Professional Documents
Culture Documents
2
1 Strong commitment
Godrej E&E has shown strong & dedicated commitment in the past
to ensure on-time completion of projects in challengingconditions
Why Godrej?
3
15 Dec 1951
Lighting, etc.,
HVAC
• 1500+ Manpower provision
Plumbing
SITC of water supply, drainage system, sanitation,
• Vast pool of Technically qualified
STP/ETP, Rain water harvesting, etc., along with
Project Managers & Engineers
designing.
• Strategic Partnership with
Fire Protection the best in field
SITC of Fire hydrant and sprinkler system, fire
extinguisher, Fire alarm & Public address system. • Reputation of completing projects on
time
Bus Duct
SITC of Bus Duct for high rise building • Strong financial backup
along with designing.
11345 Cr
11167 Cr
10029 Cr
9992 Cr 9904 Cr
8989 Cr
8402 Cr
Adani Electric 79 Cr
1
© GODREJ & BOYCE | GODREJ INTEGRATED OFFERING
1
Godrej Business District, Vikhroli
1
© GODREJ & BOYCE | GODREJ INTEGRATED OFFERING
2
Godrej Business District, Vikhroli
• Construction
• MEP
• Interiors
• GBCS
1
© GODREJ & BOYCE | GODREJ INTEGRATED OFFERING
3
Project : CAPGEMINI IT PARK, VIKHROLI, MUMBAI
• Client: Godrej Construction
• Area = 11Lac sqft
• Piping : 80000 rmt
• Peak manpower strength= 140
• Scope Value: 14Cr
Project - ITC Green Centre Bangalore PANEL ROOM
• Scope: Complete MEPF services
• Duration: 12 Months
• Scope Value: 58Cr
• 2280 TR of HVAC FPS PUMP ROOM
19
MEP
2
© GODREJ & BOYCE | GODREJ INTEGRATED OFFERING
1
IICC Dwarka HIAL Hyderabad
India International Convention & Expo Centre (IICC), Dwarka Hyderabad International Airport Ltd. expansion (HIAL)
Flagship project of GOI
• Client: L&T Const. • Client: L&T Const.
• Scope: Fire Suppression Systems • Scope: Fire Suppression Systems & PHE
• 213212mtr of FPS piping with 51518 nos. of sprinklers & 595 no. • 98000 mtr of FPS piping with nos. 300 of internal & external
• Flipkart Big Box Ware House, under Kalash Program • Sify Greenfort, Noida Data Center
• Client: Flipkart (Wallmart) • Serving to the largest service provider, systems integrator, and all-in-
• Scope: FPS-FAPA + Electrical one network solutions company on the Indian subcontinent
• Scope Value: 60 Cr • Completed SITC Electrical Integration 12 Cr
• 2 Lac. Mtr. Of Piping with more than 50k Sprinklers in 24 mtr. • Completed SITC HVAC Integration 8 Cr
building on completion inspite of pandemic. • Ontime completion inspite of pandemic.
GODREJ INTEGRATED
PROJECT
Project: SAKRA WORLD HOSPITAL, Bangalore Project: ITC Guntur, Andra Pradesh.
Client: Takshashila Healthcare & Research Service Pvt. Ltd Client: ITC
Total Bed : 310 Bed Hospital Area: 10,00,000 SFT
Scope : MEP Scope : Electrical, PHE & FPS
25
Bangalore International Exhibition Centre – Reliance Twin Tower, Navi Mumbai
IMTMA
32
400/220kV Substation Projects
400kV S/S with 50MVAR Reactor at Samba , Jammu 400/220KV 500MVA Power Transformer, Boisar
400kV S/S with 315MVA Transformer at Kharagpur 400/220KV 500MVA Power Transformer, Kala
220/132kV GIS Substation Projects
220/132kV GIS, Sagardighi, West Bengal 220/132kV GIS, Sagardighi, West Bengal
220/132kV GIS, Sagardighi, West Bengal 132/33kV GIS ,Salar, West Bengal
Adani - GC works for 12 MW Expansion of Data Center
Chennai, Siruseri
35
Project details
NAME AND NATURE OF WORK: Adani - GC works for 12 MW Expansion of Data Center Chennai, Siruseri
Siruseri Sipcot IT park Chennai Old Mahabalipuram Road, Near Chennai, Siruseri, Tamil
LOCATION:
Nadu 603103
Project Brief:
AdaniConnex Private Limited (“AdaniConnex”) is a 50:50 joint venture (JV) between of
Adani Enterprises Ltd., the flagship company of the Adani Group and EdgeConneX a
PROJECT BRIEF
leading global data center operator with 50 facilities in 30 markets around the world.
