payment of money.
3.3 Reference to a recovery statement or an Interim or Final Payment Certificate, or a Certificate(s) of Practical or Final Completion shall
mean such certificate issued by the Principal Agent.
4.0 Subject to the Guarantor’s maximum liability referred to in clauses 1.0 or 2.0, the Guarantor undertakes to pay the Employer the sum
certified on receipt of the documents identified in 4.1 to 4.3:--‐
4.1 A copy of a first written demand notice issued by the Employer to the Contractor stating that payment of a sum certified by the Principal
Agent in an interim or Final Payment Certificate has not been made in terms of the Agreement and failing such Payment within seven
(7) calendar days, the Employer intends to call upon the Guarantor to make payment in terms of 4.2.
4.2 A first written demand notice issued by the Employer to the Guarantor at the Guarantor’s physical address with a copy to the
Contractor stating that a period of seven (7) calendar days has elapsed since the issue of the first written demand notice in terms of
4.1 and that the sum certified has not been paid to date. The Employer herewith calls up this Guarantee for Construction and demands
payment of the sum certified from the Guarantor.
4.3 A copy of the applicable payment advice which entitles the Employer to receive payment in terms of the Agreement of the sum
certified in 4.0.
5.0 Subject to the Guarantor’s maximum liability referred to in 1.0 or 2.0 , the Guarantor undertakes to pay the Employer the Guaranteed
Sum or the full outstanding balance upon receipt of a first written demand notice from the Employer to the Guarantor at the Guarantor's
physical address calling up this Guarantee for Construction stating that:--‐
5.1 The Agreement has been terminated due to the Contractor's default and that the Security for Construction is called up in terms of 5.0.
The demand notice shall enclose a copy of the notice of termination; or
5.2 A provisional sequestration or liquidation court order has been granted against the Contractor and that the Guarantee for
Construction is called up in terms of 5.0. The demand notice shall enclose a copy of the court order.
6.0 The aggregate amount of payment to be made by the Guarantor in terms of 4.0 and 5.0 shall not exceed the Guarantor's maximum
liability in terms of 1.0 or 2.0.
7.0 Where the Guarantor is a registered insurer and has made payment in terms of 5.0, the Employer shall within one hundred and eighty
(180) calendar days of receipt of payment submit an expense account to the Guarantor showing how all monies received in terms of
the Guarantee for Construction have been expended, or will be expended, and shall refund to the Guarantor any surplus amount. All
monies refunded to the Guarantor in terms of this Guarantee for Construction shall bear interest at the prime overdraft rate of the
Employer’s bank compounded monthly and calculated from the date of payment by the Guarantor to the Employer until the date of
refund.
8.0 Payment by the Guarantor in terms of 4.0 or 5.0 shall be made within seven (7) calendar days upon receipt of the first written demand
notice to the Guarantor.
9.0 The Employer shall have the absolute right to arrange his affairs with the Contractor in any manner which the Employer deems fit and
the Guarantor shall not have the right to claim his release from this Guarantee for Construction on account of any conduct alleged to
be prejudicial to the Guarantor.
10.0 The Guarantor chooses the physical address stated above for all transactions in relation to this security.
Page 3 of 4
Department of Public Works
Effective Date:April 2017
Version: 3
11.0 This Guarantee for Construction is neither negotiable nor transferable and shall expire in terms of either 1.1.4 or 2.1, or on payment in
full of the Guaranteed Sum or on the Security expiry date, whichever is the earlier, where after no claims will be considered by the
Guarantor. The original Guarantee for Construction form shall be returned to the Guarantor after it has expired.
12.0 This Guarantee for Construction, with the required demand notices in terms of 4.0 or 5.0, shall be regarded as a liquid document for
the purpose of obtaining a court order.
13.0 Where this Guarantee for Construction is issued in the Republic of South Africa the Guarantor hereby consents to the jurisdiction of a
court in the area where the project is located.
Date
Signed at
Page 4 of 4
JBCC Edition 4.1 March 2005
a) Civil Engineering work has been drawn up in accordance with the provisions of the latest edition of SABS
1200 Standardised Specifications for Civil Engineering Works.
b) Mechanical Work has been drawn up in accordance with the provisions of the Model Bill of Quantities for
Mechanical Work, published by the South African Association of Quantity Surveyors (February 2006).
c) Electrical Work has been drawn up in accordance with the provisions of the Model Bill of Quantities for
Electrical Work, published by the South African Association of Quantity Surveyors (February 2006).
2 The agreement is based on the JBCC Principal Agreement (version 4.1). The additions, deletions and alterations
to the JBCC PBA as well as the contract specific variables are as stated in the Contract Data. Only the headings
and clause numbers for which allowance must be made in the Bill of Quantities are recited.
3 It will be assumed that prices included in the Bill of Quantities, unless otherwise stated in the Scope of Work, are
based on Acts, Ordinances, Regulations, By-laws, International Standards and National Standards that were
published before the closing date for tenders. (Refer to www.stanza.org.za or www.iso.org for information on
standards).
4 The drawings listed in the Scope of Works used for the setting up of this Bill of Quantities are kept by the Project
Manager and can be viewed at any time during office hours up until the completion of the works.
5 Reference to any particular trademark, name, patent, design, type, specific origin or producer is purely to
establish a standard for requirements. Products or articles of an equivalent standard may be substituted.
6 Where any item is not relevant to this specific contract, such item is marked not applicable.
7 The Contract Data and the standard form of contract referenced therein must be studied for the full extent and
meaning of each and every clause set out in Section 1 (Preliminaries) of the Bill of Quantities .
8 The Bill of Quantities is not intended for the ordering of materials. Any ordering of materials, based on the Bill of
Quantities, is at the Contractor’s risk.
Tender C2.1
Part C2: Pricing data Page 1 of 2 Pricing Instructions
JBCC Edition 4.1 March 2005
9 The amount of the Preliminaries to be included in each monthly payment certificate shall be assessed as an
amount prorated to the value of the work duly executed in the same ratio as the preliminaries bears to the total of
prices excluding any contingency sum, the amount for the Preliminaries and any amount in respect of contract
price adjustment provided for in the contract.
10 Where the initial contract period is extended, the monthly charge shall be calculated on the basis as set out in 9
but taking into account the revised period for completing the works.
11 The amount or the items of the Preliminaries shall be adjusted to take account of the theoretical financial effect
which changes in time or value (or both) have on this section. Such adjustments shall be based on adjustments
in the following categories as recorded in the Bill of Quantities:
b) an amount which is to be varied in proportion to the contract value, namely Value Related;
and
c) an amount which is to be varied in proportion to the construction period as compared to the initial
construction period excluding revisions to the construction period for which the contractor is not entitled to
adjustment in terms of the contract, namely Time Related.
12 Where no provision is made in the Bill of Quantities to indicate which of the three categories in 11 apply or where
no selection is made, the adjustments shall be based on the following breakdown:
a) 10 percent is Fixed;
13 The adjustment of the Preliminaries shall apply notwithstanding the actual employment of resources in the
execution of the works. The contract value used for the adjustment of the Preliminaries shall exclude any
contingency sum, the amount for the Preliminaries and any amount in respect of contract price adjustment
provided for in the contract. Adjustments in respect of any staged or sectional completion shall be prorated to the
value of each section.
14 Those parts of the contract to be constructed using labour intensive methods have been marked in the Bill of
Quantities with the letters LI in a separate column filled in against every item so designated. The works, or parts
of the works so designated are to be constructed using labour intensive methods only. The use of plant to
provide such works, other than plant specifically provided for in the Scope of Work, is a variation to the contract.
The items marked with the letters LI are not necessarily an exhaustive list of all the activities which must be done
by hand, and this clause does not over-ride any of the requirements in the generic labour intensive specification
in the Scope of Work
15 Payment for items which are designated to be constructed labour intensively (either in this schedule or in the
Scope of Work) will not be made unless they are constructed using labour intensive methods. Any unauthorised
use of plant to carry out work which was to be done labour intensively will not be condoned and any works so
constructed will not be certified for payment
Tender C2.1
Part C2: Pricing data Page 2 of 2 Pricing Instructions
PART C2.2
PROVISIONAL BILLS
OF QUANTITIES
PART A
BUILDERS'WORK
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 1
BILL No. 1
PRELIMINARIES NOTES
PREAMBLES
SUPPLEMENTARY PREAMBLES
Notes
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-1-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Municipal Regulations
Hoarding
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-2-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Disturbances
PROJECT SPECIFICATION
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-3-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-4-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
- Installation of furniture
- Installation of medical equipment
PRICING OF PRELIMINARIES
1 Clause 1.0
F:.............................. V:.............................
T:............................. Item
2 Clause 2.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-5-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
3 Clause 3.0
F:.............................. V:.............................
T:............................. Item
4 Clause 4.0
F:.............................. V:.............................
T:............................. Item
5 Clause 5.0
F:.............................. V:.............................
T:............................. Item
6 Clause 6.0
F:.............................. V:.............................
T:............................. Item
7 Clause 7.0
F:.............................. V:.............................
T:............................. Item
8 Clause 8.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-6-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
INDEMNITIES (A9)
9 Clause 9.0
F:.............................. V:.............................
T:............................. Item
INSURANCES (A10)
10 Clause 10.0
F:.............................. V:.............................
T:............................. Item
SECURITY (A11)
11 Clause 11.0
F:.............................. V:.............................
T:............................. Item
EXECUTION
12 Clause 12.0
F:.............................. V:.............................
T:............................. Item
13 Clause 13.0
F:.............................. V:.............................
T:............................. Item
14 Clause 14.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-7-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
15 Clause 15.0
F:.............................. V:.............................
T:............................. Item
16 Clause 16.0
F:.............................. V:.............................
T:............................. Item
17 Clause 17.0
F:.............................. V:.............................
T:............................. Item
COMPLETION
18 Clause 18.0
F:.............................. V:.............................
T:............................. Item
Clause 19.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-8-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
20 Clause 20.0
F:.............................. V:.............................
T:............................. Item
21 Clause 21.0
F:.............................. V:.............................
T:............................. Item
22 Clause 22.0
F:.............................. V:.............................
T:............................. Item
23 Clause 23.0
F:.............................. V:.............................
T:............................. Item
24 Clause 24.0
F:.............................. V:.............................
T:............................. Item
PAYMENT
PAYMENT (A25)
25 Clause 25.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-9-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
26 Clause 26.0
F:.............................. V:.............................
T:............................. Item
27 Clause 27.0
F:.............................. V:.............................
T:............................. Item
28 Clause 28.0
F:.............................. V:.............................
T:............................. Item
29 Clause 28.0
F:.............................. V:.............................
T:............................. Item
TERMINATION (A29)
30 Clause 29.0
F:.............................. V:.............................
T:............................. Item
31 Clause 30.0
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-10-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
AGREEMENT
32 Clause 31.0
F:.............................. V:.............................
T:............................. Item
CONTRACT DETAILS
Works Description:
Site Description:
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-11-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
· Section 1- Decanting
Date- 6 months after site handover
Penalty per day- 1c per R100 of the contract
value
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-12-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
INSURANCES
Management of Water
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-13-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
DOCUMENT
N/A
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-14-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SECTION B: PRELIMINARIES
F:.............................. V:.............................
T:............................. Item
Documents (B2)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-15-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-16-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-17-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-18-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
67 Advertising (B6.3)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-19-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
71 Location (B7.1)
F:.............................. V:.............................
T:............................. Item
72 Water (B7.2)
Alternative A
F:.............................. V:.............................
T:............................. Item
73 Electricity (B7.3)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-20-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-21-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
General (B11)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-22-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
90 Disturbance (B11.5)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
92 Vermin (B11.7)
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-23-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-24-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-25-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-26-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
No
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-27-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
99 CONTRACT DOCUMENTS
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-28-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:.............................
Item
F:.............................. V:.............................
T:.............................
Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-29-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................ Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-30-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
105 GUARANTEE
Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-31-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
107 SAMPLES
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-32-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
109 OVERTIME
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:.............................
Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-33-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
EMPLOYMENT TARGETS
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-34-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-35-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-36-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
RECORD KEEPING
119 Every employer must keep in the project site office the
following minutes of site progress minutes; contractors’
monthly site progress reports; accurately recorded
attendance register; proof of payment as means to verify
authenticity of data in the EPWP Participants form
submitted with payment certificates. Copies of submitted
EPWP Participants data forms should also be kept in
the site office. A project file should be kept consisting of
data as per the EPWP project file check list.
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-37-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-38-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
EPWP PROMOTION
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-39-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
The Contractor shall allow for and pay any and all costs
necessary for the engagement of the services of a
Community Liaison Officer (CLO) for the full duration of
this contract
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-40-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-41-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-42-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-43-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
CO-ORDINATION
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-44-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
ATTENDANCE
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-45-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Note:
F:.............................. V:.............................
T:............................. Item
UIF
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-46-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
COIDA
F:.............................. V:.............................
T:............................. Item
Note:
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-47-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-48-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:.............................
Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-49-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:.............................
Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-50-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:.............................
Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-51-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-52-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
152 The contractor shall take delivery of, handle, store, use
apply and/or fix all proprietary branded products in strict
accordance with the manufacturers' instruction after
consultation with the manufacturer's authorised
representative.
