Professional Documents
Culture Documents
1. MAIN ENGINE
PLEASE FILL IN THE FOLLOWING
1) MAIN ENGINE MAKER, TYPE, OUTPUT WHICH YOU SERVED UNTIL NOW.WARTSILA TYPE W6L32,3000 KW,STX B&W TYPR 8S-35MC 5920KW
.-SLOW DOWN.L.O PRESSURE FALLS TO 1,5 BAR,CAM SHAFT PRESS BELLOW 2 BAR,OIL MIST DETECTOR,PISTON COOLING TEMPERATURE HIGH
3. ELECTRIC
PLEASE REFER TO THE HYD POWER PCK SIRCUIT DIAGRAM.
IF RL1 ALARM IS RAISED, WHICH ITEMS ARE TO BE CHECKED. CHECKED CURRENT C204,X 16,17 & LTX,AND F7 (3A)
4. ELECTRIC
PLEASE REFER TO THE STEERING GEAR WIRING DIAGRAM.
IF RL11 ALARM IS RAISED, WHICH ITEMS ARE TO BE CHECKED.FIRST TIME CHECKED CURRENT OF TRC1 AFTER THAT CHECK F13
5. HYDRALIC
PLEASE REFER TO THE HYD DIGARM FOR RESCUE BOAT & LIFE RAFT HANDLING CRANE
1. IN CASE 10 VALVE IS KEEP OPEN, PROBLEMS THAT MAY ARISE TO USAGE OF THE CRANE.
2. IF HYD PUMP FAILURE, HOW TO OPERATE THE LUFFING CYLINDER BY ACCUMULATOR
PLEASE DESCRIBE SEQUENCE OF AIR FLOW (OR MARK OIL FLOW ON THE DRAWING)