You are on page 1of 91

TOTAL UNIT

DATE ASSM. MK. QTY QTY


BOLTS LENGTH REMARKS ASSEMBLY LIST
1401-LS-A-1001 6 6 19 DIA A307 57 MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)
1401-LS-A-1002 6 6 19 DIA A307 57 1401-LS-A-1001 STRINGER UNP200 1486 1 1.63 52.1
1401-LS-A-1002 STRINGER UNP200 1486 1 1.63 52.1
1401-LS-A-1003 10 10 19 DIA A307 44
1401-LS-A-1003 STRINGER UNP200 1981 1 2.12 67.9
1401-LS-A-1004 12 12 19 DIA A307 57
BY

1401-LS-A-1004 STRINGER UNP200 1981 1 2.16 69.7


1401-LS-A-1005 216 108 22 DIA A307 76 1401-LS-A-1005 VERTICAL BRACING HEB260 5504 1 12.99 732.1
1401-LS-A-1006 144 144 19 DIA A307 76 1401-LS-A-1006 FRAME UNP200 5766 1 46.38 2114.5
DISCIPLINE

1401-LS-A-1007 VERTICAL BRACING HEA160 1479 1 1.34 43.4


1401-LS-A-1007 16 16 19 DIA A307 57
1401-LS-A-1008 FRAME HEB160 7999 1 11.74 526.7
1401-LS-A-1008 34 34 25 DIA A307 64 1401-LS-A-1009 FRAME HEB160 8118 1 29.72 1610.6
1401-LS-A-1009 108 108 22 DIA A307 76 1401-LS-A-1010 MONORAIL HEB200 4975 1 12.65 623.9
1401-LS-A-1011 VERTICAL BRACING HEA180 1520 1 1.56 52.4
1401-LS-A-1010 72 72 19 DIA A307 76
1401-LS-A-1012 FRAME HEB260 4366 1 14.02 640.2
1401-LS-A-1011 16 16 19 DIA A307 57 1401-LS-A-1013 FRAME HEB260 9544 1 27.34 1537.2
DATE

1401-LS-A-1012 28 28 22 DIA A307 64 1401-LS-A-1014 FRAME HEB180 4629 1 29.91 1266.3


1401-LS-A-1014 76 76 16 DIA A307 51 1401-LS-A-1015 FRAME HEB180 16545 1 144.63 6518.3
1401-LS-A-1016 FRAME HEB180 8290 1 45.50 1930.6
1401-LS-A-1015 2 2 16 DIA A307 57
1401-LS-A-1017 FRAME HEB180 4264 1 19.17 1049.4
1401-LS-A-1017 72 72 22 DIA A307 76 1401-LS-A-1018 VERTICAL BRACING HEA180 1148 1 1.18 39.8
BY

1401-LS-A-1018 16 16 19 DIA A307 57 1401-LS-A-1019 VERTICAL BRACING HEA180 1251 1 1.29 43.3
1401-LS-A-1019 16 16 19 DIA A307 57 1401-LS-A-1020 FRAME HEB260 8418 1 39.73 2527.9
1401-LS-A-1021 FRAME HEB180 8450 1 50.28 2567.0
DISCIPLINE

1401-LS-A-1020 108 108 22 DIA A307 83 1401-LS-A-1022 COLUMN HEB360 3850 2 10.47 1449.5
1401-LS-A-1021 26 26 16 DIA A307 57 1401-LS-A-1023 FRAME HEB260 8405 1 40.58 2552.8
1401-LS-A-1023 108 108 22 DIA A307 83 1401-LS-A-1024 VERTICAL BRACING HEB260 5504 1 12.98 731.9
1401-LS-A-1025 VERTICAL BRACING HEB260 3451 2 5.17 604.8
1401-LS-A-1024 216 108 22 DIA A307 76
1401-LS-A-1026 FRAME HEB160 7979 1 61.49 2754.4
1401-LS-A-1025 96 48 22 DIA A307 76 1401-LS-A-1027 FRAME HEB160 7979 1 39.26 1938.6
DATE

1401-LS-A-1028 56 56 19 DIA A307 70 1401-LS-A-1028 FRAME HEB180 4589 1 44.06 1870.0


1401-LS-A-1029 128 64 22 DIA A307 76 1401-LS-A-1029 VERTICAL BRACING HEB220 5226 2 6.57 713.1
1401-LS-A-1030 FRAME HEB200 5090 1 22.31 1008.2
1401-LS-A-1030 16 16 22 DIA A307 70
1401-LS-A-1031 BEAM HEB180 1760 2 1.81 175.8
1401-LS-A-1031 96 48 19 DIA A307 70 1401-LS-A-1032 BEAM IPE160 1000 1 0.71 18.3
BY

1401-LS-A-1032 8 8 16 DIA A307 44 1401-LS-A-1033 BEAM IPE160 1000 1 0.80 20.9


1401-LS-A-1034 VERTICAL BRACING HEA160 1600 1 1.45 46.9
1401-LS-A-1033 8 8 16 DIA A307 44
1401-LS-A-1035 VERTICAL BRACING HEA160 1277 1 1.16 37.6
DISCIPLINE

1401-LS-A-1034 16 16 19 DIA A307 57 1401-LS-A-1036 FRAME HEB160 10429 1 25.25 1007.7


1401-LS-A-1035 16 16 19 DIA A307 57 1401-LS-A-1037 VERTICAL BRACING UNP80 2590 8 0.81 176.5
1401-LS-A-1036 44 44 19 DIA A307 57 1401-LS-A-1038 VERTICAL BRACING HEB180 3477 2 3.60 336.0
1401-LS-A-1039 VERTICAL BRACING HEB180 3478 2 3.60 336.2
1401-LS-A-1037 128 16 19 DIA A307 51
1401-LS-A-1040 BEAM HEB180 1019 1 1.18 56.8
1401-LS-A-1038 96 48 19 DIA A307 57 1401-LS-A-1041 FRAME HEB180 2460 1 12.85 601.0
DATE

1401-LS-A-1039 96 48 19 DIA A307 57 1401-LS-A-1043 VERTICAL BRACING HEB160 2607 2 2.41 210.9
1401-LS-A-1044 VERTICAL BRACING HEB160 2607 2 2.42 211.3
1401-LS-A-1040 8 8 19 DIA A307 57
1401-LS-A-1045 VERTICAL BRACING HEA160 1287 1 1.17 38.0
1401-LS-A-1043 128 32 19 DIA A307 57 1401-LS-A-1046 COLUMN HEB260 3937 1 7.01 403.4
1401-LS-A-1044 128 32 19 DIA A307 57 1401-LS-A-1047 BEAM HEB160 4839 1 4.44 198.8
BY

1401-LS-A-1045 16 16 19 DIA A307 57 1401-LS-A-1055 VERTICAL BRACING HEA160 1600 1 1.45 46.9
1401-SK1-A-1001FRAME HEB360 15142 1 246.83 14575.1
1401-LS-A-1046 36 36 22 DIA A307 76
1401-SK1-A-1002LIFTING LUG PL30*240 596 4 0.37 134.8
DISCIPLINE

1401-LS-A-1055 16 16 19 DIA A307 57 1401-SK2-A-1001FRAME HEB260 11138 1 144.91 7330.1


1401-SK1-A-1001 216 216 22 DIA A307 83 1401-SK2-A-1002LIFTING LUG PL20*240 496 4 0.30 76.3
1401-SK1-A-1002 96 24 29 DIA A307 95 Total Area(Sqm): 1204.41 Total weight(kg): 63727.83

1401-SK2-A-1001 252 252 22 DIA A307 76


1401-SK2-A-1002 64 16 25 DIA A307 76
DATE

1401-LS-A-1047
BY

HEB160
DISCIPLINE

1401-LS-A-1046
DATE

HEB260
BY
DISCIPLINE
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

STEEL STRUCTURE A FOR SK.1 & SK.2


ISOMETRIC VIEW CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ISOMETRIC VIEW
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 1 OF 91 0

A0
DATE

A8
BY

A7 A6 A5 A4 A1 A2 A3
DISCIPLINE

31950
22650

3800 3800 3800 3550 3850 3850 9300


DATE

1540 1450 1000


LS-A-1002 LS-A-1041
1 Nos. 1 Nos.
810 190
BY

LS-A-1028 DET - 4
1 Nos. SHEET - 3
DISCIPLINE

UP

900

900
(TYP@4 LOCATIONS)
463
595

1150
AA.3
LS-A-1001
DATE

295
555

1 Nos.
1220

1220
LS-A-1041 LS-A-1041
665

640
1 Nos. 1 Nos.
BY

2530
AA.2 1686
LS-A-1041
DISCIPLINE

1 Nos. LS-A-1015 LS-A-1015 LS-A-1015


1310

1310
1 Nos. 1 Nos. LS-A-1015
LS-A-1028 1 Nos. 1 Nos.

489
1 Nos.
AA.1
DATE

DET - 1
LS-A-1015 LS-A-1015 SHEET - 3

1250

1250

1250
1 Nos. LS-A-1015 1 Nos. (TYP@6 LOCATIONS)
1 Nos.
BY

AA
2900

378
DISCIPLINE

LS-A-1028 LS-A-1015 LS-A-1030


1 Nos. LS-A-1015

1275
1 Nos. 1 Nos.
LS-A-1015

1650

1650
1 Nos.
LS-A-1015 1 Nos. 1350

9810
LADDER FROM EL. +300
1 Nos. TO EL. +2225
DATE

AB.2 1000
LS-A-1022
2 Nos.
3850
BY

DET - 3 LS-A-1015

2550

5100
SHEET - 3 1 Nos.
DISCIPLINE

2400

2400
(TYP@18 LOCATIONS) LS-A-1030
1 Nos.
LS-A-1016 DET - 5
1 Nos. SHEET - 3
DATE

AB.1
LS-A-1021 1000

1050
1 Nos.
BY

LS-A-1014 LS-A-1016 LADDER FROM EL. +300


1500

1500
LS-A-1016 TO EL. +2875
1 Nos. 1 Nos. 1 Nos. LS-A-1016
1 Nos. AB
DISCIPLINE

480 450
AC.2 LS-A-1021 LS-A-1022

347

1260
790
480

490

1 Nos. 2 Nos.
AC.1
489

LADDER FROM EL. +300 AC

330
TO EL. +2875 LADDER FROM EL. +300
TO EL. +2875
LS-A-1027 DET - 6 LS-A-1042
654

1200
LS-A-1027 DET - 2 1 Nos. SHEET - 3 2 Nos.
2043 1757 LS-A-1027
1 Nos. SHEET - 3 1 Nos. (TYP@2 LOCATIONS)
(TYP@6 LOCATIONS) AD.2

14950

5100

3000
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

LS-A-1042
2 Nos.

LS-A-1026 LS-A-1026
LS-A-1026 1 Nos. AD.1
1 Nos.
1 Nos.

900
AD

BASE PLATE PLAN AT EL. +0.550


IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) BASE PLATE PLAN AT EL. +0.550
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 2 OF 91 0

A0
DATE
CL CL
CL CL CL
640

HEB180
Nr 12 ANCHOR BOLTS M32X890 NO.4 HST3 M20x200
BY

1B ASTM F1554 GR. 36 NO.4 HST3 M20x200


Nr 4 PLATES 80 180 60 60 180 80

HEB160
150X12X300 HOLES Ø38 HEB360
HEB360
DISCIPLINE

BASEPLATE
PL20*300 *355 EL.+0.550 BASEPLATE
EL.+0.550 PL20*250 *250
Nr 4 PLATES Nr 4 PLATES B.O.P B.O.P

80
150X12X300 150X12X300
DATE

BASE PLATE 50 GROUTING


670X25X640 PL50*350

180
BY

Nr 4 PLATES BASE PLATE


150X12X300 670X25X640

300
HEB360
DISCIPLINE

75
150
670
CL BASE PLATE

300
670X25X640 300 250

75
EL.+0.550
B.O.P 100 100 100 125 125

25
DATE

EL.+0.550

180
B.O.P

55
150
GROUTING
PL50*740

25
BY

GROUTING

80 45 45 80
80
PL50*740
DISCIPLINE

PL20*250 *250

250
HOLES Ø22

355

245
1A 1A POCKET PL20*300 *355
HOLES Ø22

890
171 12 273 12 SHEAR KEY
DATE

POCKET HEB200

890
12 - ANCHOR BOLTS M32x890 1B SHEAR KEY
HEB200
ASTM F1554 GR. 36 HOLES Ø38mm CONNECTION DETAIL - 5

55
BY

CL
DISCIPLINE

TYPICAL BASE PLATE CONNECTION DETAIL - 4


CONNECTION DETAIL - 1
(REQUIRED Nr 6) 360
BASE PLATE
DATE

10 175 10 80
82.5 360X20X360
82.5 HEB200
40

40
BY
DISCIPLINE

EMBEDDED PLATE Ø70x10 12 - ANCHOR BOLTS M32x890 N0. 4 PL 80X10X200 BASE PLATE
EMBEDDED PLATE Ø70x10 680X25X280

140
ASTM F1554 GR. 36 HOLES Ø38mm
12 - ANCHOR BOLTS M32x890

200
ASTM F1554 GR. 36 HOLES Ø38mm

= =
360
SECTION 1A - 1A CL EL.+0.550
DATE

10
B.O.P

140

120

20
SECTION 1B - 1B

50
280
BY

CL CL GROUTING
2B PL50*460
80 60 60 80

40
DISCIPLINE

500
10 10 Nr 4 ANCHOR BOLTS M16X500
HEB260

4 NO. PL15*200 *300 40 140 140 40 ASTM F1554 GR.36

HEB260
10

Nr 4 PLATES HOLES Ø18


200X15X300 4 NO. PL15*200 *300 360
60

4 NO. PL15*200 *300

TYPICAL BASE PLATE


90

EMBEDDER PLATE Ø40X10


CONNECTION DETAIL - 6
BASE PLATE (REQUIRED Nr 2)
680X25X280 BASE PLATE
190

680X25X280 BASE PLATE CL


HEB260 680X25X280 230
EL.+0.550 BASEPLATE 3A
380

25

B.O.P EL.+0.550 PL20*230 *420 80 70 80 4 NO. PL10*120 *200


70 50
25

HOLES Ø 28mm

HEB180
B.O.P TYP TYP 4 NO. PL10*120 *200
190

GROUTING
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

HOLES Ø 28mm HEB180


150

PL50*380

60
GROUTING
150

PL50*380 BASEPLATE

210
SHEAR KEY PL20*230 *420
90

HEB160
SHEAR KEY GROUTING

TYP
200

420

300
60

HEB160 PL50*330
POCKET
EL.+0.550
840
10

20
2A 2A B.O.P
POCKET

210
Nr 8 ANCHOR BOLTS M30X840
Nr 8 ANCHOR BOLTS M30X840 ASTM F1554 GR.36 Nr 8 ANCHOR BOLTS M30X840
ASTM F1554 GR.36 HOLES Ø36 ASTM F1554 GR.36

150

60
HOLES Ø36 HOLES Ø36
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

2B
4 - ANCHOR BOLTS M24x690 78 78
SHEAR KEY ASTM F1554 GR. 36 HOLES Ø28mm
EMBEDDER PLATE Ø65X10 HEB120 115 115 3A
TYPICAL BASE PLATE EMBEDDER PLATE Ø65X10
CONNECTION DETAIL - 2 POCKET CONNECTION DETAIL - 3
(REQUIRED Nr 6)
CLIENT:

PetroChina International Iraq FZE Iraq Branch


SECTION 2A - 2A CONTRACTOR:

SECTION 2B - 2B EMBEDDED PLATE Ø50x10


300 4 - ANCHOR BOLTS M24x690
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

ASTM F1554 GR. 36 HOLES Ø28mm


PEG ENGINEERING & CONTRACTING DMCC

SECTION 3A - 3A
VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) BASE PLATE DETAILS & SECTIONS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 3 OF 91 0

A0
DATE
BY
DISCIPLINE
DATE

A6
1450 1000
LS-A-1041
BY

LS-A-1002 LS-A-1041 190 1 Nos.


1 Nos. 1 Nos.

90
DISCIPLINE

UNP200

A A 1487
LS-A-1041
DATE

1 Nos. 2491
10 1477

635
10 1477 1004 2 - Ø 21 HOLES FOR
31 4*250=1000 446 M 19 BOLTS - 60 mm LG
BY

900

19 4*250=1000 248 198 LS-A-1041 THREADS


THREADS 1 Nos. EL.+1.705 233 LS-A-1041 EL.+1.705
DISCIPLINE

UNP200 1 Nos. (T.O.G)


LS-A-1001 WP (T.O.G) WP
1 Nos.
UNP200

170

170
UNP200

595
DATE

LS-A-1041
LS-A-1001

2189
295

B B LS-A-1002 1 Nos.

2450
UNP200 1 Nos. 1 Nos.
BY

AA.3 2 - Ø 21 HOLES FOR

4*200=800

4*200=800
RISER
M 19 BOLTS - 60 mm LG

RISER
C C

1170

1175
DISCIPLINE

800
800
LS-A-1003 LS-A-1041
1 Nos. 1 Nos.
1000 1000
DATE

900

177
EL.+0.550 EL.+0.550
(T.O.G) (T.O.G)

205

205
WP
LS-A-1004
BY

1 Nos.
UNP200 WP
DISCIPLINE

227
SECTION A - A SECTION B - B
D D
DATE

171
LS-A-1041 439 561
1 Nos.
BY

PLAN AT EL. +1.675 (T.O.S)


DISCIPLINE

1981 2990

2 - Ø 21 HOLES FOR 288 1500 193 2 - Ø 21 HOLES FOR 292 1500 193 1004
M 19 BOLTS - 45 mm LG M 19 BOLTS - 60 mm LG
96 248 4*250=1000 252 248 4*250=1000 252
EL.+2.905 EL.+2.905 100
THREADS THREADS
(T.O.G) WP (T.O.G) WP

130 20
60
130 20

UNP200 UNP200
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

170
170

60
50
50

96 LS-A-1003 96
LS-A-1028 1 Nos. LS-A-1028
1 Nos. 1 Nos. LS-A-1004

4*200=800
4*200=800

1 Nos.
RISER

RISER
1200
800

800
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1000
EL.+1.675 1000 EL.+1.705

230
WP WP (T.O.G)
(T.O.G)

LS-A-1041
2 - Ø 21 HOLES FOR 1 Nos. 2 - Ø 21 HOLES FOR LS-A-1041 LS-A-1041
SECTION C - C M 19 BOLTS - 60 mm LG M 19 BOLTS - 60 mm LG
CLIENT:

1 Nos. 1 Nos.
PetroChina International Iraq FZE Iraq Branch
SECTION D - D
CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PLAN AT EL. +1.675 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 4 OF 91 0

A0
DATE
BY
DISCIPLINE

A1 A2 A3
DATE

3850 3850
BY

2850 1000 1100 2750


DISCIPLINE

DET - 7 HEB200 DET - 9

A2 A2
AA
DATE

HEB360
1275 DET - 8 300
BY

50 L60*6
100 100 50

2550
HEB200
HEB160 4 - Ø 24 HOLES FOR
DISCIPLINE

M 22 BOLTS - 70 mm LG
AA

60
PL15*220
IPE160
DATE

80

220
5100

2550

HEB160

HEB200

80
7A 7A
BY
DISCIPLINE

HEB160

2550
LS-A-1030
1 Nos. LS-A-1015 L50*6
1 Nos.
1275

LS-A-1030
DATE

1 Nos.
HEB200 L50*6
AB SECTION 7A - 7A
BY

1260
DISCIPLINE

LADDER FROM EL.+300


TO EL.+2875

AC
DATE

PLAN AT EL. +2.225 (T.O.S)


BY
DISCIPLINE

A2

FL25*95.5 * 200
LS-A-1030
AA LS-A-1030 1 Nos.
HEB200 9A PL15*200 * 200 1 Nos. A2
15 15 81 5

20
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

PL15*170 * 200
200
4 - Ø 24 HOLES FOR PL10*95.5
AA LS-A-1030 PL15*80.5 * 170 M 22 BOLTS - 65 mm LG 50 50 50 50
1 Nos. PL15*200

8A 8A
65

9B 9B

20
200

FL25*95.5
70

GR-p-1195 PLT6*130
LS-A-1030
65

LS-A-1030 1 Nos.
GR-p-1196 PLT6*130
SECTION 8A - 8A
1 Nos. HEB200
9A LS-A-1015
1 Nos. DETAIL - 8
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

SECTION 9A - 9A SECTION 9B - 9B TYPICAL


DETAIL - 9
TYPICAL
CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PLAN AT EL. +2.225 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 5 OF 91 0

A0
DATE

TYPICAL WELD DETAILS


W1 W2
BY

BEAM TO BEAM Typ.1 BEAM TO BEAM Typ.2


A7 A6 A5 A4 A1 A2 A3
PRIMARY
ELEMENT
45°
CPJ PRIMARY
ELEMENT
45°
CPJ
DISCIPLINE

R=
"AS

3800 3800 3800 3550 3850 3850


R= T RE
"A QU
S T IRE
RE D"
QU
IR
ED
"

T SECONDARY
T T ELEMENT
T

SECONDARY

1000 800 800 1200 950 950 950 950 650 650 600 950 950 888 887 888 888 962 962 962 963 45°
NOTE: Following completation of the welding, the sloted holes shall be properly filled
CPJ
ELEMENT

NOTE: Following completation of the welding, the sloted holes shall be properly filled
DATE

UNP200 337
AA.3
BY

HEB180
UNP200

HEB180

UNP160
300

HEB180
1220

1220
DISCIPLINE

UNP200

950
CL OF SPLICE HEB180
AA.2
HEB180 HEB180 89 874
DATE

UNP200

HEB180
IPE160

IPE160
IPE160

HEB180
HEB180
IPE160
1401-LS-A-1040

HEB180
IPE160
1310

1310
UNP160
1401-LS-A-1028 HEB180

310
HEB180

800
BY

HEB180
AA.1
DISCIPLINE

HEB180 HEB180 HEB180 HEB180 HEB180

HEB180
IPE160
IPE160

HEB180
IPE160

IPE160

1250
HEB180

IPE160

IPE160

IPE160
1450

1450
HEB180
DET - 10
DATE

250 HEB180
510

510
AA
IPE160 IPE160
IPE160 IPE160 IPE160 IPE160

HEB180
BY

HEB180
IPE160

HEB180
HEB180
IPE160

HEB180

HEB180

HEB180

IPE160
IPE160
IPE160

IPE160

IPE160
IPE160

IPE160
IPE160

IPE160

IPE160
IPE160
800

IPE160
1450

1450

1240
DISCIPLINE

HEB180 240
HEB180 HEB180
HEB180
AB.2
HEB180 IPE160 HEB180 HEB180

616
1401-LS-A-1015
DATE

HEB180 950 950 HEB180


HEB180 IPE160
345

350

HEB180

5100
HEB180
HEB180
BY

IPE160

HEB180
IPE160
2400

2060
1401-LS-A-1031
349 350
DISCIPLINE

HEB180
345 543 887 888 888 962 962 962 963
HEB180

1401-LS-A-1014 HEB180 1401-LS-A-1016


HEB180 1401-LS-A-1031 HEB180
616

HEB180 HEB180
HEB180 HEB180
AB.1
DATE

HEB180 HEB180 240

HEB180

HEB180
IPE160

IPE160

IPE160

IPE160
HEB180

IPE160
IPE160
IPE160
350

1050
300
HEB180

HEB180
IPE160

IPE160
IPE160
IPE160

IPE160
1500

IPE160
HEB180

IPE160
BY

HEB180

AB

660 270
HEB180
DISCIPLINE

480 450
HEB180 HEB180

HEB180
HEB180
AC.2 HEB180

1260
HEB180 HEB180
480

350 HEB180
UNP160

HEB180
AC.1

UNP160
HEB180 AC HEB180

850
IPE160 IPE160

330

330
1401-LS-A-1027
HEB160
IPE160

750
HEB160 10A 10A
1401-LS-A-1021

1450
804 196 HEB180
293 IPE160 IPE160
IPE160

700
HEB160
HEB160
DETAIL - 10
HEB160

800 1000 800 800 1200 950 950 950 950 950 950 950 950 345 543 2663 1925 1925 3850 4 - Ø 18 HOLES FOR
IPE160 M 16 BOLTS - 50 mm LG
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

2200

5100
1401-LS-A-1015
HEB180 245 10 Nr 2 PLATES
1925 1925 1925 1925 110x10x280
IPE160
380 HEB160

50
HEB160 HEB160
IPE160

IPE160

IPE160
HEB160 HEB160 UNP100 4 - Ø 18 HOLES FOR

750
M 16 BOLTS - 50 mm LG 40 60 60 40
IPE160 IPE160 IPE160 IPE160
80
1401-LS-A-1026

700
HEB160
HEB160
SECTION 10A - 10A
AD
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

700
700
HEB160 IPE160 HEB160 IPE160 HEB160
HEB160

UNP160
850

32 3850 3850 CLIENT:

PLAN AT EL. +2.875 (T.O.S) PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PLAN AT EL. +2.875 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 6 OF 91 0

A0
DATE

588 14480

A4 A1 A2 A3
BY

600 3550 3850 3850 2630


DISCIPLINE

AA.1 5103 5800 947 LIFTING LUG TYPE A

130 561 689 900 1000 1000 953 897 1000 1000 1000 1000 903 1250 664 586 130
DATE

450 550
HEB260 H HEB360 F HEB360 HEB260
AA
BY

425
F

HEB260
DISCIPLINE

917

HEB400

HEB200

HEB260
IPE160

HEB400
IPE160

L75*6
HEB160

IPE160
IPE160
HEB400
IPE160

2300
DET - 11
DATE

G G

HEB200
2518

IPE160
L75*6

2820
AB.2
HEB200
BY

25 200 HEB200
HEB200 HEB200 HEB200 HEB200
DISCIPLINE

HEB100

349
5100

5100
500
J HEB200 HEB260

IPE160

HEB200
HEB100

IPE160
E E

IPE160
200

IPE160
CL OF 91401-R-16/17
604

HEB200
DATE

IPE160
L75*6

L75*6
200 250 HEB200 HEB200

650
601
E HEB100 E HEB200 HEB200 HEB200 HEB200
BY

HEB200

450
HEB200 HEB200
2151
DISCIPLINE

IPE160

IPE160
IPE160
AB.1
1978

600
HEB160
L75*6 HEB200 HEB200

IPE160
HEB400

IPE160

IPE160
IPE160
200 DET - 19 DET - 20 150
DATE

600
HEB360 HEB360 HEB260
200

AB
HEB260
BY

630
HEB260 DET - 21
1401-LS-A-1008 HEB160 DET - 22 J 1401-LS-A-1032
DET - 18 HEB160 HEB160 IPE160

110
AC.2 HEB160
11460

L75*6
1260

1060

1260
L75*6 L75*6
DISCIPLINE

HEB260 1401-LS-A-1033
L75*6 HEB160 PL10*275 PL10*255 HEB200 HEB160 IPE160
IPE160 DET - 12

630
AC.1 IPE160

200
HEB260 HEB260 HEB260 L75*6

12910
AC
DATE

431
200

30

600
724

723
DET - 23 HEB200 HEB200
HEB260
105 200 CL OF 91401_E_07
1401-LS-A-1012
BY

350
HEB260 M M

1401-SK2-A-1001
HEB260 35 200 495 1550 IPE160
HEB200 HEB200

HEB260
L75*6
DISCIPLINE

IPE160

HEB200

HEB260
HEB200
HEB260
1250 900 1000 1000

IPE160

HEB200

1759
IPE160

1256

HEB200

HEB260

L75*6

HEB200

1750
HEB200
CL OF 91401_E_14

PL10*280
HEB200 HEB200
5100

5100
HEB200 HEB200 HEB200

L L

530
250 495 455 250 PL15*41.2
IPE160

805
HEB160

IPE160

HEB200
450 400 671 379

L75*6
814
K K

HEB200
IPE160
IPE160

494
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

PL10*280
HEB200

1595
HEB200 DET - 15

HEB200

1056
L75*6
DET - 13 CL OF 91404_E_15
606

HEB260 HEB260
AD
HEB260

600
DET - 16 DET - 17
IPE160 IPE160
HEB160

HEB160

DET - 14

1450
IPE160
IPE160

HEB200
HEB160
HEB260

IPE160
IPE160
IPE160
IPE160

L75*6
850
N
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

HEB160 HEB160
HEB160
573

1401-LS-A-1036
HEB160
N
3550 1000 940 960 950 1100 850 850 1050 1250 772 478

3375 3800 LIFTING LUG TYPE B CLIENT:

PetroChina International Iraq FZE Iraq Branch

PLAN AT EL.+8.600 (T.O.S) CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

FOR DETAILS AND SECTIONS REFER SHEET - 22 & 23. VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PLAN AT EL. +8.600 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 7 OF 91 0