F:.............................. V:.............................
T:............................. Item
OVERTIME
F:.............................. V:.............................
T:............................. Item
AS BUILT DRAWINGS
F:.............................. V:.............................
T:............................. Item
SITE INSTRUCTIONS
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-53-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LABOUR RECORDS
156 At the end of each week the contractor shall provide the
Principal Agent with a written record, in schedule form,
reflecting the number and description of tradesmen and
labourers employed by him and all sub-contractors on
the works each day.
F:.............................. V:.............................
T:............................. Item
PLANT RECORD
157 At the end of each week the contractor shall provide the
Principal Agent with a written record, in schedule form,
reflecting the number, type and capacity of all plant,
excluding hand tools, currently used on the works.
F:.............................. V:.............................
T:............................. Item
158 The contractor shall not cede nor assign his rights or
claims to any monies due or to become due under this
contract.
F:.............................. V:.............................
T:............................. Item
SECTIONAL COMPLETION
F:.............................. V:.............................
T:............................. Item
Carried Forward R
Section No. 1
Bill No. 1
Preliminaries
BILL OF QUANTITIES
-54-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
F:.............................. V:.............................
T:............................. Item
LOCAL LABOUR
F:.............................. V:.............................
T:............................. Item
-55-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 1
DEMOLITIONS AND ALTERATIONS
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-56-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Disposal of debris
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-57-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-58-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-59-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-60-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-61-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
BUILDING UP OPENINGS
Brickwork in NFP bricks in class II mortar in
building up openings
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-62-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-63-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 1
Demolitions and Alternations
BILL OF QUANTITIES
-64-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-65-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 2
EARTHWORKS
PREAMBLES
SUPPLEMENTARY PREAMBLES
Nature of ground
Carried Forward R
Section No. 2
Bill No. 2
Earthworks
BILL OF QUANTITIES
-66-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 2
Earthworks
BILL OF QUANTITIES
-67-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
1 Trenches m3 775
B:0 E:0 F:0 G:0
H : 717 I : 58 N:0
2 Holes m3 61
B:0 E:0 F:0 G:0
H:0 I : 61 N:0
3 Soft rock m3 84
B:0 E:0 F:0 G:0
H : 72 I : 12 N:0
Carried Forward R
Section No. 2
Bill No. 2
Earthworks
BILL OF QUANTITIES
-68-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
4 Hard rock m3 42
B:0 E:0 F:0 G:0
H : 36 I:6 N:0
Carried Forward R
Section No. 2
Bill No. 2
Earthworks
BILL OF QUANTITIES
-69-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-70-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 3
CONCRETE, FORMWORK AND
REINFORCEMENT
PREAMBLES
SUPPLEMENTARY PREAMBLES
Cost of tests
Carried Forward R
Section No. 2
Bill No. 3
Concrete, Formwork & Reinforcement
BILL OF QUANTITIES
-71-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
LIGHTWEIGHT CONCRETE
Lightweight concrete
Carried Forward R
Section No. 2
Bill No. 3
Concrete, Formwork & Reinforcement
BILL OF QUANTITIES
-72-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
25MPa/19mm concrete
3 Aprons m3 551
B : 44 E : 127 F : 171 G : 42
H : 159 I:9 N:0
30MPa/19mm concrete
5 Bases m3 43
B:0 E:0 F:0 G:0
H:0 I : 43 N:0
7 Surface beds m3 93
B:0 E:0 F:0 G:0
H : 90 I:3 N:0
8 Columns m3 8
B:0 E:0 F:0 G:0
H:0 I:8 N:0
TEST BLOCKS
Carried Forward R
Section No. 2
Bill No. 3
Concrete, Formwork & Reinforcement
BILL OF QUANTITIES
-73-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with
power float
12 Rectangular columns m2 78
B:0 E:0 F:0 G:0
H:0 I : 78 N:0
Carried Forward R
Section No. 2
Bill No. 3
Concrete, Formwork & Reinforcement
BILL OF QUANTITIES
-74-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
REINFORCEMENT
High tensile steel reinforcement
Fabric reinforcement
-75-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 4
PRECAST CONCRETE
PREAMBLES
SUPPLEMENTARY PREAMBLES
GENERAL NOTES TO TENDERERS
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
WINDOW SILLS
Similar Approved
Modcon Concrete Solutions "Type 014" precast
concrete window sill, complete with damp proof
course, and installed as per manufacturer's
specification
-76-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 5
MASONRY
PREAMBLES
SUPPLEMENTARY PREAMBLES
BRICKWORK
Sizes in descriptions
Carried Forward R
Section No. 2
Bill No. 5
Masonry
BILL OF QUANTITIES
-77-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
FOUNDATIONS
Brickwork of NFX bricks (14MPa nominal
compressive strength) in class I mortar
SUPERSTRUCTURE
Brickwork of NFP bricks in class II mortar
2 345mm walls m2 27
B:0 E:0 F:0 G:0
H : 27 I:0 N:0
5 In beamfilling m2 1 413
B : 131 E : 375 F : 516 G : 102
H : 282 I:7 N:0
Carried Forward R
Section No. 2
Bill No. 5
Masonry
BILL OF QUANTITIES
-78-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
FACE BRICKWORK
FBX clay face bricks with PC sum amount of R 4
708.00 per thousand bricks delivered to site
(excluding VAT) manufactured in accordance with
SANS 227-2007, bedded and jointed in Class II
mortar and pointed with recessed vertical and
recessed horizontal joints
BRICKWORK SUNDRIES
2.5mm brickwork reinforcement
Carried Forward R
Section No. 2
Bill No. 5
Masonry
BILL OF QUANTITIES
-79-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Turning pieces
Roof ties
-80-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 6
WATERPROOFING
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 6
Waterproofing
BILL OF QUANTITIES
-81-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
WATERPROOFING LAYER
Similar Approved
4mm "a.b.e. Abegum" dual reinforced waterproofing
membrane one layer "a.b.e bituprime" waterproofing
membrane or similar approved fully boned by
means of "torch fusion", with 75mm side laps and
100mm end laps applied in accordance with
manufacturer's recommendations.
Carried Forward R
Section No. 2
Bill No. 6
Waterproofing
BILL OF QUANTITIES
-82-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Similar Approved
One coat "a.b.e" bituminous aluminium paint
-83-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL NO. 7
ROOF COVERINGS
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
ROOF SHEETING
Carried Forward R
Section No. 2
Bill No. 7
Roof Coverings
BILL OF QUANTITIES
-84-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SIDE CLADDING
0,58mm "Klip-Lok" or similar approved galvanized
steel Z200 troughed sheeting with "Chromadek"
finish on both sides, in single lengths fixed to steel
structure and 0,8mm aluminium accessories with
"Chromadek" finish on both sides
Carried Forward R
Section No. 2
Bill No. 7
Roof Coverings
BILL OF QUANTITIES
-85-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-86-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 8
CARPENTRY AND JOINERY
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 8
Carpentry and Joinery
BILL OF QUANTITIES
-87-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 8
Carpentry and Joinery
BILL OF QUANTITIES
-88-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
ROOFS, ETC
Approved SA Pine timber roof truss construction etc
Sawn softwood
Carried Forward R
Section No. 2
Bill No. 8
Carpentry and Joinery
BILL OF QUANTITIES
-89-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
DOORS ETC
Carried Forward R
Section No. 2
Bill No. 8
Carpentry and Joinery
BILL OF QUANTITIES
-90-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 8
Carpentry and Joinery
BILL OF QUANTITIES
-91-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SKIRTINGS
Solid meranti
BUMPRAIL
Timber bumprail installed 500mm above the skirting
-92-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 9
FLOOR COVERINGS, WALL LININGS, ETC.
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 9
Floor Coverings, wall linings, etc.
BILL OF QUANTITIES
-93-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
VINYL SHEETING
Similar Approved
Floorworx floorflex superflex vinyl floor sheets
2,5mm thick in old steel finish (colour code:
mf2516), manufactured in accordance with sans
581:1999, laid in floorworx no. 60 plus acrylic
adhesive spread with a notched trowel on self
levelling (elsewhere specified) with a hygrometer
reading showing a moisture content of less than
70% and rolled with 68kg three section metal roller
on completion.
1 On floors m2 7
B:0 E:0 F:0 G:7
H:0 I:0 N:0
EPOXY FINISH
Two coats gloss epoxy finish (Colour: TBC) fixed on
screed
3 On floors m2 9 731
B : 793 E : 2266 F : 3574 G:0
H : 3098 I:0 N:0
5 On vinyl sheeting m2 7
B:0 E:0 F:0 G:7
H:0 I:0 N:0
-94-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 10
IRONMONGERY
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Rates
Carried Forward R
Section No. 2
Bill No. 10
Ironmongery
BILL OF QUANTITIES
-95-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Finishes to ironmongery
LOCKS
Similar Approved
Carried Forward R
Section No. 2
Bill No. 10
Ironmongery
BILL OF QUANTITIES
-96-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
HANDLES
Similar Approved
SUNDRIES
Carried Forward R
Section No. 2
Bill No. 10
Ironmongery
BILL OF QUANTITIES
-97-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
PANIC HARDWARE
Similar Approved
Carried Forward R
Section No. 2
Bill No. 10
Ironmongery
BILL OF QUANTITIES
-98-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-99-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 11
CEILINGS, PARTITIONS AND ACCESS
FLOORING
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 11
Ceilings, Partitioning and Access Flooring
BILL OF QUANTITIES
-100-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 11
Ceilings, Partitioning and Access Flooring
BILL OF QUANTITIES
-101-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SUSPENDED CEILINGS
Similar Approved
600 x 600 x 6mm thick vinyl clad gypsum board
ceiling tiles (Colour and Texture: TBC), suspended
in 38mm wide white powder coated, open
suspension system including main tees, cross tees,
hangers, hold down clips, wedges, etc all installed
in accordance with manufacturer's specifications
Carried Forward R
Section No. 2
Bill No. 11
Ceilings, Partitioning and Access Flooring
BILL OF QUANTITIES
-102-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
FIBRE CEMENT
Similar Approved
6mm "Nutec" fibre cement board in 900mm or
1200mm width, with joints in standard H-profile
galvanised strips, nailed to SAP brandering at
300mm centres in one direction, with ceiling *panels
arranged according to ceiling layout plan
SUNDRIES
Similar Approved
Cornices
Carried Forward R
Section No. 2
Bill No. 11
Ceilings, Partitioning and Access Flooring
BILL OF QUANTITIES
-103-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
CEILING INSULATION
Similar Approved
-104-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 12
STRUCTURAL STEELWORK
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 12
Structural Steelwork
BILL OF QUANTITIES
-105-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 12
Structural Steelwork
BILL OF QUANTITIES
-106-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
PAINTING
Prepare and apply one coat 75 micron primer inter
zinc 233, one coat of 100 micron intermediate coat
interseal 101-mio and one finishing coat 50-70
micron to architects' colour specification of
interthane 990 as per Engineers' specification:
SUNDRIES
Carried Forward R
Section No. 2
Bill No. 12
Structural Steelwork
BILL OF QUANTITIES
-107-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-108-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 13
METALWORK
PREAMBLES
SUPPLEMENTARY PREAMBLES
SPECIFICATIONS
User Note:
Scaffolding
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-109-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Protection:
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-110-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-111-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
STEEL DOORS
Mild steel gates, with rebated meeting stiles, with 40
x 40mm mild steel frame bolted to wall using anchor
bolts on inside of frame, all to Architects
specification
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-112-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
STEEL CAGES
Purpose made mild steel cage
304/VEM 320G expanded metal mesh size 1200mm x
2400mm manufactured in accordance with SANS
190-1:1983 fixed to 76 x 50mm timber purlins using
40x 0.5mm hat channels @ 400mm centres with 12 x
20mm tac screws.
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-113-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-114-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
26 On walls
m 3 092
B : 188 E : 771 F : 970 G:0
H : 1162 I:0 N:0
ALUMINIUM WINDOWS
Purpose made natural anodised aluminium windows
and shopfronts to specialist details, with safety
glass glazing executed in strict conformance to
AAAMSA requirements, SANS 613, SANS
10137:2011 and SANS 10400 Parts B, N and XA,
plugged to brick wall, including burglar bars to
opening and fixed panels, made up of 50 x 50 x
2mm iron frame welded to lugs and built into wall,
including 25 x 3 x 200mm long lugs welded to angle
iron and built into wall, 60 x 40 x 2mm mild steel
square tubing surround with 19mm diameter steel
rods welded vertically/ horizontally into surround at
110mm centres, including 40mm x 6mm horizontal
steel 2 x bars at 160mm apart at 900mm above floor
line with 19mm holes for vertical steel rods
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-115-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-116-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
ALUMINIUM DOORS
Purpose made glazed aluminium sliding door
(Colour and Finish: TBC), supplied with sliding gear,
locks, etc, with glazing compliant with AAAMSA
recommendations, all installed as per
manufacturer's recommendation
MIRROR, ETC
Similar Approved
18/10 stainless steel with reflective polished surface
and concealed thief resistance fixing. Screws and
wall plugs are included.