AdaniConneX will focus on building a network of hyperscale data centers in India starting
with Chennai.
8.1Total ten (10%) percent of Contract Value (including of applicable GST) as an advance shall be paid in two (2) parts –
8.1.1 Initial advance of 5% of Contract Value (including applicable GST) shall be paid as an Initial advance within fifteen (15) days from the
date of receipt of documents:
Mobilization Advance
8.1.2 Balance advance of 5% Contract Value (including of applicable GST) shall be paid as a mobilization advance within fifteen (15) days
from the date of receipt of documents:
8.2.1 Ninety (90%) percentage of the Contract Price along with applicable GST shall be released against monthly progressive Running
Account (RA) Bills on pro rata basis within thirty (30) days from the date of receipt of Invoice along with all other required documents after
recovering the advance amount mentioned below point no. 8.2.3 –
Intermediate / Progressive
8.2.2 Ten percentage (10%) shall be recovered as a retention amount from each progressive running account (RA) Invoices.
Payments:
8.2.3 Above 8.1 mentioned advance (a. Initial advance and b. mobilization advance) shall be recovered on pro-rata basis commencing from
1st RA Invoice and same shall be recovered in full when the RA bill certification reached 80% of the contract price.
Intermediate payment shall be processed on submission documents:.
RETENTION Retained retention amount of Ten percentage (10 %) shall be recovered from each progressive Invoices.
SCOPE OF WORK
Electrical HVAC
Sr. Makes / Mfg Makes / Mfg
Item Description Qty Sl.No. Item Description Qty
No Considered Considered
1 Pumps 28 Xylem
2 Chiller 0 RO items.
Wire- KEI 3 PAC 0 RO items.
1 Point Wiring 2536 Points
MS Conduit- BEC 4 CAC 5,631 Unified Profile
2 Industrial Plug Soc 2005 Nos. 5 AHU 6 Edgetech
6 Fan 11 Kruger
3 GI Conduit 18.8 KM BEC
7 Pipe 6,230 Jindal
HT-LT Cables with
4 175 KM KEI 8 Valves 1,343 Advance
Termination
9 Drain 1,260
5 Tray & Trunking 20 KM Slotco
10 Duct 3,490 Ductofab
6 Busduct 900 mtr. Godrej 11 BTU 14 Schenitech
7 Earthing Strips 16 KM Local 12 ADP 4,521 Cosmos
8 Light Fixtures 2075 Nos. Crompton/ Bajaj 13 Insulation 9,558 Armacell
14 Expansion Tank 0 Anergy
Installation of RMU, HT- LT 15 THERMAL STORAGE 3 Triozone
9 103 Nos.
Panels, Transformer, UPS 16 Dosing 4 Vasu Chem/nalco
Supports (C-Strut, Z 17 VRF 5,226 Daikin
10 10 KM 18 Fire Coating 1,175 3M Flambar
angles)
11 Liasoning Work 1 LOT 19 Fire Sealant 4 Hilti
20 Heat Load Testing 3,614 Unified Profile
12 Testing Work 1 LOT
SCOPE OF WORK
HSD
Intergen
Sr.
Item Description Qty Sr. No Item Description Qty
No
1 Gas Flooding System 1 Lot
underground Double Wall 2 Pipe Sch 80 seamless 9216 Mtr
Horizontal cylindrical HSD storage 3 LED type display sign board 37 No.