A0
DATE

A3
BY

786 1135 900 800 800 220


7
DISCIPLINE

1401-LS-A-1006 A3
HEB200 R S

100
HEB200 1176 900 1600 220

31
HEB200
UNP160 792 1401-LS-A-1006
DATE

EL.+11.400 HEB200 HEB200


P P (T.O.S)
LS-p-1083 FL25*91 LS-p-1304 FL25*95.5

600
BY

IPE160
DISCIPLINE

HEA160
AB

892
DATE
BY

IPE160

IPE160
DISCIPLINE

UNP200
HEB200
HEB200
2*D18

1260

2460
892

HEB200
2*D18 1401-LS-A-1006
HEB200
DATE

2800
1401-LS-A-1006
HEB200
BY

AC
DISCIPLINE

600
DATE

DET - 24
HEB180 (TYP)
HEB200 HEB200
BY
DISCIPLINE

Q Q
HEB200

525
R
EL.+8.600 HEB200
(T.O.S) HEB400 HEB200 HEB200
DATE

2*D18 2*D18
UNP200
BY

1076
DISCIPLINE

S
PLAN AT EL.+11.400 (T.O.S) SECTION P - P

24A 200
1401-LS-A-1006 30 60 30
HEB200
6 - Ø 21 HOLES FOR 40 60 60 40
M 19 BOLTS - 65 mm LG
6 - Ø 21 HOLES FOR
40

TYPICAL WELD DETAILS

40
M 19 BOLTS - 70 mm LG
W1 W2
75

BEAM TO BEAM Typ.1 BEAM TO BEAM Typ.2

75
PRIMARY CPJ PRIMARY CPJ
ELEMENT ELEMENT
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

45° 45°
75

75
R=
6 - Ø 21 HOLES FOR
"AS
R= T RE
"A QUIR
S T E
40

M 19 BOLTS - 70 mm LG RE D"
460

40
QU
I

460
RE

24B 24B
D"
75 40

75 40
T SECONDARY
T T ELEMENT
T

SECONDARY
ELEMENT
CPJ
45°
75

6 - Ø 21 HOLES FOR
75
NOTE: Following completation of the welding, the sloted holes shall be properly filled NOTE: Following completation of the welding, the sloted holes shall be properly filled

M 19 BOLTS - 65 mm LG
70 60 70
40

40

15 15
EL.+8.600 PL15*80
1401-SK1-A-1001
(T.O.S) PL15*80 HEB200
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

PL15*200
PL15*200
HEB200
60 60

PL15*120
PL15*120
24A PL15*80
CLIENT:

DETAIL - 24 SECTION 24A - 24A


(TYP) SECTION 24B - 24B PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PLAN AT EL. +11.400 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 8 OF 91 0

A0
DATE

A3
900
BY

1176 107 792 1600 100


EL.+11.400
DISCIPLINE

TO BE WELDED ON SITE AC AB
(T.O.S)
HEB200 HEB200
100 600 1260 600 100
EL.+11.400

301
DATE

(T.O.S)

391

291
HEB180
BY

892
80

892
1
DISCIPLINE

B
HE

430
488

577
HEA160 2*D18

1000
DATE

845 500
BY

HEB200
1345
DISCIPLINE

HEB200
DATE

2509

2800
1401-LS-A-1006
HEB200
BY
DISCIPLINE

1401-LS-A-1006
HEB200

LS-p-1307 PL6*20
DATE

PL15*80

PL15*80
BY

EL.+8.600 PL15*200
HEB260 SK2-p-1073 L75*6
DISCIPLINE

(T.O.S)
SK2-p-1035 PL10*255
HEB260 PL15*200
SK2-p-1072 L75*6
HEB200 HEB200
PL15*120 PL15*120
SK2-PS-p1012 PL12*190 EL.+8.600
4*D21
(T.O.S) HEB260
2*D18 HEB260
DATE

SECTION Q - Q
BY

HEB260
DISCIPLINE

600 2460 100


EL.+11.400 SECTION R - R
(T.O.S)

100
HEB200

TYPICAL WELD DETAILS


NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

W1 W2
BEAM TO BEAM Typ.1 BEAM TO BEAM Typ.2
PRIMARY CPJ PRIMARY CPJ
ELEMENT ELEMENT
45° 45°
HEB200

R=
"AS
R= T RE
"A QUIR
S T E
RE D"
QU
IRE
D"

T SECONDARY
T T ELEMENT
T

SECONDARY
2830

ELEMENT
CPJ
SK2-PS-p-1001 UNP160 45°
NOTE: Following completation of the welding, the sloted holes shall be properly filled NOTE: Following completation of the welding, the sloted holes shall be properly filled

1401-LS-A-1006
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

HEB200
UNP160 SK2-PS-p-1023 UNP160

LS-p-1044 PL15*120

CLIENT:

PetroChina International Iraq FZE Iraq Branch


HEB200

CONTRACTOR:

LS-PS-p1054 PL8*25

HEB200 IPE160 2*D18


LS-PS-p1328 PL8*28
HEB260 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
SK2-p-1074 FL25*95.5
2*D18
PEG ENGINEERING & CONTRACTING DMCC
2*D18 4*D21
VENDOR:
LS-PS-p1328 PL8*28 2*D18 FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
UNP160 SK2-PS-p1001 UNP160
PROJECT TITLE:
NOTES : HOLDS:
SECTION S - S DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) SECTIONS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 9 OF 91 0

A0
DATE
PL15*373.9PLT6*150
A4 HOLES Ø 24mm
A1 A2 A3 PL10*80 75 CL
3550 3850 3850 PLT6*150 ==
BY

2 -Ø 18 HOLES PL10*180
730 776 2774 953 2897
UNP160 2903 947 1250 PL10*801380 2 -Ø 18 HOLES 12 - Ø 24 HOLES FOR 4 -Ø 18 HOLES

HEB360
DISCIPLINE

PL10*80 4 -Ø 18 HOLES M 22 BOLTS - 80 mm LG


2 -Ø 18 HOLES DET - 32 1401-SK1-A-1002 PL25*118.5
1401-SK1-A-1002 DET - 32 4 -Ø 18 HOLES

10
PLT6*150 1401-SK1-A-1001
SHEET - 11 PL30*240 HEB360 PL30*240 PLT6*150
SHEET - 11
L75*6 PLT6*150 2 -Ø 18 HOLES 2 NO. PL15*170 *470 2 NO. PL15*170 *470

10
EL.+8.600 2 -Ø 18 HOLES 2 -Ø 18 HOLES PLT6*150 PL10*80
4 -Ø 18 HOLES PL10*80 PL10*80 2 -Ø 18 HOLES 2 -Ø 18 HOLES PLT6*150 HOLES Ø 24mm HOLES Ø 24mm PL12*180
(T.O.S) PL10*80 PLT6*150 PLT6*150

45
DATE

2 -Ø 18 HOLES PL25*118.5

39
PL10*80 HEB260 PL10*80 4 -Ø 18 HOLES 4 -Ø 18 HOLES PL10*80 PL10*80 HEB360 HEB260 PL10*80 HEB260 UNP160 HEB200

45
PL10*360 PL10*80 PL10*80 4 -Ø 21 HOLES
2 -Ø 18 HOLES 2 -Ø 18 HOLES
2 -Ø 18 HOLES 2 -Ø 18 HOLES

70 70
2 -Ø 18 HOLES 4 -Ø 18 HOLES

70 70
2 -Ø 18 HOLES HEB160
BY

PLT6*115.8

10 70
4 -Ø 18 HOLES

10 70
PL12*180

0
JOINT AXIS

45
0
1400
HEB160

70
HEB200
DISCIPLINE

70
DET - 26 DET - 26 DET - 31 75 L50*6 L50*6
==

23
45

5
DET - 26 EL.+7.330 4 -Ø 21 HOLES DET - 28 1401-LS-A-1019
DET - 25 HEA180
(T.O.S) HEB260 MIR.
12 - Ø 24 HOLES FOR
4 -Ø 18 HOLES M 22 BOLTS - 80 mm LG PL15*375.6
DATE

HOLES Ø 24mm
DETAIL - 25 DETAIL - 27

930
800
HEB HEB 0
BY

B26 DET - 29
1401-LS-A-1025 260 260 E

350
HEB260 H

512
DISCIPLINE

DET - 27 1000
3
1498 111
1000
HEB260 4 -Ø 18 HOLES
EL.+5.700 26A
5
(T.O.S) 2423 925 642 175 300 180
DATE

HEB200 HEA140 HEA140


5725

2950
4 -Ø 18 HOLES
4 -Ø 21 HOLES 4 -Ø 21 HOLES 180 80
DET - 28
100

HEB360
4 -Ø 21 HOLES == HEB360 ==
12 - Ø 24 HOLES FOR
BY

2 -Ø 18 HOLES 2288 1562 M 22 BOLTS - 85 mm LG


2 NO. PL15*180 *460
DISCIPLINE

HEB360
1450

2 -Ø 18 HOLES 2 -Ø 18 HOLES

75 40
1401-LS-A-1023 1401-LS-A-1024

75 40
HEB360 4 -Ø 21 HOLES HEB260
2 -Ø 18 HOLES

230
2 -Ø 18 HOLES

230
75

75
26B 26B

460
DATE

80
C

460
JOINT AXIS JOINT

80
L OF SPLICE

75

230

75
AXIS

230
4505

40 75

40 75
BY

1401-LS-A-1023 2 NO. PL15*300 *460


DISCIPLINE

1375

1375
2 NO. PL15*300 *460 HEB360 4 NO. PL15*110 *460 HOLES Ø 24mm
HOLES Ø 24mm
26A 1401-LS-A-1023 12 - Ø 24 HOLES FOR

6055
EL.+2.875 PLT6*130 DET - 28 HEB360 M 22 BOLTS - 80 mm LG
(T.O.S) PLT6*130 PLT6*130 SIM. DETAIL - 26
SECTION 26A - 26A
DATE

PLT6*130 (TYP DETAIL)

12 - Ø 24 HOLES FOR
M 22 BOLTS - 70 mm LG
BY

2 -Ø 18 HOLES EL.+2.225
HEB200
HEB200 HEB200(T.O.S)
DISCIPLINE

L75*6
2 -Ø 18 HOLES 1401-LS-A-1022
1401-LS-A-1015 HEB360
HEB360
1100
2 -Ø 18 HOLES 100 460

HEB360
2325

2325
2 -Ø 18 HOLES 40 460
75 2 NO. PL15*260 *460 40 75 80 75 40
2 NO. PL15*155 *460 80 HOLES Ø 24mm
75 2 NO. PL15*260 *460 75 75
75 1401-LS-A-1024
75 40 HOLES Ø 24mm HEB260

1550
HEB260
DET - 30

75
==
EL.+0.550 1401-LS-A-1024
HEB260
(B.O.BP)

260
160
==
28A
50

155
2 NO. PL15*100 *460 230
230 28A 12 - Ø 24 HOLES FOR
M 22 BOLTS - 80 mm LG 230 230
12 - Ø 24 HOLES FOR
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

M 22 BOLTS - 70 mm LG
DETAIL - 28 SECTION 28A - 28A
(TYP DETAIL)

A3
1401-LS-A-1022
HEB260
2 NO. PL10*120 *290 HEB360
HOLES Ø 24mm
4 NO. PL12*150 *300
ELEVATION ALONG GRID LINE "AA" 1401-SK1-A-1001
HEA180
BASEPLATE
HEB260 60 PL25*640
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

PL15*110 == EL.+0.550
PL15*300 PL15*110
SK1-CT-p1046 PL10*70
HEB360
PL12*180

10
PL15*300 8 - Ø 21 HOLES FOR (B.O.BP)

25
4 -Ø 21 HOLES M 19 BOLTS - 60 mm LG
60

1401-LS-A-1023
PL15*180 HEB260

40
10 90

50
GROUTING

60
60

PL10*232.6 PL50*740 SHEAR KEY

60
40

90
HEB200

890
2 NO. PL10*120 *290 CLIENT:

0
PL15*180

28

0
POCKET

53
8 - Ø 21 HOLES FOR PetroChina International Iraq FZE Iraq Branch
PL15*110 30 M 19 BOLTS - 60 mm LG
CONTRACTOR:

PL15*110 30
HEA180 PL10*304.9 *452 CC
SECTION 26B - 26B HOLES Ø 24mm CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DETAIL - 31 DETAIL - 29
PEG ENGINEERING & CONTRACTING DMCC

DETAIL - 30 VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AA
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 10 OF 91 0

A0
DATE
BY
DISCIPLINE

3550 3850 3850


SK1-HR-p-1003
A4 A1 A2 A3
DATE

10 SK1-p-1082
730 776 2774 953 2897 2903 947 1250 1380
DU1008
DET - 32 1401-SK1-A-1002 1401-SK1-A-1002 DET - 32
EL.+8.600 DU1007 PL30*240 PL30*240 TYP
BY

(T.O.S) LS-HR-p-1132
DU1006 SK1-p-1088 HEB260 HEB360
LS-p-1125 LS-p-1129 HEB260
DISCIPLINE

4 -Ø 14 HOLES SK1-CT-p1052
LS-PS-p1328
SK1-PS-p1052
4 -Ø 21 HOLES 32A
SK1-PS-p1046 DET - 31

642
SK1-PS-p1053 SK1-PS-p1059
SK1-PS-p1045 C L OF SPLICE JOINT AXIS SHEET - 10 240

1270
DATE

SK1-p-1069 DET - 28 MIR. PL25*118.5 ==


DET - 26 1401-LS-A-1018 120
SHEET - 10 SHEET - 10 EL.+7.330 HOLE Ø45
EL.+7.330 DET - 26 HEA180
FOR PIN Ø42

120
DET - 25 DET - 26 (T.O.S) SHEET - 10 DET - 28 (T.O.S)SK1-CT-p1051 PL30*240
BY

20
SHEET - 10 SHEET - 10 HEB260 SHEET - 10
EL.+8.600
2900
DISCIPLINE

240

240
(T.O.S)

130
133

120
930
HEB 6 0 6 0

80
1401-LS-A-1025

600
HEB260 260 HEB
260 H EB2 H EB2 DET - 29

100
DET - 27 SHEET - 10 1401-SK1-A-1001

360

360
DATE

512
SHEET - 10 1498 HEB360
1000 3
111

100
EL.+5.700 2423 925
BY

PL15*114 15
(T.O.S)
642 1 755 6 - Ø 33 HOLES FOR
HEB200 M 29 BOLTS - 100 mm LG
DISCIPLINE

120 32A
DETAIL - 32

2150
LIFTING LUG TYPE A
2288 1562
DATE

1401-LS-A-1020
1450

HEB360

HEB360
HEB360
1401-LS-A-1005
HEB260
BY

8050

30
C
DISCIPLINE

L OF SPLICE 25 25

4505
PL30*240
PL25*118.5 PL25*118.5
DATE

1401-SK1-A-1001
1375

SK1-p-1038 HEB400
HEB360

6055
EL.+2.875 GR-p-1147
BY

DET - 28 SIM.

80
GR-p-1345 GRTG30*800
(T.O.S) GR-p-1148 GR-p-1115 SHEET - 10
GR-p-1344 GRTG30*700 PL15*114
DISCIPLINE

12 - Ø 24 HOLES FOR
M 22 BOLTS - 70 mm LG
1200 EL.+2.225 PL30*240

3675
(T.O.S) 30SK1-p-1081
30 PL22*107.3
6
LS-p-1119 LS-p-1298 114
LS-p-1117
1401-LS-A-1022 SECTION 32A - 32A
HEB360
2325

HEB2
1401-LS-A-1021
HEB360

HEB360

1675

60
DET - 30

1550
EL.+0.550 SHEET - 10
(B.O.BP)
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

25
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

ELEVATION ALONG GRID LINE "AB"


CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AB
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 11 OF 91 0

A0
DATE

A4
A1 A2 A3 HEB260
3550 3850 3850
BY
DISCIPLINE

730 2100 1450 3375 475 3325 525 1250 1350 PL10*190 *292
2 NO. PL10*105 *230 HOLES Ø 18mm

10
DET - 42 HOLES Ø 18mm
SK2-A-1002 DET - 43

30
SK2-A-1002 SHEET - 13

0
DET - 33

30
4 Nos. 4 Nos. SHEET - 13 HEA160
EL.+8.600 PLT6*150
DATE

HEB260
(T.O.S) HEB260 HEB260 PL10*275 HEB260 HEB200 HEB260

50

70
50
PL10*170 PL10*255 L75*6

50
4 -Ø 21 HOLES
BY

PL10*120 8 - Ø 21 HOLES FOR


642

642
HEB260
M 19 BOLTS - 60 mm LG
CL OF SPLICE
DISCIPLINE

JOINT AXIS DETAIL - 35

1380
DET - 42 DET - 35 PL10*90

1000
DET - 43 SHEET - 13

1613
DET - 43 SHEET - 13 PL6*53 PL10*230.6 *344
SHEET - 13 1401-LS-A-1035 UB254*146*31 HOLES Ø 21mm

978
1000 HEA160 PL10*50 HEB260
PL10*120
DATE

1926 1924
1401-LS-A-1011 EL.+6.980 CL HEA160 PL10*90
HEA180
(T.O.S)

50
HEB180 8 - Ø 21 HOLES FOR PL10*50
DET - 36 M 19 BOLTS - 60 mm LG
BY

2 NO. PL10*120 *290

10
501
1401-LS-A-1017 PL10*120
2 NO. PL10*105 *230 HOLES Ø 21mm
DISCIPLINE

10
HEB260
DET - 34 HOLES Ø 18mm
HEB180

40
1401-LS-A-1011

33
0
HEA180

30
3708

70 50

60
DATE

30

50

60
60
90
5725

==
0

0
25

12
DET - 37

40
2730
1401-LS-A-1046

HEB260
1401-LS-A-1017
BY

HEB260 HEB260
PL10*270.2 *395
HOLES Ø 18mm
8 - Ø 21 HOLES FOR
DISCIPLINE

DETAIL - 36 M 19 BOLTS - 60 mm LG
1401-LS-A-1039 DETAIL - 33

4105
DET - 38 HEB180 HEB180
DET - 38
1401-LS-A-1038
DET - 38 HEA180
DATE

HEB180
C 8 - Ø 21 HOLES FOR
L OF SPLICE JOINT AXIS

500
M 19 BOLTS - 60 mm LG

HEB180

0
PL10*214.6 *483

12
C
BY

HOLES Ø 18mm L

60
==
DISCIPLINE

DET - 39

380
DET - 39
1375

1375

860
MIR.
1401-LS-A-1046

50
PL10*120 HEB260

10
PL10*120 PL10*120
EL.+2.875 1925 1925 2 NO. PL10*120 *290 UNP160

50
70
DATE

HOLES Ø 21mm
(T.O.S)

50
50
HEB160 HEB160

40
30

60
BY

12 - Ø 21 HOLES FOR

10
1401-LS-A-1038 HEB160
M 19 BOLTS - 60 mm LG

40
60
90
HEB180

0
DISCIPLINE

PL10*120 DET - 40

B18

28
PL10*120 2 NO. PL10*115 *330

0
HE
PL10*115 HOLES Ø 18mm UNP100
PL10*115 50 PL10*306.5 *453
DETAIL - 37

HEB260
HOLES Ø 21mm

HEB260
2325

1401-LS-A-1027 = DETAIL - 34
HEB260 =
1401-LS-A-1044 1401-LS-A-1043
HEB160 HEB160 37A
HEB260 2 NO. PL15*155 *460 4 NO. PL15*100 *460
DET - 41 CL HOLES Ø 24mm HOLES Ø 24mm
EL.+0.550 PL10*115 DET - 41 PL10*115 4 NO. PL15*100 *460 C
MIR. HOLES Ø 24mm 12 - Ø 24 HOLES FOR L
(B.O.BP) M 22 BOLTS - 80 mm LG 2 NO. PL15*260 *460 HEB260
HOLES Ø 24mm

75 40
12 - Ø 24 HOLES FOR
M 22 BOLTS - 70 mm LG

75 40
230
75
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

460
80

75
460
75

80
230
37B 37B

40 75

75
40 75
ELEVATION ALONG GRID LINE "AC" 1401-LS-A-1027
HEB260
1401-LS-A-1027
2 NO. PL15*260 *460 160 HEB260
2 NO. PL10*115 *250 HOLES Ø 24mm == 2 NO. PL15*155 *460
CL
HOLES Ø 18mm HEB160 1401-LS-A-1027 HOLES Ø 24mm 75
HEB260 260
==
120 12 - Ø 21 HOLES FOR 155
M 19 BOLTS - 60 mm LG 8 - Ø 21 HOLES FOR PL10*239.3 *242 37A
50
10

M 19 BOLTS - 60 mm LG HOLES Ø 18mm


HEB180 CL
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

== HEB160
0
22

DETAIL - 38 SECTION 37A - 37A


2 NO. PL10*120 *350
80 50

35

35

HOLES Ø 18mm EL.+0.550


50

50 80

B.O.P
PL10*203.6 *517 PL15*260 PL15*100
35

PL15*100
50

35

HOLES Ø 18mm
35

20
HEB260

LS-A-1044 50
0
HE
50

2 Nos. == PL15*155
PL15*260
B1
50
80

60

CLIENT:

12
50

0
50

35

PetroChina International Iraq FZE Iraq Branch


2 NO. PL10*120 *250 1401-LS-A-1017
HOLES Ø 18mm HEB260 PL15*155 PL15*100
364

CONTRACTOR:

8 - Ø 21 HOLES FOR PL15*100 CC


M 19 BOLTS - 60 mm LG CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PL10*323.7 *414
HOLES Ø 18mm DETAIL - 40 SECTION 37B - 37B PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


DETAIL - 41 P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AC
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 12 OF 91 0

A0
DATE

42A
BY

240
==
DISCIPLINE

PL15*118.5 120 HOLE Ø45


FOR PIN Ø42
PL20*240

120
DATE

EL.+8.600
(T.O.S) SK2-p-1037 PL10*280

90

210
500
BY

A1 A2 A3

260

80
DISCIPLINE

3850 3850 2600


1401-SK2-A-1001
HEB260

90
3375 475 3325 525 1250 1250 100 15
120
DATE

1401-SK2-A-1002 4 - Ø 28 HOLES FOR


1401-SK2-A-1002 42A
EL.+8.600 PL20*240 PL20*240 DET - 43 PL15*105 M 25 BOLTS - 80 mm LG
(T.O.S) PLT6*150 PL15*118.5 PL15*118.5 L75*6 PLT6*150 DETAIL - 42
PL10*280 L75*6 HEB260 L75*6
BY

PL10*105
HEB260
PL10*105 2 -Ø 18 HOLES
DISCIPLINE

20
642

HEB260 2 -Ø 18 HOLES
CL OF SPLICE JOINT AXIS DET - 42 HEB260 DET - 42 DET - 35 15 15
SHEET - 12 PL20*240
PL15*118.5

1250
HEB260 PL15*118.5
DATE

1401-LS-A-1045
PL10*105 HEA160 1401-SK2-A-1001
DET - 43 HEB260
978

EL.+6.980 DET - 43

90
240
TYP 1926
(T.O.S)
BY

HEB160 HEB160 HEB180


PL15*105
DISCIPLINE

DET - 36 PL20*225
SHEET - 12

500
110
20 20
DATE

HEB180
2 -Ø 18 HOLES
SECTION 42A - 42A
BY

DET - 37
SHEET - 12
2730

2 -Ø 18 HOLES 4 -Ø 21 HOLES
DISCIPLINE

4 -Ø 18 HOLES 4 -Ø 21 HOLES 4 -Ø1401-LS-A-1009


21 HOLES
HEB260

HEB260
2 -Ø 18 HOLES
2 -Ø 18 HOLES

HEB260
4 -Ø 21 HOLES
DET - 38 4 -Ø 21 HOLES
DATE

SHEET - 12 2 -Ø 18 HOLES
DET - 38 DET - 38
2 -Ø 18 HOLES
8050

SHEET - 12 1401-LS-A-1038
HEB180 SHEET - 12
BY

CL OF SPLICE JOINT AXIS


A1
DISCIPLINE

4 -Ø 21 HOLES 1401-LS-A-1039 12 - Ø 21 HOLES FOR PL15*260


HEB180 EL.+8.600 80 80 M 19 BOLTS - 80 mm LG
DET - 39 (T.O.S)

50
DET - 39 MIR. SHEET - 12
1375

SHEET - 12
DET - 40 PL15*100
PL10*120 1925 SHEET - 12 PL10*120 PL15*100

60
EL.+2.875 1925

HEB260
PL10*120 2 -Ø 18 HOLES 12 - Ø 24 HOLES FOR
(T.O.S) M 22 BOLTS - 80 mm LG PL15*155 PL15*155
PL10*120

80
HEB160 HEB160 PL15*100
2 -Ø 18 HOLES PL15*100

75
PL10*115 2 -Ø 18 HOLES
PL10*115

40 75
43A 43A

40
PL15*260

75 75
SECTION 43A - 43A
HEB260

HEB260

40
1401-LS-A-1026
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

2325

1000

HEB260
1401-LS-A-1043 50 160 50
HEB160
857
DET - 41 MIR. 1401-LS-A-1044 DETAIL - 43
HEB160 DET - 41
SHEET - 12 SHEET - 12
EL.+0.550 PL10*115 PL10*115
(B.O.BP)
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

ELEVATION ALONG GRID LINE "AD" PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AD
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 13 OF 91 0

A0
DATE
BY
DISCIPLINE

AD AC AB AA
DATE
BY

80 1450 5100 1260 5100


DISCIPLINE

EL.+8.600 1401-LS-A-1036 1401-SK1-A-1001


DET - 44 HEB160
1401-LS-A-1008
HEB400
HEB160
(T.O.S)
DATE

80 HEB360
642

HEB360
BY

HEB260 HEB260
C
L OF SPLICE
DISCIPLINE

1400
1000 1000
978

1401-LS-A-1034
EL.+6.980
DATE

HEA160

53
1401-LS-A-1047 AD
(T.O.S) HEB160 HEA160

45
44
90
DET - 45
BY

8 - Ø 21 HOLES FOR
DISCIPLINE

8 8 M 19 BOLTS - 60 mm LG

2 NO. PL10*105 *230


HOLES Ø 18mm 1401-LS-A-1009
HEB260
DATE

50
5725
1401-LS-A-1009
2730

70 50
HEB260

30
BY

28
PL10*175.8 *278

0
1401-LS-A-1046 1401-LS-A-1020 1401-LS-A-1023 HOLES Ø 18mm
DISCIPLINE

HEB260 HEB360 HEB360

DETAIL - 45
DATE

C
L OF SPLICE

HEB160
BY
DISCIPLINE

1550 1530 930 1050 LS-A-1034


1450 1650 1250 PL10*190.5 *270 1 Nos.
850 700 700 750 80 700 700 HOLES Ø 18mm 1401-LS-A-1034
EL.+2.875 700 550 HEA160

30
(T.O.S)

23
HEB160 HEB160
80

90
HEB160
LS-p-1359 HEB180 HEB180 HEB180
80

HEB180

51
50 70

50
50
700

700

700

700
3700

HE

1401-LS-A-1026

51
HE

60
HE

1000
1000

60
UNP160
A1

A1
1000

60

A1

A1
8 - Ø 21 HOLES FOR

A1

1000
1000

1000
60

HE
A1

60

60

HE
1000 1000
M 19 BOLTS - 60 mm LG
HE

1000
1000 1000 1000

DETAIL - 44

2325
HEB180
1401-LS-A-1026
HEB260 1401-LS-A-1027 1401-LS-A-1021 1401-LS-A-1015
HEB260 HEB360 HEB360
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

EL.+0.550
(B.O.BP)
50
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

ELEVATION ALONG GRID LINE "A1" PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - A1
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 14 OF 91 0

A0
DATE
BY

1401-SK1-A-1001
EL.+8.600 HEB400
DISCIPLINE

(T.O.S)

330
AD AC AB AA
DATE

70
70
70
100
BY

70
1530 5100 1260 5100

610

70
DISCIPLINE

DET - 44 2550 2550


SHEET - 14 80 1450

45

70
220
EL.+8.600 1401-LS-A-1036 1401-LS-A-1008

HEB
1401-SK1-A-1001
HEB260 HEB160
(T.O.S) HEB360 HEB400
DATE

HEB
16 - Ø 24 HOLES FOR
M 22 BOLTS - 80 mm LG

220
642

HEB360
BY

HEB260 HEB260 30
JOINT AXIS 30 80
DISCIPLINE

60
1450

80
1000

DET - 46 PL15*367.8 *639


HOLES Ø 24mm
1000
16 - Ø 24 HOLES FOR
DATE

M 22 BOLTS - 80 mm LG
DET - 45
SHEET - 14 2 NO. PL15*130 *610
1401-LS-A-1007 HOLES Ø 24mm
BY

HEA160 1401-LS-A-1023
HEB360
DETAIL - 46
DISCIPLINE

600
3708
DATE

HEA140
5725

16 - Ø 24 HOLES FOR
80 M 22 BOLTS - 80 mm LG
BY

1000
60

1000
1401-LS-A-1009 1401-LS-A-1017
HEB260 1401-LS-A-1020 80 AA
DISCIPLINE

HEB260
HEB360 454
454
HEB220
1401-LS-A-1029 1401-LS-A-1029
HEB220

70
DATE

HEB220

2850
JOINT AXIS

70
70
BY

100
DET - 47 1401-LS-A-1015
HEB360

70
DISCIPLINE

1450 80
1375

70
1530

70
80 700 700
EL.+2.875 930 1050
80 1450
(T.O.S) PL15*310.5 *771
HEB160 HEB160 HEB180 HEB180 HEB180 HOLES Ø 24mm

700
HEB160 HEB180

HEB180
HEB180

650
EL.+2.225

660

660
60

HE

HE
(T.O.S)
HE

A1

HEB200
1000

A1

A1
A1

HE

60

60
60

1000
1000

1000

1000
1000 1650 1250 DETAIL - 47
2325

1000
1000 1401-LS-A-1021
1401-LS-A-1027 HEB360

1675
HEB260
1401-LS-A-1026 1401-LS-A-1015
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

HEB180
HEB260 HEB360

EL.+0.550
BOP
50
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

ELEVATION ALONG GRID LINE "A2"


CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - A2
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 15 OF 91 0

A0
DATE

SHEET -17
AD AC AB AA
U
DET - 44 1530 5100 1260 5100
BY

SHEET - 14
1450 2400
EL.+8.600 1401-LS-A-1008
DISCIPLINE

1401-LS-A-1036 1401-SK1-A-1001
HEB160 HEB160 T HEB400
(T.O.S)

642
DATE

642
HEB260 HEB260 HEB260 HEB360
JOINT AXIS HEB360

1450

1000
BY

2310
DISCIPLINE

1000

2600
1401-LS-A-1055
HEA160

HEB200
2088
DET - 45 1401-LS-A-1017
DATE

HEB260 1401-LS-A-1020
SHEET - 14 1401-LS-A-1013 HEB360
HEB260 EL.+6.290
(T.O.S) 1401-LS-A-1023
HEB360
BY

EL.+6.000
3708

(T.O.S)
EL.+5.725
DISCIPLINE

2200 1401-LS-A-1010 (T.O.S)