Carried Forward R
Section No. 2
Bill No. 13
Metalwork
BILL OF QUANTITIES
-117-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Aluminium trims
Aluminium strips
-118-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 14
PLASTERING
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
SCREEDS
Similar Approved
3:1 Cement plaster screed on concrete
Carried Forward R
Section No. 2
Bill No. 14
Plastering
BILL OF QUANTITIES
-119-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
GRANOLITHIC
Polished granolithic screed on concrete
INTERNAL PLASTER
One coat 1:4 cement plaster on brickwork, steel
trowelled
5 On walls m2 2 585
B : -388 E : -952 F : -2063 G : 949
H : 4464 I : 575 N:0
7 On walls m2 9 318
B : 752 E : 1971 F : 3292 G : 338
H : 2947 I : 17 N:0
Carried Forward R
Section No. 2
Bill No. 14
Plastering
BILL OF QUANTITIES
-120-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-121-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 15
TILING
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 15
Tiling
BILL OF QUANTITIES
-122-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
WALL TILING
Similar Approved
Matt full bodied porcelain tiles, size 600 x 300mm x
12mm fixed to internal wall plaster backing with tal
tile adhesive (elsewhere specified) mixed with tal
bonding liquid in lieu of water with joints continuous
in both directions and grouted with tal tile grout
Colour as per architects finishing schedules
1 On walls m2 17
B:0 E:0 F:0 G:0
H:0 I : 17 N:0
2 On walls m2 9 300
B : 752 E : 1971 F : 3292 G : 338
H : 2947 I:0 N:0
Carried Forward R
Section No. 2
Bill No. 15
Tiling
BILL OF QUANTITIES
-123-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
3 On splashbacks m2 840
B : 68 E : 180 F : 260 G : 23
H : 308 I:3 N:0
FLOOR TILING
Similar Approved
Matt full bodied porcelain tiles, size 600 x 300mm x
12mm fixed with approved tiling adhesive rapid-
setting high strength to grout flush pointed with
dove grey anti-fungal jointing compound. Tiles to be
laid with approved resilient joint every sqm. Colour
to match colour of grout as per architects finishing
schedule.
Carried Forward R
Section No. 2
Bill No. 15
Tiling
BILL OF QUANTITIES
-124-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
ATTIC STOCK
Similar Approved
8 400 x 400 mat full bodied "R9" non slip rating porcelain
tiles m2 36
B:0 E:0 F:0 G : 36
H:0 I:0 N:0
9 400 x 400 mat full bodied "R10" non slip rating porcelain
tiles m2 425
B : 34 E : 92 F : 139 G:2
H : 158 I:0 N:0
10 400 x 400 mat full bodied "R12" non slip rating porcelain m2 5
B:0 E:0 F:0 G:5
H:0 I:0 N:0
Carried Forward R
Section No. 2
Bill No. 15
Tiling
BILL OF QUANTITIES
-125-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-126-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 16
PLUMBING AND DRAINAGE
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-127-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
RAINWATER GOODS
Similar Approved
0.58mm Thick galvanised steel gutters and rainwater
pipes as per architect specification. Pipes with
reinforced edges fixed to and including brackets to
fascias (measured elsewhere)
4 Extra over gutter for outlet for 100mm diameter pipe No 155
B : 16 E : 48 F : 64 G : 11
H : 12 I:4 N:0
5 Extra over gutter for offset for 100mm diameter pipe No 155
B : 16 E : 48 F : 64 G : 11
H : 12 I:4 N:0
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-128-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Outlets
Similar Approved
SINKS, etc.
Standard single bowl sink 800 x 460mm to be
installed to manufacturer's details and specification,
complete with fitments and fixings. etc.
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-129-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
BASINS, etc
Wash hand basins
Similar Approved
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-130-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SANITARY FITTINGS
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-131-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
URINALS, ETC
Towel disposers
Soap Dispenser
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-132-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Soap holders
BATH
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-133-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
SHOWER CUBICLE
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-134-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Taps
Mixers
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-135-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Carried Forward R
Section No. 2
Bill No. 16
Plumbing and Drainage
BILL OF QUANTITIES
-136-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
TRAPS ETC
"Marley"
-137-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 17
GLAZING
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
-138-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 2
BILL No. 18
PAINTWORK
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
Carried Forward R
Section No. 2
Bill No. 18
Paintwork
BILL OF QUANTITIES
-139-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
ON METAL SURFACES
Spot priming defects in pre primed surfaces with
zinc phosphate metal primer, one coat universal
undercoat and two coats seal grey - 000NN25 paint
or similar approved
ON WOOD
Prepare and apply one coat wood primer, one coat
universal undercoat and two coats gloss enamel
paint (Colour: TBC)
4 On doors m2 60
B : 12 E:0 F : 48 G:0
H:0 I:0 N:0
ON SMOOTH CONCRETE
Carried Forward R
Section No. 2
Bill No. 18
Paintwork
BILL OF QUANTITIES
-140-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
7 On columns m2 78
B:0 E:0 F:0 G:0
H:0 I : 78 N:0
ON FIBRE-CEMENT
One coat plaster primer, one coat gypsum skim
plaster trowelled to a smooth polished surface and
two coats matt enamel paint (Colour: TBC)
ON PLASTERBOARD
Prepare and apply one coat primer and two coats
internal paint with mat finish
ON METAL SURFACES
Carried Forward R
Section No. 2
Bill No. 18
Paintwork
BILL OF QUANTITIES
-141-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
16 On gutters m 8 310
B : 771 E : 2205 F : 3032 G : 601
H : 1659 I : 41 N:0
17 On downpipes m 474
B : 49 E : 147 F : 196 G : 34
H : 37 I : 12 N:0
ON WOOD
Carried Forward R
Section No. 2
Bill No. 18
Paintwork
BILL OF QUANTITIES
-142-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
18 On doors m2 3 057
B : 236 E : 600 F : 751 G : 262
H : 1184 I : 24 N:0
-143-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
2 Earthworks 70
4 Precast Concrete 76
5 Masonry 80
6 Waterproofing 83
7 Roof Coverings 86
10 Ironmongery 99
13 Metalwork 118
14 Plastering 121
15 Tiling 126
17 Glazing 138
18 Paintwork 143
Sub Total R
-144-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 3
BILL No. 1
BUDGETARY ALLOWANCES
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 3
Bill No. 1
Budgetary Allowances
BILL OF QUANTITIES
-145-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Cash discount
Profit
Builder's work
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
BUDGETARY ALLOWANCES
Carried Forward R
Section No. 3
Bill No. 1
Budgetary Allowances
BILL OF QUANTITIES
-146-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
-147-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 3
BILL No. 2
PROVISIONAL SUMS
PREAMBLES
SUPPLEMENTARY PREAMBLES
Carried Forward R
Section No. 3
Bill No. 2
Provisional Sums
BILL OF QUANTITIES
-148-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
Cash discount
Profit
Builder's work
ATTENDANCE
Note
Carried Forward R
Section No. 3
Bill No. 2
Provisional Sums
BILL OF QUANTITIES
-149-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
2 Attendance %
3 Profit %
IT ALLOWANCE
5 Attendance %
6 Profit %
AS-BUILT DRAWINGS
8 Attendance %
9 Profit %
CLINICAL EQUIPMENT
11 Attendance %
Carried Forward R
Section No. 3
Bill No. 2
Provisional Sums
BILL OF QUANTITIES
-150-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
12 Profit %
CLERK OF WORK
14 Attendance %
15 Profit %
DEEP CLEANING
17 Attendance %
18 Profit %
LANDSCAPING
20 Attendance %
21 Profit %
JOINERY
23 Attendance %
24 Profit %
26 Attendance %
Carried Forward R
Section No. 3
Bill No. 2
Provisional Sums
BILL OF QUANTITIES
-151-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
27 Profit %
STRUCTURAL STEELWORK
29 Attendance %
30 Profit %
-152-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
SECTION No. 3
BILL No. 3
PREAMBLES
SUPPLEMENTARY PREAMBLES
LOCATIONAL SPLIT
[B] - Ward 3
[E] - Ward 7, 8 and 9
[F] - Ward 2, 4, 5 and 11
[G] - Conversion of Laundry room to Bulkstore
[H] - Wards 13, 14 and 15
[I] - Gate House
[N] - External Works
2 Attendance %
3 Profit %
Carried Forward R
Section No. 3
Bill No. 3
EPWP
BILL OF QUANTITIES
-153-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
Brought Forward R
5 Attendance %
6 Profit %
8 Attendance %
9 Profit %
-154-
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
3 EPWP 154
-155-
PART B
ELECTRICAL WORK
STERKFONTEIN PSYCHIATRIC HOSPITAL
SCHEDULE 1: PRELIMINARY & GENERAL (Excl VAT)
1.2 Sureties
1.3 Insurance
1.4 Contractor's temporary site offices and stores
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Carried forward -
Tender
Item Description Unit Qty
Amount
Brought forward -
Supply and install new 10kVA, 3 Phase in and Three Phase out on
f) No 6 -
line Double conversion UPS with 60 minutes autonomy at full load.
Supply and install new 5kVA, 3 Phase in and Three Phase out on
g) No 28 -
line Double conversion UPS with 60 minutes autonomy at full load.
DIN Pre-Wired 11 Way Surface mounted Distribution Board
installed in indoor plantrooms complete with 1x 63A 1P+N MCB
h) No 20 -
(Mains), 1x 32A DP MCB, 1x 20A SP MCB, 1x 63A ELU 30mA, 2x
20A SP MCB, 1x 10A SP MCB
Surface mounted industrial IP54 Single Door distribution board - 2x
i) No 5 -
12 Way
Surface mounted industrial IP54 Single Door distribution board - 3x
j) No 5 -
12 Way
Surface mounted industrial IP65 Single Door distribution board - 2x
k) No 5 -
12 Way
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
3,7 CABLES
Stranded copper cables, installed in cable trenches, on cable
racks or trays or fixed to steel structures. Prices must include for
all extras needed for fixing of cables, as no claim for this shall be
considered. (Excavation of cable trenches and bedding, backfilling
and consolidation of trenches in soft soil, hand or machine
excavations for all cables to be included in costs)
3.7.1 4-Core PVC/PVC/SWA/PVC
a) 2,5mm² m 1280 -
b) 6mm² m 1280 -
c) 10mm² m 1600 -
d) 16mm² m 1600 -
e) 50mm² m 1600 -
f) 70mm² m 800 -
g) 95mm² m 800 -
h) 185mm² m 800 -
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
3.7.7 Cable Wireways and Sleeves
All prices shall include for supports and all other fixing materials as
needed as no extra claims for above shall be entertained. Rates
for this must however be provided where it is asked for.
a) IP65 100mm x 100mm Drawbox with Cover No 25 -
b) PVC Trunking - 20mm x 20mm complete with Cover m 100 -
c) PVC Trunking - 40mm x 20mm complete with Cover m 100 -
d) PVC Trunking - 60mm x 40mm complete with Cover m 100 -
50mm PVC sleeves (With slow radius bends and Min 5mm wall
e) m 70 -
thickness)
110mm PVC sleeves (With slow radius bends and Min 5mm wall
f) m 50 -
thickness)
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
3.8.4 Bare Copper earth wire drawn into conduit:
a) 1,5 mm² m 1685 -
b) 2,5 mm² m 1785 -
c) 6mm² m 1585 -
16A, 220V, Single Socket Outlet mounted into wall complete with
a) conduits 4x4 outlet boxes, cover plates, switch & 2,5mm² No 50 -
conductors & earthing wiring
16A, 220V, Double Socket Outlet mounted into wall complete with
b) conduits 4x4 outlet boxes, cover plates, switch & 2,5mm² No 84 -
conductors & earthing wiring
20A, 220V, Double Pole wall mounted Isolator complete with 4x4
d) outlet box, cover plates, 6mm² conductor and 4mm² earthing wiring No 52 -
& conduits
c) 6mm² m 200 -
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
Replace existing 2x 36W 1200mm flourescent luminaire completed
c) No 521 -
with new 2x36W LED lamp similar or equal to existing
Light Switch (One Lever) comprising of the 1,5mm² conductors and
d) earthing wiring, conduits outlet boxes, cover plates, switches, and No 188 -
connections in the DB
Light Switch (Two Lever) comprising of the 1,5mm² conductors and
e) earthing wiring, conduits outlet boxes, cover plates, switches, and No 35 -
connections in the DB
Install new lamps for Downlights over Nurses service station desk
f) No 27 -
(example: Ward 17)
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
3.10 MISCELLANEOUS
Supply and install of the following equipment, complete with all
accessories:
Carried forward -
Supply Tender
Item Description Unit Qty Install Rate
Rate Amount
Brought forward -
The single plate x-ray viewing screen shall be mounted close to the
doctor’s desk, for the doctor’s use during consultation if the patient
has x-ray plates. The X-Ray viewing screens shall be Hutz HU-
d) 1 -
XRU-W-01 wall mounted, with an acrylic diffuser viewing area of
355x435mm, 4x15w vertical mounted lamps operated by electronic
control gear and a dropped roller film holder.
Electronic Hand Dryer with proximity switch for hand motion
detection and switching complete with IR light filter and high
e) No 8 -
speeds fan to be installed at existing hand dryer points. Similar to
existing.