1 tank 80 KL 2 Set 4 Standard Nozzle 175 No.s
underground Double Wall 5 Acoustic Nozzles 350 No.s
Horizontal cylindrical HSD storage
2 tank 40 KL 2 Set
Fire Protection
3 MS Pipe 1768 Mtr
4 Valves 642 Nos Sr. No Item Description Qty
41
Dedicated task-force to be created for large scale projects
On-site task force to be create Periodic cadence setup for on-site project
reporting directly to respective division reviews at multiple levels
heads at HO
LoB head
LoB head
Execution head
HO team
Purchase head
Design head
Safety head Procurement Execution
head head
PROJECT MANAGER
d) Dedicated Project team with experienced project manager directly reporting to Area Execution Head
5. All approval processes of all the functions with high priority approach.
Site Mobilization Timelines
Sr. No. Description Timeline
1 Office setup 2 weeks
2 Organization Chart 1 Week
3 Milestone Schedule 2 Weeks
4 Drawings Submittal Schedule 1 Weeks
5 Technical Data Submittal schedule 1 Weeks
6 Logistic Plan 1 Weeks
7 Manpower Histogram & Productivity Chart 2 Weeks
8 Communication Protocol 1 Week
9 Long lead item tracker 2 Weeks
10 Billing Schedule 2 Weeks
11 Cash flow Statement 2 Weeks
12 EHS management Plan 2 Weeks
13 Project Quality Plan 3 Weeks
14 Project Work Schedule 3 Weeks
Note: All dates are from date of receipt of LOI
Milestone schedule
Note: Schedule is indicative and may change depending on work front availability and A class material delivery.
Manpower Histogram
Manpower Histogram
300
20
250 20
20 20
200
140 10
MANPOWER
120 80
120
150 60
80
100 60
50
60 60
40 50 15 40
40 15
50 25 15 15 20 20 20 20
30 10 15
15 15 15 20 20 20 20 10 10
10
5 10
5 10 10 10 10 10 5 10
5 10
5
0
Aug-22 Sep-22 Oct-22 Nov-22 Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23
HSSD PHE Gas Flooding System FPS HVAC Electrical DG low side work
Note: Histogram is indicative. Actual manpower may vary according to work front availability, approvals and other site conditions & site requirements.
Site mobilization plan – Proposed Site Office & Store
54
Organization Inhouse Credentials
In-house expertise to carry out LEED facilitation, Energy Simulation, Day Lighting
Analysis, Life Cycle Assessment, Fundamental & Enhanced Commissioning. Having
* LEED Design & Certification
experience in Design & implementing 600+ Green Certification Projects across India. (In-
house certified professional Strength - LEED AP -7, IGBC AP - 18, GRIHA CP – 6)
REVIT & BIM software & system are in place along with the competent in-house team in
3) In House / On Roll BIM Capability
MEP of GODREJ MEP.
BIM MODELLER & BIM CO-ORDINATOR
We are having in house set up for BIM Modelling.
BIM CO-ORDINATOR : Mr. Vijay Patel We are having proficient auto-cad operator.
Mr. Shrikant Patil
BIM MODELLER : Mr. Pravin Shewale
We are having set up to carry out flow analysis in Pipe net
Mr. Balu Gaikwad software.
License available : AEC_Version 2022 We are having set up to carry out Heat load calculation in HAP
software.
ELECT. HVAC PHE FF
Manager - Manager - 1No.
1No.
Asst. Manager Asst. Manager Asst. Asst.
- 4Nos. - 4Nos. Manager - Manager -
3Nos. 3Nos.
Designer – Designer – Designer – Designer –
12Nos. 12Nos. 8Nos. 8Nos.
Org. Chart is indicative. Same subject to change as per actual site requirement
FEEDBACK FORM FROM DC CLIENT
PROJECT COMPLETION CERTI. FROM DC CLIENT
Sample Value Engineering initiatives done in past
projects for cost saving
Material specifications change without affecting Pipe Length changed from 6m to 12m
quality & requirement.
Before After Before After
(Double skin cabinet inline fan) (Mixed air flow inline fan) Pipe 6m Pipe12m ,Reduced fittings
Butterfly Valve DI to CI for PN-16 Rating Valve We can use CI MOC valves in PN-16
rating as general industry practice.
Ball Valve DI to CI for PN-16 Rating Valve We can use CI MOC valves in PN-16
rating as general industry practice.
Manual Balancing Valve DI to CI for PN-16 Rating Valve We can use CI MOC valves in PN-16
rating as general industry practice.
NRV DI to CI for PN-16 Rating Valve We can use CI MOC valves in PN-16
rating as general industry practice.
Ducting 275 GSM to 180 GSM As per the industry standard
generally we usr 180 GSM for
Commercial Projects.