HEB200
HEA140
T
U HEB260
DATE

1401-LS-A-1009 780
HEB260
BY
DISCIPLINE

JOINT AXIS
DATE

1530

780 1450 80
1375
BY
DISCIPLINE

EL.+2.875 80 700 700

5225
(T.O.S) HEB160 HEB160
DATE

HE

60
A1
A1

HE
60

1401-LS-A-1022 1401-LS-A-1022
HEB360 HEB360
BY
DISCIPLINE

2325

1401-LS-A-1027
1401-LS-A-1026 HEB260
HEB260

EL.+0.550
BOP
50
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

ELEVATION ALONG GRID LINE "A3"

EL.+8.600 A4 A1 A2 1401-SK1-A-1001 A3
HEB200
(T.O.S) HEB200 HEB200 HEB200 HEB200 HEB200 HEB200

640
HEB200
JOINT AXIS
HEB400
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1512

2310
1210

1670
HEB200
1401-LS-A-1010
UNP80
HEB200

EL.+6.290 L50*6 CLIENT:

(T.O.S) 1401-LS-A-1010
HEB200 PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

3000 1960 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
4960
PEG ENGINEERING & CONTRACTING DMCC
3550 3850 3850
VENDOR: FABTECH International Ltd.
SECTION T - T P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - A3
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 16 OF 21 0

A0
AC.1 AC.2 AB.1 AB.2 AA.1
DATE

1980 2400 2900


EL.+2.875
(T.O.S) HEB180 HEB180
BY
DISCIPLINE
DATE

HEB180
BY

1401-LS-A-1016

HEB180
HEB180

2325
1401-LS-A-1015
HEB180
DISCIPLINE
DATE

EL.+0.550
BY

(B.O.BP)
DISCIPLINE

50
DATE

ELEVATION ALONG GRID LINE "A4"


BY

AC.1 AC.2 AB.1 AB.2 AA.1 AA.2


DISCIPLINE

480 1500 2400 2900 1310


EL.+2.875
DATE

(T.O.S)
HEB180 HEB180 HEB180
BY

HEB180

60
A1
DISCIPLINE

HE

850
1000
1000
DATE

HEB180

HEB180
850
2325

1401-LS-A-1015
BY

1401-LS-A-1016 HEB180
HEB180
DISCIPLINE

EL.+0.550
BOP
50

ELEVATION ALONG GRID LINE "A5"


NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

A8
A1 A2 A3

3850 3850 2500 6800


EL.+8.600
(T.O.S)
HEB200 HEB200 HEB200 HEB200 HEB200
+8600.00 +8600.00
642

HEB260
JOINT AXIS
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

2600
1958

HEB260

CLIENT:

PetroChina International Iraq FZE Iraq Branch


EL.+6.000
1401-LS-A-1013
HEB260 (T.O.S) CONTRACTOR:

+6000 +6000
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

130 100 PEG ENGINEERING & CONTRACTING DMCC

9530
VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
SECTION U - U UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - A4 & A5
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 17 OF 91 0

A0
DATE
BY
DISCIPLINE

AC.1 AC.2 AB.1 AB.2 AA.1 AA.2 AA.3


DATE

3900
1500 2400 2900 1310
EL.+2.875
BY

(T.O.S)
DISCIPLINE

HEB180 HEB180 HEB180


UNP100

L50*6
60
DATE

A1

L50*6
HE

1200
1000
BY

1000
EL.+1.675
DISCIPLINE

1401-LS-A-1041

HEB180

HEB180
1401-LS-A-1015 HEB180 (T.O.S)
2325

HEB180

1401-LS-A-1016
DATE

HEB180

1125
HEB180

HEB180
BY

EL.+0.550
DISCIPLINE

(B.O.BP)
50
DATE
BY
DISCIPLINE

665 1150 725


ELEVATION ALONG GRID LINE "A6"
DATE
BY
DISCIPLINE

AC.2 AB.1 AB.2 AA.1 AA.2 AA.3

3900 4210 1220

3550 350
EL.+2.875
400
(T.O.S) HEB180 HEB180
40 60 60 40 60 60 40
40
HEB180 12 - Ø 21 HOLES FOR

35
M 19 BOLTS - 70 mm LG

30
DET - 48 HEB180

25
25
2 NO. PL15*110 *400
HOLES Ø 21mm
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

30
HEB180

35
10

HEB180
1401-LS-A-1028

HEB180

2325
HEB180

1401-LS-A-1028
HEB180 DETAIL - 48
1401-LS-A-1014
HEB180

EL.+0.550
(B.O.BP)
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

50
CLIENT:

ELEVATION ALONG GRID LINE "A7"


PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - A6 & A7
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 18 OF 91 0

A0
DATE
BY

A7
1290 6*250=1500 A7 A6 A5
DISCIPLINE

EL.+2.875 THREADS 3800 3800


(T.O.S) UNP100 UNP100 WP
1290 6*250=1500 1010
EL.+2.875 THREADS
DATE

HEB180 HEB180
1401-LS-A-1003 (T.O.S) UNP200
UNP200 UNP200
BY

WP

800
HEB180 EL.+1.675 HEB180 HEB180

6*200=1200
WP 1401-LS-A-1015

HEB180
1000

RISERS
DISCIPLINE

(T.O.S) HEB180

800
30
HEB180
250 1000
UNP200 EL.+1.675

5*200=1000
1401-LS-A-1001
TYP 200 1401-LS-A-1004

RISERS
UNP200 1401-LS-A-1028 (T.O.S)
DATE

HEB180 UNP200

HEB180

TYP
800

200
TYP
200 EL.+0.550
250 HEB180
1000
(B.O.BP)
BY

WP TYP

1175
EL.+0.300
DISCIPLINE

EL.+0.550
205

50
(B.O.BP)

200
DATE

5*250=1250
BY

328 THREADS
1540 1450
DISCIPLINE

ELEVATION ALONG GRID LINE "AA.3" ELEVATION ALONG GRID LINE "AA.2"
DATE
BY

HEB100
A7 A6 A5 A4 A1 A2
DISCIPLINE

3800 3800 3800 7400

3500 300

HEB100

L60*6
EL.+2.875

UNP100
DET - 49 1401-LS-A-1015
DATE

L60*6
(T.O.S) HEB180
HEB180 HEB180
L60*6
L60*6
BY

1401-LS-A-1028
HEB180 DET - 48 1401-LS-A-1037
SHEET - 18 1401-LS-A-1037 UNP80
DISCIPLINE

UNP80 UNP100
HEB180 UNP100

HEB180
HEB180

HEB180

HEB180
L60*6
1000

1000

UNP100
DET - 50
EL.+0.550 850 850 MIR.
(T.O.S)

DET - 50
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

ELEVATION ALONG GRIDLINE "AA.1"

1401-LS-A-1015 1401-LS-A-1015
HEB180 IPE160 HEB180 A6
49A
IPE160
1401-LS-A-1015
40
21

HEB180
35

L60*6
2 UNP80
50

40
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

50
35

2 - Ø 21 HOLES FOR 2 - Ø 21 HOLES FOR PL10*169.7


50

M 19 BOLTS - 50 mm LG M 19 BOLTS - 50 mm LG HOLES Ø18mm EL.+0.550 2 - Ø 21 HOLES FOR


(B.O.BP) M 19 BOLTS - 55 mm LG
UNP80
35
0

UNP80
P8

2-
UN

PL10*218.4
UN
2-

P8
0

PL10*169.7 49A
CLIENT:

HOLES Ø18mm
10 PetroChina International Iraq FZE Iraq Branch
DETAIL - 49
CONTRACTOR:

SECTION 49A - 49A


CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DETAIL - 50 PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AA.1 & AA.2 & AA.3
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 19 OF 91 0

A0
DATE
BY

A1 A2
DISCIPLINE
DATE
BY

A7 A6 A5 A4
DISCIPLINE

3800 3550 3850

3450 350 350 3200


DATE

EL.+2.875 1401-LS-A-1014 1401-LS-A-1016 1401-LS-A-1021


(T.O.S) HEB180 HEB180
HEB180 HEB180
BY

650
DET - 51 EL.+2.225 HEB180
DET - 51
DISCIPLINE

(T.O.S) HEB160
HEB180
2375
DATE

1675
1401-LS-A-1030
1000
HEB160
BY

EL.+0.550
(B.O.BP)
DISCIPLINE
DATE
BY

ELEVATION ALONG GRID LINE "AB.1"


DISCIPLINE
DATE
BY

A7 A6 A5 A4 A1 A2
DISCIPLINE

800 3800 3800 3800 3550 3850


3450 350

EL.+2.875 1401-LS-A-1028 1401-LS-A-1015


HEB180 HEB180 HEB180
(T.O.S) HEB180 HEB180 HEB180 HEB180

HEB180

650
EL.+2.225
DET - 51 HEB160 (T.O.S)

1401-LS-A-1030
HEB160
HEB180

HEB180

HEB180

HEB180

HEB180

1675
1000
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

EL.+0.550
(B.O.BP)

ELEVATION ALONG GRID LINE "AB.2"


IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

400
12 - Ø 21 HOLES FOR
40 60 60 40 60 60 40 M 19 BOLTS - 70 mm LG
EL.+2.875 40
(T.O.S)
30

CLIENT:
110
50

PetroChina International Iraq FZE Iraq Branch


30

CONTRACTOR:

HEB180
10 2 NO. PL15*110 *400 CC
HOLES Ø 21mm
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DETAIL - 51 PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AB.1 & AB.2
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 20 OF 91 0

A0
DATE
BY
DISCIPLINE

A5 A4 A1 A2
DATE

3800 3550 3850


BY

3800 350 3200


EL.+2.875 DET - 51
DISCIPLINE

(T.O.S) SHEET - 20

1401-LS-A-1016
DATE

1401-LS-A-1021
HEB180 HEB180 HEB180
BY

HEB180
DISCIPLINE
DATE

EL.+0.550
(B.O.BP)
BY
DISCIPLINE
DATE

ELEVATION ALONG GRID LINE "AC.1"


BY
DISCIPLINE
DATE
BY
DISCIPLINE

A7 A6 A5

3800 3800

3450 350
DET - 49
EL.+2.875 SHEET - 19
(T.O.S) HEB180

1401-LS-A-1014
HEB180 DET - 51 1401-LS-A-1016
SHEET - 20 HEB180
HEB180
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

1000

1000
HEB180

HEB180

HEB180

2325
850 850

1401-LS-A-1037 1401-LS-A-1037
UNP80 UNP80
DET - 50 MIR.
EL.+0.550 DET - 50 SHEET - 19
(B.O.BP) SHEET - 19

50
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

ELEVATION ALONG GRID LINE "AC.2"


CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) ELEVATION ALONG GRID LINE - AC.1 & AC.2
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 21 OF 91 0

A0
250
DATE

1 - Ø (33x53)
5800 2 - Ø 33 HOLES SLOTED HOLES
950 A2 1100 850 850
FOR M 30 BOLTS FOR M 30 BOLTS
HEB400
BY

PL25*470
HEB400 PL25*470 300
(TYP) 4 - Ø 47 HOLES
DISCIPLINE

(TYP)
4*D47(82x47) FOR M 36 BOLTS HEB260
SLOT HOLES

150

150
AC
DATE

431
288

288
TYP
25
CL OF 91401_E_07

723
493

493
485

485
==

==
236

236
525

525
BY

289

289
DISCIPLINE

==
50

50
HEB200 PL10*255 HEB200

TYP
25 274 255
PL10*275
91401-R-16/17
PL40*500

2225

2225
611

611
==

==
900

900

HEB200

HEB200
DATE

IPE160
1759
HEB260
2 - Ø (23x48)

1256
SLOTED HOLES
FOR M 20 BOLTS
280
BY

289

289
300 2 - Ø 23 HOLES 50
HEB200 FOR M 20 BOLTS
DISCIPLINE

236

236
525

525

HEB200
CL OF 91401_E_14
277

277

520
520
DATE

720

520
PL10*280
25

150

150

25

250

250
11A 11A
BY

A2
HEB200 HEB200
DISCIPLINE

DETAIL - 11

IPE160

1344
IPE160
DATE

HEB200
HEB200
500 500
BY

A2
PL40*500
== == HEB200
PL40*500
DISCIPLINE

PL25*470 300 1 - Ø (23x48)


40

40
280
SLOTED HOLES
FOR M 20 BOLTS
PL25*470
HEB200
EL.+8.600
470

470
PL25*500
DATE

PL25*500 (T.O.S)

HEB200
CL OF 91401_E_15

430

430
==

==
25

25

606
100 100
BY

100 100

441
226

226
DISCIPLINE

SK2-p-1050 PL20*225

HEB400 HEB400 AD
SLIDING

SLIDING
SADDLE

SADDLE
SK2-p-1046 PL20*240

HEB260
PL10*280 2 - Ø 23 HOLES 50
FOR M 20 BOLTS

SECTION 11A - 11A


CATALYTIC REACTOR DETAIL - 12
(91401-R-16/17) ACID GAS PREHEATER 91401_E_07
1ST CLAUS REHEATER 91401_E_14
1ST CLAUS REHEATER 91401_E_15
A4
AB

600 650 AB AA
EL.+8.600 15 3 EL.+8.600
HEB200
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

(T.O.S) AA HEB400
5100 (T.O.S)
EL.+8.600 606 160
HEB260 HEB260 HEB260
(T.O.S)
IPE160 IPE160 IPE160
UNP160
HEB200

642

40 75 80 75 50
TYP
6 HEB200
HEB360

75 75
774
HEB200

HEB200
PL15*200
EL.+7.826
425 450 (T.O.S) PL15*120
HEB200
EL.+7.211 6 - Ø 21 HOLES FOR 100
PL15*80

UNP160
(T.O.S) G1 M 19 BOLTS - 70 mm LG
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

==
20

2685

PL10*360 2200

1477
SECTION H - H
HEB260 PL10*143.8 SECTION J - J
HEB200 EL.+8.600
ROD20 PL10*125 HEB360
(T.O.S) EL.+8.600
G1 TYPICAL WELD DETAILS
(T.O.S)
ROD20 W1 W2
HEB100 BEAM TO BEAM Typ.1 BEAM TO BEAM Typ.2
132

425 450 PRIMARY


ELEMENT
CPJ PRIMARY
ELEMENT
CPJ
CLIENT:
EL.+6.130
45° 45°

R=
"AS
R= T RE

315
"A QU

(T.O.S)
S T IRE
RE D"
QU
IR
ED
"
PetroChina International Iraq FZE Iraq Branch
HEB200 ROD20 T
T T
T
SECONDARY
ELEMENT

CONTRACTOR:
HEB200
SECONDARY
ELEMENT
CPJ
45°
NOTE: Following completation of the welding, the sloted holes shall be properly filled NOTE: Following completation of the welding, the sloted holes shall be properly filled

6 144 10 CC
14

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


SECTION E - E
1268
(SPS-ICA-0206) PEG ENGINEERING & CONTRACTING DMCC

SECTION G1 - G1 SECTION F - F VENDOR: FABTECH International Ltd.

(SPS-ICA-0466) (SPS-1-0020) P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI


UNITED ARAB EMIRATES

SECTION G - G
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) DETAILS & SECTIONS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 22 OF 91 0

A0
DATE

494
A1 A2 A3
HEB200 3850 3850 2500
EL.+8.600 EL.+8.600
BY

(T.O.S) (T.O.S) HEB260 SK2-p-1074 FL25*95.5


HEB260 SK2-p-1074 FL25*95.5 HEB260 HEB200
HEB160 HEB200 HEB200 HEB200
SK2-p-1074 FL25*95.5 SK2-p-1074 FL25*95.5 SK2-p-1074 FL25*95.5 HEB200 HEB200
DISCIPLINE

2*D18
SK2-p-1074 FL25*95.5

PL10*95.5
HEB260

642

40 75 80 75 40
12 - Ø 24 HOLES FOR
M 22 BOLTS - 70 mm LG
DATE

230 230
6

75 75
6 6
6
SECTION L - L
BY

SECTION K - K
PL15*260
(SPS-ICA-0060) (TYP) 75
DISCIPLINE

PL15*100
PL15*155 == (TYP)
(TYP)
A3
900 1600
135
DATE

6 - Ø 21 HOLES FOR IPE160 HEB200 35 65 35


M 19 BOLTS - 65 mm LG 160 4 - Ø 21 HOLES FOR
M 19 BOLTS - 60 mm LG PL10*135 4 - Ø 18 HOLES FOR
60 60 573 HEB260 40 80 40 HEB260 M 16 BOLTS - 45 mm LG
BY

6 - Ø 21 HOLES FOR EL.+8.600 HEB160

55
== ==

55
M 19 BOLTS - 65 mm LG (T.O.S) HEB160 HEB260
DISCIPLINE

75

75

60
AD

225
HEB200 AD

225

50
75

75
HEB200

400
EL.+8.600
HEB260
210

210
(T.O.S) HEB200 HEB200 14A 14A PL10*115

128
13A 13A PL15*160 HEB260
DATE

2*D18
PL15*110 PL10*135
PL15*160 SECTION 14A - 14A
DETAIL - 13 DETAIL - 14
HEB200 SECTION N - N SECTION 13A - 13A
HEB260
BY

SECTION M - M
DISCIPLINE
DATE

200 260
A3
HEB200 HEB260 50 80 50
BY

A2 A3
A2 50 100 50 10 80
DU1006 PL12*250
HEB260 240 HEB260 HEB260
DISCIPLINE

HEB260 260 PL15*110 DU1007 UNP100


HEB260 HEB260 40 80 40 HEB260

90
6
HEB260 HEB260 40 180 40 PL15*200 4*D14
HEB260 80

65
50
HEB260 HEB260 HEB260
4*D14
90

180
DATE

225

80
AD

60
2*D18
18A 18A

70
AD 17A 17A 4 - Ø 24 HOLES FOR
4 - Ø 24 HOLES FOR HEB260 PL15*260
M 22 BOLTS - 65 mm LG
80

16A 16A 4 - Ø 21 HOLES FOR HEB260 M 22 BOLTS - 65 mm LG


BY

SK2-PS-p-1008 UNP160
4 - Ø 24 HOLES FOR HEB260 HEB260 M 19 BOLTS - 60 mm LG PL15*200
15A 15A PL15*260 M 22 BOLTS - 65 mm LG PL15*260 DETAIL - 18 SECTION 18A - 18A
DISCIPLINE

DETAIL - 17 SECTION 17A - 17A


DETAIL - 15 HEB260 SECTION 16A - 16A
DETAIL - 16
SECTION 15A - 15A

300
HEB400 4 - Ø 27 HOLES FOR 200
135 HEB360 50 200 50
260 M 25 BOLTS - 70 mm LG IPE160
IPE160 HEB260 50 100 50 HEB200
HEB160 HEB260 HEB260
4 - Ø 18 HOLES FOR 35 65 35 50 160 50 PL15*180

40
HEB360

65
M 16 BOLTS - 45 mm LG PL10*135 SK1-PS-p1046 L75*8
PL15*260
SK1-p-1003 PL15*128.8
HEB260

90
SK1-p-1101 PL15*225

180
80
HEB260

130 70
55

PL15*200

60
160

SK1-p-1100 PL15*110
PL15*200

80
20A 20A 21A 21A
HEB260
50
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SK1-p-1103 PL10*115
4 - Ø 24 HOLES FOR 22A 22A
19A 19A HEB160 HEB360 HEB360 HEB360
HEB260 M 22 BOLTS - 65 mm LG HEB200 6 - Ø 27 HOLES FOR
IPE160 IPE160 DETAIL - 21 M 25 BOLTS - 65 mm LG
PL10*135 SECTION 21A - 21A
SK1-p-1001 PL15*373.9 DETAIL - 20 SECTION 20A - 20A DETAIL - 22
DETAIL - 19 SECTION 22A - 22A
SECTION 19A - 19A

TYPICAL WELD DETAILS


W1 W2
BEAM TO BEAM Typ.1 BEAM TO BEAM Typ.2

40 60 40 40 60 40
PRIMARY CPJ PRIMARY CPJ
ELEMENT ELEMENT
45° 45°

12 - Ø 21 HOLES FOR R=
"AS

10 R= T RE
QU
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

"A

M 19 BOLTS - 60 mm LG
S T IRE
RE D"
QU
IR
ED

PL10*170 EL.+8.600
"

HEB260 HEB260 T
T T
SECONDARY
ELEMENT

(T.O.S)
T
80

SECONDARY
ELEMENT
CPJ

GR-p-1352 GRTG30*677 45°


NOTE: Following completation of the welding, the sloted holes shall be properly filled NOTE: Following completation of the welding, the sloted holes shall be properly filled
50

SK2-p-1061 PL10*90
AC
SK2-p-1056 PL10*50
50

SK2-p-1067 UB254*146*31 CLIENT:


SK2-HR-p-1003 L60*8

SK2-p-1056 PL10*50
SK2-HR-p-1025 PLT6*150
PetroChina International Iraq FZE Iraq Branch
23A PL10*170 23A HEB260 HEB260
80

SK2-HR-p-1002 L60*8
CONTRACTOR:
SK2-HR-p-1004 PL6*53

SK2-p-1058 PL10*90
SECTION 23A - 23A CC
DETAIL - 23 CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) DETAILS & SECTIONS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 23 OF 91 0

A0
TOTAL UNIT
DATE ASSM. MK. QTY QTY
BOLTS LENGTH REMARKS ASSEMBLY LIST
1401-LD-A-1001 56 8 16 DIA A307 44 MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)
1401-LD-A-1002 56 8 16 DIA A307 44 1401-LD-A-1001 LADDER FL10*65 3855 1 3.06 85.7
1401-LD-A-1002 LADDER FL10*65 3855 1 3.01 84.6
1401-LD-A-1003 16 8 16 DIA A307 44
1401-LD-A-1003 LADDER FL10*65 3855 1 3.06 86.3
1401-LD-A-1004 56 8 16 DIA A307 44
BY

1401-LD-A-1004 LADDER FL10*65 3855 1 3.12 88.1


1401-LD-A-1005 56 8 16 DIA A307 44 1401-LD-A-1005 LADDER FL10*65 3855 1 3.01 84.6
1401-LD-A-1006 8 8 16 DIA A307 44 1401-LD-A-1006 LADDER FL10*65 3855 1 3.01 84.6
DISCIPLINE

1401-LD-A-1007 LADDER FL10*65 4050 1 3.18 89.2


1401-LD-A-1007 16 8 19 DIA A307 44
1401-LD-A-1008 LADDER FL10*65 3025 1 1.37 46.1
1401-LD-A-1008 8 8 16 DIA A307 44 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 3.19 72.6
1401-LS-HR-A-1001 48 8 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.97 68.1
1401-LS-HR-A*** HANDRAIL L50*6 1161 1 1.62 37.0
1401-LS-HR-A-1002 182 2 16 DIA A307 51
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 0.95 21.8
1401-LS-HR-A-1002 546 6 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** POST L50*6 1261 1 3.35 76.6
DATE

1401-LS-HR-A-1003 2 2 16 DIA A307 51 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.49 102.7


1401-LS-HR-A-1003 4 4 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 3.06 69.7
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.94 67.0
1401-LS-HR-A-1004 182 2 16 DIA A307 51
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.65 60.4
1401-LS-HR-A-1004 182 2 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 3.74 85.5
BY

1401-LS-HR-A-1005 12 3 16 DIA A307 38 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.10 93.8


1401-LS-HR-A-1005 32 8 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.28 51.8
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.57 58.6
DISCIPLINE

1401-LS-HR-A-1006 910 10 16 DIA EN-14399-3-HR-8.8 45 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.33 30.3
1401-LS-HR-A-1007 728 8 16 DIA EN-14399-3-HR-8.8 45 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.30 29.6
1401-LS-HR-A-1008 728 8 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.30 29.6
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.69 38.3
1401-LS-HR-A-1009 728 8 16 DIA EN-14399-3-HR-8.8 40
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.13 25.6
1401-LS-HR-A-1010 728 8 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.36 30.9
DATE

1401-LS-HR-A-1011 *** 12 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.02 23.3
1401-LS-HR-A-1012 728 8 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.30 29.6
1401-LS-HR-A*** HANDRAIL L60*8 1281 1 2.41 61.4
1401-LS-HR-A-1013 546 6 16 DIA EN-14399-3-HR-8.8 40
1401-LS-HR-A*** HANDRAIL L60*8 1281 1 2.52 64.5
1401-LS-HR-A-1014 546 6 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.79 109.6
BY

1401-LS-HR-A-1015 364 4 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.40 100.6
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.73 108.3
1401-LS-HR-A-1016 364 4 16 DIA EN-14399-3-HR-8.8 40
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.45 56.1
DISCIPLINE

1401-LS-HR-A-1017 546 6 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.92 43.8
1401-LS-HR-A-1018 364 4 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.23 51.0
1401-LS-HR-A-1019 364 4 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.39 54.7
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 2.57 58.7
1401-LS-HR-A-1020 8 4 16 DIA EN-14399-3-HR-8.8 40
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 0.93 21.4
1401-LS-HR-A-1021 24 4 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 4.47 102.4
DATE

1401-LS-HR-A-1024 273 3 16 DIA A307 38 1401-LS-HR-A*** HANDRAIL L50*6 1261 1 3.33 76.6
1401-LS-HR-A*** HANDRAIL L50*6 1261 1 1.63 37.3
1401-LS-HR-A-1024 910 10 16 DIA EN-14399-3-HR-8.8 45
1401-LS-HR-A*** HANDRAIL L60*8 1281 1 2.53 67.9
1401-LS-HR-A-1025 273 3 16 DIA A307 38 1401-LS-HR-A*** HANDRAIL L50*6 2023 1 1.06 24.2
1401-LS-HR-A-1025 910 10 16 DIA EN-14399-3-HR-8.8 40 1401-LS-HR-A*** HANDRAIL L50*6 2223 1 1.22 28.1
BY

1401-LS-HR-A-1026 273 3 16 DIA A307 38 1401-LS-HR-A*** HANDRAIL L50*6 2023 1 1.06 24.2
1401-LS-HR-A*** POST L50*6 2223 1 1.22 28.1
1401-LS-HR-A-1026 910 10 16 DIA EN-14399-3-HR-8.8 40
1401-LS-HR-A*** HANDRAIL L50*6 1121 1 0.50 12.0
DISCIPLINE

1401-LS-HR-A-1027 546 6 16 DIA EN-14399-3-HR-8.8 45 1401-LS-HR-A*** HANDRAIL L50*6 1078 1 0.24 5.7
1401-LS-HR-A-1028 273 3 16 DIA A307 38 1401-LS-HR-A*** HANDRAIL L50*6 1078 1 0.25 6.0
1401-LS-HR-A-1028 546 6 16 DIA EN-14399-3-HR-8.8 40 1401-SG-A-1001 SAFETY-GATE ROD25 538 6 0.11 26.6
1401-SG-A-1002 SAFETY-GATE ROD25 538 1 0.11 4.4
1401-LS-HR-A-1029 546 6 16 DIA EN-14399-3-HR-8.8 45 1401-SG-A-1003 SAFETY-GATE ROD25 584 1 0.12 4.9
1401-LS-HR-A-1030 546 6 16 DIA EN-14399-3-HR-8.8 40 1401-SK1-HR-*** HANDRAIL L50*6 1261 1 2.57 58.6
DATE

1401-LS-HR-A-1031 273 3 16 DIA A307 38 1401-SK1-HR-*** HANDRAIL L50*6 1261 1 3.83 87.8
1401-SK1-HR-*** HANDRAIL L50*6 1261 1 0.91 20.7
1401-LS-HR-A-1031 728 8 16 DIA EN-14399-3-HR-8.8 40
1401-SK1-HR-*** HANDRAIL L50*6 1261 1 4.63 106.0
1401-LS-HR-A-1032 455 5 16 DIA A307 38 1401-SK1-HR-*** HANDRAIL L50*6 1261 1 2.32 53.1
1401-LS-HR-A-1032 182 2 16 DIA EN-14399-3-HR-8.8 45 1401-SK1-HR-*** HANDRAIL L50*6 1261 1 3.00 68.6
BY

1401-LS-HR-A-1033 273 3 16 DIA A307 38 1401-SK1-HR-*** HANDRAIL L50*6 1261 1 1.96 44.7
1401-SK2-HR-*** HANDRAIL L60*8 1281 1 3.82 96.8
1401-LS-HR-A-1033 910 10 16 DIA EN-14399-3-HR-8.8 45
1401-SK2-HR-*** HANDRAIL L60*8 1281 1 4.10 102.5
DISCIPLINE

1401-LS-HR-A-1034 728 8 16 DIA EN-14399-3-HR-8.8 40 1401-SK2-HR-*** HANDRAIL L50*6 1261 1 4.67 107.2
1401-SK2-HR-*** HANDRAIL L50*6 1261 1 4.83 110.5
LS-HR-A-1010 SG-A-1001 1401-LS-HR-A-1035 273 3 16 DIA A307 38

1 Nos. LS-HR-A-1013 6 Nos. 1401-LS-HR-A-1035 546 6 16 DIA EN-14399-3-HR-8.8 45


1401-SK2-HR-*** HANDRAIL L50*6 1261 1 4.24 96.9

1 Nos. 1401-LS-HR-A-1037 8 4 16 DIA A307 44


Total Area(Sqm): 161.25 Total weight(kg): 3883.54

SK2-HR-A-1003 LD-A-1007 1401-LS-HR-A-1038 8 4 16 DIA A307 44

1 Nos. 1 Nos.
DATE

1401-LS-HR-A-1039 4 4 16 DIA A307 44


SK2-HR-A-1002 1401-LS-HR-A-1040 12 4 16 DIA A307 44
1 Nos. LS-HR-A-1036 SK1-HR-A-1002 1401-LS-HR-A-1041 4 2 16 DIA A307 51