Compile and draw up As-built/Record drawings of Electrical
f) Sum 45 -
infrastructure and distribution boards
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
c) Fingerprint reader
(i) Supply No 47 R -
(ii) Install No 47 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
c) Fingerprint reader
(i) Supply No 90 R -
(ii) Install No 90 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
Brought Forward R -
c) Fingerprint reader
(i) Supply No 4 R -
(ii) Install No 4 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
Brought Forward R -
c) Fingerprint reader
(i) Supply No 8 R -
(ii) Install No 8 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
Brought Forward R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 4 - ACCESS CONTROL SYSTEM
Brought Forward R -
b) Fingerprint readers
(i) Supply No 0 R -
(ii) Install No 0 R -
(i) Supply No 0 R -
(ii) Install No 0 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
f) 16 Channel Multiplexer
(i) Supply No 3 R -
(ii) Install No 3 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 5 - CCTV SYSTEM
d) Verification Dongle
(i) Supply No 2 R -
(ii) Install No 2 R -
Carried Forward R -
STERKFONTEIN HOSPITAL
SCHEDULE 6 - SECURITY CONTROL ROOM
AC SECTION
Double Pole: 20A
Supply No 32,00 -
Install No 32,00 -
Three Pole: 20A -
Supply No 2,00 -
Install No 2,00 -
-
Wires -
2 core, 4 mm2, Copper -
Supply No 500 -
Install No 500 -
4 core, 4 mm2, Copper -
Supply No 500 -
Install No 500 -
DB-EC (Normal/Standby Power) -
Three Pole: 80A -
Supply No 2,00 -
Install No 2,00 -
Single Pole: 6A -
Supply No 4,00 -
Install No 4,00 -
Single Pole: 20A -
Supply No 32,00 -
Install No 32,00 -
Three Pole: 63A -
Supply No 2,00 -
Install No 2,00 -
Double Pole: 20A -
Supply No 2,00 -
Install No 2,00 -
Double Pole: 25A -
Supply No 2,00 -
Install No 2,00 -
Double Pole Earth Leakage Unit: 63A -
Supply No 8,00 -
Install No 8,00 -
Double Pole: 40A -
Supply No 4,00 -
Install No 4,00 -
Single Pole: 16A -
Supply No 14,00 -
Install No 14,00 -
Photo cell -
Supply No 2,00 -
Install No 2,00 -
Cables -
Supply meters 100 -
Install meters 100 -
6mm2, 3 core, Copper -
Supply meters 500 -
Install meters 500 -
Install meters -
Wires -
2 core, 4 mm2, Copper -
Supply meters 500 -
Install meters 500 -
2.5mm bare copper -
Supply meters 500 -
Install meters 500 -
UPS SECTION -
5kVA UPS with 60 minutes autonomy -
Supply No 2,00 -
Install No 2,00 -
Domestic type isolator mounted in lockable enclosure
at UPS -
Supply No 4,00 -
Install No 4,00 -
Rotary type UPS type bypass switch -
Supply No 2,00 -
Install No 2,00 -
Single Pole: 20A -
Supply No 12,00 -
Install No 12,00 -
Double Pole: 32A -
Supply No 2,00 -
Install No 2,00 -
Cables -
6mm2, 3 core, Copper -
Supply meters 500 -
Install meters 500 -
Wires -
2 core, 2.5 mm2, Copper -
Supply meters 1000 -
Install meters 1000 -
2.5mm bare copper meters -
Supply meters 1000 -
Install meters 1000 -
Single Lever Light Switch -
Supply No 94,00 -
Install No 94,00 -
Two way Light Switch -
Supply No 4,00 -
Install No 4,00 -
-
Type FL3 - 1200x600 recessed prismatic with LED
tubes -
Supply No 276,00 -
Install No 276,00 -
Type B1 - surface mounted cheese cake bulkhead with
LED lamp, 3m cord, and 5A plug -
Supply No 40,00 -
Install No 40,00 -
Type B2 - outdoor surface mounted round bulkhead
with LED lamp -
Supply No 38,00 -
Install No 38,00 -
Photo cell -
Supply No 2,00 -
Install No 2,00 -
Illuminated Exit Signs -
Supply No 4,00 -
Install No 4,00 -
Two way switch -
Supply No 4,00 -
Install No 4,00 -
20 Amp double pole weatherproof - Lockable Type -
Supply No 2,00 -
Install No 2,00 -
Wired outlet for ceiling fan -
Supply No 4,00 -
Install No 4,00 -
Single Euro socket outlet -
Supply No 64,00 -
Install No 64,00 -
Combo socket outlet (1x Euro and 1x PIN) -
Supply No 216,00 -
Install No 216,00 -
Dedicated single socket outlet in power skirting -
Supply No 64,00 -
Install No 64,00 -
Telephone/Data RJ45 point -
Supply No 64,00 -
Install No 64,00 -
P8000 steel truncking -
Supply meters 552,00 -
Install meters 552,00 -
150mm wide wire basket -
Supply meters 516,00 -
Install meters 516,00 -
PVC conduit complete with draw boxes and
accessories, surface mounted or built/ chased into
walls or cast into concrete.
(Hospital saddles to be used for surface mounted
conduit) -
20 mm -
Supply m 1 000,00 -
Install m 1 000,00 -
25 mm -
Supply m 1 000,00 -
Install m 1 000,00 -
Data rack for electronic equipment -
Supply No 1,00 -
Install No 1,00 -
Distribution Board - White outside, inside colour panels
(orange for normal, red for emergency and violet for
UPS). 1000mm length, 350 depth, 1800mm height, IP44,
100 A busbar rating -
Supply No 1,00 -
Install No 1,00 -
-
Earthing and lightning protection
Supply and install No 1 -
-
Total (Excl. VAT) -
STERKFONTEIN PSYCHIATRIC HOSPITAL
SCHEDULE 7: SUMMARY
Tender
Schedule Description Amount
4 SUB-TOTAL: CCTV R -
ADD: 15% OF Nett Tender Sum ("T") for VALUE ADDED TAX (VAT) R -
My/our Total Tender Sum for the Works including contingencies ** and the items in the Tender Addenda
to the Schedule of Quantities issued (if any) is (in words):
___________________
DATE SIGNATURE
On behalf of the TENDERER
PART C
MECHANICAL (HVAC) INSTALLATION
Priced rates for repairs, service and maintenance on Kitchens and Laundry
installations
All prices shall be priced to RSA currency excluding VAT
PROVISIONAL
PART NO SCHEDULED PARTS UNIT RATES PRICE PER UNIT
QUANTITIES
GENERAL ITEMS
1 General purpose grease 5KG containers KG 2
2 Bolts 6mm dia x 25mm long & nuts (HTS) S 100
3 Bolts 8mm dia x 25mm long & nuts (HTS) S 300
4 Bolts 8mm dia x 40mm long & nuts (HTS) S 300
5 Bolts 10mm dia x 25mm long & nuts (HTS) S 120
6 Bolts 10mm dia x 40mm long & nuts (HTS) S 120
7 Bolts 10mm dia x 50mm long & nuts (HTS) S 80
8 Bolts 12mm dia x 40mm long & nuts (HTS) S 90
9 Bolts 12mm dia x 50mm long & nuts (HTS) S 50
CONVENTION OVENS
10 Boiler elements S 1
11 Oven element S 1
12 Contactor S 1
13 oveload S 1
14 Boiler thermostat S 1
15 Oven thermostat S 1
16 Level switch S 1
17 Door swicth S 1
18 Timer relay S 1
19 Selector swicth S 1
20 Solenoid valve S 1
21 Solenoid coil S 1
22 Door seal S 1
23 Door handle S 1
24 Fan motor S 1
25 Timer S 1
PROVISIONAL
PART NO SCHEDULED PARTS UNIT RATES PRICE PER UNIT
QUANTITIES
1 15mm ball float valve S 22
2 20mm ball float valve S 22
3 25mm ball float valve S 22
4 15mm Steam barrel nipples S 8
5 20mm Steam barrel nipples S 29
6 25mm Steam barrel nipples S 8
7 40mm Steam barrel nipples S 43
8 50mm Steam barrel nipples S 8
Armstrong 800 Steam trap repair kit 4.27mm
9
orifice S 22
10 Armstrong 800 Steam trap gasket sets S 43
11 15mm Spirax FT14 Steam traps S 22
12 20mm FT14 Spirax S 22
13 25mm FT14 Spirax Steam Taps S 22
15 to 20mm Spirax Sarco sight glass window
14
repair kits S 8
15 15mm brass horns Valves S 8
16 20mm brass horns Valves S 8
17 25mm brass horns Valves S 8
18 32mm brass horns Valves S 8
19 15mm S'S trim globe valve 10 bar S 8
20 25mm S'S trim globe valve 10 bar S 8
21 25mm S'S trim globe valve 10 bar S 8
22 15mm cone face face steam unions S 8
23 20mm cone face face steam unions S 8
24 25mm cone face face steam unions S 8
25 15mm copper tubing, class 2 6'1m length S 8
26 20mm copper tubing, class 2 6'1m length S 8
27 25mm copper tubing, class 2 6'1m length S 8
28 40mm copper tubing, class 2 6'1m length S 8
29 50mm copper tubing, class 2 6'1m length S 8
30 80mm copper tubing, class 2 6'1m length S 8
31 15mm heavy duty steam pipe, 6'1m length S 8
32 20mm heavy duty steam pipe, 6'1m length S 8
33 25mm heavy duty steam pipe, 6'1m length S 8
34 40mm heavy duty steam pipe, 6'1m length S 8
35 50mm heavy duty steam pipe, 6'1m length S 8
36 80mm heavy duty steam pipe, 6'1m length S 8
37 Valve gland packing 12.5mm S 8
38 Valve gland packing 10mm S 8
39 Valve gland packing 6mm S 8
40 Granite pipe jointing compound; 5kg container S 8
41 Rope packing; non asbestors; 40mm x 30mm S 8
42 Rope packing; non asbestors; 25mm x 30mm S 8
15mm flap type type brass brass body non return
43
valves S 15
20mm flap type type brass brass body non return
44
valves S 15
25mm flap type type brass brass body non return
45
valves S 15
40mm flap type type brass brass body non return
46
valves S 15
50mm flap type type brass brass body non return
47
valves S 15
48 15mm steam strainers, brass body S 8
49 20mm steam strainers, brass body S 29
50 25mm steam strainers, brass body S 8
51 40mm steam strainers, brass body S 29
52 50mm steam strainers, brass body S 8
53 Rope packing; non asbestors; 15mm x 30mm S 29
Packing material: 1.5mm Graphite impregnated'
54
wire reinforced sheet 1.2 x 2.4m x 1.5m S 43
Packing material: 3mm Graphite impregnated'
55
wire reinforced sheet S 43
56 Valve gland packing 8mm S 29
57 Paint: PWT TPA no 1 container S 29
58 Fibre glass wool sheeting rolls 50mm x 1,2m S 113
Pressure Gauge, 100mm dia, bottom entry x
59
10mm BSO thread, range 0 to 2000 KPA S 8
60 10Mmm siphon tube S 22
61 10mm cock valves S 3
62 15mm TLV steam traps S 29
63 20mm TLV steam traps S 29
64 25mm TLV steam traps S 29
65 Steam Separator 6" S 29
66 Exspansion Bellows 5" S 8
67 Lagging preformed pipe section fibre glass 1/2" S 29
68 Lagging preformed pipe section fibre glass 3/4" S 29
69 Lagging preformed pipe section fibre glass 1" S 29
70 Lagging preformed pipe section fibre glass 1 1/2" S 29
71 1/2" brass globe valves S 2
72 3/4" brass globe valves S 2
73 1" brass globe valves S 2
74 1 1/2" brass globe valves S 2
75
Lagging preformed pipe section fibre glass 1 3/4" S 29
76 Lagging preformed pipe section fibre glass 2" S 29
Lagging preformed pipe section fibre glass 12
77
1/2" S 29
78
Lagging preformed pipe section fibre glass 2 3/4" S 29
79 Lagging preformed pipe section fibre glass 3" S 29
80 Lagging preformed pipe section fibre glass 4" S 29
81 Lagging preformed pipe section fibre glass 5" S 29
82 Lagging preformed pipe section fibre glass6" S 29
83 Galvanised muffs 1/2" S 22
84 Galvanised muffs 3/4" S 29
85 Galvanised muffs 1" S 29
86 Galvanised muffs 1 1/2" S 22
87 Galvanised muffs 1 3/4" S 15
88 Galvanised muffs 2" S 15
89 Galvanised muffs 2 1/2" S 15
90 Galvanised muffs 2 1/2" S 15
91 Galvanised muffs 3" S 15
92 Galvanised muffs 4" S 15
93 Galvanised muffs 5" S 15
94 Galvanised muffs 6" S 15
95 40mm conex straight connector S 57
96 50mm conex straight connector S 57
97 Gate valves 1/2" S 29
98 Gate valves 3/4" S 29
99 Gate valves 1" S 29
100 Gate valves 1 1/2" S 29
101 Gate valves 1 3/4" S 29
102 Gate valves 2" S 29
103 Gate valves 3" S 29
104 Gate valves 4" S 29
105 15mm cast steel body strainer S 29
106 20mm cast steel body strainer S 26
107 25mm cast steel body strainer S 23
108 40mm cast steel body strainer S 20
109 1/2"brass angle globe valve S 17
110 1 1/2"brass angle globe valve S 15
111 Tempreture Thermometer Ispesl 0-120°C S 12
112 Pressure relive Bailey 323 2" S 16
113 15mm pressure reducing valve 100-700Kpa S 8
114 Pressure reducing valves 3/4" 100-700KPA S 8
115 Circulating pump Moway S 7
116 Condensate pump Mand B 40M0/75 S 8
117 Level switch Mobrey S 15
118 Safety valve pull up type 3/4" S 15
119 Safety valve pull up type 1" S 15