Hydrant Valve & Accessories Gun metal To SS
HAP – We are having In-house capability of doing Heat load calculation in HAP.
Sample HAP Report.pdf
Shop Drawing delivery schedule
Shop Drawings shall be submitted within 20-25 days after receipt of GFC drawings.
64
KEY QUALITY DOCUMENTATIONS
66
What we do in Quality
Drive Material Quality Assurance Plan (MQAP) Trainings
• Supplier assessment and evaluation with • On Job Training (OJT), OEMs, Mocks-ups &
Purchase team Fit-ups
• Material inspection at supplier end (FAT) • Project specification awareness & Site Field
• Supporting purchase for material readiness and Quality Plan (SFQP) / Method Statement
dispatch. • Quality DOs & DON’Ts
• Documentary support & Drive MIR acceptance
by customer
• Third party (TPIA/RQM/NQM) compliances
Drive Field Quality Assurance Plan (FQAP) closures
• Double check for Material at site store (SAT) • Instrument calibration & Records as per
• Developing checklist to transfer QUALITY project requirement
ownership to execution employees
• QUALITY INDEX to assess overall quality
performance of projects • IMS - Driving of Processes and PRS
• Structured monthly audits for the processes Handling
• Rework analysis through Observations & NCRs.
• Drive Kaizen
Customer connect
• Regular meetings with customers
• Six monthly Customer feedback collection Pre-Bid Technical Support to BD team (PIRE &
& analysis Busbar)
67
Framework Customer Voice: CSI, Customer Meetings, Senior management inputs, MOM,
Prompt communication, proactive
Feedback Verbal , written and reports.
reporting. Integrated and comprehensive approach towards the
Statutory Compliance requirement. Mutual Agreement on specification of project deliverables
Quality Management. -PO
Holistic approach across the -PF/ESIC compliance by contractor.
project with approved documents -WQ, WPQS.
. -TPT.
-MTC Site Quality index: Weekly :Progress with quality.
-Approved method statements,
ITP and Checklist.
-Approved TDS Contractor Competency evaluation and development
-Approved Shop drawings. :Weekly :On job trainings, Pictorial SOP, handbooks and Defect
-Trainings to all contractors,
supervisors and engineers of prevention plan.
above mentioned drawing.
-Competency evaluation, Process audit and improvement: Weekly: Proactive steps
certification and authorization to
work.
to avoid the process failure
Process monitoring and
-On job Training .
Improvement.
-Handbook and pictorial SOP
based work at site.
Toll Gates: Material and installations. Poor quality will not paid.
-Planning
-Execution
-Purchase
-Logistic/Store
Improvements and initiatives at project site: Site
Weekly Audit based on checklist engineering, new tools and techniques, kaizens
69
Shivaji Desai
Quality Structure Divisional Quality
(MEP – QA Head)
Head SP SARMA
Mahesh Chaudhari
(PIRE – QA Head) Sujit
Pavan Faizan Kumar Amit M. Surendra
Prosenjit
Kushwaha Abid (HFC, Rajput Aamerul Chitti
Banerji (Aurobindo +
IICC+DIAL (LTBT+Taj KRC,MM (Oberoi + (HIAL+
S V Shukla Nitish Singh Darpan M (Flipkart) Dwarka)
GPL
Pawai) L,CTRLS, Sify) DIAL) Bangalore )
MQA FQA - North FQA - East RTT)
Dada Dinesh
Kushagra Vinod
Salunkhe Sahoo Paritosh Muzzam M
Goel Dhawale
(MQA, West (FQA – IOCL (Supervisor) (Supervisor)
(FQA – BGCL) (Supervisor)
& South) Paradeep)
70
Project Specific: Structure of Quality Team E&E
71
Quality Management Process Implementation
Appraisal/Inspection
Prevention
Installation Material
Installation Material
Quality Index:
1. Cost of Conformance: Resource , Tools
and Procedure and Third party.
1. Approval of Methos statement, ITP and
2. Cost of non conformance: CAPA cost on
Checklist
observations and NCRs.
2. Quality Training.
3. Training on Method statement.
4. Observations in MIR.
5. Observations in WIR.
6. NCs in MIR and WIR.
7. Improvements and Kaizens
Improvements at Site .