SK2-HR-A-1001 1 Nos. 1 Nos. 1401-LS-HR-A-1042 2 2 16 DIA A307 51


BY

1 Nos. 1401-LS-HR-A-1043 2 2 16 DIA A307 44

SK2-HR-A-1004 SK1-HR-A-1006 1401-SG-A-1001 84 12 16 DIA A307 44

1 Nos. 1 Nos. 14 2 16 DIA A307 44


DISCIPLINE

1401-SG-A-1002
1401-SG-A-1003 2 2 16 DIA A307 38
1401-SK1-HR-A-1001 184 8 16 DIA EN-14399-3-HR-8.8 40
1401-SK1-HR-A-1002 184 8 16 DIA EN-14399-3-HR-8.8 40
1401-SK1-HR-A-1003 92 4 16 DIA EN-14399-3-HR-8.8 40

LS-HR-A-1011 SK1-HR-A-1005 1401-SK1-HR-A-1004 230 10 16 DIA EN-14399-3-HR-8.8 40

1 Nos. 1 Nos. 138 6 16 DIA EN-14399-3-HR-8.8 40


LS-HR-A-1001 1401-SK1-HR-A-1005

1 Nos. SK1-HR-A-1003 SK1-HR-A-1004 1401-SK1-HR-A-1006 69 3 16 DIA A307 38

SK1-HR-A-1001 1 Nos. 1 Nos. LD-A-1005 1401-SK1-HR-A-1006 138 6 16 DIA EN-14399-3-HR-8.8 40

1 Nos. LS-HR-A-1024 1 Nos. 1401-SK1-HR-A-1007 69 3 16 DIA A307 38

SK1-HR-A-1007 LS-HR-A-1007 LS-HR-A-1022


1401-SK1-HR-A-1007 92 4 16 DIA EN-14399-3-HR-8.8 40

1 Nos. 1 Nos. SG-A-1001 21 3 16 DIA A307 38


1 Nos.
1401-SK2-HR-A-1001
6 Nos. 1 Nos. 1401-SK2-HR-A-1002 21 3 16 DIA A307 38
LS-HR-A-1027 LS-HR-A-1029 1401-SK2-HR-A-1003 140 10 16 DIA EN-14399-3-HR-8.8 40
1 Nos. 1 Nos. 42 3 16 DIA A307 38
SK2-HR-A-1005 1401-SK2-HR-A-1004
140 10 16 DIA EN-14399-3-HR-8.8 40
1 Nos. LS-HR-A-1035 1401-SK2-HR-A-1004

LD-A-1002 1 Nos. LS-HR-A-1033 1401-SK2-HR-A-1005 42 3 16 DIA A307 38

LS-HR-A-1012 1 Nos. 1 Nos. 1401-SK2-HR-A-1005 112 8 16 DIA EN-14399-3-HR-8.8 40

1 Nos. SG-A-1001
SG-A-1002
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

LS-HR-A-1006 6 Nos.
1 Nos.
1 Nos. LS-HR-A-1031
LD-A-1003 LS-HR-A-1017 LD-A-1004 LS-HR-A-1002
1 Nos. 1 Nos.
1 Nos. 1 Nos. 1 Nos.
LD-A-1001
LS-HR-A-1014 SG-A-1001 1 Nos. LS-HR-A-1038
1 Nos. 6 Nos. 1 Nos.
LS-HR-A-1030 LS-HR-A-1034 SG-A-1001
1 Nos. 1 Nos. 6 Nos.
LS-HR-A-1032
LS-HR-A-1025 1 Nos.
1 Nos.
LS-HR-A-1040
LS-HR-A-1008 1 Nos.
LS-HR-A-1026 1 Nos.
1 Nos. LS-HR-A-1021 LS-HR-A-1039
1 Nos.
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1 Nos.
LS-HR-A-1020 LS-HR-A-1028
LS-HR-A-1016 1 Nos. 1 Nos.
1 Nos. LS-HR-A-1003 LS-HR-A-1037
1 Nos. 1 Nos.
LS-HR-A-1015 SG-A-1001 LS-HR-A-1005 LS-HR-A-1004
1 Nos. 6 Nos. 1 Nos. 1 Nos.
LS-HR-A-1043 LD-A-1006 LS-HR-A-1041
1 Nos. 1 Nos. 1 Nos. CLIENT:

LS-HR-A-1023 SG-A-1003
LS-HR-A-1042 1 Nos.
1 Nos. 1 Nos. PetroChina International Iraq FZE Iraq Branch
LS-HR-A-1019
LS-HR-A-1009 1 Nos. CONTRACTOR:

1 Nos. LS-HR-A-1018
1 Nos. CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

LD-A-1008
1 Nos. PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL - ISOMETRIC VIEW
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2).
ISOMETRIC VIEW HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 24OF91 0

A0
DATE

AA.3
BY

2474
1215
DISCIPLINE

1102 1372 332 882


167 200 895 895 200 117 167 200 600 247
LS-HR-A-1004
3 LS-HR-A-1005 1 Nos.
DATE

150
1 Nos.
A6
75 676 496 A
BY

LS-HR-A-1005
LS-HR-A-1037 1 Nos. DET - 3
C

480

480
1 Nos. B B 205
DISCIPLINE

109 75 126 MID RAIL


MID RAIL
PLT6*75

144
PLT6*75

1100

1100
DATE

H H L50*6 L50*6
TYP TYP
DET - 1

620

620
TOE PLATE TOE PLATE
BY

PLT6*150 PLT6*150
EL.+1.675 EL.+1.675
972
DISCIPLINE

1351

150

150
(T.O.S) (T.O.S)

36

36
LS-HR-A-1039 GR-A-1140
1 Nos. 75
1 Nos.
DATE

DET - 4

G G SECTION A - A SECTION B - B
228

226

2453
BY

AA.3
DISCIPLINE

31
60
F F
LS-HR-A-1040
1 Nos.
1218
AA.3
DATE

A6
1102 1372 882 336
972

247 600 200 171

1102
185 948 228 948 165
BY

LS-HR-A-1038 LS-HR-A-1041 LS-HR-A-1004 LS-HR-A-1003


DISCIPLINE

1 Nos. LS-HR-A-1003 137 1 Nos. 3 1 Nos. 1 Nos.


1 Nos.
164

E E
DATE

380
125
205 MID RAIL

480
D D

380
120 PLT6*75
139
60 1197 GR-A-1261
BY

1 Nos.

1000
L50*6

1100
DISCIPLINE

MID RAIL TYP

1000
PLT6*75 L50*6
C A TYP

620
TOE PLATE
158 112 PLT6*150

620

620
HANDRAIL PLAN AT EL. +1.675 (T.O.S)
TOE PLATE EL.+1.675

150
PLT6*150 EL.+1.675 (T.O.S)

150
(T.O.S)

36
36
DET - 2
SECTION D - D
SECTION C - C
480

70
30 40 5
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

2 - Ø 18 HOLES FOR 5
L50*6

M 16 BOLTS - 50 mm LG
L50*6
1100
30

PLT6*75 85
140
80

PL10*70 85 PLT6*150 50 35
37

5 LS-HR-A-1005
60
620

PLT6*75
5 3 1 Nos. 50 35 PLT6*150

35
30

3
30 50

L50*6

37.5
10 PLT6*75
150

PLT6*150 2 - Ø 18 HOLES FOR

150
SECTION E1 - E1

80
21
75
M 16 BOLTS - 40 mm LG
36

PL10*80 30 15 PLT6*75

37.5
L50*6

35
PL10*80 1 - Ø 18 HOLES FOR 2 - Ø 18 HOLES FOR
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

DETAIL - 1 M 16 BOLTS - 40 mm LG PLT6*85 M 16 BOLTS - 40 mm LG


PL10*70 L50*6 6 DETAIL - 2
DETAIL - 3 DETAIL - 4
80 HANDRAIL POST DETAIL
TYPICAL
60

50
30 CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DETAIL - 5 PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL PLAN AT EL.1.675 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 25OF91 0

A0
DATE
BY
DISCIPLINE

75 1753 60

339 1200 214


75 1753 60
1324 75
339 1200 214
DATE

125 950 249


BY

480 LS-HR-A-1039
DISCIPLINE

LS-HR-A-1040

480
1 Nos.

480
LS-HR-A-1038

480
1 Nos. 1 Nos.
1100

1100
DATE

1100
1070
620

L50*6
PL
*75 W.P
BY

620
TYP

620
TY L6*7 TY 6*7

590
EL.+2.905 6

L50*6
PL YP

L50*6
EL.+2.905 P 5

TYP
P 5

TYP
(T.O.G) W.P EL.+1.705
150

T
DISCIPLINE

(T.O.G) W.P (T.O.G)

150
36

36
480
DATE

480
480
DET - 5

480
137
BY

138
138
DISCIPLINE

800
590
800

590
375

800
620
DATE

1000

620
1000 162
(TYP) EL.+1.675 1000 EL.+0.550
EL.+1.675
E1 E1 (T.O.S) W.P (B.O.P)
(T.O.S)
BY
DISCIPLINE

W.P W.P

133 SECTION G - G
SECTION F - F
SECTION E - E
DATE
BY

1324 71
DISCIPLINE

125 950 249

LS-HR-A-1037
1 Nos.
480
1100

L50*6
6 *75 PL10*70
620

PL YP
L50*6

5A
TYP

T 80
EL.+1.705 60
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

(T.O.G)
30 80 30 70
50 5A
511

50 30 2 - Ø 18 HOLES FOR 30 40 6
L50*6 6
M 16 BOLTS - 50 mm LG
30

30
40
W.P
208 10

140
80
PL10*70

37
PL10*70

30
559

2 - Ø 18 HOLES FOR
800

30
M 16 BOLTS - 45 mm LG L50*6 10
DETAIL - 5
SECTION 5A - 5A SECTION E1 - E1
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1000

EL.+0.550
(B.O.P)

W.P
CLIENT:

PetroChina International Iraq FZE Iraq Branch


375
CONTRACTOR:

SECTION H - H
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL SECTIONS & DETAILS FOR EL.+1.675 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 26OF91 0

A0
DATE
BY
DISCIPLINE
DATE
BY

AB AA
DISCIPLINE

151 5100 152

1156 50 2500 50 731 772 145


178 550 200 127 1055
DATE

177 200 654 125 230 1050 1050 170 171 386 175 B5 45 152 775 128
SG-A-1003 LS-HR-A-1009
3 1 Nos. 1 Nos.
B5 LS-HR-A-1019
TYP
3
BY

1 Nos.

177

55 194
LS-HR-A-1009 LS-HR-A-1023
DISCIPLINE

1 Nos. 1 Nos. REMOVABLE


HANDRAIL

480
L50*6
480

B5 2 - Ø 18 HOLES
135 125 171 175 MID RAIL 86 TYP
MID RAIL 25

480
102 PLT6*75 125
PLT6*75 B5 110 MID RAIL
DATE

PLT6*75

1100
1100

L50*6

LS-HR-p-1023 L50*6
TYP

1100
851
(TYP)
BY

620
TOE PLATE
620

TOE PLATE
1 PLT6*150
DISCIPLINE

PLT6*150

620
TOE PLATE

LS-HR-p-1004 L50*6
EL.+2.225 EL.+2.225 PLT6*150

150
150

LS-p-1281 PL10*80
1401-LS-HR-A-1018 (T.O.S) (T.O.S) EL.+2.225
CHS42.4X3.6

150
(T.O.S)
LS-p-1281 PL10*80

36
36
DATE

36
DET - 1
1
BY

(SHT 14 TO 15) SECTION A - A


DISCIPLINE

SECTION B - B SECTION C - C

A2 A3
DATE

3850
1350
BY

200 1031 C
L OF RUNGS
DISCIPLINE

250 B

123
C C

378
AA

772
G G C L OF LADDER

50 731
F
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

REMOVABLE HANDRAIL 2500 LS-HR-A-1023


1 Nos.
LS-HR-A-1009
1 Nos.
50
1135

D
AB
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

A A
C L OF RUNGS
347

E E
B
AC
790
D
C L OF LADDER CLIENT:

PetroChina International Iraq FZE Iraq Branch

HANDRAIL PLAN AT EL. +2.225 (T.O.S) CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL PLAN AT EL. +2.225 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 27OF91 0

A0
DATE

AA
BY

792
DISCIPLINE

10 772 10
EL.+3.325 167
486 AC AB 6 6 (T.O.S) FL10*65

75
90
147 798 315
DATE

FL6*75 FL6*75
733 65 EL.+4.155 ROD25
180

E3 E3
(T.O.S)
BY

50
ROD25
FL6*75
DISCIPLINE

1070

1070
916

1100
FL6*75

901
FL6*25

1000

1000
TYP
DATE

LS-HR-p-1084 PLT6*150
1270

FL6*25 HEB200 LS-HR-p-1115 PLT6*102.1


TYP EL.+2.225

80

80
168 168
(T.O.S)
BY

75
1270

79

79
DISCIPLINE

EL.+2.875

1930
(T.O.S) 1*D18

50
EL.+2.875
E2 E2 (T.O.S) DET - 5

2975
DATE

3025
FL6*50 FL10*100
255

170

5*300=1500
E1 E1
BY

FL6*50

6*300=1800
255
LD-A-1008
DISCIPLINE

FL6*50
1 Nos.

1875
12*300=3600
EL.+2.225
LD-A-1004 (T.O.S)

44
DATE

LD-A-1008

3855
1 Nos.
1 Nos.

100
LD-A-1004
BY

1 Nos.
DET - 4 HEB200
DISCIPLINE

FL10*100
LD-A-1004
1 Nos. FL10*65

455
1*D22
2150

EL.+0.300

35

35
35
DATE

155
F1 F1 B.O.P 1*D22
LD-p-1002 ROD20
2150

50
50

50

50
1 Ø (60x18)
BY

10 10

1925
SLOTED HOLE 32.5 32.5
FOR M 16 BOLT
70 460 70
DISCIPLINE

SECTION G - G 368 194


600
FL10*100
SECTION F - F
368 227

50 75

75
FL10*100
1 Ø (60x18)
SLOTED HOLE

75
EL.+0.300
35

35

FOR M 16 BOLT

50
E4 E4 4A
B.O.P 325
50

50

10 10 15 2 - Ø 22 HOLES FOR FL10*100 2 - Ø 22 HOLES FOR

50
85

205
LS-HR-p-1004 L50*6 M 19 BOLTS - 45 mm LG M 19 BOLTS - 45 mm LG

50
70 460 70 LD-A-1004 2 - Ø 22 HOLES FOR 2 - Ø 22 HOLES FOR SECTION 5A - 5A
32.5 32.5 1 Nos. M 19 BOLTS - 45 mm LG SECTION 4A - 4A M 19 BOLTS - 45 mm LG
600
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

LD-p-1002 ROD20
SECTION E - E SECTION D - D
4A

772 37 835 DETAIL - 4

156 460 156 772 219 460 156


FL10*65
10 10 156 460 156 L50*6 10 10
ROD20 10 10 ROD20 5A
1075
94
94

ROD20 4 Nos. 100 228


94

FL6*25 FL10*65 FL10*65 FL6*25 100 15


60 40
379

FL10*65 TYP
379

TYP
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

285
285

60 40

32.5
FL6*25 FL10*65 1 - Ø 22 HOLE
FL10*65
379

32.5
TYP
285

766

LD-p-1034 FL6*25 1 - Ø 22 HOLE


866

65
PLT10*50
45°

45°

45°

45°

65

45°
766

45° 163 45° 45°


387

32.5
45°
45°

32.5
487

45°
45° 5A
387

R
25

38

SECTION E4 - E4
0

20 140 SECTION F1 - F1 DETAIL - 5 CLIENT:

L50*6
0

0
38

38

PetroChina International Iraq FZE Iraq Branch


R

160
R

CONTRACTOR:

SECTION E1 - E1 SECTION E2 - E2 SECTION E3 - E3


CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) LADDER DETAILS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 28OF91 0

A0
DATE

A1 A2 A3
A7 A6 A5 A4
121 3800 3800 3800 3550 3850 3850
BY

LS-HR-A-1033 1173 75 1681 C


L OF RUNGS
1 Nos. M 8090 639 1172
DISCIPLINE

L LS-HR-A-1040 LD-A-1001 463


K K 1 Nos. 1 Nos.
J J
AA.3

136
1681 LS-HR-A-1038 U LS-HR-A-1028
DATE

1 Nos. CL OF LADDER 1 Nos.


H H LS-HR-A-1002 F
1 Nos.

639
G G LD-A-1006
BY

1 Nos. AA.2

182
DISCIPLINE

U LS-HR-A-1034 U

820
L LS-HR-A-1008

1310
3020 3066 636 1248 1 Nos. C
L OF LADDER 1 Nos.
LS-HR-A-1025 D
E 1 Nos. E

490
DATE

AA.1
U
5430

1141
2164 724
BY

C
DISCIPLINE

L OF RUNGS
AA
D
LS-HR-A-1029
1 Nos.

1880
LS-HR-A-1022
DATE

1 Nos.
P 814
N N
BY

53

AB.2
M
REMOVABLE HANDRAIL
DISCIPLINE

5100
2307
2468
DATE

REMOVABLE HANDRAIL
LS-HR-A-1020 C
1 Nos.
BY

AB.1
DISCIPLINE

50

901
C
LS-HR-A-1007 L OF RUNGS
1571

1 Nos. C
654 L OF RUNGS
DATE

1757 AB
R
AC.2

1679

1260
BY

490

Q P Q V T

480

386
AC.1
CL OF LADDER
DISCIPLINE

490
LS-HR-A-1024 S S AC
1 Nos. CL OF LADDER LS-HR-A-1006
LD-A-1005 R 1 Nos.
1 Nos. LS-HR-A-1027
1 Nos. LS-HR-A-1021

1356

1356
LD-A-1002 V
1 Nos. 1 Nos.
940 639 6822 1528 639 5124
T LS-HR-A-1015
1 Nos. C

5100
LS-HR-A-1016
1 Nos. B
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

LS-HR-A-1014 U1
1 Nos.

1353
901

180
360
AD

631 180
C
L OF RUNGS
233

631
1179
W

479
A A
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

C L OF LADDER LS-HR-A-1026
1 Nos. B
LS-HR-A-1017 LD-A-1003
1 Nos. U1 1 Nos.
W

341 639 6943

CLIENT:

HANDRAIL PLAN AT EL. +2.875 (T.O.S) PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL PLAN AT EL.+2.875 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 29OF91 0

A0
DATE

A1 A2 A3
132 3850 3850 133 AD
2365 1163
BY

362 642 6961


133 125 270 125 175 1053 125 175 570 300 117
257 1280 1280 1280 1280 1279 215 92
DISCIPLINE

SG-A-1002 LS-HR-A-1016 3 LS-HR-A-1008


1 Nos. 3 LS-HR-A-1026 150 1437
1 Nos. 1 Nos. TYP 1 Nos.

55 140 54
DATE

L50*6 175 122

480
480

2 - Ø 18 HOLES FOR MID RAIL

480
319 MID RAIL TYP 50 90 175 75
M 16 BOLTS - 45 mm LG PLT6*75 PLT6*75 MID RAIL
PLT6*75
BY

L50*6

1100
1100

1100
25 25 TYP
DISCIPLINE

TOE PLATE
TOE PLATE

620
620

150
PLT6*150 TOE PLATE

620
150

EL.+2.875

150
PLT6*150 EL.+2.875 PLT6*150 EL.+2.875
(T.O.S) (T.O.S) (T.O.S)
DATE

36
L50*6
36

36
TYP
SECTION A - A SECTION D - D
SECTION B - B
BY

AC AB
A2 A1 A4
DISCIPLINE

1533 1260 1143


143 3850 3550 2400
1356 1679 901
1193 639 5125 2986
178 1050 128 175 601 125
167 300 725 325 750 1300 1325 1275 1300 1300 456 80
DATE

3 LS-HR-A-1015 LS-HR-A-1020
TYP 1 Nos. 1 Nos. LS-HR-A-1008 3
1 Nos. TYP SG-A-1001 LS-HR-A-1025 150
47 6 Nos.
BY

62 45 1 Nos.

177
55 140 54
480

175 MID RAIL 125 MID RAIL


DISCIPLINE

172 122
PLT6*75 PLT6*75

480
1100

125 MID RAIL 86


L50*6 2 - Ø 18 HOLES PLT6*75
TOE PLATE TYP EL.+2.875
DATE

1100
620

150

PLT6*150 (T.O.S) 25 25
305 L50*6
TOE PLATE

620
GAP TYP

150
PLT6*150 EL.+2.875
BY

36

(T.O.S)
DISCIPLINE

L50*6 TOE PLATE

36
TYP PLT6*150
SECTION C - C SECTION E - E
DATE

A5 A6 A7
1753 1126 A7
1443 3800 2770 1753 1126
75
1270 639 3063 3041 214 1200 339
BY

214 1200 339


75
318 652 300 639 873 1020 1020 1020 1000 1000 171
DISCIPLINE

LS-HR-A-1038

480
SG-A-1001 LS-HR-A-1002 1 Nos.
45 150
6 Nos. 1 Nos.
LS-HR-A-1040
55 140 54

1100

480
EL.+2.905 1 Nos.

1070
TYP
(T.O.G)
177
480

620
275

1100
177

60 EL.+2.875
25 25
EL.+2.905

1070
TYP
H1 H1 (T.O.S)
1401-LS-HR-A-1040 (T.O.G)
1100

620
L50*6
2 - Ø 18 HOLES L50*6 60 EL.+2.875
TOE PLATE TYP (T.O.S)
2 DET - 5
620
150

PLT6*150 EL.+2.875 TYP 297 W.P


(T.O.S) PL6*75
TYP PL6*75
L50*6 TYP W.P
36

EL.+1.705 TYP 297


NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

(T.O.G) L50*6
TYP
SECTION G - G EL.+1.675 EL.+1.705
(T.O.S)

800
(T.O.G)

A7 EL.+1.675
AA.1 AA.2

800
AA.2 AA.3 1000 (T.O.S)
100 1210 143 697 518 W.P 162
100 1120 143
885 468 292 605 200 118 1000
203 924 136 SECTION H - H
235 800 318 LS-HR-A-1033 W.P 162
LS-HR-A-1034 200 SECTION J - J
1 Nos. 3 3
1 Nos. 150 L50*6
TOP RAIL L50*6
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CHS42.4X3.6 TYP
206 5A
480

480

250 MID RAIL 75 90 3 80


MID RAIL
480

6 275 PLT6*75 PLT6*75 70 60 140


MID RAIL
1100

1100

PLT6*75 30 40 PL10*70 30 80 30 2 - Ø 18 HOLES FOR


1100

PL10*70 M 16 BOLTS - 45 mm LG
TOE PLATE 8 TOE PLATE PL10*70 51

30
620

8
620
150
150

EL.+2.875 PLT6*91.7
PLT6*150 5A 29

30
TOE PLATE
620

CLIENT:
EL.+2.875
150

PLT6*150 (T.O.S)

140

70
80
(T.O.S) PetroChina International Iraq FZE Iraq Branch
36

36

L50*6

40

10
CONTRACTOR:
36

30

L50*6 2 - Ø 18 HOLES FOR 1401-LS-A-1004


TYP M 16 BOLTS - 50 mm LG L50*6 60 80
UNP200 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
SECTION L - L
SECTION K - K SECTION H1 - H1 DETAIL - 5 SECTION 5A - 5A
SECTION F - F PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL SECTIONS & DETAILS AT EL.+2.875 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 30OF91 0

A0
DATE

A7
AA.3 AA.2 AA.1 AB.2 AB.2 AB.1 AC.2
142 1220 1310 2800 100 100 835
68 2400 1500 142
BY

4227 1245 125 490 200 20 1356


2468 50 1592
LS-HR-A-1029
DISCIPLINE

172 200 1235 1235 1235 1235 160 1 Nos. 3 83 715 1500 170 175 1105 200 112 128 1053 175
LS-HR-A-1033 150 MID RAIL 3 LS-HR-A-1021
LS-HR-A-1022 REMOVABLE
1 Nos. PLT6*75 1 Nos. HANDRAIL TYP 1 Nos.

480
131 L50*6
DATE

17 TYP
L60*8
80
480

TYP

480

480
130 MID RAIL 166 L50*6 MID RAIL 170 175 70 193 MID RAIL 172

1100
PLT6*75 TYP PLT6*75 PLT6*75
BY

1100

1100

1100
620
150
L50*6 EL.+2.875
DISCIPLINE

DET - 3 L50*6
TOE PLATE TYP TYP (T.O.S) TOE PLATE TYP TOE PLATE
620

P1

620

620
150
P1

150
PLT6*150 EL.+2.875 PLT6*150 EL.+2.875 PLT6*150
(T.O.S) EL.+2.875
(T.O.S)

36
TOE PLATE (T.O.S)
PLT6*150
DATE

36

36
DET - 1 DET - 4 P1 P1
SECTION N - N SECTION T - T
BY

TYP TYP

SECTION M - M SECTION P - P
DISCIPLINE

AC.1 AC.2
A5 901 360 653
142 380 100
A7 A6 DET - 6
DATE

943 3800 3700 100 324 68 503 125 360 175 245 130 103
312 210 TYP
961 639 5625 1218 205
72 100 120 LS-HR-A-1014 AD
173 200 313 275 639 300 1125 1100 1100 1100 1100 900 118 1 Nos.
BY

230 LS-HR-A-1035
2 - Ø 18 HOLES FOR LS-HR-A-1024 90
Q1 SG-A-1001 200 1 Nos.
M 16 BOLTS - 45 mm LG 45
DISCIPLINE

6 Nos. 1 Nos.
MID RAIL
55 140 54

50

480
PLT6*75 50 175 60
126

480
130 Q1 30 MID RAIL
480

1100
124 PLT6*75
177

MID RAIL
DATE

25 25 (TYP) PLT6*75 L50*6

1100
L50*6 TYP

620

620
1100

150
TYP EL.+2.875
L50*6
BY

620

150
TOE PLATE TYP EL.+2.875 (T.O.S)
620

150

PLT6*150 EL.+2.875 (T.O.S)


DISCIPLINE

36
(T.O.S)

36
TOE PLATE
36

TOE PLATE PLT6*150


PLT6*150 SECTION U1 -U1
DATE

SECTION R - R
SECTION Q - Q 85
BY

1 - Ø 18 HOLES LS-HR-A-1029 PLT6*75


LS-HR-A-1033 119 1 Nos. 35 50
1 Nos. 6
DISCIPLINE

DET - 2 LD-A-1005

37.5
A5 A4 1 Nos. 6

50
A1
142 3800 3550 PLT6*75

75
FL10*65
1549 639 5124 180

37.5
25
1 - Ø 18 HOLES FOR

480
117 200 957 275 639 325 1250 1250 1250 924 125 5 M 16 BOLTS - 40 mm LG
SECTION Q1 - Q1
2 - Ø 18 HOLES FOR 5 DETAIL - 3
45 SG-A-1001 LS-HR-A-1006 3
M 16 BOLTS - 45 mm LG
6 Nos.

60
1 Nos.
177

1100
TYP
55 140 54

PLT6*75
LS-HR-A-1033 85
L50*6 3 1 Nos.

50
PLT6*85 35 50
5
480

125 3

620
MID RAIL 2 - Ø 18 HOLES FOR
PLT6*75 5 PLT6*150

35
25 25 M 16 BOLTS - 45 mm LG PL10*80 6
25
1100

30 15

150
PLT6*150 6
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

L50*6

150
80
10 TOE PLATE TYP DETAIL - 1 L50*6
620
150

PLT6*150

36
EL.+2.875
(T.O.S)

35
DETAIL - 2 2 - Ø 18 HOLES FOR
M 16 BOLTS - 40 mm LG
PLT6*150
36

HANDRAIL POST DETAIL


TYPICAL DETAIL - 4

SECTION S - S

90
L60*8
PL6*53 80
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLOSER PLATE L60*8 C


L OF BEAM
SUPPORT ANGLE 32 PL10*50
90 64 HANDRAIL
POST PL10*50
70
P2 P2 10 THK. PLATE

55
30

6A 42
CHS42.4X3.6
P3 P3

110
==
C 3
3

TYP
L OF POST

3
50

110
130

64
==

==
70

1401-LS-HR-A-1014 PL3*36.2 CLIENT:

P4 P4
55
L50*6
PL3*36.2 PetroChina International Iraq FZE Iraq Branch
70 SQ OPENING FOR POST L60*8 PL10*50
SUPPORT ANGLE 6A CHS42.4X3.6 CONTRACTOR:

UB254*146*31 6 3SIDES 6 SECTION 6A - 6A


6 SECTION P3 - P3 TYP DETAIL - 6
6 CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
SECTION P2 - P2 SECTION P4 - P4
SECTION P1 - P1 PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL SECTIONS & DETAILS AT EL.+2.875 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 31OF91 0

A0
DATE

AA.2 U1 AA.3
1220 A5 AC.1
BY

EL.+4.155 409 460 351 798 460 259


(T.O.LD) EL.+4.155
DISCIPLINE

495 229 231


LD-A-1001 (T.O.LD) V1

50
LD-A-1002

R 380
1 Nos. FL6*25

180
2 - Ø 18 HOLES
1 Nos.