120 Central heating radiators S 2
121 Central heating Pearch Cocks S 3
122 15mm conex male adaptor S 15
123 20mm conex male adaptor S 15
124 25mm conex male adaptor S 15
125 15mm conex straight connector S 15
126 20mm conex straight connector S 15
127 25mm conex straight connector S 15
128 50mm cast steel globe valves S 15
129 65mm cast steel globe valves S 15
130 75mm cast steel globe valves S 15
131 15mm cast steel pressure reducing valves S 8
132 20mm cast steel pressure reducing valves S 8
133 32mm cast steel pressure reducing valves S 8
134 32mm cast steel pressure reducing valves S 15
135 40mm cast steel pressure reducing valves S 15
136 50mm cast steel pressure reducing valves S 15
137 65mm cast steel pressure reducing valves S 15
138 75mm cast steel pressure reducing valves S 15
139 300 litre vertical calorifiers S 1
140 500 litre vertical calorifiers S 0
141 1000 litre vertical calorifiers S 0
142 2000 litre vertical calorifiers S 0
143 3000 litre vertical calorifiers S 12
144 300 litre horizontal calorifiers S 0
145 500 litre horizontal calorifiers S 0
146 1000 litre horizontal calorifiers S 0
147 2000 litre horizontal calorifiers S 0
148 3000 litre horizontal calorifiers S 0
149 Condensate pump Ebara CMA.075 T S 3
150 Condensate pump Ebara CMA.100 T S 3
151 Condensate pump Ebara CMA.200 T S 3
152 15mm brass angle globe valves S 3
153 20mm brass angle globe valves S 3
154 25mm brass angle globe valves S 3
155 15mm 90° BSP thread steam elbows S 3
156 20mm 90° BSP thread steam elbows S 3
157 25mm 90° BSP thread steam elbows S 3
158 15mm 90° BSP thread steam bends S 3
159 20mm 90° BSP thread steam bends S 3
160 25mm 90° BSP thread steam bends S 3
161 15mm 90° weld on black elbows S 3
162 20mm 90° weld on black elbows S 3
163 25mm 90° weld on black elbows S 3
164 15mm 90° weld on black bends S 3
165 20mm 90° weld on black bends S 3
166 25mm 90° weld on black bends S 3
167 Key Steel 6mm S 3
168 Key Steel 8mm S 3
169 Key Steel 10mm S 3
170 Key Steel 12mm S 3
171 2.5 mild steel welding rods S 29
172 PTFE thread tape S 57
173 M6 x 50mm mild bolt and nuts S 480
174 M8 x 50mm mild bolt and nuts S 480
175 M10 x 50mm mild bolt and nuts S 480
176 M12 x 50mm mild bolt and nuts S 480
178 M14 x 50mm mild bolt and nuts S 480
179 M16 x 50mm mild bolt and nuts S 480
180 M20 x 50mm mild bolt and nuts S 480
181 M6 x 100mm mild bolt and nuts S 480
182 M8 x 100mm mild bolt and nuts S 480
183 M10 x 100mm mild bolt and nuts S 480
184 M12 x 100mm mild bolt and nuts S 480
185 M14 x 100mm mild bolt and nuts S 480
186 M16 x 100mm mild bolt and nuts S 480
187 M20 x 100mm mild bolt and nuts S 480
188 BSP tread reducing bushes15-10mm S 22
189 BSP thread reducing bushes 20-15mm S 5
190 BSP thread reducing bushes 20-10mm S 5
191 BSP thread reducing bushes 25-10mm S 5
192 BSP thread reducing bushes 25-15mm S 3
193 BSP thread reducing bushes 25-20mm S 3
194 Square condensate tanks 300 litre S 3
195 Square condensate tanks 500 litre S 3
196 Square condensate tanks 1000 litre S 3
197 Condensate tank level switches float type S 3
198 Condensate tank level switches liquid 3 probes S 2
Ward 1 to 23 steam System
Install Copper Pipe complete with armor flex
one inc
199 Ф28.6 m 880
200 Ф19.1 m 522
201 Ф34.9 m 880
202 Ф25.4 m 1430
203 Ф15.9 m 4679
204 Ф31.8 m 433
205 Ф22.2 m 1221
206 Ф12.7 m 2667
207 Ф9.53 m 3244
Labour steam
208 Remove all old steam pipes and equipment S 1
209 Cleaning off site end of work S 1
CoC For Pressure Vessels & Complete Steam
210
Installation S 1
211 Labour Technician per hour S 600
212 Labour Technician per hour over time S 180
Labour Technicians per Hour Sunday and Public
213
Holidays S 90
214 Labour Technician Assistant per hour S 600
215 Labour Technician assistant per hour over time S 180
Labour Technician Assistant per hour Sunday and
216
Public Holidays S 90
217 Coded Welder per hour S 750
218 Coded Welded per hour over time S 225
Coded Welded per hour Sunday and Public
219
Holidays S 112,5
Sub-Total R -
Priced rates for repairs, service and maintenance on Air Conditioning and ventilation
installations
All prices shall be priced to RSA currency excluding VAT
PROVISIONAL
PART NO SCHEDULED PARTS UNIT RATE PRICE PER UNIT
QUANTITIES
FILTERS TO GPA SPECIFICATION
600x600x100 filter BFDF disposable 80% dust
1
spot 11 pleats S 445
2 600x600x600 8 Pocket 95% bag filters S 445
600x600x100 M5 AWM Secondary External W/S
3
Filter S 445
4 Split Aicon unit Filters S 88
5 Cassette Filter F8 600x600x292 S 55
6 Installed Hepa Filter DOP test. S 445
COMPRESSORS
7 9000 BTU Rotary Compressor S 1
8 12000 BTU Rotary Compressor S 1
9 18000 BTU Rotary Compressor S 1
10 24000 BTU Rotary Compressor S 1
11 36000 BTU Rotary Compressor S 1
12 44000 BTU Rotary Compressor S 1
13 58000 BTU Rotary Compressor S 1
14 G x 9 Extract Fan S 25
15 G x 12 Extract Fan S 25
16 GX 6 Extractor fan S 25
17 GX 12 9 Extractor fan S 1
18 GX 12 Extractor Fan S 1
V BELTS
19 13N1725 S 5
20 13X1100 S 5
21 13X1860 S 5
22 13X1150 S 5
23 1725x17 S 5
24 13 X 2900 S 5
25 13N 1800 S 12
26 13 X 8 X 1130 S 9
27 13 X 2120 S 22
28 10N 2280 S 4
29 13N 1700 S 7
30 13 X 8 X 1030 S 2
31 17 X 2890 S 18
32 10N 950 S 1
33 16N 2280 S 9
34 17 X 2080 S 1
35 17 X 4060 S 1
36 17 X 3950 S 1
37 17 X 3500 S 1
38 17 X 1820 S 1
39 10N 1420 S 1
40 10N 1900 S 1
41 13N 1600 S 1
42 13N 1140 S 1
43 13 X 1530 S 1
44 16 N 3170 S 1
45 13 X 1150 S 1
46 13 X 2020 S 1
47 16 N 2150 S 1
48 16N 2530 S 1
49 16N 3550 S 1
50 16 N 2280 S 1
51 17 X 2250 S 1
52 17 X 2460 S 1
53 17 X 2580 S 1
54 17 X 2890 S 1
55 17 X 3090 S 1
56 17 X 3500 S 1
57 17 X 3800 S 1
58 10N1320 S 4
59 10N2990 S 4
60 10N1760 S 4
61 10N1800 S 4
62 10N2037 S 4
63 10N950 S 4
64 10N720 S 4
65 SPZ 630 S 4
66 SPZ670 S 1
67 SPZ680 S 12
68 SPZ710 S 1
69 SPZ750 S 8
70 SPZ760 S 8
71 SPZ800 S 6
72 SPZ850 S 6
73 SPZ900 S 6
74 SPZ950 S 6
75 SPZ1010 S 6
76 SPZ1080 S 6
77 SPZ1140 S 6
78 SPZ1180 S 6
79 SPZ1200 S 6
80 SPZ1250 S 9
81 SPZ1270 S 9
82 SPZ1420LP S 9
83 SPZ1520 S 9
84 SPZ1700 S 2
85 SPA800 S 2
86 13 X 820 S 2
87 13 X 775LI S 2
88 13N X 850 S 2
89 SPA900 S 7
90 SPA950 S 5
91 13N X 970 LI S 7
92 SPA1000 S 7
93 SPA1120 S 1
94 13 X 143 LI S 1
95 SPS1180 S 1
96 SPA1220 S 1
97 SPA1250 S 2
98 SPA1700 S 2
99 SPA1800 S 2
100 13 X 1900 S 2
101 SPA1900 S 6
102 13 X 1930 LI S 6
103 13 X 1940 LP S 6
104 SPB1900 S 9
105 SPB2150 S 9
106 17 X 2286 LI S 1
107 SPB2400 S 1
108 SPB3170 S 1
109 SPB4560 S 1
110 Steel Cutting Disdk 115 X2.4 X 22.2MM S 5
111 Steek Grinding Disc 115 X 6 Xc22.3MM S 8
112 Steel Grinding Disc 230 X 6 X 22.2MM S 12
113 Steel Cutting Disc 230MM S 4
114 Steel Grinding Disc 400 X 4 X 25.4MM S 22
COPPER TUBING
115 Copper tubing ⅟4 p/m 100
116 Copper tubing ⅟2 p/m 133
117 Copper tubing 3/8 p/m 120
118 Flare nut ⅟2 S 11
119 Flare Union ⅟2 S 11
120 Flux 250 gram S 2
121 Rob Silver Solder Fluxed S 20
122 Rob copper to copper S 30
PC BOARDS
123 CWA 74606 S 2
124 CNR 06-839240 S 2
125 CNR 06-845600 S 1
126 CNR 06-847920 S 1
127 CWA 7432 S 1
128 CWA 73811 S 1
129 CWH 10661 S 1
130 Remote Control CWA 75C236 S 10
131 Remote Control CWA 75C226 S 10
3 WAY REVERSE VALVES
132 Reverse valve for 9000 BTU unit S 5
133 Reverse valve for 12000 BTU unit S 2
134 Reverse valve for 18000 BTU S 1
135 Reverse valve for 24000 BTU unit S 5
136 Reverse valve for 44000 BTU unit S 1
HITACHI PC BOARDS S 1
137 RAS 3HQVK2 S 1
138 RAS 4HQVK2 S 1
139 RAS 182 CHUX S 1
140 R22 Refrigerant (kg) Kg 800
141 R404A Refrigerant (kg) Kg 200
142 R410A Refrigerant (kg) Kg 600
143 Refrigeration Oil MS32 (kg) Kg 20
144 Flushing Agent 014B (kg) Kg 150
145 Refrigeration Oil MS32 (I) Litre 20
146 Refrigeration Oil Emkarate Ester (I) Litre 20
MISC
147 Magnetic Gauge 0-250Pa S 2
148 Magnetic Gauge 0-500Pa S 2
149 Magnetic Gauge 0-700Pa S 10
150 Magnetic Gauge 0-1000Pa S 25
151 Electrodes Mild Steel Each S 50
152 Coil Brite per litre 400
Ward 1 to 23 HVAC System
Outdoor Unit Heat Recovery R410a T1 68kw DBV-
153
680(24)W/D2RN1T© S 23
Universal Hide Away R410A Medium Static
154
11.2kw DBV-D112T2/N1-BA5 S 92
Universal Hide Away R410A Medium Static 5,6kw
155
DBV-D56T2/N1-BA5 S 23
Universal Hide Away R410A Medium Static 3,6kw
156
DBV-D36T2/N1-BA5 S 69
Universal Hide Away R410A Medium Static 7,1kw
157
DBV-D71T2/N1-BA5 S 23
Universal 4 Way Compact Cassette 2,2kw R410A
158
DBV-D22Q4/N1-A3 S 23
159
Indoor Branch Heat Recovery 71 - 134kw N-04SB S 23
160 Outdoor Branch 2 Moduals 02-N1SB S 23
Mode Switch Max 24 indoor - 6 Zones DBV-
161
MS06/N1-C S 23
Mode Switch Max 16 indoor - 4 Zones DBV-
162
MS04/N1-C S 23
163 Wire cntrl KJR-12B S 230
164 Ceiling Diffuser Mounting Diffuser 595 x 595 S 48
165 Consumables ( all) ALL 1
Ouditoriun system
Supply and install Air cooled Split Unit 73kw
166
ACCS CS3H-25mm-AH032-BF S 1
167 Internal Cleaning of existing duct network S 400
Decontamination of Existing duct net work(F10
168
HVAC Disinfectant) S 400
169 Insulation repair S 80
170 Photo report Before & After S 1
Sewage pump
Supply and in stallation of sewage pump DN 65 –
171
DN 200 MultiStream S 1
172 Sewage pump controller S 1
MONTHLY SERVICES S 8
173 Service Diffusers are per Schedule A, 4.3 item 1 S 1
Service of Filter Banks as per Schedule B, 4.3 item
174
2 S 1
175 Service of chillers as per Schedule C, 4.3 item 2 S 1
176 Service of Pumps as per Schedule D, 4.3 item 4 S 1
Service of Belt Driven Fans as per Schedule E, 4.3
177
item 5 S 1
Service of Air Handling Units Handling Units as
178
per Schedule G, 4.3 Item 7 S 1
THREE MONTHLY SERVICES S 1
Service of Split Units as per Schedule H, 4.4 item
179
1 S 1
SIX MONTHLY SERVICES S 1
service of Hepa Filters as per schedule J, 4.5 item
180
2 S 1
181 Service of Chillers as per Schedule J,4.5 item 2 S 1
Service of Distribution Boards as per Schedule,
182
4.5 item 3 S 1
Service of Chilled and Condensing water lines as
183
per Schedule L, 4.5 item 4 S 1
YEARLY SERVICES S 1
Service of Cooling Towers as per Schedule M, 4.6
184
item 1 S 1
Service of Pressure Vessels as per Schedule N, 4.7
185
item 1 S 1
186 Internal Cleaning of existing duct network S 800
Decontamination of Existing duct net work(F10
187
HVAC Disinfectant) S 800
188 Insulation repair S 60
189 Photo report Before & After S 1
LABOUR RATES
190 Labour Technician per hour S 680
191 Labour Technician per hour over time S 408
Labour Technicians per hour Sunday and public
192
holidays S 204
193 Labour Technician Assistant per hour S 600
194 Labour Technician Assistant per hour over time S 360
Labour Technician Assistant per hour Sunday and
195
Public Holidays S 180
NEW AIRCONDITIONING
INSTALLATION
196 9000 S 12
197 12000 S 12
198 18000 S 12
199 22000 S 5
200 24000 S 5
HIGH WALL UNIT / CAPACITY RANGE
201 9000 S 12
202 12000 S 12
203 18000 S 12
204 22000 S 5
205 24000 S 5
CASSETTE TYPE UNIT / CAPACITY
RANGE
206 12000 S 5
207 18000 S 5
208 24000 S 6
209 28000 S 2
210 36000 S 2
211 44000 S 2
212 48000 S 2
213 60000 S 2
UNDER CEILING / CAPACITY RANGE
214 12000 S 6
215 18000 S 6
216 19000 S 6
217 25000 S 4
218 30000 S 4
219 36000 S 2
220 48000 S 2
221 60000 S 2
HIGH WALL SPLIT TYPE
222 7 000 - 12 000 288
Conduct major service on the units