Improvements in work methodology.
Monthly monitoring and sharing to all stake holders. Apex Quality review on monthly Monthly basis at HO.
73
Technology - Quality APP
All observations & Non-conformity are mapped through Quality APP
74
Mockup approval:
75
On site Processing of Pipe and fit up in HVAC work.
Installation of Fit up Final Testing
Material Handling Pipe cutting and Fit up Fabrication of Fit up and
Jig, Chain Pulley and
Plasma Cutting Skilled and certified Commissionin
Forklift Combination for
Welders with onsite g
machine set up at Three-layer Installation
Material unloading DPT testing.
site. safety.
at site by forklift
and Hydra
machine.
This is Unique Industry practice where our team adapted the onsite processing of pipes and fit up to save time and cost.
Mobile based Quality Application
Reference evidence for assurances/compliance of pre-qualification
Sify Rabale- Method statement, Checklist and ITP approval
Reference evidence for assurances/compliance of pre-qualification
• CtrlsDC-4 _Method statement, Checklist and ITP approval
ITP and Checklist Samples
ITP and Checklist Samples
Observation/ Any deviations and/ or acknowledgment for quality requirement
Internal NCR sample
Site Inspection Photographs
Welder Test Inspection Pull-Out Test Calibarated Pressure
gauge
Hydrotest- Pressure
Welder Test Inspection gauge
93
LEVELS OF TESTING & COMMISSIONING
• Installation checks
Pre-functional Checks • Quality Checks
• Safety
• Interlocks
• Pressure Tests
• Flushing
Start Up Checks
Functional Checks
Performance Checks
HVAC
• Pull the plug test
• Fire alarm integration test
SECURITY ELECTRICAL
• Multiple generator failure test
• Single utility connection failure test
IST •
•
Single chiller failure test
Multiple chiller failure test
ACCESS FIRE
• Transformer failure test
• Client BMS failure tests
BMS
INTEGRATED SYSTEM TESTS (IST)
Communicate the
Conduct a pre-IST Get the IST MS Define success
requirements to all
meeting approved criteria
stakeholder
Allocate timelines
Take corrective
and communication Conduct pre-IST test Schedule Final IST
actions if any
mode
Develop
Kick off Commissioning Approval from
Factory Testing
meeting Plan & Method Client
Statement
Formulate
Construction Pre-functional Site Acceptance
Commissioning
Kick off Check Test
Schedule
Integrated Project
T&C Reports Handing Over
System Test Closeout
Godrej MEP Safety practices
99
OHS policy
SAFETY PRACTICES AT GODREJ
Work permit system strictly followed
Site specific HIRA prepared beforehand to start the activity
Site-specific on-site emergency plan
IMS document maintained
Everyday tool-box talk to be conducted and record maintained
Periodically conducting the training program on OHS management system
Display of instruction charts/safety postures at site
Implementation of best practices like safety notice board,
safety kaizen, dept. safety performance
Reporting near miss and hazards at site
Use of standardized PPE
Promotional activity like national safety day, fire safety day, safety poster competition,
etc. conducted
Safety audit of sites and stores conducted
Good housekeeping at site to be ensured
SOP prepared for all site-specific activity 101
PROJECT SPECIFIC OHS
Jamshyd Godrej
OHS PROCESS FRAMEWORK
OHS POLICY
IMS CERTIFICATES
Benefits:
• Hindi
• Marathi
• English
• Odia
• Bengali
• Punjabi
• Kannada
Technicians
Supervisors
23 OHS Plan / OHS ABP of TEC 1 hr
Fabricator
Engineers
Electrical
Plumber
welder
Helper
fitters
Duration in
Training Topics 24 Legal Requirement / ROR 2 hrs
Hours
25 Ladder Safety 2 hrs
1 On Site Emergency Plan 2.25 hrs 26 Training on Occupational Health 1 hrs
2 Electrical Safety 2 hrs
27 Implementated KAIZEN idea 2 hrs
3 Permit to work 3 hrs
28 Housekeeping 2 hrs
4 New Joinee Induction training 3 hrs
29 SOP in pictorial form 1 hr
5 OHS Policy 1.5 hrs
12 On Line Near Miss / Hazard Reporting 2 hrs 35 Departmental Safety Performance 1.5 hrs
OHSAS 18001:2007 introduction + HIRA Road Map + 36 Awareness training on OHSAS 18001:2007 2 hrs
13 5.5. hrs
HIRA Practical
14 Safety in ware house 1.5 hrs 37 OHS Lag & Lead Indicators 1.5 hrs
21 Others
Note - Training of all Upcountry sites to be conducted during the site visit.