50

50
U2 U2 ROD25
V2 V2 PLT10*50

54
DATE

LD-A-1002

140
FL6*25 ROD25 FL6*75
FL6*25 1 Nos. 4

387
45° 5°
BY

FL6*25 CHS33.4X3.2 FL6*25


FL6*25 FL6*25

45°
45°
FL6*25

55
1280

1280
DISCIPLINE

766
FL6*25 FL6*25 FL6*25 PLT10*50 FL6*25
FL6*25 SG-A-1001

1280
FL6*25 FL6*25 FL10*65
FL6*75 6 Nos.

285
1270

1100
FL10*65

379
FL6*25 FL6*25
FL10*65

1270
FL6*25 FL6*25
DATE

EL.+2.875 ROD20

94
DET - 3
(T.O.S) 150 FL10*65
EL.+2.875
BY

U3 U3 FL10*65

32
(T.O.S) 150 156 460 173 25

32
V3 V3
DISCIPLINE

170

138
FL6*50 SECTION V2 - V2
U4 U4 V4 V4 FL6*50

475
FL10*100

305

475
138
FL6*50 FL10*100 FL6*50
DATE

FL6*25 10 460 10

305
U5 U5

12*300=3600
V5 V5 FL10*100 FL10*65

12*300=3600

12*300=3600
FL6*50 FL10*100 FL10*65

32.5
BY

3855

3855
FL6*50 FL6*50 ROD20

65
241 239

3855

3855
DISCIPLINE

32.5
FL10*100
FL10*65 LD-A-1002
1 Nos. 38 440 38
DATE

2325

SECTION V3 - V3
LD-A-1002
1 Nos.
BY

2575
LD-A-1001

0
38
1 Nos.

R
DISCIPLINE

2100

2100
45°
45°

387
2100

45°
45°
FL10*65

766
DATE

LD-A-1002

285

285
1 Nos.

379
1*D 60x18
BY

SLOTED HOLES
FOR M 16 BOLTS
DISCIPLINE

1*(60x18)
ROD20

94

94
SLOTTED HOLES
FL10*65 FOR M 16 BOLTS FL10*65 156 460 156 LD-A-1002
EL.+0.300 FL10*65 V6 V6 FL10*65 1 Nos.
U6 U6

85
250

35

35

EL.+0.300 772
205

(B.O.P) FL10*65

35

85
(B.O.P)

35

205

205
60 480 60 SECTION V4 - V4
50

50

1*D 60x18

50
SLOTED HOLES

50
600 FOR M 16 BOLTS SECTION V1 - V1
U1 SECTION U1 - U1 60 480 60
V1
600
SECTION U - U

38
37 299 460 156 LD-A-1001 772 SECTION V - V
1 Nos. FL10*100
FL10*65 440 FL10*100 LD-A-1001
FL10*65 LD-A-1001 110
1 Nos.

38
ROD20 FL10*100 1 Nos. FL10*65 LD-A-1002
94
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

1 Nos. 680 LD-A-1002 70 40 1 - Ø 22 HOLE


FL10*65 ROD20 1 Nos. SECTION 3B - 3B
94

94

FL6*75

0
110 460 110

38
150

FL10*65

32.5
R
379

LD-A-1002 ROD20
1401-SG-A-1001
285

ROD20 DET - 1 FL6*50 1 Nos. FL10*65 DET - 2 FL10*100


ROD25 3A
627

379

487

65
EL.+2.875 LD-A-1001
285

285

66 460 66 4 FL10*65
45° 5°
766

(T.O.S) 1 Nos.

32.5

32.5
45°
45°

32.5
ROD20 FL10*65

45°
45°
409
766

866

45°
45° 3B 3B
387

45°

45°

SECTION U3 - U3 FL10*65 TYP

32.5

32.5
45°

57
45°
387

285

285
R

1 - Ø 22 HOLE
DETAIL - 2
38

379
0

1 - Ø 22 HOLE 1401-LD-A-1001
R

ROD20 FL10*65

50
38

LD-A-1001
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

SECTION V6 - V6 6
0

1 Nos. 772
SECTION U2 - U2 SECTION U4 - U4
94

94
46 3A
FL10*65 156 460 156 FL10*65
FL10*65 156 460 156 FL10*65
ROD20 DETAIL - 3

50 57
94

94

110 772 LD-A-1001


LD-A-1001 LD-A-1001 1 Nos.
1 Nos. 1 Nos. SECTION V5 - V5
40 70
379

2 - Ø 22 HOLES FOR CLIENT:


285

285

M 19 BOLTS - 45 mm LG
32.5

FL10*65 PetroChina International Iraq FZE Iraq Branch


FL10*65
150

ROD20 SECTION 3A - 3A
866

65
45°
45°

CONTRACTOR:

45° 1 - Ø 22 HOLE
32.5

TYP TYP CC
487

CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.


LD-A-1001 DETAIL - 1
1 Nos. SECTION U6 - U6 PEG ENGINEERING & CONTRACTING DMCC
R
38

VENDOR: FABTECH International Ltd.


0

SECTION U5 - U5 P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI


UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) LADDER DETAILS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 32OF91 0

A0
DATE
BY
DISCIPLINE
DATE
BY
DISCIPLINE

798
460 789
33 200
EL.+4.125 229 231 W1 A1 FL10*65 156 460 149 24
DATE

(T.O.LD)
SG-A-1002 LD-A-1003 772
129 25

50
1 Nos. ROD25 1 Nos. FL10*65

180
FL6*75 156 460 156
BY

ROD20 FL10*65 FL10*65


W2 W2

94
ROD20
DISCIPLINE

FL6*25 ROD25 ROD16 46 440 46

94

94
CHS33.4X3.2 FL10*65 LD-A-1003
FL6*25 FL6*75 1 Nos.

379
FL10*65

285
PLT10*50
FL6*25

379
FL6*25 FL6*25 SG-A-1002 FL10*100

285

285
DATE

1280

1280

766

32.5
LD-A-1003 FL6*25 1 Nos. ROD20

65
LD-A-1003 FL10*65

45°

45°

766
1 Nos. 1 Nos.

1270
45° PLT10*50
45°

387
FL10*65

45°

45°
32.5
BY

FL6*25 LD-A-1003
45°

387
FL10*100 10 460 10 45° 1 Nos.
DISCIPLINE

FL6*25

R
EL.+2.875 FL10*100

38
0
38
SECTION W3 - W3

0
SECTION W2 - W2

R
(T.O.S) W3 W3

32
SECTION W4 - W4
DATE

W4 W4 FL6*50

475
138
FL6*50
BY

772

305
W5 W5 257
156 460 156
DISCIPLINE

12*300=3600

FL10*65 FL10*65
100
FL6*50 FL6*50 DET - 2 ROD20
110 460 110

94

94
3855

3855
10 60 40
40 60
TYP
DATE

FL10*65
LD-A-1003

379
DET - 1 ROD20
FL10*65

32.5
285

285
1 Nos.
BY

65
866
1 - Ø 22 HOLE 1 - Ø 22 HOLE FL10*65

45°

45°
DISCIPLINE

32.5
FL10*65
45°
45° LD-A-1003
2575

487
SECTION W6 - W6 1 Nos. 1 - Ø 22 HOLES
LD-A-1003 DETAIL - 1
1 Nos.

2100

0
38
R
FL10*65 SECTION W5 - W5

FL10*65
2B
1401-LD-A-1003 EL.+2.875
6 FL10*100 (T.O.S)
UNP160
W6 W6 FL10*65 2A 2A LD-A-1003 38 38
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

1 Nos. UNP160

57
FL10*65 FL10*100
EL.+0.300 FL10*65

38
85
35

35

(B.O.P)
205

FL10*65

50 57
50
LD-A-1003
1 Nos.
50

50

38
60 480 60 1*D 60x18
33 33 UNP160
SLOTED HOLES
600 FOR M 16 BOLTS 2B
15 2 - Ø 22 HOLES
W1 SECTION W1 - W1 DETAIL - 2
SECTION 2A - 2A SECTION 2B - 2B
SECTION W - W
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) LADDER DETAILS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 33OF91 0

A0
DATE

A4 A1 A2 A3
BY

785 3550 3850 3850 2633


AA.1
DISCIPLINE

4334 115 2137 165 5174 113 2631

SK1-HR-A-1006 SK1-HR-A-1005 SK1-HR-A-1004 SK1-HR-A-1007


1 Nos. 1 Nos. 1 Nos. 1 Nos. A
C
DATE

B B

124
20

37
AA
BY

582
DISCIPLINE

355
1650
SK1-HR-A-1003
1 Nos.

600
DATE

AB.2
SK1-HR-A-1001

878
1 Nos.
BY
DISCIPLINE

5100
305
2400
DATE

SK1-HR-A-1001

1633
1 Nos.
BY

AB.1
DISCIPLINE

SK1-HR-A-1002 1975 600


1 Nos.

453 294
1050

387
127

158
DATE

AB

4
LS-HR-A-1012
REMOVABLE HANDRAIL 1 Nos.
AC.2
BY

1256
943
E
1133

1305
DISCIPLINE

AC.1

453 158
AC
172
DATE

D D
C SK2-HR-A-1001
1 Nos.

294
BY
DISCIPLINE

SK2-HR-A-1002
1 Nos. SK2-HR-A-1005
1 Nos.

5100
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

AD
E

1583
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

F SK2-HR-A-1003 SK2-HR-A-1004 A F
1 Nos. 1 Nos.

83 3850 3850 2652

HANDRAIL PLAN AT EL.+8.600 (T.O.S) CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL PLAN AT EL.+8.600 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 34OF91 0

A0
DATE

453 294 2816 600 1061


GAP GAP
5926 829
BY

LS-HR-A-1012 228 1075 885 615 13 63 279 10


336 1500 1500 1262 1262 53 294 228 307 1 Nos.
DISCIPLINE

275 178
LS-HR-A-1012 3 SK1-HR-A-1001
SK2-HR-A-1005 SK1-HR-A-1001 330 250 SK1-HR-A-1003
1 Nos. 1 Nos. TYP 1 Nos. 1 Nos. 1 Nos.
DATE

DET - 6
148 3 271 175 225

480
539
330 250 10 60 10
BY
DISCIPLINE

719

620
546 LS-A-1033

150
1 Nos. EL.+8.600
(T.O.S)
DATE

36
DET - 1
BY

SECTION A - A
DISCIPLINE
DATE

A3 A2 A1 A4
2633 3850 3850 3550 785
BY
DISCIPLINE

78 280 850 1100 700 1400 1400 1400 1400 1400 700 1200 1200 1200 360

3 SK1-HR-A-1007 710 165 525


SK1-HR-A-1004 SK1-HR-A-1005 150 SK1-HR-A-1006
TYP 1 Nos. 200 1 Nos. 1 Nos. 1 Nos.
DATE

DET - 2
480

710 525
BY

85 (TYP) MID RAIL


PLT6*75
DISCIPLINE

350 608 L50*6


DET - 1 DET - 3 TOE PLATE TYP 552 408
620

150

(TYP) (TYP) PL30*240 SK1-p-1065 PL30*240


PLT6*150 EL.+8.600
DATE

(T.O.S)
36
BY
DISCIPLINE

SECTION B - B

AC.2 AC.1
AB.2 AB.1
1783 2400 1133 367 480

1487 1500 1273 322 88 620 506 71 LS-HR-A-1036


1 Nos.
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SK1-HR-A-1002
1 Nos.

396 25 42
480

MID RAIL 275


60
PLT6*75

L50*6

472
TYP TOE PLATE
620

PLT6*150 EL.+8.600
(T.O.S)
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

186
SECTION C - C
CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) SECTIONS & DETAILS FOR EL.+8.600 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 35OF91 0

A0
DATE
BY

A1 A2 A3
83 3850 3850 2652
DISCIPLINE

103 205 930 1070 800 1400 1300 1500 1400 1400 250 77
SK2-HR-A-1003 200 SK2-HR-A-1004
3 1 Nos.
DATE

1 Nos.
BY

100 20 35
MID RAIL SK2-HR-p-1030 PLT6*75
MID RAIL SK2-HR-p-1021 PLT6*75

PLT6*75 PLT6*75
DISCIPLINE

SK2-HR-p-1007 L50*6

SK2-HR-p-1007 L50*6

SK2-HR-p-1007 L50*6

SK2-HR-p-1007 L50*6

SK2-HR-p-1007 L50*6

SK2-HR-p-1007 L50*6
SK2-HR-p-1023 L50*6

SK2-HR-p-1023 L50*6
L50*6 L50*6
TYP TOE PLATE SK2-HR-p-1031 PLT6*85 TYP TOE PLATE
150

PLT6*150 PLT6*150 EL.+8.600


DATE

LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80 LS-p-1282 PL10*80
(T.O.S)
BY

SECTION F - F
DISCIPLINE
DATE

AC AD
A1 130 4970 133
A4
BY

772 3420 130


235 1480 1480 1480 400 28
DISCIPLINE

157 250 1222 1222 1222 121


150 SK2-HR-A-1002 REMOVABLE 3
150 SK2-HR-A-1001 REMOVABLE 1 Nos. HANDRAIL DET - 5
1 Nos. HANDRAIL
DATE

480
L60*8 235 SK2-HR-p-1030 PLT6*75 MID RAIL 25
127 PLT6*75
480

114 MID RAIL TYP

SK2-HR-p-1002 L60*8
LS-HR-p-1215 PLT6*75
BY

PLT6*75

1100
LS-HR-p-1131 L60*8

LS-HR-p-1050 L60*8

SK2-HR-p-1002 L60*8

SK2-HR-p-1002 L60*8
SK2-p-1061 PL10*90
SK2-p-1061 PL10*90
1100

SK2-p-1061 PL10*90 SK2-HR-p-1003 L60*8


L60*8
DISCIPLINE

SK2-HR-p-1003 L60*8 SK2-HR-p-1003 L60*8


TOE PLATE TYP

620
LS-HR-p-1051 L60*8 LS-p-1286 PL10*90 SK2-p-1061 PL10*90 SK2-HR-p-1003 L60*8
1 SK2-HR-p-1004 PL6*53
EL.+8.600

150
SK2-HR-p-1004 PL6*53 SK2-p-1067 UB254*146*31
LS-p-1286 PL10*90 TOE PLATE PLT6*150
620

LS-HR-p-1052 PL6*53 SK2-HR-p-1003 L60*8 SK2-HR-p-1003 L60*8 SK2-HR-p-1031 PLT6*85


(T.O.S)
150

SK2-p-1067 UB254*146*31
PLT6*150
LS-p-1283 PL10*50
EL.+8.600
SK2-HR-p-1004 PL6*53
LS-HR-p-1125 PLT6*85 SK2-HR-p-1004 PL6*53 SK2-HR-p-1004 PL6*53 SK2-HR-p-1004 PL6*53 2*D18
LS-p-1284 PL10*50
(T.O.S) 2*D18
SK2-p-1057 PL10*50
DATE

LS-p-1289 UB254*146*31 LS-p-1289 UB254*146*31 SK2-p-1067 UB254*146*31 SK2-p-1067 UB254*146*31

36
2*D18
LS-p-1283 PL10*50 SK2-p-1056 PL10*50
36

LS-p-1283 PL10*50 LS-p-1283 PL10*50 SK2-p-1056 PL10*50 SK2-p-1056 PL10*50 SK2-p-1056 PL10*50
LS-p-1285 PL10*90 SK2-p-1056 PL10*50
LS-p-1286 PL10*90 LS-p-1283 PL10*50 LS-p-1284 PL10*50 SK2-p-1057 PL10*50 SK2-p-1057 PL10*50
1 SK2-p-1057 PL10*50
SK2-p-1058 PL10*90
LS-p-1289 UB254*146*31 SECTION E - E
BY

LS-p-1284 PL10*50 LS-p-1283 PL10*50 SK2-p-1056 PL10*50 SK2-p-1056 PL10*50 SK2-p-1056 PL10*50

LS-p-1285 PL10*90
(TYP) 2*D18

SECTION D - D LS-p-1285 PL10*90 SK2-p-1058 PL10*90 SK2-p-1058 PL10*90 SK2-p-1058 PL10*90


DISCIPLINE

SK2-HR-A-1005
1 Nos.

L60*8 C L OF BEAM
25

480

480
L50*6
PL6*53
CLOSURE PLATE
L60*8 85 PLT6*75

38
SUPPORT ANGLE 90 L50*6 85
10 THK. PLATE 2 - Ø 18 HOLES FOR
SK1-HR-p-1027 PLT6*150
35 50

1100
37
1A 1A 70 M 16 BOLTS - 40 mm LG PLT6*75 50 35
30

37.5
5
PLT6*150 2 - Ø 18 HOLES FOR

60
SK1-HR-A-1003

509
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SK1-CT-p1018 HEB100
C L OF POST M 16 BOLTS - 40 mm LG 1 Nos.

620
110

75
==

==

PLT6*150

35
SK1-CT-p1046 PL10*70
1B 1B 2*D18
70
50

130

75
PL3*36.2

50
1C 1C 3

37.5
4*D18
6SK2-p-1068 PL10*80

150
150
3

80
70 SQ OPENING FOR POST PLT6*75

30 50 171
PL10*80 21

75
PLT6*75

36
6 3SIDES 6 30 15 1 - Ø 18 HOLES FOR
M 16 BOLTS - 40 mm LG L50*6

35
6 6
UB254*146*31 PLT6*85
DETAIL - 1
DETAIL - 2 DETAIL - 3 DETAIL - 4 4*D21
SECTION 1A - 1A
SECTION 1 - 1 HANDRAIL POST DETAIL
TYPICAL
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

90
80 PL10*50 SK2-HR-A-1002 5A
1 Nos.
1 - Ø 18 HOLE 3
32
64 HANDRAIL
42
55

POST
TYP
10

3
3

3 3 SK2-HR-A-1002 CLIENT:
110
==

==

6
1 Nos.
70

SK2-p-1058 PL10*90
SK2-HR-p-1012 L60*8
PL3*36.2 PetroChina International Iraq FZE Iraq Branch
64

30
10

PL10*50 PL3*36.2
5A CONTRACTOR:

L60*8 PL10*50
6

SUPPORT ANGLE SECTION 5A - 5A DETAIL - 6 CC


TYP CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

DETAIL - 5
PEG ENGINEERING & CONTRACTING DMCC
SECTION 1B - 1B SECTION 1C - 1C VENDOR: FABTECH International Ltd.
TYPICAL HANDRAIL DETAILS P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) SECTIONS & DETAILS FOR EL.+8.600 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 36OF91 0

A0
DATE
A3
1231 2776
A3
4007
BY

1207 2776
E 130 250 1059 1059 1059 300 151
DISCIPLINE

C L OF LADDER 3983 3 LS-HR-A-1010 LS-HR-p-1216 PL3*36.2


TYP 1 Nos.
1575
LS-HR-A-1011
D 1 Nos. B
DATE

C C

480
85 105
MID RAIL
342

342
BY

PLT6*75

218
C
L OF RUNGS
DISCIPLINE

LS-HR-A-1011

1100
703
1 Nos.
L50*6

LS-HR-p-1023 L50*6
LS-HR-p-1023 L50*6
440 TYP
390
387

620
TOE PLATE

LS-HR-p-1004 L50*6
LS-HR-p-1004 L50*6
DATE

639

1309
PLT6*150
AB EL.+11.400
F F (T.O.S)

150
LS-p-1281 PL10*80 LS-p-1281 PL10*80
249
BY

SG-A-1001

36
6 Nos.
DISCIPLINE

LS-HR-A-1001
1 Nos.
LD-A-1007 SECTION A - A
DATE

1 Nos. E
1593 246 1309

246
1011

60 528 952 53 981 250 78


BY

63 53 LS-HR-A-1001 3
LS-HR-A-1001 1 Nos.
DISCIPLINE

LS-HR-p-1216 PL3*36.2

1 Nos.
LS-HR-p-1248 CHS42.4X3.6

2460
LS-HR-p-1216 PL3*36.2
AC
DATE

2214

1058

480

LS-HR-p-1200 L50*6

LS-HR-p-1030 L50*6

LS-HR-p-1030 L50*6

LS-HR-p-1030 L50*6

LS-HR-p-1200 L50*6
75 MID RAIL 75
PLT6*75
LS-HR-A-1013
BY

1 Nos.

1100
DISCIPLINE

L50*6
1203

TYP

620
TOE PLATE
PLT6*150
DATE

EL.+11.400

412
LS-p-1281 PL10*80

150
LS-p-1281 PL10*80 LS-p-1281 PL10*80 (T.O.S)
LS-p-1281 PL10*80

LS-p-1281 PL10*80
BY

36
15 123
28
DISCIPLINE

46
A A SECTION B - B
LS-HR-A-1010 B
1 Nos.
4007

HANDRAIL PLAN AT EL.+11.400


AB AC
753 1260 1203
4004 363 639 2214
2776 1229 2 - Ø 18 HOLES FOR
M 16 BOLTS - 40 mm LG 128 235 D1 D1 350 818 650 215 153
126 705 850 1250 900 174 SG-A-1001
LS-HR-A-1011 LS-HR-A-1013 3
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

45 6 Nos.
A3 1 Nos. 1 Nos. TYP
3 LS-HR-A-1011
1 Nos.

177
55 194
D1

480
85 MID RAIL 25
25
480

PLT6*75 LS-HR-p-1203 PLT6*75


80 MID RAIL 131 1100 D1
PLT6*75 3

LS-HR-p-1023 L50*6

LS-HR-p-1023 L50*6

LS-HR-p-1023 L50*6
1100

851
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

620

3 TOE PLATE

LS-HR-p-1004 L50*6

LS-HR-p-1004 L50*6
L50*6
TYP PLT6*150
620

TOE PLATE
LS-HR-p-1253 L50*6

LS-HR-p-1004 L50*6

LS-HR-p-1004 L50*6

LS-HR-p-1004 L50*6

EL.+11.400
150

PLT6*150 LS-p-1282 PL10*80 LS-p-1281 PL10*80


(T.O.S)
EL.+11.400
150

2*D18 2*D18
LS-p-1281 PL10*80 LS-p-1281 PL10*80 LS-p-1281 PL10*80
(T.O.S)
LS-p-1281 PL10*80
36

LS-p-1282 PL10*80 LS-p-1282 PL10*80


36

CLIENT:

SECTION D - D PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

SECTION C - C
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) HANDRAIL PLAN AT EL.+11.400 (T.O.S)
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 37OF91 0

A0
DATE
BY

AB
379 419
DISCIPLINE

733 65 416

772

50

50
FL6*75

180
DATE

F3 F3
156 460 156
LD-A-1007 772
LD-A-1007 ROD25 1 Nos. FL10*65 LD-A-1007
10 156 460 156 FL10*65
BY

1 Nos. 10 FL10*65 1 Nos.


10 FL10*65 10

94

94
LD-p-1002 ROD20
DISCIPLINE

LD-A-1007

94

94
FL6*25
1 Nos. TYP

1300
FL6*25

379
TYP

285

285

379
LS-HR-p-1197 PLT6*75
1270

1270

285

285
DATE

866

766
45°

45°

45°

45°
BY

EL.+11.400 45° FL6*25


218 LS-HR-p-1198 PLT6*150
45°

487
TYP

387
UNP160 (T.O.S) 45°
IPE160 45°
DISCIPLINE

32

170
F2 F2

80
R 380

R3
DATE

FL6*50

50
DET - 8 SECTION F2 - F2
SECTION F1 - F1
500

500
FL10*100 FL6*50

12*300=3600

12*300=3600
BY

F1 F1
DISCIPLINE

4050
FL6*50 FL6*50
LD-p-1002 ROD20 765
DATE

156 460 149


LD-A-1007
1 Nos. 10 FL10*65 10
LD-p-1002 ROD20 FL10*65
LS-HR-p-1201 L50*6 200
ROD20
BY

94
15 3A UNP160
DISCIPLINE

2750

FL6*75

379
FL6*25 ROD25

32
LD-p-1002 ROD20

FL10*65
80 532

FL10*65

285
TYP
6

57
FL10*100
FL10*65

766
DATE

57
2100

2100

93

45°

45°
LD-p-1002 ROD20

50
45°
LD-p-1037 FL6*25
74 19
45°

387
3A

50
BY

2 - Ø 22 HOLES FOR
2 - Ø 22 HOLES FOR UNP160 M 19 BOLTS - 45 mm LG
LD-p-1002 ROD20 89 FL10*65
DISCIPLINE

M 19 BOLTS - 45 mm LG
SECTION F3 - F3 DETAIL - 8 SECTION 3A - 3A

LD-p-1002 ROD20

100
400

400
EL.+8.630 60 40
35

35

35 (B.O.S)
1 - Ø 22 HOLES

32.5
F4 F4 FOR M 19 BOLTS
10
50

50

50

10

65
1 Ø (60x18)
SLOTED HOLES
32.5 32.5

32.5
FOR M 16 BOLTS 60 480 60

SECTION E - E 600 SECTION F4 - F4


NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION F - F
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) LADDER DETAILS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 38OF91 0

A0
TOTAL UNIT
DATE ASSM. MK. QTY QTY
BOLTS LENGTH REMARKS ASSEMBLY LIST
LS-PS1002 4 4 16 DIA A307 44 MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)
LS-PS1004 16 8 16 DIA A307 51 LS-PS1001 PIPE SUPPORT L50*6 300 1 0.06 1.3
LS-PS1002 PIPE SUPPORT UNP100 113 1 0.33 9.4
LS-PS1007 2 2 16 DIA A307 38
LS-PS1004 PIPE SUPPORT UNP100 645 1 1.02 30.0
LS-PS1014 8 8 19 DIA A307 51
BY

LS-PS1007 PIPE SUPPORT L75*8 395 1 0.13 3.6


LS-PS1023 8 4 19 DIA A307 57 LS-PS1008 PIPE SUPPORT UNP100 335 1 0.12 3.5
LS-PS1035 2 2 16 DIA A307 44 LS-PS1009 PIPE SUPPORT L75*8 310 1 0.09 2.8
DISCIPLINE

LS-PS1012 PIPE SUPPORT L75*8 422 1 0.12 3.8


LS-PS1039 2 2 16 DIA A307 38
LS-PS1013 PIPE SUPPORT HEB160 235 1 0.58 24.0
LS-PS1044 8 4 19 DIA A307 57 LS-PS1014 PIPE SUPPORT HEB100 1169 1 1.10 39.0
LS-PS1045 4 4 19 DIA A307 57 LS-PS1015 PIPE SUPPORT HEB160 605 1 1.12 48.2
LS-PS1018 PIPE SUPPORT L75*8 301 1 0.24 6.5
4 4 16 DIA A307 57
LS-PS1129
LS-PS1046
LS-PS1132 LS-PS1079 4 4 16 DIA A307 38
LS-PS1019 PIPE SUPPORT L75*8 300 1 0.25 6.8
L75*8 L60*5 LS-PS1020 PIPE SUPPORT L75*8 261 1 0.18 4.6
DATE

LS-PS1081 8 8 19 DIA A307 57 LS-PS1021 PIPE SUPPORT L75*8 230 1 0.07 2.1
LS-PS1132 LS-PS1013
LS-PS1200 L60*5
LS-PS1083 4 4 16 DIA A307 44 LS-PS1023 PIPE SUPPORT UNP160 765 1 0.49 17.2

UNP160 LS-PS1131 HEB160 LS-PS1085 8 4 16 DIA A307 38


LS-PS1025 PIPE SUPPORT UNP160 993 1 0.54 18.5
L75*8 LS-PS1026 PIPE SUPPORT UNP160 749 1 0.41 14.0
LS-PS1133 LS-PS1134 LS-PS1086 8 4 16 DIA A307 38 LS-PS1027 PIPE SUPPORT L75*8 400 1 0.12 3.5
BY

HEB100 LS-PS1108 4 4 16 DIA A307 44 LS-PS1028 PIPE SUPPORT L75*8 901 1 0.38 11.3
L75*8 LS-PS1102 UNP160
LS-PS1087
LS-PS1029 PIPE SUPPORT L75*8 237 1 0.07 2.1
LS-PS1088 8 8 19 DIA A307 51
L65*8 LS-PS1020 LS-PS1030 PIPE SUPPORT UNP100 644 1 0.93 28.6
DISCIPLINE

LS-PS1122 LS-PS1211 L75*8


LS-PS1089 12 12 16 DIA A307 57 LS-PS1031 PIPE SUPPORT UNP100 370 1 0.14 3.9
L75*8 L75*8
LS-PS1090 4 4 19 DIA A307 44 LS-PS1032 PIPE SUPPORT UNP100 534 1 0.39 10.9

LS-PS1015 LS-PS1014 LS-PS1091 4 4 19 DIA A307 44 LS-PS1033


LS-PS1034
PIPE SUPPORT
PIPE SUPPORT
L50*6
L75*8
433
177
1
1
0.13
0.18
2.8
4.7
HEB160 PL12*220 LS-PS1094 4 4 19 DIA A307 57
LS-PS1035 PIPE SUPPORT L75*8 459 1 0.30 8.4
LS-PS1095 4 4 19 DIA A307 57 LS-PS1036 PIPE SUPPORT L75*8 436 1 0.13 3.9
DATE

LS-PS1014 LS-PS1097 8 4 16 DIA A307 38 LS-PS1037 PIPE SUPPORT L50*8 433 3 0.13 10.8
HEB100 LS-PS1110 4 4 16 DIA A307 44 LS-PS1038 PIPE SUPPORT UNP160 549 1 0.30 10.2
LS-PS1123 2 2 16 DIA A307 51
LS-PS1039 PIPE SUPPORT L75*8 625 1 0.21 6.5
LS-PS1073
LS-PS1183
LS-PS1041 PIPE SUPPORT UNP160 816 1 0.59 20.1
L75*8 LS-PS1004 LS-PS1184 2 2 16 DIA A307 38
L75*8 LS-PS1042 PIPE SUPPORT UNP100 280 1 0.10 2.9
BY

LS-PS1121 UNP100 2 2 16 DIA A307 44 LS-PS1043 PIPE SUPPORT UNP100 330 1 0.12 3.4
LS-PS1167
LS-PS1185
LS-PS1044 PIPE SUPPORT UNP160 765 1 0.49 17.2
L75*8 L75*8 LS-PS1198 LS-PS1187 2 2 16 DIA A307 44
LS-PS1045 PIPE SUPPORT UNP160 1184 1 0.72 25.1
DISCIPLINE