223 18 000 - 26 000 230
1 Extract-Air Ducting
1,1 Sheet-metal ducting
Category 1 m² 64 -
1,2 Canvas Connection:
Ø315 (150mm, estimated) No 28 -
1,3 Flexible Connection:
Ø200 (1500mm, estimated) No 28 -
1,4 Spigots (c/w painting and external insulation)
Ø200 (100mm Long) No 16 -
2 Fresh-Air Ducting
2,1 Sheet-metal fittings
Category 1: Transformations No 8 -
2,2 Canvas Connection:
Ø560 (150mm, estimated) No 8 -
5 Air Filters
Primary Fresh-Air filters
50mm primary washable filters - 1500x510 No 4 -
6 Air-Terminals
Door Grilles: DG01 - 400x400 No 4 -
Door Grilles: DG01 - 400x200 No 20 -
Extract-Air Grilles: EG01 - 600x600 c/w Ø150 neck/spigot size No 18 -
Duct Extract-Air Grilles: EG02 - 200x150 No 8 -
Fresh-Air Grilles: FG01 - 600x600 No 16 -
Transfer Air Grille: TG01 - 600x510 No 2 -
Extract-Air Weather Louvre: WL01 - 1500x510 No 4 -
Extract-Air Weather Louvre: WL03 - 400x170 No 14 -
VII.2.2/1
PART VII.2.2
Bill No. 1: Laundry to stores conversions
STERKFONTEIN HOSPITAL
Item Description Unit Qty Rate/ Tariff Amount/ Cost
8 Wall-mounted Controllers
8,1 Stand-alone controller for Midwall-Type Split Units No 66 -
mounted at 1500mm AFFL onto a 80mm round draw box
installed by electrical subcontractor. Controller to provide
following functions, - Unit On/Off, Temperature setpoint
o o
adjustment (20 C --> 24 C), Fan speed adjustment
(Low/Medium/High) and wiring to VFC occupancy sensor
provided by others within 2m of DXU for switching of DXU.
Including electrical connection to isolator provided by others.
VII.2.2/2
PART VII.2.2
BILL No.2: Laundy to Stores Conversions (HVAC)
STERKFONTEIN HOSPITAL
Item Description Unit Qty Rate/ Tariff Amount/ Cost
10 Budgetary Allowances
"Budgetary Allowance" means a sum of money included in the
Contract Sum for work intended for execution by the Contractor, the
extent of which is identified but not detailed
VII.2.2/3
SUMMARY OF TENDER SUMS: STERKFONTEIN PSYCHIATRIC HOSPITAL -
HVAC INSTALLATION
Kitchen Equipment -
Steam Installations -
HVAC -
Refrigeration -
Medical Gas -
Allowances (HVAC) -
SUBTOTAL -
PAYMENT
ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.
MAINTENANCE & INSTALLATION OF FIRE PROTECTION EQUIPMENT
Fire Doors
.01 Install double Class B Fire Doors Each 0 -
.02 Install single Class E Fire Doors Each 0 -
.03 Install single Class F Fire Doors Each 0 -
.04 Install single Class B Fire Doors in service shaft Each 0 -
.05 Self closer for Fire Doors Each 0 -
.06 Additional escapes required Each 0 -
.07 Change opening direction Each 235 -
Signage
Install escape/fire equipment signage that complies with SANS 1186-5
.01 Each 613 -
mechanically without the use of adhesives - 2 signs
Install escape/fire equipment signage that complies with SANS 1186-5
.02 Each 169 -
mechanically without the use of adhesives - 3 signs
Install escape/fire equipment signage that complies with SANS 1186-5
.03 Each 979 -
mechanically without the use of adhesives - 2 signs double
Install escape/fire equipment signage that complies with SANS 1186-5
.04 Each 186 -
mechanically without the use of adhesives - 3 signs double
Install single escape signage that complies with SANS 1186-5 mechanically
.05 Each 1 947 -
without the use of adhesives
Install single escape signage that complies with SANS 1186-5 mechanically
.06 Each 0 -
without the use of adhesives - Internally luminated
.07 Mechanically fix existing fire equipment and escape signage - 2 signs Each 0 -
.08 Mechanically fix existing fire equipment and escape signage - 2 signs Each 0 -
.06 Install a deluge sprinkler system over the bulk mobile natural gas vessel Each 0 -
Fire Walls
.01 Extend walls above fire doors to the under side of the roof sheeting/slab Each 0 -
Fire Sealing
.01 Seal services penetrating fire walls Each 0 -
Escape Routes
.01 Install a 120 minute fire wall on ground floor to protect escape route Each 0 -
Locking Devices
Install approved locking devices on doors in the escape route that would not
.01 Each 117 -
require a key to open
Smoke Ventilation
.01 Mechanical fans Each 0 -
.02 Roof Vents Each 0 -
Compartmentation of Ceilings
.01 20 Minute fire stops Each 66 -
.02 Sprinklers in all wards Item 1 12 000 000,00 12 000 000,00
1,0 Decomissioning & Engineering Preliminaries and General In the main BOQ
2,0 Ward 1
3,0 Ward 2
4,0 Ward 3
5,0 Ward 4
6,0 Ward 5
7,0 Ward 6
8,0 Ward 7
9,0 Ward 8
10,0 Ward 9
11,0 Ward 10
12,0 Ward 11
13,0 Ward 12
14,0 Ward 13
15,0 Ward 14
16,0 Ward 15
17,0 Ward 16
18,0 Ward 17
19,0 Ward 18
22,0 Laundry
23,0 Kitchen
27,0 Workshops
2 Explosive
3 General
.01 The contractor shall carry out the whole of the works with as little mess and
noise as possible and with a minimum of disturbance to adjoining premises
and their tenants.
.02 The contractor shall provide proper protection and provide, erect and
remove when directed, any temporary tarpaulins that may be necessary
during the progress of the works, all to the satisfaction of the project
manager
.03 Water supply pipes and other piping that may be encountered and found
necessary to disconnect or cut, shall be effectually stopped off or grubbed up
and removed, and any new connections that may be necessary shall be
made with proper fittings, to the satisfaction of the project manager and
engineer.
.01 Existing equipment, fittings, frames, fixtures etc. which are to be re-used
shall be thoroughly overhauled before re-fixing and making good and easing,
oiling, adjusting and repairing as necessary, replacing any damaged in
removal or subsequently and stopping up all nail and screw holes using
appropriate methods and materials, unless otherwise described.
.02 Making good of finishes shall include making good of the brick and concrete
surfaces onto which the new finishes are applied, where necessary
.03 The contractor will be required to take all dimensions affecting the existing
buildings on the site and he will be held solely responsible for the accuracy
of all such dimensions where used in the manufacture of new items (doors,
windows, fittings, etc.)
5,0 Decomissioning
Carefull Dismantling and disposing/ Storing as directed by client of Sum
Any fittings, Ancillaries, piping and sanitary ware as directed by the 1
Engineer
Page 2 of 107
STERKFONTEIN HOSPITAL WET SERVICES INSTALLATION
BILL1 -ENGINEERING, PREAMBLES AND GENERAL (EPG)
8,0 DOCUMENTATION
8,1 Preparation of As Built Drawings & Operation & Maintenance manuals
as specified
.01 Water supply system Sum 1
.02 Drainage system Sum 1
.03 Fire Installation, Smoke control system & Springler system Sum 1
10,0 Other:
.01 Project Management Sum 1
Page 3 of 107
OHS MAINTENANCE STERKFONTEIN HOSPITAL
Bill No 1.2
Plumbing and Drainage
Item DESCRIPTION UNIT QTY RATE AMOUNT
Ward 1
1.0 Decomisioning of redundant piping
Remove and take off site all redundant water
Sum 1
distribution piping
4,0 Drainage
02 water Taps No 35
03 Flush Master No 10
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 475,00 R 8 475,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 60
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 60
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 45
05 Labour Technician per hour over time Hr 20
Labour Technicians per hour Sunday and public
06 holidays Hr 10
07 Labour Technician Assistant per hour Hr 45
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
4,0 Drainage
Geysers
01 100L No - Rate only
02 150L No - Rate only
03 200L No - Rate only
04 250L No - Rate only
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 40
05 Labour Technician per hour over time Hr 15
Labour Technicians per hour Sunday and public
06 holidays Hr 7,5
07 Labour Technician Assistant per hour Hr 40
08 Labour Technician Assistant per hour over time Hr 15
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 7,5
.02 80mm m 0
.03 65 mm m 0
.04 54 mm m 0
.05 40 mm m 0
.06 32 mm m 0
.07 25 mm m 0
.08 22 mm m 0
09 15mm m 0
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No -
02 150L No -
03 200L No -
04 250L No -
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 24
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 24
08 Labour Technician Assistant per hour over time Hr 10
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 5
.02 80mm m 0
.03 65 mm m 0
.04 54 mm m 0
.05 40 mm m 0
.06 32 mm m 0
.07 25 mm m 0
.08 22 mm m 0
09 15mm m 0
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No -
02 150L No -
03 200L No -
04 250L No -
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 24
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 24
08 Labour Technician Assistant per hour over time Hr 10
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 5
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No -
02 150L No -
03 200L No -
04 250L No -
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 21
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 30
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No -
02 150L No -
03 200L No -
04 250L No -
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 21
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 30
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No 1
02 150L No 1
03 200L No 1
04 250L No 1
10 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
12 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 35
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 35
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No 1
02 150L No 1
03 200L No 1
04 250L No 1
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 35
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 70
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
.02 80mm m 0
.03 65 mm m 0
.04 54 mm m 0
.05 40 mm m 0
.06 32 mm m 0
.07 25 mm m 0
.08 22 mm m 0
09 15mm m 0
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No -
02 150L No -
03 200L No -
04 250L No 1
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 16
05 Labour Technician per hour over time Hr 5
Labour Technicians per hour Sunday and public
06 holidays Hr 2,5
07 Labour Technician Assistant per hour Hr 15
08 Labour Technician Assistant per hour over time Hr 5
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 2,5
.02 80mm m 0
.03 65 mm m 0
.04 54 mm m 0
.05 40 mm m 0
.06 32 mm m 0
.07 25 mm m 0
.08 22 mm m 0
09 15mm m 0
4,0 Drainage
02 water Taps No -
03 Flush Master No 0
Geysers
01 100L No 2
02 150L No -
03 200L No -
04 250L No -
13 Pressure Testing
Pressure Testing of water distribution system Sum 1
Pressure testing of Hot water distribution system Sum 1
16 Existing Services
Tracing and identifying of existing services PcSum 1 R 8 650,00 R 8 650,00
17 LABOUR RATES
01 Remove all redundant piping Sum 1
02 COC for distribution line Sum 1
03 Cleaning off site end of work Sum 1
04 Labour Technician per hour Hr 21
05 Labour Technician per hour over time Hr 10
Labour Technicians per hour Sunday and public
06 holidays Hr 5
07 Labour Technician Assistant per hour Hr 30
08 Labour Technician Assistant per hour over time Hr 20
Labour Technician Assistant per hour Sunday and
09 Public Holidays Hr 10
SCHEDULE NO 1 : STORMWATER . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .
