Mobily STC
Sharing Operator Antenna: NA NA
Sharing Operator RRU: NA NA
Sharing Operator MW: NA NA
Before Implementation:
Existing MW Antenna: 1
0.6m( 4+0 )NEC
Total GSM Antennas: 3
RRU Quantity: 4
4 *BOX(2*FXDB+2*FXEB+1*ARMA+1*FRGT+1*FRGU)
Ant. Type1: RV4-65D-R5-V6
for G900/U2100/L800/L1800/L2100
Ant. Qty: 3
Ant. Dim: L2.688 X W 0.35 X D 0.208
Ant. Type2:
for
Ant. Qty:
Ant. Dim:
Total MW Antenna: 1
0.6m( 4+0 )NEC
After Implementation:
Total GSM Antennas: 6
RRU Quantity: 4
4 *BOX(2*FXDB+2*FXEB+1*ARMA+1*FRGT+1*FRGU)
Ant. Type2:
for
Ant. Qty:
Ant. Dim:
New RRU Qty:
Total MW Antenna: 1
(1*0.3) NOKIA
Sector A:
Add New Antenna
Keep Existing both SEC A Ant's (RV4-65D-R5-V6 For
G900/U2100/L800/L1800/L2100 ) And
need Instal new ANT AEHC at sec A
Azimuth : 35 Height: 35
Mount Proposal : NO
Mount Quantity : NA
Azimuth : 35 Height: 35
Sector B:
Add New Antenna
Keep Existing both SEC B Ant's (RV4-65D-R5-V6 For
G900/U2100/L800/L1800/L2100 ) And
need Instal new ANT AEHC at sec B
Mount Proposal : NO
Mount Quantity : NA
Sector C:
Add New Antenna
Keep Existing both SEC C Ant's (RV4-65D-R5-V6 For
G900/U2100/L800/L1800/L2100 G119
NEED SHIFT RRU and install ANT SEC C AEHC at existing pole
Mount Proposal : NO
Mount Quantity : NA
NEED SHIFT RRU and install ANT SEC C AEHC at existing pole
BBU/Cards Solution:
dismantle NEC IPASSO 400 and need new MSS8 FOR NEW LINK
Existing DCDU:
NA
Existing DCDU
DCDU Proposal :
NA
* Need to INSTALL 4 new CB …....................... 2*16A for MSS8 and
2*100A for new FPFH for new 3*AEHC
DC Calculation :
Remakrs:
Battery :
NA
• BATTERY TYPE:
NA
• Batteries Qty:
NA
• Capacity:
• Capacity:
Remarks: ________________
• Space Available:
GPS :
NA
Existing GPS
SCECO Breaker Information :
CAPACITY: NA A
NA
Meter CAPACITY: NA A
Transformer Information :
Generator Information :
Generator Brand:
CAPACITY: 100 A NA
SCECO VOLTAGE PH to PH
VOLTAGE: 380 V
EXISTING PHASE-01
Current: 9.8 A
EXISTING PHASE-02
Current: 9.9 A
EXISTING PHASE-03
Current: 5.2 A
EXISTING PHASE-01
NA
Current: A
EXISTING PHASE-02
NA
Current: A
EXISTING PHASE-03
NA
Current: A
AC cable size Information :
NA
SM istalled
Site Final Need Access Shelter In(BTS/Rect
Site ID Need crane Project SCOPE
Type Access contact /ODU fier
cabinate )
Rectfier
Sophia
HAW2359 GF-36m NA NA NA ODU cabinet & 2.6 NR Introduce + MW Link
Phase 4
BTS
Nokia NEC
na na NA 0 0 0 0 0 1 0
EXISTING TI&TX DATA
NEC
0.9 1.2 1.8 2.5 3.5 900 Band ANT Type 3G Band ANT Type
1800 Power
Band/LTE ANT Type AEHC ANT Type C-BAND ANT Type wifi GPS Ant F/FL cable
Band/2100 length
share share 0 0 NA NA NA 0 FL 45
Nokia NEC
4
*BOX(2*FXDB+2*FXEB
45 1 0 0 0 0 0 0
+1*ARMA+1*FRGT+1*F
RGU)
Nokia _Planed TL Data
NEC Antena Data
1800
1.2 1.8 900 Band
ANT Type 2G Band ANT Type Band/LTE ANT Type AEHC
LTE 800
Band/2100
New SM
ANT Type C BAND ANT Type wifi GPS NEW RRU Action on tower
Location
4
3*AEHC 0 0 NA 0 NA *BOX(2*FXDB+2*FXEB+1*AR
MA+1*FRGT+1*FRGU)
Site Inforamation