LS-PS1088 UNP100 LS-PS1191 4 4 16 DIA A307 38 LS-PS1046 PIPE SUPPORT HEB160 900 1 0.92 40.1
HEB160 LS-PS1126
LS-PS1196 8 8 19 DIA A307 57 LS-PS1051 PIPE SUPPORT L75*8 1286 1 0.54 17.9
LS-PS1019 4 4 16 DIA A307 38 LS-PS1055 PIPE SUPPORT L75*8 400 1 0.12 3.6
LS-PS1114
LS-PS1200
L75*8 L60*6 LS-PS1058 PIPE SUPPORT UNP100 690 1 0.26 7.2
4 4 19 DIA A307 44
LS-PS1130 LS-PS1058 L75*8
LS-PS1229
LS-PS1063 PIPE SUPPORT L75*8 391 1 0.24 6.4
4 4 16 DIA A307 57
L75*8 UNP100 LS-PS1236 LS-PS1073 PIPE SUPPORT L75*8 330 1 0.10 2.9
DATE

8 8 19 DIA A307 57 LS-PS1076 PIPE SUPPORT L75*8 432 1 0.23 6.9


LS-PS1127
LS-PS1240
LS-PS1214 LS-PS1215 LS-PS1078 PIPE SUPPORT L75*8 443 1 0.24 6.3
LS-PS1088 L75*8 L50*6 L75*8 LS-PS1079 PIPE SUPPORT UNP160 940 1 0.55 18.3
HEB160 LS-PS1080 PIPE SUPPORT UNP160 734 1 0.40 13.7
LS-PS1122 LS-PS1081 PIPE SUPPORT HEB160 1564 1 3.94 163.1
LS-PS1091
BY

L75*8 LS-PS1082 PIPE SUPPORT HEB100 1474 1 1.25 42.9


LS-PS1183 LS-PS1028 UNP160 LS-PS1083 PIPE SUPPORT UNP160 715 1 0.44 14.9
L75*8 LS-PS1128 LS-PS1084 PIPE SUPPORT UNP100 793 1 0.30 7.7
L75*8
DISCIPLINE

LS-PS1021 L60*5 LS-PS1085 PIPE SUPPORT UNP100 378 1 0.62 17.3


LS-PS1184 LS-PS1027 L75*8 LS-PS1219 LS-PS1086 PIPE SUPPORT UNP100 378 1 0.62 17.3
LS-PS1185 L75*8 L75*8 UNP100 LS-PS1046 LS-PS1087 PIPE SUPPORT L75*8 741 1 0.51 15.0
L75*8
LS-PS1012 HEB160 LS-PS1088 PIPE SUPPORT HEB160 1453 1 3.66 162.9
LS-PS1161 LS-PS1008 LS-PS1051 LS-PS1090 L75*8 LS-PS1089 PIPE SUPPORT HEB160 1231 1 3.18 133.2
UNP200 UNP100 LS-PS1104 L75*8 UNP160 LS-PS1172 LS-PS1090 PIPE SUPPORT UNP160 754 1 0.52 18.7
LS-PS1168
DATE

LS-PS1161 L75*8 HEB160


LS-PS1091 PIPE SUPPORT UNP160 1495 1 1.03 35.0

L75*8 LS-PS1081 LS-PS1097 LS-PS1023


LS-PS1092 PIPE SUPPORT L75*8 832 1 0.38 12.4
UNP100 L75*8 L75*8 LS-PS1166 LS-PS1093 PIPE SUPPORT L75*8 543 1 0.16 4.5
UNP160 LS-PS1094 PIPE SUPPORT UNP160 1106 1 0.74 25.0
UNP100 LS-PS1095 PIPE SUPPORT UNP160 479 1 0.33 11.9
LS-PS1196 LS-PS1081
BY

LS-PS1096 PIPE SUPPORT L75*8 599 1 0.17 5.4


HEB120 LS-PS1094 HEB160 LS-PS1044 LS-PS1234
LS-PS1097 PIPE SUPPORT L75*8 590 1 0.59 18.2
LS-PS1100 PIPE SUPPORT UNP160 595 1 0.33 11.1
UNP160 UNP160 LS-PS1086 UNP160
DISCIPLINE

LS-PS1101 PIPE SUPPORT L50*6 391 1 0.15 3.1


LS-PS1026 UNP100 LS-PS1233 LS-PS1079 LS-PS1102 PIPE SUPPORT L65*8 551 1 0.14 4.2
LS-PS1041 UNP160 LS-PS1055 L50*6 UNP160 LS-PS1235 LS-PS1089 LS-PS1103 PIPE SUPPORT UNP100 954 1 0.36 9.9
LS-PS1095 UNP160 L75*8 UNP100 HEB160 2
UNP160
LS-PS1092 LS-PS1240
LS-PS1104
LS-PS1105
PIPE SUPPORT
PIPE SUPPORT
L75*8
L65*8
484
430 1
0.14
0.11
8.6
3.3
L75*10
HEB160 LS-PS1106 PIPE SUPPORT HEB100 883 1 0.50 16.2
LS-PS1025 LS-PS1085 LS-PS1109 LS-PS1107 PIPE SUPPORT L50*6 341 1 0.07 1.5
DATE

LS-PS1108 PIPE SUPPORT UNP160 1346 1 1.95 66.5


UNP160 UNP100 LS-PS1037 HEB160 LS-PS1109 PIPE SUPPORT HEB160 2471 1 2.78 115.6
LS-PS1103 LS-PS1187 LS-PS1145 L50*8 LS-PS1113
LS-PS1110 PIPE SUPPORT UNP160 725 1 0.43 14.3
UNP100 L50*6 LS-PS1236 L75*8 LS-PS1111 PIPE SUPPORT UNP100 470 1 0.18 4.9
LS-PS1082 UNP160 L75*8
BY

LS-PS1113 PIPE SUPPORT L75*8 498 3 0.23 20.8


LS-PS1191 HEB100 LS-PS1188 LS-PS1119 LS-PS1113 PIPE SUPPORT L75*8 499 3 0.23 20.8
UNP100 LS-PS1182 LS-PS1114 PIPE SUPPORT L75*8 223 1 0.15 4.5
L75*8 LS-PS1036 UNP160 L75*8
DISCIPLINE

LS-PS1115 PIPE SUPPORT UNP160 849 1 0.46 15.4


L75*8 LS-PS1153 LS-PS1117 PIPE SUPPORT L50*6 310 1 0.88 28.7
LS-PS1192 LS-PS1035 HEB100 LS-PS1118 PIPE SUPPORT L50*6 149 1 0.12 2.6
UNP100 L75*8 LS-PS1078 LS-PS1118 LS-PS1119 PIPE SUPPORT L75*8 809 1 0.32 9.5
LS-PS1039 LS-PS1037 L50*6 LS-PS1121 PIPE SUPPORT L75*8 223 1 0.15 4.5
L75*8 LS-PS1029 L75*8 L50*8 LS-PS1122 PIPE SUPPORT L75*8 223 2 0.15 8.9
LS-PS1209 LS-PS1237 L75*8 LS-PS1122 PIPE SUPPORT L75*8 224 2 0.15 8.9
L75*8 L60*6 LS-PS1150 LS-PS1123 PIPE SUPPORT L75*8 224 1 0.13 4.1

LS-PS1045 L50*6 LS-PS1034 LS-PS1124 PIPE SUPPORT L60*6 250 1 0.06 1.3

LS-PS1223 LS-PS1076 L75*8


LS-PS1125 PIPE SUPPORT L60*6 521 1 0.12 2.8
LS-PS1168 UNP160 L75*8 LS-PS1126 PIPE SUPPORT L60*6 761 1 0.18 4.1
L75*8 UNP100 LS-PS1228 LS-PS1113 LS-PS1147
LS-PS1210 UNP100 L50*6
LS-PS1127 PIPE SUPPORT L75*8 223 1 0.17 5.0

L75*8 LS-PS1033 L75*8 LS-PS1128 PIPE SUPPORT L60*5 451 1 0.11 2.0
LS-PS1111 LS-PS1129 PIPE SUPPORT L75*8 1118 1 0.40 11.7
UNP100 LS-PS1030 L50*6
LS-PS1093 LS-PS1037 LS-PS1117 LS-PS1130
LS-PS1131
PIPE SUPPORT
PIPE SUPPORT
L75*8
L75*8
451
363
1
1
0.24
0.20
6.5
5.8
L75*8 HEB100 L50*8 UNP160
LS-PS1092 LS-PS1132 PIPE SUPPORT L60*5 1449 2 0.34 13.1

LS-PS1096 LS-PS1212 L75*8 LS-PS1110 LS-PS1230 LS-PS1133 PIPE SUPPORT L75*8 878 1 0.37 10.9

L75*8 L75*8 UNP160 HEB100 LS-PS1134 PIPE SUPPORT HEB100 479 1 0.34 11.6
LS-PS1115 LS-PS1145 PIPE SUPPORT L75*8 1150 2 0.58 35.3
UNP160 LS-PS1147 PIPE SUPPORT L50*6 236 1 0.11 2.2
1
LS-PS1031 LS-PS1150 PIPE SUPPORT L50*6 280 0.21 4.6

UNP100 LS-PS1113 LS-PS1153 PIPE SUPPORT HEB100 499 1


1
0.65 22.2

LS-PS1226 L75*8 LS-PS1161 PIPE SUPPORT L75*8 1102 1.17 40.0


NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

LS-PS1165 PIPE SUPPORT UNP100 729 2 0.27 15.2


LS-PS1232 LS-PS1080 UNP100 LS-PS1166 PIPE SUPPORT UNP100 715 1 0.27 7.4
L60*6 UNP160 LS-PS1167 PIPE SUPPORT L75*8 1315 1 0.69 21.5
LS-PS1229
LS-PS1032 UNP160 LS-PS1168 PIPE SUPPORT L75*8 349 2 0.10 6.2
UNP100 LS-PS1043 LS-PS1168 PIPE SUPPORT L75*8 350 2 0.10 6.2
UNP100 LS-PS1169 PIPE SUPPORT L75*8 425 1 0.12 3.7
LS-PS1030 LS-PS1171
LS-PS1172
PIPE SUPPORT
PIPE SUPPORT
L75*8
HEB160
402
1984
1
1
0.21
2.60
5.6
113.6
UNP100 LS-PS1182 PIPE SUPPORT UNP160 1520 1 1.62 54.6
LS-PS1183 PIPE SUPPORT L75*8 510 1 0.18 5.7
LS-PS1184 PIPE SUPPORT L75*8 550 1 0.19 6.1
LS-PS1185 PIPE SUPPORT L75*8 1025 1 0.33 10.3
LS-PS1187 PIPE SUPPORT L50*6 76 1 0.11 2.4
LS-PS1188 PIPE SUPPORT L75*8 405 1 0.22 5.6
LS-PS1191 PIPE SUPPORT UNP100 896 1 0.37 10.6
LS-PS1192 PIPE SUPPORT UNP100 477 1 0.43 12.0
LS-PS1196 PIPE SUPPORT HEB120 1830 1 2.65 95.6
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

LS-PS1198 PIPE SUPPORT UNP100 474 1 0.26 7.4

LS-PS1042 LS-PS1200
LS-PS1201
PIPE SUPPORT
PIPE SUPPORT
UNP160
L60*6
340
300
1
1
0.22
0.07
6.4
1.6
UNP100 LS-PS1209 PIPE SUPPORT L75*8 269 1 0.15 4.5
LS-PS1210 PIPE SUPPORT L75*8 268 1 0.22 6.3
LS-PS1211 PIPE SUPPORT L75*8 477 1 0.25 6.7
LS-PS1212 PIPE SUPPORT L75*8 240 1 0.22 5.9
LS-PS1214 PIPE SUPPORT L75*8 355 1 0.10 3.2
LS-PS1215 PIPE SUPPORT L50*6 413 1 0.08 1.8
LS-PS1218 PIPE SUPPORT L75*8 194 1 0.22 5.7
LS-PS1219 PIPE SUPPORT UNP100 582 1 0.39 11.1
STAND ALONE STRUCTURE PIPE SUPPORTS LS-PS1221
LS-PS1223
PIPE SUPPORT
CLIENT:
PIPE SUPPORT
L75*8
UNP100
302
297
1
1
0.22
0.11
6.2
3.1
ISOMETRIC VIEW LS-PS1226 PIPE SUPPORT UNP100 393 1 0.15 3.3
LS-PS1228 PIPE SUPPORTPetroChina
UNP100 International857 1 0.46 12.8
Iraq FZE Iraq1
Branch
LS-PS1229 PIPE SUPPORT UNP160 1202 0.69 22.8
LS-PS1230 PIPE SUPPORT HEB100 530 1 0.30 10.3
LS-PS1232 CONTRACTOR:
PIPE SUPPORT L60*6 399 1 0.09 2.1
LS-PS1233 PIPE SUPPORT L50*6 350 1 0.07 1.5
LS-PS1234 PIPE SUPPORT UNP160 461 1 0.25 8.6
LS-PS1235 C
PIPE SUPPORTC UNP100 396 1 0.15 4.1
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.
LS-PS1236 PIPE SUPPORT UNP160 1231 1 0.74 25.4
LS-PS1237 PIPE SUPPORT L60*6 350 1 0.08 1.9
LS-PS1240 PIPE SUPPORT PEG ENGINEERING & CONTRACTING
HEB160 1447 DMCC 1 3.00 122.0
Total Area(Sqm): 68.61 Total weight(kg): 2474.48
VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 39OF91 0

A0
DATE
BY
DISCIPLINE

A6 A5 A4 A1
A7
3800 3800 3800 3550
DATE

1000 800 800 1200 950 950 950 950 650 650 600 950 950 888 887 888 888
BY
DISCIPLINE

AA.3
DATE

LS-PS1175
1220

HEB100
An
LS-PS1024 67 380 LS-PS1151 Bp 488 988 Ap
L50*6 15 L50*6 292
Bm LS-PS1117
BY

N Bl

144
UNP160

21

21
Ar

2
AA.2
DISCIPLINE

N LS-PS1118

684

684
Bl Bm Bp 203

449
LS-PS1149 L50*6
X L50*6 LS-PS1074
LS-PS1016 33 LS-PS1119

1490

1490
LS-PS1017 HEB160 L75*8 LS-PS1115
1310

1 Bn L75*8
HEB160 X
DATE

42 UNP160
LS-PS1153 233

853
807

807
LS-PS1109
Y Y HEB100 22 HEB160

510
Aa Ah Aq

344
310

44
BY

25

15
AA.1

10
Ar
DISCIPLINE

LS-PS1181 Bn Aa Av An Av Aq

452

479

485
Ap LS-PS1113 As
371 HEB160

38
LS-PS1147 Ah L75*8
153

940
LS-PS1120 L50*6
172 192

33
HEB200 Al Al Am Am 47
1450

W Z As
LS-PS1063
DATE

32 572 378 LS-PS1113 496 392 LS-PS1113

2
L75*8
L75*8 L75*8
W LS-PS1098 553 Ak Ak

384
HEB200 233 AA
BY

Z
LS-PS1139

678
DISCIPLINE

359
LS-PS1064 43

857
LS-PS1138 LS-PS1074 UNP100

596

596
Aj

657
HEA160 L65*8 L75*8 26
U Af Af 20 Au
Be LS-PS1061 Ae Au LS-PS1034
1450

38 Ab Ab LS-PS1037 Au At At L75*8
LS-PS1048 LS-PS1060 V V L75*8 25 37 38 LS-PS1037 LS-PS1037
DATE

L50*8

183
L75*8 L75*8 Be L50*8 L50*8
19 Aj 26

793
226
735

12 Ad LS-PS1061 Au
224 U

480
R 240 L75*8
BY

Ae

247
AB.2
DISCIPLINE

22
32

280

456
25 R S S Ad LS-PS1157
570

616
162 LS-PS1003 L75*8
LS-PS1005 T
29

UNP100 Ag Ag
1268

L50*6 LS-PS1182
25
300

L65*8
P LS-PS1062
L50*6 T 434 950 133 1200 567

FAB-3021117-01-M01-GA-003-
LS-PS1069
2400

1169
131
815

LS-PS1057 L50*6
Q 32 Q LS-PS1066

(MATCH LINE AREA IN


L75*8 150 156 L L50*6
LS-PS1047
L75*8 LS-PS1070
LS-PS1050 M 38 M HEB100 1278 622 378 LS-PS1145
302

L75*10 L Bf L75*8
715

J LS-PS1140
616

F G LS-PS1143

3 OF 26 )
A H 469 422 L60*6 L60*6
32

22

22
19
19

AB.1
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

15

22 LS-PS1056
392

G 1 E H J K Bc 1000 Bc
F 240
632

632
600

L75*8
209 181 Bf 40
LS-PS1059 Bk
L65*8 LS-PS1068 LS-PS1146
177
1500

E 19 LS-PS1144 227
A L50*6 K IPE160
L60*6 LS-PS1071 LS-PS1072
22 LS-PS1052 LS-PS1067 12 Bg Bh Bj Bk L75*8 L75*8
LS-PS1006 L75*8 L50*6 LS-PS1158 AB
LS-PS1053 59 248 248 Ay Az Az
L60*10 HEB160 900

470
L75*8 C Aw Ax
C 84
39
32

AC.2
19
42

44

44

44
44

44

B B D D LS-PS1010
480

Aw Ax Bd Bb Ac
613

C C L50*6 Ay
22

22
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

AC.1
LS-PS1060
6

L75*8 LS-PS1141 Ba Ba LS-PS1172


LS-PS1052 LS-PS1022

LS-PS1086
L60*6 HEB160 AC
Bg Bh Bj L75*8 L75*8 LS-PS1145

969

969
UNP100
573 782 696 492 L75*8 Bb
474 369 413 293 887 LS-PS1085
UNP100
LS-PS1142 113
L75*8
Bd Ac CLIENT:

STAND ALONE STRUCTURE PLAN AT EL. +2.875 (T.O.S) 654 1500


PIPE SUPPORTS PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 40OF91 0

A0
DATE
A1 A2 A3
3850 3850
962 962 962 962
BY

781
DISCIPLINE

Bw
203 Cd

LS-PS1229
LS-PS1030

UNP160
LS-PS1115

1207
HEB100
DATE

UNP160
853
LS-PS1031
375 UNP100
BY

Bw Cd LS-PS1228

80 228 453
485
UNP100
Bx
DISCIPLINE

866

1250
LS-PS1113 Cp Cp
Bx

22
L75*8 47
26
Cb 107 Ca Cb Ca
DATE

AA
730 LS-PS1110
LS-PS1034

678
UNP160

773
Cc

857
L75*8 22
BY

25 Cn
DISCIPLINE

Cq Cq LS-PS1033 Cc
43 L50*6 Cn
229

15
DATE

Bu Bu LS-PS1032
UNP100
LS-PS1150
BY

L50*6

5100
DISCIPLINE

FAB-3021117-01-M01-GA-003-
454 924
Bt

(MATCH LINE AREA IN


Ce
DATE

LS-PS1092 LS-PS1221
L75*8 L75*8

44
BY

44
Ce

121
Bt

2 OF 26)
DISCIPLINE

Cg Cg Ch

535
473 300

180
AB
DATE

LS-PS1223
LS-PS1111 UNP100 LS-PS1209 LS-PS1096
L75*8

600
UNP100 By L75*8

1260
BY

656 128 LS-PS1210


L75*8 38

44
DISCIPLINE

22
AC
Bq Bq

548
Ch
750

LS-PS1212
L75*8 1058
Bv LS-PS1093
By L75*8
LS-PS1035
700

L75*8 Cj 13

490
32

Cj Bv
1898
2200

5100
Bs
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

988 1013
LS-PS1187
LS-PS1188 L50*6
L75*8
371
37

67

Cs Cs
LS-PS1007 Bs
L75*8 1013 912
LS-PS1039
1450

L75*8
LS-PS1192

161
Bz Bz Br UNP100
348

108
21
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

AD
Cr Cr Ck Ck
LS-PS1082 629
378

400
700

LS-PS1171 Cm HEB100
L75*8 Cf
79

Cl
214

LS-PS1041
LS-PS1191

Cl 258
UNP160
900

UNP100

1252 Br Cm CLIENT:

Cf PetroChina International Iraq FZE Iraq Branch


1035 890
CONTRACTOR:

1925 1925 1925 1925


CC
3850 3850 CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

STAND ALONE STRUCTURE PLAN AT EL. +2.875 (T.O.S)


PIPE SUPPORTS VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 41OF91 0

A0
LS-PS1060
DATE

EL.+2.875 EL.+2.875 400 292


L75*8 EL.+4.298
LS-PS1050 (T.O.S) EL.+2.875 15
(T.O.S) LS-PS1052 (T.O.S) LS-PS1056 142 150
L75*10 EL.+2.875 HEB180 HEB180 (T.O.S)
L75*8 L75*8
41 100 51
BY

(T.O.S) EL.+2.875
HEB180 EL.+3.186 327 100 HEB180
(T.O.S) (T.O.S) EL.+4.635
44 HEB180
DISCIPLINE

19 EL.+2.875 5 (T.O.S) HEB100


HEB180 H1
5 5 EL.+2.399 (T.O.S)

191
EL.+2.400 5

371
356
(T.O.S)

161
(T.O.S)

L75*8
EL.+2.875 L75*8 EL.+2.695 PL10*47 LS-PS1069

311
TYP 5 H1

161
(T.O.S) (T.O.S) TYP L50*6
DATE

5 TYP

11
L75*10 L60*10 IPE160 5 10 (TYP) SECTION J - J
600 LS-PS1006

191
L75*10 315 L60*10 LS-PS1067 177 LS-PS1068 TYP

1423
L50*6 5
380 L50*6
BY

SECTION A - A

L75*8
LS-PS1059 LS-PS1066
HEB180 L65*8 L50*6 302 EL.+2.875
DISCIPLINE

SECTION B - B (T.O.S)
SECTION C - C SECTION D - D SECTION E - E
SECTION G - G

EL.+2.875

55
1760
EL.+2.875 32 LS-PS1070
300
DATE

EL.+2.875 (T.O.S) IPE160 (T.O.S) HEB100


IPE160 EL.+2.875 TYP 5 HEB180
(T.O.S) IPE160 135 165 5
(T.O.S)
37 EL.+3.065 L50*6 HEB100 SECTION L - L
143 PL10*47
BY

EL.+2.607 (T.O.S) 204 19 HEB180


EL.+2.503 PL10*47

21
LS-PS1024

L50*6
L50*6

212
(T.O.S) L50*6 (T.O.S) P1
DISCIPLINE

EL.+2.399 TYP EL.+2.875 L50*6 ROD20


168

368
L75*8

190
5

391
(T.O.S) (T.O.S) CTR'D

191
L60*6 L50*6 5 TYP
324 HEB180 TYP SECTION H1 - H1 5
5 5 SECTION P1 - P1 LS-PS1059

60
L65*8
EL.+2.875
DATE

LS-PS1143 L50*6 210 90


L60*6 LS-PS1057 LS-PS1005 (T.O.S) PL10*95.5
SECTION K - K L75*10 5 HEB180 HEB180 L50*6 SECTION F - F PL10*95.5
540 P1
300
BY

SECTION M - M SECTION N - N
SECTION P - P
DISCIPLINE

EL.+2.875 HEB180 LS-PS1120


EL.+2.875 EL.+2.875 (T.O.S) HEB200
HEB180 EL.+2.875 162 HEB180
(T.O.S) EL.+2.875 HEB180 HEB180 (T.O.S) SECTION H - H
(T.O.S) IPE160 SECTION W1 - W1
(T.O.S) HEB180 HEB180 EL.+2.875 29
32
DATE

5 (T.O.S) LS-PS1064 19 500


32 L65*8
EL.+2.499 AD1
250 250
(T.O.S) EL.+2.499
L75*8

5
271

LS-PS1062 EL.+2.399
BY

EL.+2.399 LS-PS1003

391

L75*8
(T.O.S) L50*6 (T.O.S)

L75*8
L75*8

100 300 100

371
L50*6
271

5 5 (T.O.S) 5
DISCIPLINE

LS-PS1047
L75*8 157
LS-PS1061 45 200 200 55

311

21
477 LS-PS1048 LS-PS1060
L75*8 L75*8
L75*8 5 10 L50*6

191
414 380 380 EL.+3.327 W1 EL.+2.875
DATE

SECTION Q - Q TYP

111
(T.O.S) LS-PS1120 (T.O.S)

20
SECTION R - R SECTION U - U ROD20 HEB200
SECTION S - S
BY

SECTION T - T SECTION V - V
500
500
DISCIPLINE

250 250 252 248 UNP100


500
150 200 150 5 AD1
45 200 200 55 HEB180
EL.+2.875 HEB180 5

452
250 250 PL10*95.5 HEB200 W1
10 45 200 200 55 (T.O.S) TYP
EL.+3.407 LS-PS1017 EL.+3.347
X1 HEB160 45 200 150 105 (TYP) SECTION Ad - Ad
(T.O.S) TYP HEB160 EL.+3.573 10 LS-PS1074
10 (T.O.S) ROD20 W1 25 L75*8 EL.+2.875

20
(T.O.S) X1 TYP
HEB160 PL10*76 TYP (T.O.S) 5
PL10*76
PL10*76 X1 LS-PS1016 EL.+2.875

311
TYP
532

(TYP) HEB160 5 247 183


X1 (T.O.S)
EL.+2.875 PL10*76 PL10*95.5 HEB180 IPE160
TYP TYP
698
(T.O.S) SECTION X1 - X1 33
SECTION Aa - Aa
HEB160

HEB200

472
EL.+2.875 TYP W1
5 TYP SECTION W - W
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

TYP (T.O.S) 5 EL.+2.398


5

317
HEB180 5 5
300 (T.O.S)

425
EL.+2.875 EL.+2.290 LS-PS1157
LS-PS1098 EL.+2.875 EL.+3.008 L75*8 L75*8
SECTION X - X (T.O.S) HEB200 (T.O.S) HEB180 135 165 (T.O.S)
HEB180 (T.O.S)
LS-PS1074 L50*6 LS-PS1061

21
25 L75*8 L75*8
SECTION Y - Y 380
EL.+3.887 HEB180 EL.+2.875 691
230

133
Af1 (T.O.S) (T.O.S)
L50*6

311
5 SECTION Ae - Ae
L50*6 1200 LS-PS1003 TYP
EL.+2.875 SECTION Z - Z UNP100 5
SECTION Ab - Ab LS-PS1153
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

Ag1 Ag1 (T.O.S)


HEB180 SECTION AD1 - AD1 HEB100
650
10

10

5 EL.+2.875
1011

508 594 56 PL10*47 PL10*47


(T.O.S)
1011

85

L50*6 485 EL.+3.375 (TYP)


L50*6 L65*8 L65*8 EL.+3.103
263 221 (T.O.S) Ah1 HEB100 SECTION Ah1 - Ah1
(T.O.S)
404

EL.+2.291 UNP100
LS-PS1139 UNP160 L65*8 140
EL.+2.875 UNP160
574

EL.+2.875 LS-PS1182 (T.O.S) HEB180 LS-PS1085


CLIENT:

IPE160 UNP100 30 45 30 Ah1


(T.O.S) UNP160 EL.+2.875
499

(T.O.S) UNP100 HEB180


228

UNP160 Ac1 35 PetroChina International Iraq FZE Iraq Branch


(T.O.S) 5 LS-PS1153

500
LS-PS1182 UNP100
170

UNP160 HEB100

120
25 70 30
EL.+2.875 CONTRACTOR:

Af1 HEB180 (T.O.S)

25
TYP
10

10

5 IPE160 LS-PS1139 Ag1 Ag1 LS-PS1085 CC


UNP100 80 1360 80 UNP100 Ac1 CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

717 233 HEB180


379 969 4 - Ø 18 HOLES FOR
SECTION Af1 - Af1
PEG ENGINEERING & CONTRACTING DMCC
950 1520 PL10*120 M 16 BOLTS - 60 mm LG
SECTION Ag1 - Ag1
VENDOR:
SECTION Ac - Ac
FABTECH International Ltd.