SCHEDULE NO 2 : ROADWORKS . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .
SCHEDULE NO 6 : SEWER. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .
SCHEDULE NO 7 : FENCING . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . .
TOTAL OF SCHEDULE OF QUANTITIES - CIVIL AND STRUCTURAL WORK- CARRRIED OVER TO FINAL R
SUMMARY
1 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
SCHEDULE NO 1 : STORMWATER
PAYMENT
ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.
SANS 1200LE .100 STORMWATER INFRASTRUCTURE
2 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
SCHEDULE NO 2 : ROADWORKS
PAYMENT
ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.
SANS 1200M .200 ROADWORKS
.03 Supply & lay Bosun Edge Beam flush with finished road m 340
level, including concrete bedding and backing.
.06 Supply and lay charcoal colour interlocking "G" paving m2 5720
blocks, 60mm thick, including 20mm sand bedding and
sand grouting, plate vibration, complete
.02 Earthworks for Road widening at new gatehouse, fill from m3 495
cut using G7 material to underside of lower subbase
.06 Extra Over item 202.05 for supply of portland cement Tonne 13,5
.07 Supply and install Fig 3 kerbs, on Upper subbase layer, m 250
including concrete bedding and haunching
.08 Supply, lay & slush, G1 Gase, 150mm thick, compacted m3 270
to 88% Apparent Density
.09 Supply and lay coloured interlocking paving blocks, 80mm 2 1800
m
thick, including 20mm sand bedding and sand grouting,
plate vibration, complete
.11 Provide for traffic + pedestrian accomodation, incuding SUM 1 R400 000,00 R400 000,00
design and approval of design. Include for maintenance of
traffic + pedestrian accomodation for the construction
period + 3 provisional extra months
.01 Road markings to include white and yellow broken and un-
broken lines of width 100mm, to include white characters
and symbols
Reinstatement of faded pedestrian and road marking by
use non-reflectorized paint applied at nominal rate of 0,42
l/m2 m2 1900
3 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
ITEM NO
PAYMENT
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.300 WATER MAINS (INTERNAL)
SANS DB .08 Protection of exposed existing other services that must PC 1 R50 000,00 R50 000,00
8.3.5 remain live, eg existing water pipes, electrical cables,
fibre cables, sewer pipes, CCTV cables, etc. Include for
immediate repairs to maintain the live status of the
service. NOTE - existing services damaged by neglect
will be to the Contracor's own cost.
4 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
ITEM NO
PAYMENT
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
5 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
ITEM NO
PAYMENT
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
6 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
ITEM NO
PAYMENT
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.400 PUMP HOUSE BUILDING
SANS 400 BUILDING STRUCTURE in compliance with the
National Building Regulations and Building
Standards Act 103 (1977), aa amended by SABS 400-
1990
7 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
PAYMENT
ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.01 Supply or manufacture all steel pipework, copon lined PC Sum 1 R403 000,00 R403 000,00
internal & external, to re-configure to suit new pumps,
including all couplings , flanges, gaskets, cadmium plated
nuts & bolts, etc.
.02 Provide Shop drawings of the proposed pipework, for PC Sum 1 R80 000,00 R80 000,00
approval, based on the preliminary design as per Drg No
J1901-D-STE-W-C-CON-420
8 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
SCHEDULE NO 6 : SEWER
ITEM NO
PAYMENT
DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.03 Flush the existing sewers pipe, using a watercart, and Rate/day 3
discover any blockages. Blockages to be recorded for
attention.
.06 Allowance for repair to sewer reticulation pipes and PC Sum 1 50 000,00 R50 000,00
manholes, including supply of all material, excavation and
backfill
9 of 13
STERKFONTEIN HOSPITAL OHS COMPLIANCE SERVICES
SCHEDULE NO 7 : FENCING
PAYMENT
ITEM NO DESCRIPTION UNIT QTY RATE AMOUNT
ITEM
.
.700 FENCING
10 of 13
OCCUPATIONAL HEALTH AND SAFETY COMPLIANCE SERVICES
AT STERKFONTEIN PSYCHIATRIC HOSPITAL
FINAL SUMMARY
Section Page Amount
No No
SUB-TOTAL R
ELECTRICAL INSTALLATION
(Brought forward - Part B)
(Value-Added Tax excluded) Item
SUB-TOTAL R
SUB-TOTAL R
SUB-TOTAL R
SUB-TOTAL R
CIVIL WORKS
(Brought forward - Part F)
(Value-Added Tax excluded) Item
SUB-TOTAL R
-156-
JBCC Edition 4.1 March 2005
The employer's objectives are to deliver public infrastructure and services using labour-intensive methods in accordance with EPWP guidelines
The works are refurbishment and upgrading of the various wards at Sterkfontein Psychiatric Hospital. The other engineering works are civil, Mechanical and Electrical upgrade.
Labour intensive works shall be constructed/Maintained using local workers who are temporarily employed in terms of the scope of work. Labour-Intensive works comprise the
activities such as those described in SANS 1921-5, Earthworks activities which are to be performed by hand, and its associated specification date.
The works are refurbishment and upgrading of the hospital facilities at Sterkfontein Psychiatric Hospital.
The site is located at Sterkfontein Hospital, Honingklip 178 IQ, Krugersdorp, ( 26° 03´ 25.76" S; 27° 44´ 49.55" E). Buildings to be refurbished are as shown on the site map
2 ENGINEERING
2,1 Design services
responsibilities for design and related documentation:
Works designed by, per design stage:
Concept, feasibility and overall process …...................................................................................................
Basic engineering and detail layouts to tender stage ................................................................................
Final design to approval for construction stage ...........................................................................................
Temporary works …………………………...…………………........................................................................
Preparation of as-built drawings ………………………...…..........................................................................
Contract C3.1
Part C3: Scope of Work Page 1 of 17 Scope of Work
JBCC Edition 4.1 March 2005
2,4 Drawings
Architectural drawings - Refer to Book 2 of 2 (Annexure A)
Electrical drawings - Refer to Book 2 of 2 (Annexure B)
Mechanical drawings -Refer to Book 2 of 2 (Annexure C)
Civil and Structural drawings - Refer to Book 2 of 2 (Annexure D)
3 PROCUREMENT
3,1 Preferential procurement deliverables
Where the contractor claims a preference in the Preferencing Schedule for subcontracting work to
CIDB registered contractors having specified CIDB contractor grading designations, the contractor
shall deliver deliverable C1, Provide business opportunities for targeted enterprise, in accordance
with the requirements of the CIDB Specification for Social and Economic Deliverables in
Construction Works Contracts (SSED) (see www.cidb.org.za) and the following associated
specification data associated with SANS 1914-1 which shall have precedence in the interpretation
of any ambiguity or inconsistency:
2,7 The employer’s representative is the Project Manager identified in the Contract Data
2,17 A targeted enterprise is a CIDB registered contractor who has a contractor grading
designation of 1, 2, 3 or 4.
The targeting strategy is A.
The contract participation goal is as proposed in the Preferencing Schedule for which
a preference was granted.
The contract participation goal may only be achieved by subcontracting work to one
or more targeted enterprises to perform commercially useful functions in the
performance of the contract.
The targeted enterprise declaration and letters of undertaking are to be submitted
within three (3) months of the commencement of the contract.
3,2 Provide employment and skills development opportunities to targeted labour
The contractor shall deliver Deliverable B1, provide employment and skills development opportunities The contractor shall deliver Deliverable B1, provide employment and skills
development opportunities to targeted labour, in accordance with the requirements of the CIDB Specification for Social and Economic Deliverables in Construction Works Contracts
(SSED) (see www.cidb.org.za) and the following associated specification data, which shall have precedence in the interpretation of any ambiguity or inconsistency:
4.3.1.1 The following activities are to be carried out by temporarily employed local workers:
● earthworks activities which are to be performed by hand, namely. Trench
excavation, compaction of backfilling to trenches in areas not subject to traffic,
clearing and grubbing, shaping, loading, haul, off-loading, spreading,
compaction and grassing
● stone pitching and rubble masonry
● manufactured elements
Contract C3.1
Part C3: Scope of Work Page 2 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Variations
Prior approval to be obtained from GDID before works proceed
....................................
Additional clauses
....................................
state additional requirements and identify other activities to be performed by hand, as required
The Schedule which is to be attached to payment claims in terms of clause 4.3.2.2.8 of SSED is as shown in figure 1.
1. The successful tenderer will be required to subcontract a minimum of 30% of value of the contract to exempted micro enterprises (EME's) and/or qualifying small business
3.3.1
enterprises (QSE's) in accordance with the Preferential Procurement Regulations, 2017.
2. The Department will avail the list of all suppliers registered on a database approved by the National Treasury to provide the required goods or services in respect of the applicable
designated groups mentioned in subregulation (2) of Regulation 9 of the Preferential Procurement Regulations, 2017 from which the tenderer must select a supplier.
3.3.2 Employ a maximum of 40% of the total labour requirement of the contract from the local community.
The salaries of the 40% labour from the community is to the contractor's account and no funds from the EPWP allowable will be used for salaries.
3.3.3 The total labour requirements of the contract should be in the following proportions:
● a minimum of 55% to women;
● a minimum of 55% to youth who are between the ages of 17 and 35 years of age; and
● a minimum of 2% to persons with disabilities.
EPWP budget will be managed in conjunction with EPWP personnel from the employer.
The contractor shall deliver the following deliverables as described in the CIDB Specification for Social and Economic Deliverables in Construction Works Contracts (SSED) and the
following associated specification data:
1) Deliverable ……
2) Deliverable ……
The Specification Data shall have precedence in the interpretation of any ambiguity or inconsistency between it and these standards
Each item of Specification Data given below is cross-referenced to the clause in the standard to which it mainly applies
Variations:
1)……
2)………..
Additional clauses:
1)…….
Deliverable ………
Clause Specification data
Variations:
1)……
2)………..
Additional clauses:
1)…….
Contract C3.1
Part C3: Scope of Work Page 3 of 17 Scope of Work
JBCC Edition 4.1 March 2005
4 CONSTRUCTION
4,1 Works specification
The works specifications that are applicable to the works are marked with a cross hereunder in the relevant box(es). The specifications are obtainable on request from the Employer.
relevant box(es). The specifications are obtainable on request from the Employer.
Architectural, Structural and Civil
X General Specification for Material and Methods to be used for
Building Contracts GP/ASC
Electrical
X Standard quality specifications for Intercom Systems GP/E1/1
X Standard quality specifications for Public Address Systems GP/E1/2
X Standard quality specifications for Silent Call Systems GP/E1/3
X Standard quality specifications for Access Control Systems GP/E2/1
X Standard quality specifications for Intruder Alarm Systems GP/E2/2
X Standard quality specifications for Fire Detection Systems GP/E2/3
X Standard quality specifications for Standby Generators GP/E4/1
X Standard quality specifications for UPS Systems GP/E4/2
X Standard quality specifications for Solar Power Systems GP/E4/3
X Standard quality specifications for General Installations GP/E5/1
X Standard quality specifications for Material and Equipment GP/E5/2
Mechanical
X Standard quality specifications for Heating Installations GP/M2
X Standard quality specifications for Steam and Condensate Reticulation GP/M4
X Standard quality specifications for Medical Gas and Vacuum Systems GP/M5
X Standard quality specifications for Air Conditioning Installations GP/M6
X Standard quality specifications for Refrigeration Services GP/M7
As per CD attached
1 Standard General Specification for materials and installation Rev GP / ASC Rev 0
2 Standard Quality Specification for general Electrical Installations
3 Quality Specification for Electrical Materials and Equipment
4 Standad Specifications for Communications, security and specialized power supply systems
5 Standard Quality Specifications for Mechanical Equipment
Architects specification
Structural Engineer specification
Civil Engineer specification
Electrical Engineer specification
Mechanical Engineer specification
Fire Specialist specification
ICT Specialist specification
Health Technologies specification
Health and Safety specification
4.1.5 Certification by recognised bodies
The contractor shall provide all plant, equipment, materials, scaffolding, formwork, tools and the like necessary for the execution of the works
Contract C3.1
Part C3: Scope of Work Page 4 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Workmanship samples
The supervisor may instruct the contractor to furnish samples of workmanship for his approval. Where the supervisor requires an assembly of various elements of the building or
installation which is not incorporated in the works, the contractor shall arrange such an assembly at the employer's expense and the contract value shall be adjusted accordingly.