22 Audit finding in IMS Internal & External Audit 1 hr
Note – At site, we make a weekly schedule as per the OHS Training Calendar and conduct the sessions on OHS topics.
PPE MANAGEMENT
Personal Protective Equipment Matrix
Foot Protection
Eye Protection
Ear Protection
against dust
PPE
Face Shield
Protection
Protection
Protection
Reflective
Full Body
Welding
Harness
Helmet
Jacket
Hand
Head
CATEGORY
G&B Staff √ √ √ √
Contractor Staff
Supervisor - √ - - - - - √ √ √
Electrician Fitter √ √ - - √ √ √ √ √ √
Helper √ √ - - √ √ - √ √ √
Plumber √ √ - - √ - √ √ √ √
Welder √ √ - √ √ √ - √ √ √
Fabricator √ √ √ √ - √ √ √ √ √
Note – all PPEs inspect as per checklist on monthly basis. Also all PPEs
procured as per Corporate Safety guideline.
WORK PERMIT SYSTEM (SITE SPECIFIC)
MEP business is expanding all over India and we have carried out many critical
activities very all safety measures and it was very challenging for us.
In such activities, there is a prime role of Work Permit System which help us to
identify the hazards & its controls, roles, and responsibilities of Contractors,
Supervisors and Engineers.
Previously, we are using G&B's work permit and client work permit. So, we have
identified that we need to develop, our site-specific MEP Work permit system to
continue the safe work at various MEP sites.
Hereby, attached the all-new MEP work permit formats with a flowchart for
your information.
PROJECT ENGINEER
Risk Level
SITE SUPERVISOR
HIRA
OHS TEAM
REVIEW TEAM
HIRA FORMAT
ON SITE EMERGENCY PLAN
Site Specific On Site Emergency Plan prepared in line
with HO guideline as well as statue.
OEP contains,
• Roles and Responsibility of Site team
• Emergency Guideline
• Emergency Contact Nos
• List of Fire Fighters / First Aiders / Rescue team
• Emergency Layout Plan
• MSDS of Chemicals
Note – Safety Officer / Supervisor along with Project In-charge conducting internal site audit as per the site
schedule and maintain the record with compliance.
OHS FORMATS
Sr No Title of the Format Document No Rev No Revision Date LADDER INSPECTION CHECKLIST-
17 2/ OHS/ F / 21 00 09/04/2019
PORTABLE
1 PPE approval form 2 / OHS / F /03 00 09/04/2019
LADDER INSPECTION CHECKLIST-
Minutes of Safety Committee 18 2/ OHS/ F / 22 00 09/04/2019
2 2 / OHS / F / 04 00 09/04/2019 SSEL
Meeting LADDER INSPECTION CHECKLIST-
3 PPE inspection format 2 / OHS / F / 05 00 09/04/2019 19 2/ OHS/ F / 23 00 09/04/2019
WREL
4 Electrical Safety audit format 2 / OHS / F /09 00 09/04/2019 20 GRINDING REGISTER MONITORING 2/ OHS/ F / 24 00 09/04/2019
FLOW CHART WORK PERMIT
5 2 / OHS / F / 10 00 09/04/2019 21 FIXED LADDER INSPECTION 2/ OHS/ F / 25 00 09/04/2019
SYSTEM
22 PPE MANAGEMENT MONITORING 2/ OHS/ F / 26 00 09/04/2019
6 FORMAT FOR OHSE GUIDELINES 2 / OHS / F /07 00 09/04/2019
23 FIRST AID BOX AUDIT 2/ OHS/ F / 27 00 09/04/2019
7 HT / LT PERMIT 2 / OHS / F / 13 00 ELECTRICALS
24 Incident Investigation form for sites 2/ OHS/ F / 28 00 09/04/2019
8 LIST OF AMMENDMENTS 2 / OHS / AMD/01 00 08/08/2018
9 LIST OF FORMATS 2/ OHS / F / 00 00 09/04/2019 Shut Down Intimation format (for
25 2/ OHS/ F / 29 00 09/04/2019
manual SIA)
PERIODIC TEST AS PER CLAUSE
10 2 / OHS / F / 14 00 09/04/2019 Checklist for Clearance to Work for
4.4.7, EMS & OHSAS 26 2/ OHS/ F / 30 01 09/04/2019
Shut down at sites
11 PPE INSPECTION CHECKLIST 2 / OHS / F / 15 00 09/04/2019 27 Mock Drill Report 2/ OHS/ F / 31 00 09/04/2019
12 SITE AUDIT REPORT 2 / OHS / F / 16 01 09/04/2019 28 HIRA Format 1/IMS/F/21 00 09/04/2019
Benefits:
Benefits:
Benefits:
It helps for easy understanding of workmen about
hazards and control measures associated with
chemicals. Marathi
Hindi
V – CARD SYSTEM (VOILATION CARD)
V-Card system developed for
monitoring and controlling
Unsafe Acts / Conditions at site.