SECTION Af - Af SECTION Ag - Ag SECTION Ac1 - Ac1 SECTION Ah - Ah P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 42OF91 0

A0
DATE

EL.+2.875 Am1 LS-PS1113


EL.+2.875 IPE160 Al1 496 LS-PS1113
(T.O.S) (T.O.S) 569 L75*8
EL.+3.374 300 8 EL.+3.374 L75*8 300 853
32 8 L75*8
BY

23
(T.O.S) EL.+3.374 (T.O.S) 172 128

23
LS-PS1063 128 172 EL.+3.374
(T.O.S) EL.+2.875 LS-PS1115
L75*8

23
LS-PS1113 (T.O.S)
DISCIPLINE

(T.O.S) UNP160

23
L75*8

L75*8
L75*8
5 5 EL.+2.399

499
391
L50*8

476
434

EL.+2.332 (T.O.S) L75*8 LS-PS1113 EL.+2.875


EL.+2.875 5

499
(T.O.S) L75*8
(T.O.S)

499
38
DATE

5 (T.O.S) EL.+2.875 33 EL.+2.875


HEA100
(T.O.S) TYP (T.O.S) TYP
LS-PS1037 5 IPE160 5 5
260 L50*8 428 HEB180 IPE160 TYP
HEA100
BY

HEB180 5
Al1 HEA100
SECTION Ak - Ak IPE160
SECTION Aj - Aj
DISCIPLINE

Am1 SECTION Ar - Ar
SECTION Al1 - Al1 SECTION Am1 - Am1
SECTION Al - Al
807 684 SECTION Am - Am
DATE

195 275
500 572 EL.+2.875 EL.+2.875
EL.+3.025 Aq1 HEB180
LS-PS1118 EL.+5.305 300 (T.O.S)
(T.O.S) LS-PS1113 (T.O.S)
L50*6 238 262
BY

21
(T.O.S) Aq2 L75*8 Aq2 128 172 L75*8
EL.+3.374

33
L75*8 (T.O.S) 43
DISCIPLINE

EL.+2.875

23
L50*6
(T.O.S) UNP160 TYP 10

266
5 UNP100 Aq1
L75*8 5

L50*8
UNP100 TYP EL.+2.592

434
5 EL.+2.332

499
DATE

(T.O.S) 5

L75*8
(T.O.S)
SECTION Aq1 - Aq1

178
UNP100 EL.+2.875
679 (T.O.S) LS-PS1037
L50*8
BY

SECTION An - An LS-PS1034 260


L75*8
DISCIPLINE

HEB180 SECTION Au - Au
302 455
EL.+3.684 SECTION As - As SECTION At - At
(T.O.S) LS-PS1109
DATE

L75*8 UNP100 HEB160 364


EL.+4.053

2430
(T.O.S)
L75*8 EL.+2.875 39 L75*8
BY

EL.+2.875

12

2131
TYP HEB180 (T.O.S) HEB180 (T.O.S)
5
DISCIPLINE

LS-PS1119 SECTION Aq2 - Aq2 5 LS-PS1071

566
L75*8 L75*8
EL.+2.508
(T.O.S)
DATE

237
L75*8

1178
L50*6
809

LS-PS1147 330 5

L50*6
BY

EL.+2.504

241
807 684 L50*6
10 (T.O.S)
DISCIPLINE

SECTION Av - Av

612
195 275 EL.+2.875 TYP
EL.+3.025 5
(T.O.S) LS-PS1010 EL.+2.875 TYP
(T.O.S) L50*6 (T.O.S) 5
21

44 L50*6 333
HEB180 HEB180
5 TYP EL.+2.875 SECTION Aw - Aw
150

LS-PS1117 HEB180
L50*6

TYP UNP160 (T.O.S) SECTION Aq - Aq


HEB180 5
SECTION Ax - Ax
293 113 800
EL.+2.875
HEB180 (T.O.S) 600 200
EL.+4.859
(T.O.S) HEB160
5
5 L75*8 EL.+2.541

154
HEB180 TYP
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION Ap - Ap 5
276 EL.+3.988

404
L75*8
Az1 (T.O.S) EL.+2.291

75
364 250 L75*8
EL.+4.375 LS-PS1022 (T.O.S)
(T.O.S) L75*8
Ay1 L75*8 Ay1 L75*8

11

11

86
LS-PS1145 279
L75*8 1000 L60*6
LS-PS1172
L75*8 HEB160
SECTION Ba - Ba
1113

1113

299
LS-PS1072 364

1984
L75*8
L75*8 L75*8 EL.+2.875
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

L75*8
LS-PS1072 (T.O.S) HEB180 LS-PS1172
L75*8 HEB160
EL.+2.875
199
1500

5 LS-PS1146 38 EL.+2.875 HEB180


IPE160 (T.O.S)
L75*8 (T.O.S) Bb1
L75*8 LS-PS1145 SECTION Bb1 - Bb1
375 L75*8 TYP 69
5

404
EL.+2.291 L75*8 CLIENT:

SECTION Ay1 - Ay1 Az1 IPE160 LS-PS1146 (T.O.S)


IPE160 TYP IPE160 L75*8
5 PetroChina International Iraq FZE Iraq Branch
5 EL.+2.875 L60*6
SECTION Az1 - Az1 5
723 227 (T.O.S) IPE160
CONTRACTOR:

EL.+2.875

11

11

86
(T.O.S) 950
1000 HEB180
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

SECTION Az - Az
HEB180 PEG ENGINEERING & CONTRACTING DMCC
SECTION Bc - Bc Bb1 VENDOR: FABTECH International Ltd.
SECTION Ay - Ay SECTION Bb - Bb P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 43OF91 0

A0
DATE

319 327 520


490 EL.+2.875 618
EL.+3.186 320 201
510 5 (T.O.S)
LS-PS1052 44 (T.O.S)

58
245 245 L75*8 96 223
BY

EL.+4.572 L75*8 EL.+5.254


485
EL.+3.103 (T.O.S) (T.O.S) Bj1
262 223
DISCIPLINE

(T.O.S) 332
LS-PS1140 5

311
LS-PS1086 EL.+2.875 HEB160
140 L60*6 HEB180 L75*8 Bh2

34
UNP100 Bh1 (T.O.S) Bh1
30 45 30 SECTION Bf - Bf L60*6
HEA160 Bj1 HEB160
DATE

35
229

LS-PS1086 TYP L60*6


EL.+2.874 HEB180 UNP100 6 LS-PS1142
UNP100 Bd1 EL.+3.829 L75*8 SECTION Bj1 - Bj1

30
(T.O.S) Bh2 HEB180
UNP100 (T.O.S)
BY

70 25
70 55
SECTION Bh - Bh

120
DISCIPLINE

130
LS-PS1142 30 35 30

1697
25
L75*8
PL10*120 35
4 - Ø 18 HOLES FOR HEB180
HEB180
DATE

30
M 16 BOLTS - 60 mm LG LS-PS1141 617
969
L60*6

954
SECTION Bd1 - Bd1 LS-PS1138

30
Bd1

60

2379
HEA160 L75*8
BY

SECTION Bd - Bd LS-PS1052

30
770 L75*8
EL.+2.875
DISCIPLINE

19
(T.O.S)

304
660 110 HEB180 2 - Ø 18 HOLES FOR
EL.+5.592 EL.+2.875 TYP LS-PS1142 PL10*60
6 L75*8 M 16 BOLTS - 60 mm LG
HEB160 (T.O.S) (T.O.S) 44 HEB180
EL.+2.875 650
EL.+4.405 SECTION Bh2 - Bh2 LS-PS1158
DATE

(T.O.S) IPE160 HEB180


(T.O.S) HEB160
20

HEB180 SECTION Bh1 - Bh1 60


EL.+2.607
BY

HEB180 SECTION Bg - Bg 12 30 5
(T.O.S) 2 - Ø 18 HOLES FOR
HEB100 30 M 16 BOLTS - 60 mm LG 25
168
DISCIPLINE

SECTION Be - Be 22
L60*6 EL.+2.875 PL10*60
LS-PS1144 264 378 58 EL.+2.875 6
260 HEB160 (T.O.S)
L60*6 324 5 EL.+2.875 (T.O.S)

30
EL.+3.145 HEB160 (T.O.S)
L75*8 152 108 IPE160 HEB160
DATE

(T.O.S) HEB180
SECTION Bk - Bk

77

27

65 55
LS-PS1209

23

180
L75*8
1550
1530

EL.+2.875 Bs1 L50*6 Bs1 LS-PS1187


BY

L50*6 SECTION Bj - Bj

270
(T.O.S) LS-PS1192 IPE160 EL.+2.389 LS-PS1187 354
5

30
326
UNP100 L50*6 HEB160
DISCIPLINE

EL.+2.875 (T.O.S)

436
21 LS-PS1175 TYP
(T.O.S) UNP100 5 SECTION Bs - Bs
HEB100
UNP100 SECTION Bs1 - Bs1
LS-PS1149

2717
HEB180 L50*6 HEB160

10
110
DATE

EL.+2.508 EL.+2.875 SECTION Bq - Bq EL.+2.875 300


Bl1 Bl1 (T.O.S) 5 50 378 50
(T.O.S) HEB180
237

(T.O.S) HEB180 EL.+3.374 128 172


478
BY

439 (T.O.S)
L50*6 EL.+3.178 854

23
330 44
DISCIPLINE

(T.O.S) SECTION Br - Br EL.+2.875 LS-PS1115


LS-PS1181 L75*8 (T.O.S) UNP160
SECTION Bl - Bl HEB160 L75*8
SECTION Bm - Bm 5 EL.+2.875 LS-PS1113
5

499
EL.+2.875 (T.O.S) L75*8
HEB160

303
EL.+2.875 LS-PS1221 (T.O.S) EL.+2.875
21 L75*8 LS-PS1150 5 HEB180
160 HEB180 (T.O.S)
(T.O.S) L50*6 5

821
LS-PS1149 30 50 30 EL.+2.550
HEB180 SECTION Bw - Bw
L50*6 (T.O.S)

165
50 HEB180 HEB180 L75*8 EL.+1.924
5
EL.+2.875 5 (T.O.S)
L50*6
70
35

10

HEB180 5 (T.O.S) SECTION Bt - Bt


LS-PS1212 SECTION Bx - Bx
237

L75*8
2 - Ø 18 HOLES FOR 530
35

M 16 BOLTS - 60 mm LG L50*6 280


PL10*70 LS-PS1151
L50*6 305 SECTION Bv - Bv
HEB180 HEB180 SECTION Bu - Bu EL.+2.875
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SECTION Bl1 - Bl1


SECTION Bp - Bp (T.O.S)
IPE160
SECTION Bn - Bn
469
548 963

UNP100
409 61 EL.+3.733 TYP
479 (T.O.S) EL.+2.875 5
IPE160

434
140 (T.O.S) EL.+2.281
44 Bz1 HEB100
130 LS-PS1110 11 (T.O.S)
L75*8 LS-PS1007 HEB180 30 30 30 UNP160
L75*8 30 35 30 UNP100 50
400 EL.+2.875 11

30 55 30
(T.O.S) 35 HEB160 LS-PS1032
5

2
LS-PS1228 157 HEB180 TYP
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

28

UNP100

35
LS-PS1210 UNP100 5 612
858

L75*8 LS-PS1030
730 EL.+2.331
30

UNP100
269

120
60

5 LS-PS1007 (T.O.S) SECTION Cc - Cc


EL.+2.875 L75*8 24 Ca1 4 - Ø 18 HOLES FOR
LS-PS1093
30

(T.O.S) HEB160 EL.+2.875 PL12*120 M 16 BOLTS - 60 mm LG


L75*8
Bz1 (T.O.S) 5 UNP100
PL10*60 2 - Ø 18 HOLES FOR SECTION Ca1 - Ca1
28

M 16 BOLTS - 60 mm LG 61 551
SECTION Bz - Bz CLIENT:

SECTION Bz1 - Bz1 612


5 PetroChina International Iraq FZE Iraq Branch
5 HEB180 Ca1 LS-PS1110 SECTION Cb - Cb
HEB160 UNP160
CONTRACTOR:

SECTION By - By SECTION Ca - Ca CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 44OF91 0

A0
489
DATE

140 EL.+3.707 170


(T.O.S) 473 350 180
1207 HEB180 30 50 30 900 30 32 30 LS-PS1168
EL.+2.875 EL.+2.875 EL.+3.245
78 LS-PS1191 L75*8
BY

EL.+2.875 30 PL12*120 LS-PS1191 (T.O.S) HEB160 LS-PS1111 IPE160 (T.O.S)


(T.O.S)

30 60 30
LS-PS1229 UNP100 UNP100 UNP100
(T.O.S) Cd1 UNP160 LS-PS1092 Cf1

25 50 30
30

55
DISCIPLINE

30
L75*10

25

30
L75*8

370
120
EL.+2.875 600 180

50

100
832
LS-PS1229 (T.O.S)

HEB360
4 - Ø 21 HOLES FOR UNP160 Cf1 4 - Ø 18 HOLES FOR
DATE

HEB180 Cd1 SECTION Cd - Cd M 19 BOLTS - 60 mm LG HEB160 PL10*100 M 16 BOLTS - 60 mm LG 5 5


44 SECTION Cf - Cf
SECTION Cd1 - Cd1 EL.+2.875 SECTION Cf1 - Cf1 SECTION Cg - Cg
(T.O.S) LS-PS1096
BY

L75*8 TYP
5
640
DISCIPLINE

HEB180
199 441
EL.+2.875 EL.+4.349 SECTION Ch - Ch
SECTION Ce - Ce 423
(T.O.S) HEB160 (T.O.S)
150
DATE

EL.+3.691 80 343 HEB100


LS-PS1039 130 (T.O.S)
30 26 30 L75*8 EL.+2.875
LS-PS1035 65 2 - Ø 18 HOLES FOR 12 50 30 UNP160
L75*8 629 HEB260 (T.O.S)
BY

Cj1 Cj1 PL10*100 M 16 BOLTS - 60 mm LG EL.+2.875 38 PL10*100 IPE160

499
LS-PS1035 (T.O.S) Ck1 366
HEB160 EL.+3.850

50 37 33
EL.+2.330

45
DISCIPLINE

50
L75*8

460

L75*8
(T.O.S) (T.O.S)

13
38 LS-PS1041
12
100

100
LS-PS1039 5

384

L50*6
UNP160

434
20 HEB160 HEB160 Ck1 L75*8 HEB160 L75*10 EL.+2.332
DATE

466

1474
2 - Ø 18 HOLES FOR (T.O.S)
M 16 BOLTS - 60 mm LG EL.+2.875
SECTION Cj1 - Cj1 SECTION Ck - Ck 5
SECTION Cj - Cj SECTION Ck1 - Ck1 (T.O.S) LS-PS1082 LS-PS1033

50
BY

HEB100 L50*6

975
260
DISCIPLINE

HEB160
SECTION Cn - Cn

SECTION Cl - Cl 5 EL.+2.875
DATE

(T.O.S)
BY

SECTION Cm - Cm
DISCIPLINE

EL.+2.875
HEB180
(T.O.S)
375 LS-PS1188
LS-PS1171
DATE

EL.+2.875 EL.+2.875 L75*8


L75*8 HEB160
HEB180 (T.O.S) 43 EL.+2.875 (T.O.S)
5 HEB160 (T.O.S)
BY

EL.+2.592 LS-PS1034
29

(T.O.S) L75*8
DISCIPLINE

178
L75*8
5 5
EL.+2.388

402
LS-PS1031 EL.+2.387

403
(T.O.S) L75*8
UNP100 (T.O.S)
6
455
SECTION Cp - Cp L75*8 335
335
SECTION Cq - Cq SECTION Cs - Cs
SECTION Cr - Cr
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 45OF91 0

A0
DATE
BY
DISCIPLINE

A4 A1 A2 A3
DATE

730 776 2774 3850 3850 1250 443


EL.+8.600
(T.O.S) LS-PS1036
BY

400

130
LS-PS1226 L75*8
UNP100

12
DISCIPLINE

188
LS-PS1055 5
PL12*180 L75*8

1337
5

1270
DATE

LS-PS1046 32 5
32 LS-PS1044

196
HEB160 UNP160 1401-LS-A-1015 1401-LS-A-1015
LS-PS1012 HEB360 HEB360

326
BY

L75*8
SECTION A - A
E E SECTION B - B
DISCIPLINE

LS-PS1023
UNP160 LS-PS1025

1040
429

1082
LS-PS1089 UNP160

1200
HEB160
1000

1432
DATE

G G 348
LS-PS1234
UNP160 D1 945

43
EL.+5.700 412 LS-PS1107
BY

LS-PS1240 10

300

89
100

106
(T.O.S) D LS-PS1236 L50*6

405
80
HEB160 44 UNP160 139
DISCIPLINE

269

269
C C TYP

34
D 4 -Ø 21 HOLES 5 PL10*135

164
164
LS-PS1235
LS-PS1089 UNP100 LS-PS1233 LS-PS1237

300
HEB160 LS-PS1045 24 145 1401-LS-A-1023 LS-PS1079
HEB160L50*6 L60*6
DATE

LS-PS1107 LS-PS1001 LS-PS1079 UNP160 HEB360 1401-LS-A-1023 UNP160


L50*6 D1
L50*6 UNP160 HEB200
348 139
LS-PS1089 LS-PS1001 SECTION D - D
BY

3125
HEB160 2305 L50*6
SECTION C - C
DISCIPLINE

B B
443 35 45
PL10*135 4 - Ø 18 HOLES FOR 1401-LS-A-1023
M 16 BOLTS - 60 mm LG 429
HEB360
DATE

LS-PS1036

60 59
L75*8

142
34
EL.+2.875
(T.O.S)
BY

PLT6*130 PLT6*130
LS-PS1012
DISCIPLINE

LS-PS1230 5 L75*8
544

547
406 5
HEB100 5 UNP160
F F SECTION E - E
LS-PS1226
UNP100 SECTION D1 - D1
634

LS-PS1080 400 LS-PS1232


UNP160 L60*6
A A

2300
1401-LS-A-1015 1000
406 HEB360
373

32
LS-PS1042 LS-PS1025
UNP100 UNP160

212
22

148
LS-PS1043
425

EL.+0.550 UNP100
(B.O.BP)
LS-PS1232
349

349

L60*6 5
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

25
1401-LS-A-1023
22 5 HEB360
SECTION F - F SECTION G - G

ELEVATION ALONG GRID LINE "AA"


PIPE SUPPORTS
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 46OF91 0

A0
DATE
BY

A4 A1 A2 A3
DISCIPLINE

730 3550 3850 3850 578


1250
EL.+8.600 1506 EL.+6.283 528 51
(T.O.S) (T.O.S) LS-PS1051
L75*10
DATE

23
BY

LS-PS1219 5
5
DISCIPLINE

UNP100
LS-PS1106 1663
1314 B HEB100 EL.+7.330
LS-PS-p1013

243
LS-PS1051 D (T.O.S)
322 278 L75*8
EL.+6.987 L75*10
DATE

(T.O.S)

2770

243
D TYP

23
924 5
BY

LS-PS1104 38
L75*8 22 EL.+5.700
LS-PS1219 A L75*8 (T.O.S)
DISCIPLINE

UNP100 93
LS-PS1104

1286
L75*8

290
EL.+5.700 15

583
(T.O.S) TYP 1401-LS-A-1020
DATE

300
5 C LS-PS1026 HEB200
UNP160

924
LS-PS-p1290 EL.+5.076
BY

A B SECTION A - A
(T.O.S)

196
C E E
DISCIPLINE

1450

LS-PS1218 1398
L75*8 LS-PS1103
961 UNP100 EL.+5.700
(T.O.S)
DATE

1401-LS-A-1020
1401-LS-A-1020 HEB200
HEB200 32 5
BY

1005
LS-PS1168 EL.+5.700
DISCIPLINE

L75*8
EL.+5.380 (T.O.S)
(T.O.S) L75*8 5

196
LS-PS1096
L75*8 22

370
DATE

LS-PS1218
552 L75*8
38
BY

SECTION B - B
SECTION C - C
DISCIPLINE

888

EL.+7.330 LS-PS1106 1401-LS-A-1020


HEB100 HEB260
(T.O.S)
EL.+0.550
(B.O.BP)

5
5

SECTION D - D
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

ELEVATION ALONG GRID LINE "AB"


PIPE SUPPORTS

961

LS-PS1103
UNP100
75
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1401-LS-A-1020
HEB360

CLIENT:

SECTION E - E PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 47OF91 0

A0
DATE

A4 A1 A2 A3
730 3550 3850 3850 2322 173
BY

E
411
DISCIPLINE

LS-PS1161

902
DATE

EL.+8.600 UNP200
(T.O.S)
BY

TYP
5
DISCIPLINE

LS-PS1028
L75*8 E
LS-PS1038

1774
UNP160
DATE

479
LS-PS1210 L75*8
22 EL.+6.980 22 L75*8
1500 LS-PS1165 (T.O.S) 22
BY

UNP100

23
DISCIPLINE

530 86 884 PL12*160 LS-PS1209

154
EL.+6.378

160
L75*8

431
(T.O.S) LS-PS1165 LS-PS1166

270
269
B B UNP100 UNP100 548

61

44
EL.+2.875 EL.+2.875
5

378
DATE

5
(T.O.S) (T.O.S)
L60*6
1014

EL.+5.381 LS-PS1091 L60*6 1401-LS-A-1027


5725

UNP160 PL12*160 HEB160


BY

(T.O.S) 44

779
A A LS-PS1093 5
L75*8
DISCIPLINE

LS-PS1090 1401-LS-A-1027
UNP160 760 HEB160 SECTION D - D
SECTION C - C
DATE
BY

EL.+9.502
L75*8
DISCIPLINE

(T.O.S)
656 2137
D
C LS-PS1210 LS-PS1209 152 108
DATE

EL.+2.875 L75*8 L75*8

23
(T.O.S) UNP100 UNP100 TYP

270
269
5
BY

UNP100 UNP100

80

80
DISCIPLINE

781 LS-PS1028
LS-PS1093 D L75*8
C
L75*8

902
2325

L75*8
L75*10 L75*8

EL.+0.550
(B.O.BP) 194
1401-SK2-A-1001
HEB260 5
EL.+8.600
(T.O.S)
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

ELEVATION ALONG WITH GRID LINE "AC" 1401-LS-A-1033


1401-LS-A-1033
PIPE SUPPORTS PL8*28
IPE160

1500

1401-LS-A-1046 PL12*160 SECTION E - E


HEB260 B1 45 45 4 - Ø 21 HOLES FOR
LS-PS1091 PL12*160
M 19 BOLTS - 60 mm LG
45 45 LS-PS1090 UNP160
UNP160

145
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

50
4 - Ø 21 HOLES FOR

83
PL12*160
760 M 19 BOLTS - 60 mm LG
PL12*160
1401-LS-A-1046 A1
168
50

225
HEB260
83

5
292

LS-PS1090 LS-PS1091
UNP160
98

B1 UNP160
225

50
CLIENT:

L60*6
1401-LS-A-1046 PetroChina International Iraq FZE Iraq Branch
HEB260 1401-LS-A-1046
15 65 HEB260
L60*6
CONTRACTOR:
50

5 530 86 884 SECTION B1 - B1 CC


CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

A1 48 112
SECTION B - B PEG ENGINEERING & CONTRACTING DMCC
SECTION A - A
SECTION A1 - A1 VENDOR: FABTECH International Ltd.
P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 48OF91 0

A0
DATE
BY

378 58
EL.+2.875 1401-LS-A-1026
DISCIPLINE

(T.O.S) IPE160

A1 A2 A3
DATE

EL.+8.600 3850 3850 1250


(T.O.S) 1401-LS-A-1009
HEB260
720
BY

TYP
5
DISCIPLINE

596
LS-PS1083

162
376
UNP160

436
5
32
DATE

4 -Ø 18 HOLES
EL.+6.980 201 1700 E
LS-PS1201
575

(T.O.S) 38
L60*6 LS-PS1083
BY

SECTION B - B

104

104

60
D
PL10*130

10
DISCIPLINE

104
746 LS-PS1027 LS-PS1169 LS-PS1168
LS-PS1087 L75*8
L75*8 L75*8 L75*8 SECTION A - A
231 515 D
E
EL.+6.000
DATE

(T.O.S) C C 746 1401-LS-A-1009


L75*8 HEB180
1401-LS-A-1009 LS-PS1087
518

LS-PS1087

591
BY

PL10*85
619

HEB260
L75*8 LS-PS1027
75

104
B B HEB160 5 L75*8
5
DISCIPLINE

111
10
LS-PS1083 LS-PS1196
UNP160 720 38 LS-PS1094
HEB120
UNP160
405
DATE

LS-PS1196 5 2 -Ø 18 HOLES
HEB120
SECTION D - D
SECTION C - C
BY

HEB160 1401-LS-A-1026
DISCIPLINE

1401-LS-A-1009 EL.+2.875
HEB180 HEB160
(T.O.S)
1013 925

104
DATE

F A 5 21
EL.+2.875 LS-PS1171 PLT6*130 629
(T.O.S) L75*8 PLT6*130 G G

45
BY

LS-PS1169
488

L75*8
596
DISCIPLINE

LS-PS1039

563
5 L75*8
1401-LS-A-1009 430 LS-PS1171
L75*8
75

LS-PS1192 HEB180
335 UNP100 SECTION E - E
F A
G1
629 L75*8
LS-PS1039 SECTION F - F
L75*8
EL.+0.550
LS-PS1039 1401-LS-A-1026

31
(B.O.BP) L75*8 HEB160
31
PL10*100 2 - Ø 18 HOLES FOR
M 16 BOLTS - 60 mm LG
G1
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

83
50 50
45
13
1401-LS-A-1026
ELEVATION ALONG GRIDLINE "AD" 1401-LS-A-1026 HEB260
PIPE SUPPORTS HEB260 69 50

SECTION G - G SECTION G1 - G1
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 49OF91 0

A0
DATE
BY

AD AC AB AA
DISCIPLINE

1530 5100 1260 5100


LS-PS-p-1001
EL.+8.600
(T.O.S) LS-PS-p-1002
35 35
DATE

1401-LS-A-1026 A1 400 LS-PS1007 2 - Ø 18 HOLES FOR


630 966 3000 503 HEB160 L75*8 M 16 BOLTS - 60 mm LG
10
BY

30
167 167

1337

58
28
1468
DISCIPLINE

430 1080 LS-PS1007


B LS-PS1012
C C LS-PS-p-1006 L75*8

30
LS-PS-p1271 L75*8
38 LS-PS1046 5
LS-PS1201 F HEB160 F A1
L60*6 860
EL.+6.980 1401-LS-A-1026

474
DATE

575
D D EL.+6.826 HEB160
(T.O.S) LS-PS1165 SECTION A - A

131
E UNP100 (T.O.S) E SECTION A1 - A1
LS-PS1198 997 EL.+7.454

1082
BY

13

13
TYP UNP100 (T.O.S)
5 LS-PS1002 917 80 1401-LS-A-1009
B D D EL.+6.182 UNP100 HEB260
UNP100 TYP
DISCIPLINE

EL.+6.000 5 HEB160 (T.O.S) LS-PS1201


19 LS-PS1084

395
(T.O.S) L60*6

474
175
UNP100 642 HEB160 EL.+5.812 LS-PS1198 5

32
370
UNP100
G (T.O.S) G EL.+6.980

80
LS-PS1091 15
DATE

UNP160 (T.O.S)
619

619
LS-PS1087 LS-PS1234 LS-PS1089

395
5

381
L75*8 UNP160 H H HEB160 1401-LS-A-1047

565
HEB160 300
BY

LS-PS-p1119 LS-PS1090 480 HEB160


LS-PS1001 SECTION C - C
LS-PS1083 UNP160 SECTION B - B
L50*6
DISCIPLINE

UNP160 32 32 91 860
4 -Ø 21 HOLES 714
LS-PS1107 980 EL.+6.980
L50*6 1401-LS-A-1047 1401-LS-A-1047
(T.O.S) HEB160 HEB160

2937
LS-PS1036
DATE

LS-PS1113 1401-LS-A-1046

147
L75*8 L75*8 HEB260
300
TYP
BY

128 172 5 LS-PS1084


5 UNP100

22
EL.+3.374 LS-PS1165
DISCIPLINE

A P 5
8 (T.O.S) 794 UNP100
LS-PS1034
348 LS-PS1007 SECTION E - E

837
L75*8

23
LS-PS-p1277 L75*8 SECTION D - D
EL.+2.875 L75*8

499
LS-PS-p1041
(T.O.S) J N UNP160 N
DATE

1080
1401-LS-A-1023
F1 LS-PS1046

544
J P HEB360 ROD20
678 HEB160
BY

2 -Ø 18 HOLES K K 5 CTR'D
A
DISCIPLINE

LS-PS1230 765 485 853

11
HEB100 710
LS-PS1080 168

2325

429
292 450 158
UNP160 LS-PS1226 5
HEB260

915 UNP100 F1
L L
142

425
M M
EL.+0.550 SECTION F - F

349
(B.O.BP)
50 50
LS-PS1043 1401-LS-A-1015
UNP100 510 HEB360

10
LS-PS1043 330
UNP100 PL10*180

70 55
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

22
ELEVATION ALONG GRID LINE "A1"

LS-PS1107 SECTION M - M LS-PS1046


642 1411 L50*6 1401-LS-A-1015 423 HEB160 11
HEB180 4 - Ø 18 HOLES FOR
1401-LS-A-1023 1401-LS-A-1015 M 16 BOLTS - 60 mm LG
G1 LS-PS1089 HEB360 LS-PS1034 HEB360
HEB160 H1 43 LS-PS1230 5
91 L75*8 HEB100 1401-LS-A-1015
PL12*180
283

5 735 SECTION F1 - F1
348

HEB360
178

TYP
5
139

LS-PS1234 1401-LS-A-1023 455

33
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

UNP160 HEB360 530


G1 LS-PS1089
LS-PS1001 H1 HEB160
L50*6 SECTION J - J SECTION K - K LS-PS1080
SECTION G - G UNP160
300 860
SECTION L - L
50 50 SECTION H - H
50 50 L75*8 EL.+3.374
4 - Ø 21 HOLES FOR LS-PS1089 (T.O.S)
M 19 BOLTS - 60 mm LG 2 HEB160
1401-LS-A-1015 CLIENT:
23

HEB180 LS-PS1115
UNP160 LS-PS1113 PetroChina International Iraq FZE Iraq Branch
70 55
10

L75*8
499
70

CONTRACTOR:

4 - Ø 21 HOLES FOR EL.+2.875


203
TYP

70

M 19 BOLTS - 60 mm LG (T.O.S) CC
LS-PS1089
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

10
70

HEB160
TYP PL12*180 PEG ENGINEERING & CONTRACTING DMCC

1401-LS-A-1023
HEB360 VENDOR: FABTECH International Ltd.