Shop drawings
Only shop drawings and samples submitted for approval by the contractor shall be considered by the supervisor. The supervisor's approval of shop drawings or samples shall be
limited to checking for general conformity with design and specification and shall not alter the design responsibilities in terms of the agreement. Where shop drawings are called for:
Operating and instruction manuals are to be submitted to the following employer's required format and manner:
As-built drawings are to be submitted to the employer in the required format and manner as detailed in the Standard Specification for Documentation
No known services.
4.3.2 Dimensional accuracy
The contractor shall within four (4) weeks of the access date check the existing levels, lines, profiles and the like affecting the works and satisfy himself as to the dimensional
accuracy of work previously executed. The contractor shall forthwith notify the supervisor of any inaccuracy.
Any existing services encountered during the execution of the works such as underground cables, pipes or sewers should be notified to the project manager and the contractor is to
suspend all affected work in the immediate vicinity until instruction to terminate, divert, continue to be used either temporarily or permanently has been given by the project manager.
Contract C3.1
Part C3: Scope of Work Page 5 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Service - Water
The contractor shall make and upon completion remove all the necessary temporary plumbing connections to the employer’s water supply at designated points and make use of
water free of charge for construction purposes only.
Service - Electricity
The contractor shall make and upon completion remove all the necessary temporary installation to the employer’s electrical supply at designated points and make use of electricity
free of charge for construction purposes only.
Ablution facilities
The employer shall permit the contractor usage of the existing ablution facilities. The contractor shall maintain such facilities in a thoroughly clean and tidy condition and make good
any damage thereto at his own expense.
The contractor shall provide, maintain and remove on completion of the works an office for the exclusive use of the project manager and supervisor, minimum size 4 x 3 x 3m high
internally, suitably insulated and ventilated, provided with electric lighting and fitted with boarded floor, table and eight chairs. The office shall be kept clean and fit for use at all times.
Sheds
The contractor shall provide, maintain and remove on completion of the works sheds for the proper storage of materials and for use by the contractor's workers
Water and electricity
The employer does not warrant that any water or electricity supply that may exist is adequate for the proper execution of the works. Where such supply is inadequate, the contractor
shall provide an adequate supply at his own expense.
Service - Water
The contractor is to provide and remove and make good upon completion all the necessary temporary plumbing connections and purchase water from the local authority for the
works at his own cost.
The contractor shall make and upon completion remove all the necessary temporary plumbing connections and water meters to the employer’s water supply at designated points and
be responsible for costs associated with all water consumption.
Service - Electricity
The contractor is to provide and remove and make good upon completion all the necessary temporary electrical connections and installations and purchase electricity from the local
authority for the works at his own cost.
Ablution facilities
The contractor is to provide, erect where directed, and remove on completion of the works, ablution facilities and shall maintain such facilities in a thoroughly clean and tidy condition.
Telecommunication facilities
The contractor shall provide the following telecommunication facilities and shall be entitled to recover usage costs from the users thereof:
● Telephone
● Facsimile
● E-mail
Security of the works
The contractor shall take all appropriate measures for general security of the works.
Contract C3.1
Part C3: Scope of Work Page 6 of 17 Scope of Work
JBCC Edition 4.1 March 2005
The contractor shall provide all temporary measures to protect / isolate the existing and / or sections of the occupied works and remove such measures on completion.
The contractor shall provide, erect where directed, maintain and remove on completion of the works a notice board, size 2,44m wide and 2,89m high, according to the standard
drawing available from the employer, constructed of suitable boarding with flat smooth surface and with edging bead 19mm thick round outer edges and projecting 12mm from face
of boarding and rounded on front edge. The board shall be securely fixed to hoarding, where hoarding is provided, or fixed to and including a suitable supporting structure of timber or
tubular posts and braces.
The lettering is to be 50mm and 100mm "sans serif" in ivory white on the blue background and in 100mm "sans serif" in navy blue on the ivory white background. The inscription, in
one language only, which must bear the approval of the project manager. No other names or notice boards may be erected without the written approval of the project manager.
Sketch drawings of all proposed names or notice boards must be submitted to the project manager for approval, before being prepared and erected on site. These sketch drawings
must not only show the full content of the proposed names or notice boards, but also the position and locality in which the boards will be erected.
The contractor shall give adequate notice to the project manager whenever any work or material which is subject to inspection or remeasurement is to be covered or concealed in
any way. In default of such a notice being received timeously by the project manager such work shall be exposed and later made good at the contractor's expense.
Project execution program to be supplied to ensure completion of the works in eight (8) months. The contractor shall be responsible for the planning and programming of the works in
sufficient detail as to represent the units of work to enable the project manager to assess the progress of the works.
Contract C3.1
Part C3: Scope of Work Page 7 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Microsoft Projects.
5.1.8 Environment
Care to be taken that to minimize the dust nuisance, noise levels, pollution of streams, and inconvenience to, or interference with the public or others arising out of the execution of
the works
- start-up; operation of the works ; special arrangements associated with operating plant and
machinery, etc.;
- training and technology transfer;
- take over;
- operational maintenance (if any), after completion;
- work which contractors may carry out after completion has been certified (in addition to correcting
defects); and
- arranging access for correction of defects
The contractor shall carry out preliminary tests on plant and equipment. The results of these preliminary tests shall be forwarded to the project manager.
Where the contractor fails to carry out preliminary tests the project manager may engage others to execute the tests. Any expense or loss incurred by the employer resulting from
such engagement may be recovered in terms of the contract.
Maintenance
The contractor shall execute maintenance for the following services from completion until the defects date. Maintenance shall include for the replacement or repair of all components
and include for stationary, replacement parts, lubrication, cleaning material, etc.
Preventative maintenance
The contractor shall:
● Visit the installation at least once per month.
● Make all necessary adjustments for the correct operation of the plant.
● Maintain all lubrication levels.
● Clean all relevant machinery / equipment and affected plant rooms.
● Record all work performed in a logbook.
Scheduled services
The contractor shall:
● Perform all scheduled services in accordance with the operating and maintenance manuals.
● Complete all maintenance schedules.
● Clean all relevant machinery / equipment and affected plant rooms.
● Record all services in a logbook.
Contract C3.1
Part C3: Scope of Work Page 8 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Break downs
The contractor shall:
● Attend to all call outs with due diligence.
● Make good any defects due to inferior material and/or workmanship.
● Clean all relevant machinery / equipment and affected plant rooms.
● Record all work performed in a logbook.
Vandalism
The contractor shall:
● Attend to all call outs with due diligence.
● Prove vandalised breakages.
● Submit a price for repairs to the agent.
● Effect repairs on receipt of instruction.
● Clean all relevant machinery / equipment and affected plant rooms.
● Record all work performed in a logbook.
Administration
The contractor shall:
● Submit all relevant contact details to the maintenance site foreman including the start and end dates of the maintenance period.
● Supply a triplicate record type logbook for the installation to be kept in the office of the foreman
● Report to the foreman when visiting the site.
● Sign off all logbook records with the foreman or his duly appointed representative.
● Not shut down any part of the plant or installation without the approval of the institution management
Convene three quarterly site meetings for the purpose of performance tracking. This meeting is to be attended by the site foreman, the employer's maintenance inspector and
●
the agent.
● Complete a site meeting record in the logbook, which must be signed by the foreman and the agent
● Submit a monthly invoice with copies of the monthly site inspection record, any service records and all relevant schedules
The contractor shall erect an effective rainfall gauge on the site and record daily rainfall figures in a book. Such book shall be handed to the project manager at site meetings. Any
rainfall which is considered to justify a compensation event is to be made known to the project manager within one (1) week of occurrence.
All instructions shall be via the site instruction book. Communication via e-mail is acceptable.
Contractor to indicate key personnel on site. The departmental project manager will be the liaison
officer for GDID.
The indicative duties of the project manager , supervisor and employer are as indicated in
Annexure A.
The contractor shall keep on site a set of minutes of all site meetings, daily records of resources (people and equipment employed), a site instruction book, a complete set of contract
working drawings and a copy of the procurement document and make these available at all reasonable times to all persons concerned with the contract.
Payment to the contractor will be done as per the departmental financial systems.
5.1.17 Daily records
Bonds and guarantees will be kept with contract administration and on producing the completion certificate this will be released.
Before the employer's agent issues any certificate that includes any payment in respect of work done or goods supplied by any subcontractor, the contractor is to furnish reasonable
proof of payments to subcontractors. These shall be made available at all reasonable times to all persons concerned with the contract. A monthly report on job creation should be
submitted together with claims signed off by contractor, construction project manager and contractor liaison officer
5.1.26 Permits
No permits required.
Contract C3.1
Part C3: Scope of Work Page 9 of 17 Scope of Work
JBCC Edition 4.1 March 2005
The contractor shall provide, erect, alter as necessary, maintain, remove and make good on completion of the works, suitable hoardings with gantries, fans, safety screens, barriers,
access gates, covered gangways as necessary for the enclosure of the works or portions thereof for protection of the public, employees of the contractor and others, all to the
satisfaction of the project manager.
The contractor is referred to the various sections described in clause 1.2 hereof and is to allow for suitable hoardings, safety screens, fences, barricades and such like as necessary
for the enclosure of each section for protection of the public and scholars, and remove and make good on completion of each section.
5,3 Annexures
Annexure A: EPWP training monthly summary sheet, Daily site attendance register and Beneficiary List
Annexure B: Calculation of penalties
Annexure C: EPWP branding example
Annexure D: EPWP notice board format example
Contract C3.1
Part C3: Scope of Work Page 10 of 17 Scope of Work
JBCC Edition 4.1 March 2005
Course Code
Number of
Number of
Start Date
End Date
Trainees
Number
Course
Initials
Name
Days
Total
Surname First Name ID Number Birth Date Cost Status Training Provider
10
11
12
13
14
15
16
17
18
19
20
Signature Official
Contract C3.1
Part C3: Scope of Work Page 11 of 17 Scope of Work
Tender T2.1
Part T2: Returnable Documents Page 11 of 17 List of Returnable Documents
JBCC Edition 4.1 March 2005
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
Signature of CLO
Contract Contract
Part C3: Scope of Work Page 12 of 17 Part C3: Scope of Work
Tender T2.1
Part T2: Returnable Documents Page 12 of 17 List of Returnable Documents
JBCC Edition 4.1 March 2005
Name of Contractor
Project Name
Validation: Cannot
be more than 23
days per person per
Project Number 1 = At Work A = Absent L = Leave SC = Site Closed month.
Month: SL = Sick Leave P = Public Holiday 2 = Training
Rate per Total Work Total Training Total work days &
Surname Initials ID Number Birth Date 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
day ( R) days Days training days
10
11
12
13
14
15
16
17
18
19
20
20 TOTALS TOTALS
Contract C3.1
Part C3: Scope of Work Page 13 of 17 Scope of Work
Tender T2.1
Part T2: Returnable Documents Page 13 of 17 List of Returnable Documents
ANNEXURE B: CALCULATION OF PENALTIES JBCC Edition 4.1 March 2005
R0 - R500 nearest R5
R501 - R1 000 nearest R10
R1 001 - R5 000 nearest R50
R5 001 - and above nearest R100
Contract C3.1
Part C3: Scope of Work Page 14 of 17 Scope of Work
EXAMPLE JBCC Edition 4.1 March 2005
= R687,50/day
= R690,00/day
Penalties must be calculated proportionally on the estimated contract value of each phase
Contract C3.1
Part C3: Scope of Work Page 15 of 17 Scope of Work
Annexure C: EPWP branding example
Contract C3.1
Part C3: Scope of Work Page 16 of 17 Scope of Work
Annexure D: EPWP notice board format example
Contract C3.1
Part C3: Scope of Work Page 18 of 18 Scope of Work
JBCC Edition 4.1 March 2005
The site is located at Sterkfontein Hospital, Honingklip 178 IQ, Krugersdorp, ( 26° 03´ 25.76" S; 27° 44´
49.55" E). Buildings to be refurbished are as shown in the room data sheets
2 WORK AREA
3 ACCESS
The access to site is from Honingklip 178 IQ street, Krugersdrop. The contractor must familiarise himself with the
site as no claim will be entertained in this regard.
Contract C4.1
Part C4: Site Information Page 1 of 1 Site Information
Enq. : Mr Mojalefa Monyela
Email : Mojalefa.Monyela@gauteng.gov.za
Disclaimer for: DID 17/08/2021 – Sterkfontein Psychiatric Hospital Occupational Health and
Safety
(OHS) Compliance Services
All tenderers are to note that, the responsibility to check and verify that all the information
including but not limited to the tender document and drawings is complete lies with the
tenderer.
GDID will accept queries until the day before of the closing date of the tender through
provided Email address and will respond timeously. The tenderer is to sign this
disclaimer form and submit it along with the tender documents.
GDID will not take any responsibility for the missing information in the tender document
and Drawings thereof.