PROMOTIONAL ACTIVITY
At G&B sites, various OHS Promotional and Motivational
activities carried out for encouraging the workmen to adopt
safety culture at site and also to develop the safety awareness
among them. This will be help to change the behaviour of the
workmen and as per G&B OHS Policy sets a target of
"Achieving Mile Stone of Zero Accident", this is the important
criteria in Accident Prevention Methodology.
Benefits:
Description:
G&B developed in-house ON-LINE Portal of reporting and other incidents.
Benefits:
1. User Friendly system, easy to fill up.
2. Confirmed closing actions for each and every Hazard/NM.
3. Back dated data would be traced along with the compliance actions taken .
4. Easy to trace out the Pending action data and pending with whom.
5. Very well demonstration of Line management function.
HAZARD / NEAR MISS REPORTING THROUGH MOBILE SAFETY APP
G&B E&E developed Mobile Safety App for
reporting Hazards / Near Miss / Housekeeping /
High Risk Activities
Benefits:
140
Following measures are strictly follow at PAN India Projects of MEP
1. Godrej & Boyce Corporate Guideline on Covid 19
2. Temperature & Oxygen Pulse measurement done
3. Medical check up
4. OHS Induction training
5. Self Declaration of all (G&B as well as Contractor workforce)
6. Disinfection of work area & cleaning of Hand Tools / Power Tools by using disinfecting solution
7. Maintaining social distancing during Tool Box Talk, Training, Office area
8. Daily inspection checklist of Covid 19 Safety Measures
9. Provision of Isolation Room
10. Provision of Contactless Mechanism for use of hand sanitizers
Godrej & Boyce
Corporate Guideline
on Covid 19
APPRECIATIONS FROM CLIENT
HSE STATISTICS
144
HSE Statistics
Sr. No Description 2017 - 18 2018 - 19 2019 - 20 2020 - 21 2021 – 22
12. Total Recordable Injury Frequency Rate 0.82 0.8 0.71 0.52 0.96
13 Severity Rate 0 0 0 0 0
*Provide detail of incident with RCA, CAPA and what action taken across the projects to prevent re-occurrence
*Lesson learn form incidents
LTIR Lost Time Injury Rate = Total number of lost time injuries x 200000 / Manhours worked
TRIR Total Recordable Injury Rate = Total Recordable Injuries x 200000 / Manhours worked
FR Frequency Rate = Total no. of Lost time injuries + Total no. of Major accidents x 10^6 / Manhours worked
SR Severity Rate = Total no. of Man days lost due to injuries and restricted work x 10^6 / Manhours worked
LIST OF MAJOR CONSULTANTS/ PMC
“GODREJ IS NOT WHAT ‘WE’ SAY IT IS.IT’S WHAT OUR ‘CUSTOMER’ BELIEVE IT IS”
LIST OF MAJOR CLIENTS
“GODREJ IS NOT WHAT ‘WE’ SAY IT IS.IT’S WHAT OUR ‘CUSTOMER’ BELIEVE IT IS”
Our top customers
1
© GODREJ & BOYCE | GODREJ INTEGRATED OFFERING 5
0
THANK YOU!