SECTION G1 - G1 SECTION H1 - H1 SECTION N - N P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI


UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
SECTION P - P FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 50OF91 0

A0
DATE

4 - Ø 21 HOLES FOR
M 19 BOLTS - 60 mm LG
BY

AD AC AB AA A1 1401-LS-A-1009 1401-LS-A-1009
610 35 60 35 HEB260 HEB180
DISCIPLINE

842 6361 5707


1401-LS-A-1009 60
P LS-PS1114 HEB260 5
128 172

10

50
128 172 L75*8 LS-PS1027

201
L75*8
DATE

224

224

80
EL.+8.600 5

23

24
(T.O.S) 5 LS-PS1095

23

10

50
UNP160
405
BY

41 24
A1
P
DISCIPLINE

LS-PS1122 SECTION A1 - A1 SECTION B - B

1074
L75*8 SECTION A - A
945 EL.+7.526 1401-LS-A-1020
E E (T.O.S) HEB360 1401-LS-A-1017
DATE

665 HEB260
665 311
405

112
EL.+7.087 860
(T.O.S) C C LS-PS1023 5

14
UNP160
BY

B B D D 5

1526
DISCIPLINE

22
LS-PS1104 LS-PS1009
LS-PS1027 LS-PS1104 L75*8

25
1087
LS-PS1165 L75*8 1413 215 L75*8 LS-PS1165
L75*8

876
860

826
UNP100 UNP100
EL.+6.000 357 60 5
SECTION D - D
DATE

(T.O.S)
EL.+5.595 SECTION C - C
1695 35 60 35
LS-PS1081 N N (T.O.S) 4 - Ø 21 HOLES FOR

333
74 1621 60 1401-LS-A-1023

569
EL.+5.409

80
HEB160 M 19 BOLTS - 60 mm LG
BY

1401-LS-A-1023 HEB360
(T.O.S) M M HEB360 1401-LS-A-1023
80

F F HEB360
DISCIPLINE

LS-PS1023 530

50
E1 5
410

LS-PS1233 530 UNP160

796
A A

10
L50*6 5

80
LS-PS1240

133
HEB160

10

50
DATE

32

32
610 LS-PS1095

261
UNP160 J
1621

E1 32 33 LS-PS1233
945
L50*6
BY

1377 SECTION E - E SECTION E1 - E1 SECTION F - F


384 104 228 962
DISCIPLINE

80 LS-PS1228
960 UNP100 1401-LS-A-1015 806 157
EL.+2.875 HEB180
LS-PS1212 LS-PS1110 (T.O.S)
DATE

L75*8 G UNP160
EL.+2.875 H
HEB100 LS-PS1031
(T.O.S) K UNP100 5
5 TYP

400
5
BY

545
13
K LS-PS1212 LS-PS1030 TYP
J 5
DISCIPLINE

L75*8 UNP100

103
240
530 L75*8

106
G SECTION G - G
32
LS-PS1232
L60*6 362 H LS-PS1030
551 61
UNP100 612
LS-PS1042
UNP100 SECTION H - H
460
EL.+0.900 469
(T.O.S) L L
61 409
EL.+0.550
EL.+3.733

349
BOP
(T.O.S)
4 - Ø 18 HOLES FOR 30 30 30
M 16 BOLTS - 60 mm LG 50
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

55 65
30
LS-PS1228
UNP100

858
1401-LS-A-1015
1447 HEB180
1401-LS-A-1015
HEB180
1183 265 LS-PS1110 PL12*120
J1 EL.+2.875 UNP160
1565 N1 LS-PS1240 LS-PS1110
1401-LS-A-1009 UNP100 UNP160 (T.O.S)

28
HEB160
LS-PS1081
ELEVATION ALONG GRIDLINE "A2" HEB260
460 SECTION J1 - J1

28
HEB160 HEB160 M1
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

1401-LS-A-1015 375

22
HEB180 10 24

N1 J1
LS-PS1042 730
22
29

UNP100 M1 SECTION N - N
SECTION M - M 40 50 40
LS-PS1031 SECTION J - J
UNP100 1401-LS-A-1015 50 4 - Ø 21 HOLES FOR L75*8
5 HEB360 5 PL12*180 40 50 40 LS-PS1081 M 19 BOLTS - 60 mm LG

23
SECTION K - K 50 HEB160 CLIENT:
SECTION L - L LS-PS1122
10

55

L75*8 EL.+8.600

224
10

55

PetroChina International Iraq FZE Iraq Branch


(T.O.S)
70

10 PL12*180
70

CONTRACTOR:
55

4 - Ø 21 HOLES FOR 1401-LS-A-1023 122


55

CC
M 19 BOLTS - 60 mm LG 1401-LS-A-1009 HEB360 10 LS-PS1240
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

HEB260 HEB160
SECTION M1 - M1 SECTION N1 - N1 SECTION P - P PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 51OF91 0

A0
B1
DATE

1107
35 60 35
LS-PS1094 60
629 UNP160
BY

1450 5100 1260 5100

10

50
LS-PS1128 LS-PS1039
DISCIPLINE

38
L75*8

80
654 L60*5

258
AB LS-PS1127

45
AD AC 550 AA 1401-LS-A-1009

10

50
E L75*8 HEB260 B1
376 4 - Ø 21 HOLES FOR 38 27
DATE

TYP 5 200 M 19 BOLTS - 60 mm LG


1472 5
SECTION A - A

224
EL.+8.600 SECTION B - B SECTION B1 - B1

451
BY

(T.O.S) D 1401-LS-A-1036
EL.+8.600
(T.O.S) HEB160
DISCIPLINE

480
E

1074
1026

D1 D1

1513
5
DATE

EL.+7.526 580 945 EL.+7.526


LS-PS1104 (T.O.S) L L (T.O.S)
L75*8

38
LS-PS1168 665 LS-PS1168
D EL.+7.087
BY

L75*8 LS-PS1055 LS-PS1044 L75*8


LS-PS1185 (T.O.S) F F L75*8
480 UNP160 1401-LS-A-1009
L75*8

1026
DISCIPLINE

HEB260

267
C C G G LS-PS1026 LS-PS1185
UNP160 L75*8
SECTION C - C
LS-PS1166 930 LS-PS1025 32 1379
UNP100 EL.+6.290
845 UNP160

876
1929

820
H H (T.O.S)
DATE

LS-PS1236 EL.+6.042 LS-PS1128


EL.+6.000 UNP160 (T.O.S)
169 615 1145 M M L60*5 LS-PS1127

290
(T.O.S)

43
L75*8
200 200
BY

EL.+5.595 TYP

405
5

569
(T.O.S)

591
EL.+5.399 1237 SECTION D - D
EL.+5.409
DISCIPLINE

411

TYP

451
924
(T.O.S) 5 B B (T.O.S) N N
60

105 EL.+8.600 LS-PS1185

224
1401-LS-A-1036
LS-PS1045 (T.O.S) HEB160 50 50 L75*8
LS-PS1237 530
LS-PS1196 UNP160
661

LS-PS1094 L60*6
DATE

53
HEB120

50
577

1000 UNP160 LS-PS1103


UNP100 1364
143 156

22

50
BY

2 - Ø 18 HOLES FOR 13
M 16 BOLTS - 60 mm LG PL10*100
SECTION E - E
DISCIPLINE

SECTION D1 - D1
845
LS-PS1168 1401-LS-A-1020
L75*8 HEB360
DATE

161 530 5
J J
EL.+2.875 LS-PS1104

22
A
BY

LS-PS1166

370
(T.O.S) K 780 K L75*8
UNP100
DISCIPLINE

1401-LS-A-1017
45

HEB260

38
LS-PS1096
LS-PS1039 L75*8 5
L75*8 SECTION G - G
A 665

530 SECTION F - F

LS-PS1168
L75*8 930
LS-PS1026
UNP160

38
EL.+0.550
5
(B.O.BP)

93
1401-LS-A-1022 5
HEB360
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

1401-LS-A-1020
HEB360
SECTION J - J
SECTION H - H
780

LS-PS1096
L75*8
ELEVATION ALONG GRIDLINE "A3"

38
5
1401-LS-A-1023 1401-LS-A-1022
65 65
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

L1 HEB360 HEB360
38 37 LS-PS1055 1411 30 77 30
LS-PS1044 L75*8 LS-PS1236
LS-PS1055 UNP160 53 UNP160 SECTION K - K
L75*8 M1 530 1364
PL10*180
10

50

5 LS-PS1236 30 73 57 LS-PS1045
50
UNP160 N1 LS-PS1045 UNP160
80
32

UNP160
38

10

80

PL12*180

24
L1

10

50
50

44

CLIENT:
1401-LS-A-1023
10

50

145
580 945 4 - Ø 21 HOLES FOR HEB360

80
PetroChina International Iraq FZE Iraq Branch
4 - Ø 18 HOLES FOR 44 21 PL12*180
M 19 BOLTS - 60 mm LG M1 M 16 BOLTS - 60 mm LG 1401-LS-A-1023 LS-PS1237 1401-LS-A-1023
L60*6 HEB360

50
10
HEB360 CONTRACTOR:

SECTION M - M SECTION M1 - M1 N1 4 - Ø 21 HOLES FOR


SECTION L - L SECTION L1 - L1 41 24 1401-LS-A-1023
TYP M 19 BOLTS - 60 mm LG HEB360
CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

5
SECTION N1 - N1
SECTION N - N
PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 52OF91 0

A0
DATE
BY

AC.1 AC.2 AB.1 AB.2 AA.1 AA.2 371 LS-PS1076


L75*8
DISCIPLINE

LS-PS1113
L75*8
480 1500 2400 2900 1310 EL.+3.374
(T.O.S)

437
B
DATE

EL.+3.684

362
38

23
302 LS-PS1119
LS-PS1113 (T.O.S)
L75*8

11
L75*8

499
LS-PS1029
BY

485 807 L75*8 5 EL.+2.875

23

373
DISCIPLINE

(T.O.S)

448
809
195 275 EL.+3.025

499
EL.+2.875

150
(T.O.S)

21
(T.O.S) C 5 C 1401-LS-A-1016 378
DATE

HEB180 LS-PS1078
L75*8
SECTION A - A SECTION B - B
TYP TYP LS-PS1117
BY

5 5 L50*6
LS-PS1117
UNP160
DISCIPLINE

1490
LS-PS1076 B
L75*10 300
1490

LS-PS1076
LS-PS1078
LS-PS1078 5
DATE

27
L75*8 LS-PS1117
UNP160
A A

42
6
BY

LS-PS1011
L60*8
1401-LS-A-1016
DISCIPLINE

807 684
328 HEB180
954
889

SECTION C - C
SECTION D - D
DATE

EL.+0.550
BOP
BY

EL.+2.875 1401-LS-A-1015
(T.O.S) HEB180
DISCIPLINE

25 690
DATE

ELEVATION ALONG GRIDLINE A4


5 LS-PS1075
UNP100
BY

12
5
DISCIPLINE

311
LS-PS1074
L75*8 1401-LS-A-1015
HEB180

AC.1 AC.2 AB.1 AB.2 AA.1 AA.2 AA.3 SECTION F - F


SECTION E - E
480 1500 2400 2900 1310 1220
EL.+2.875 854
(T.O.S)
E
1263
EL.+2.550 LS-PS1176
235

(T.O.S) D 390 D HEB100

401
LS-PS1074
110
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

L75*8

3
LS-PS1011 E LS-PS1176
51 L60*8 HEB100
1353 SECTION G - G
LS-PS1040
L75*8 1202 LS-PS1176
HEB100
TYP EL.+1.280
5 (T.O.S)
G G LS-PS1075
50

EL.+1.099
UNP100
F F
488
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

690
680
364

EL.+0.550

549
1000
BOP

CLIENT:

PetroChina International Iraq FZE Iraq Branch


ELEVATION ALONG GRIDLINE A5
PIPE SUPPORTS CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 53OF91 0

A0
DATE
BY
DISCIPLINE

AC.1 AC.2 AB.1 AB.2 AA.1 AA.2 AA.3


1401-LS-A-1015
19 HEB180
A
DATE

1500 2400 2900 1310 1220


C LS-PS1141 19
BY

135 165 L60*6

954
LS-PS1141
DISCIPLINE

EL.+2.875

190
L60*6

21
(T.O.S)
B 5 5
DATE

311
LS-PS1024 LS-PS1064

954
401
A LS-PS1064 L50*6 144
L65*8
L65*8
C
BY

44 854
B
DISCIPLINE

SECTION B - B
DATE

LS-PS1024 EL.+3.065
L50*6
5 59 (T.O.S)
EL.+2.875
(T.O.S)
BY

21
690
EL.+0.950

190
DISCIPLINE

EL.+2.875
D D (T.O.S)
15 (T.O.S)
EL.+0.550

399
BOP
DATE

1401-LS-A-1016
LS-PS1065
BY

HEB180
UNP160
SECTION A - A
DISCIPLINE

SECTION C - C

ELEVATION ALONG GRIDLINE A6


DATE

690 304
PIPE SUPPORTS 1401-LS-A-1028
LS-PS1065 HEB180
5 UNP160 5
BY

14
AC.2 AB.1 AB.2 AA.1 AA.2 AA.3
DISCIPLINE

128
3900 4210 1220

1401-LS-A-1015 LS-PS1049
EL.+2.875 F HEB180 L75*10
(T.O.S) SECTION E - E
SECTION D - D
EL.+2.620
255

(T.O.S) EL.+2.500
450

E E (T.O.S)
TYP
5
161

LS-PS1050
L75*10 1401-LS-A-1014
LS-PS1049 HEB180 EL.+2.875
F L75*10 304
(T.O.S)
600 19
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

2325
HEB180

341
22
LS-PS1050
L75*10

11
EL.+0.550
BOP SECTION F - F
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

ELEVATION ALONG GRIDLINE A7 PetroChina International Iraq FZE Iraq Branch


PIPE SUPPORTS
CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 54OF91 0

A0
DATE

437 448
510
BY

HEB180 4 - Ø 18 HOLES FOR 30 45 30


A5 A4 A1 A2 TYP LS-PS1078 EL.+3.103 M 16 BOLTS - 60 mm LG
5 262 223 35
3800 3550 3850 LS-PS1076 L75*8
DISCIPLINE

(T.O.S)

122
L75*10
900 EL.+4.859 L75*8

70 55
EL.+2.874 B1
C

30
(T.O.S)

229
(T.O.S) 5
DATE

L75*8
371

371
1401-LS-A-1021
HEB180
LS-PS1172
HEB160 LS-PS1086 LS-PS1086 PL10*120
BY

UNP100 B1 1401-LS-A-1021 UNP100


LS-PS1029 5 HEB180
969

1685
L75*8
DISCIPLINE

SECTION B1 - B1
SECTION A - A SECTION B - B

LS-PS1086 279 364


TYP LS-PS1022 800 EL.+4.053
5 UNP100
DATE

L75*8 (T.O.S)
B 600 200 LS-PS1052
EL.+2.875 B L75*8
L

313
(T.O.S) K 327
126 250 224 76 124 EL.+3.186
BY

154

EL.+4.859 10 (T.O.S)

566
B C
DISCIPLINE

LS-PS1085 TYP C1
404

654 1500 (T.O.S)


489
B UNP100
229

311
LS-PS1076 EL.+2.875 5
LS-PS1145 L75*10 LS-PS1078 (T.O.S)
10
85

1178
L75*8 L75*8
DATE

362 373
K L EL.+1.504 EL.+1.439 C1

2325
A A (T.O.S) LS-PS1071
293 1000 (T.O.S) L75*8 (TYP) 1401-LS-A-1014 L75*8
BY

612
HEB180
LS-PS1029 44
DISCIPLINE

L75*8 SECTION D - D EL.+2.875 TYP


954

889
(T.O.S) 5
EL.+0.550

1685
(B.O.BP)
EL.+3.829
DATE

1401-LS-A-1016
LS-PS1172 (T.O.S) HEB180
HEB160
SECTION G - G
BY
DISCIPLINE

ELEVATION ALONG GRIDLINE "AC.1" 375


EL.+4.375
L60*6 (T.O.S) H1 H1
LS-PS1172

954
69
HEB160 PL10*76 LS-PS1141
L60*6
DATE

5
A7 A6 A5
EL.+2.875

299
3800 3800 19
EL.+2.875
BY

(T.O.S)
1830 1478 492 392 248 2378 369 413 6 3 SIDES (T.O.S) LS-PS1072
PL10*76 6 TYP L75*8
DISCIPLINE

EL.+5.254
332 (T.O.S) SECTION C1 - C1
1401-LS-A-1021

1500
HEB180
34

1401-LS-A-1016
EL.+2.875 HEB180 SECTION E - E
H (T.O.S) SECTION C - C
LS-PS1158 199
HEB160 39 LS-PS1072
LS-PS1071 1401-LS-A-1016
L75*8 250 HEB180 L75*8
LS-PS1141 G EL.+2.504

241
L60*6 E 5 (T.O.S)
LS-PS1052 44 5

141
EL.+2.875
L75*8

199
(T.O.S)

1492
D LS-PS1052 LS-PS1072 LS-PS1010 333 LS-PS1040
LS-PS1054 LS-PS1053 D 1178 L50*6 L75*8 375
UNP100 TYP L75*8 L75*8 5
740 5 L75*8
954
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

D SECTION F - F SECTION J - J 1401-LS-A-1016


EL.+2.875 LS-PS1006 P 59 LS-PS1011 SECTION H1 - H1 HEB180
590 N F L60*8
L60*10
311
311

311

(T.O.S) 1401-LS-A-1016 EL.+2.875 SECTION H - H


27 HEB180 EL.+2.875
(T.O.S) LS-PS1054

325
308 84
375

22 UNP100 M1
535

M M H
50

5 LS-PS1040 J J
371

5 D D 6 UNP100
LS-PS1010 L75*8

110
D E L50*6

409
315 G 250
590

1000

669
LS-PS1060 5

22
L75*8 P 5
1000
N 1256 M1
1317 1220 380 LS-PS1022 LS-PS1145 272 378
2325
L75*8 L75*8
HEB180

10
650
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

F
SECTION K - K
SECTION L - L SECTION M - M
1401-LS-A-1014
EL.+0.550 HEB180
(B.O.BP) 1401-LS-A-1014 30 55 55 30
HEB180 EL.+2.875 EL.+2.875
42 4 - Ø 18 HOLES FOR
(T.O.S) (T.O.S) 1401-LS-A-1014 M 16 BOLTS - 60 mm LG
HEB180 CLIENT:

30
PetroChina International Iraq FZE Iraq Branch

15

70
535
CONTRACTOR:

551
5 5
CC
ELEVATION ALONG GRIDLINE "AC.2" LS-PS1006 LS-PS1060

15

30
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

L60*10 L75*8
LS-PS1054 28 22 PEG ENGINEERING & CONTRACTING DMCC

UNP100
SECTION N - N SECTION P - P
VENDOR: FABTECH International Ltd.
SECTION M1 - M1 P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 55OF91 0

A0
TOTAL UNIT
DATE ASSM. MK. QTY QTY
BOLTS LENGTH REMARKS ASSEMBLY LIST
SK1-PS1006 2 2 16 DIA A307 44 MARK DESCRIPTION PROFILE LENGTH(mm) Q'TY AREA(sqm) WEIGHT(kg)
SK1-PS1011 4 4 16 DIA A307 44 SK1-PS1001 PIPE SUPPORT HEB160 2499 1 3.03 133.9
SK1-PS1002 PIPE SUPPORT HEB100 579 1 0.46 15.7
SK1-PS1013 4 4 16 DIA A307 51
SK1-PS1003 PIPE SUPPORT HEB100 579 1 0.39 13.4
SK1-PS1015 2 2 16 DIA A307 51
BY

SK1-PS1004 PIPE SUPPORT HEB100 629 1 0.52 17.8


SK1-PS1018 2 2 16 DIA A307 57 SK1-PS1005 PIPE SUPPORT HEB100 529 1 0.38 13.1
SK1-PS1032 4 4 16 DIA A307 51 SK1-PS1006 PIPE SUPPORT L75*8 826 1 0.43 13.2
DISCIPLINE

SK1-PS1007 PIPE SUPPORT L75*8 446 2 0.21 12.9


SK1-PS1046 2 2 16 DIA A307 51
SK1-PS1009 PIPE SUPPORT L75*8 434 1 0.24 6.3
SK1-PS1047 2 2 16 DIA A307 57 SK1-PS1010 PIPE SUPPORT L75*8 494 1 0.25 6.8
SK1-PS1011 PIPE SUPPORT UNP160 1179 1 1.23 41.9
SK1-PS1013 PIPE SUPPORT UNP100 264 1 0.27 8.0
SK1-PS1014 PIPE SUPPORT L75*8 1515 1 0.54 16.1
SK1-PS1015 PIPE SUPPORT L75*8 339 1 0.30 8.3
DATE

SK1-PS1018 PIPE SUPPORT L75*8 548 1 0.26 7.0


SK1-PS1019 PIPE SUPPORT HEB160 2500 1 2.99 131.9
SK1-PS1020 PIPE SUPPORT L75*8 1509 1 0.51 16.0
SK1-PS1024 PIPE SUPPORT L60*6 292 2 0.07 3.1
SK1-PS1025 PIPE SUPPORT L75*8 374 1 0.22 5.8
BY

SK1-PS1027 PIPE SUPPORT L75*8 413 1 0.27 7.4


SK1-PS1029 PIPE SUPPORT L75*8 629 1 0.35 9.8
SK1-PS1032 PIPE SUPPORT UNP100 1045 1 0.59 17.0
DISCIPLINE

SK1-PS1036 PIPE SUPPORT UNP100 423 1 0.46 12.8


SK1-PS1038 PIPE SUPPORT HEB100 784 1 0.89 30.6
SK1-PS1041 PIPE SUPPORT L75*8 489 1 0.24 6.4
SK1-PS1043 PIPE SUPPORT L60*6 801 1 0.19 4.3
SK1-PS1046 PIPE SUPPORT L60*6 961 1 0.25 6.1
SK1-PS1047 PIPE SUPPORT L75*8 505 1 0.50 14.6
DATE

SK1-PS1049 PIPE SUPPORT L50*6 282 1 0.21 4.5


Total Area(Sqm): 16.24 Total weight(kg): 584.93
BY
DISCIPLINE
DATE
BY

SK1-PS1032
SK1-PS1027
DISCIPLINE

UNP100
L75*8 SK1-PS1025
L75*8
SK1-PS1003
SK1-PS1041 HEB100
L75*8
DATE

SK1-PS-p1043 L75*8
SK1-PS-p1008 HEB100
L75*8 SK1-PS-p1025 L75*8
SK1-PS-p1003 ROD20
SK1-PS1019 SK1-PS1043 SK1-PS-p1045 L75*8
HEB160 L60*6 SK1-PS-p1008 HEB100
BY

SK1-PS-p1054 HEB100
SK1-PS-p1011 L75*8
SK1-PS-p1041 L75*8
SK1-PS-p1054 HEB100
DISCIPLINE

SK1-PS-p1053 UNP100 L75*8 SK1-PS-p1012 L75*8

SK1-PS1001 SK1-PS-p1047 UNP100


HEB160 L75*8 SK1-PS-p1022 L75*8
SK1-PS1014 SK1-PS-p1003 ROD20
SK1-PS1011
L75*8 SK1-PS-p1006 HEB100
UNP160
DATE

SK1-PS-p1058 L75*8

SK1-PS1046
L60*6 SK1-PS1009
L75*8
BY

SK1-PS-p1009 L75*8
SK1-PS-p1004 HEB100

L75*8
SK1-PS-p1003 ROD20
DISCIPLINE

SK1-PS1015

L50*6
SK1-PS-p1009 L75*8

SK1-PS-p1061
SK1-PS-p1004 HEB100
L75*8

SK1-PS-p1064
SK1-PS1007
L75*8
SK1-PS1005
SK1-PS1007 HEB100
L75*8 SK1-PS1018
SK1-PS1002 L75*8
HEB100

SK1-PS1049 SK1-PS1047
SK1-PS1020 L50*6 L75*8
SK1-PS1004 L75*8
HEB100
UNP100 SK1-PS-p1018 UNP100

SK1-PS-p1066 L75*8
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

SK1-PS1006 SK1-PS1013
L75*8 UNP100

SK.1 PIPE SUPPORTS


ISOMETRIC VIEW
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 56OF91 0

A0
DATE
BY
DISCIPLINE
DATE

A4 A1 A2 A3
BY

588 14480
DISCIPLINE

600 3550 3850 3850 2630

130 1250 900 1000 1000 953 897 1000 1000 2000 903 947 1250 1250 130
DATE

AA.1 SK1-PS1006
124 L75*8
A
SK1-PS1011 L
BY

UNP160
DISCIPLINE

1250

SK1-PS1009 E SK1-PS1020 596 SK1-PS1006


L75*8 L75*8 L75*8
881

230 SK1-PS1018

831
D SK1-PS1015 450 245
L75*8 G 199 G H
78 L75*8 D
DATE

C F

82

31
19

19

19
AA

43
D

82

140
38

L
BY

2900

B A B SK1-PS1013

425

505
406
455 58 38

455
D Ad SK1-PS1004 K UNP100 K

677
DISCIPLINE

758
ROD20
SK1-PS1049
SK1-PS1003 L50*6
380 270 SK1-PS1002 SK1-PS1001
HEB100 SK1-PS1005 E H HEB100 F
C HEB100 15 HEB160
DATE

900
Ad 45
SK1-PS1047 M M

2300
L75*8
BY

SK1-PS1007
L75*8 R
DISCIPLINE

Ac 32 Ac
1383

AB.2
44
128 SK1-PS1014
SK1-PS1025
DATE

L75*8

727
205
L75*8 SK1-PS1046 R
L60*6 N N

224
22
BY

218

19
SK1-PS1019
DISCIPLINE

Aa Aa

5100
500
Ab Ab HEB160
43
604
2400

SK1-PS1032
1150

UNP100 SK1-PS1024

66
L60*6 292
SK1-PS1038 45

650
SK1-PS1010 250 P P
L75*8 HEB100 200
328

256

T T
12

U U SK1-PS1038 SK1-PS1007
22

Ae Ae

450
202 282 HEB100 L75*8
SK1-PS1024

70
685 318 L60*6
AB.1 Q Q

600
32
331

W
NOTICE: THIS DRAWING AND THE INFORMATION IT CONTAINS ARE THE SOLE PROPERTY OF PETROCHINA COMPANY LIMITED (HALFAYA).

682
S 292 S
SK1-PS1027 53 SK1-PS1041
L75*8 L75*8
906

Z Z W
Y SK1-PS1043
1500

600
330
512

L60*6
32

AB X X V V
28

SK1-PS1029 Y SK1-PS1036 263


292
L75*8 UNP100
AC.2
IT SHALL NOT BE REPRODUCED OR LENT WITHOUT THE AGREEMENT OF THE OWNER.

E&I SUPPORTS AT EL.+8.600

CLIENT:

PetroChina International Iraq FZE Iraq Branch

CONTRACTOR:

CC
CHINA PETROLEUM ENGINEERING & CONSTRUCTION CORP.

PEG ENGINEERING & CONTRACTING DMCC

VENDOR: FABTECH International Ltd.


P. O. No. 61015, JEBEL ALI FREEZONE, DUBAI
UNITED ARAB EMIRATES
TEL : +971 (4) 883 8833
FAX : +971 (4) 883 5126
PROJECT TITLE:
NOTES : HOLDS:
DOCUMENT No. REFERENCE DRAWINGS REV. DATE DESCRIPTION PREP'D CHK'D REV'D APP'D
1) ALL DIMENSIONS ARE IN MILLIMETERS AND ALL COORDINATES & ELEVATIONS ARE IN METERS UNLESS NOTED OTHERWISE. EPCCOM FOR GAS PROCESSING PLANT
2) MATERIAL GRADES ARE: HFY-3800-1401-STR-DWG-0003_D Sulfur Recovery Unit - Steel Structure A For Sk.1 & Sk.2 - Structural Ga & Details 0 19.04.2023 ISSUED FOR CONSTRUCTION XAR MCS RF RF
STRUCTURAL STEEL & PLATES S275 JR.
DRAWING TITLE:
STRUCTURAL BOLTS A307-HDG / A194 2H-HDG NUT / F436-HDG WASHER Module SK1 - General Arrangement (Unit 1401)
HFY-3800-1401-PIP-DWG-0002_B
3) PAINTING FINISHES SHALL BE PERFORMED FOR STEEL PLATFORMS, LADDERS, STAIRS, HANDRAILS, PIPE SUPPORTS COLUMN / BEAMS. SULFUR RECOVERY UNIT
4) ALL PAINTING AND COATING SHALL BE AS PER PROJECT SPECIFICATION HFY-3800-000-CPR-SPC-0005. HFY-3800-1401-PIP-DWG-0003_B Module SK2 - General Arrangement (Unit 1401) PIPE SUPPORTS
5) GRATING H.30 THK.30MM 50X20 HOT DIP GALVANIZED (MIN. GALVANIZATION SHALL BE 600 G/M2). HFY-3800-0000-STR-DWG-0005_1 STD - Grating

HFY-3800-0000-PIP-DWG-0001_B Pipe Support Standard Drawings STAGE DRAWING NO. SHT. REV.
Tekla Structures

HFY-3800-1401-PIP-ISO-0001_D Isometrics Drawings for Skid Mounted Equipment (Unit 1401) DETAIL DESIGN FAB-3021117-01-M01-ER-001 57OF91 0

A0
DATE

423 EL.+8.600
(T.O.S) 95
BY

195 229 EL.+8.600 2 - Ø 18 HOLES SK1-PS1015


(T.O.S) 50 45 PL10*95
DISCIPLINE

EL.+9.560 SK1-PS1011

30
(T.O.S) UNP160 455 19

65
SK1-PS1003 SK1-PS1003

160
43

80
ROD20 HEB100

75
DATE

CTR'D 200
62 SK1-PS1003

40

10
SK1-PS1003 HEB100
SK1-PS1011 HEB100 10 75 10 SK1-PS1015
TYP
BY

UNP160 SK1-PS1009
L75*8 5 L75*8
D1 D1

143
SECTION D1 - D1

43

43
270 EL.+8.600 SK1-PS1015

850
DISCIPLINE

SK1-PS1011 140
PL10*140 (T.O.S) TYP L75*8
30 80 30 5

434
4 - Ø 18 HOLES EL.+8.075 130

340
EL.+8.600 SK1-PS1013

10
A1 SK1-PS1009 (T.O.S)
(T.O.S) L75*8 EL.+7.981 TYP SK1-PS1015 PL10*130 30 70 30
DATE

50
5

50
(T.O.S) L75*8 4 - Ø 18 HOLES

30
160

80
BY

50

148
SK1-PS1011
578

210
150
10

You might also like