You are on page 1of 1

Survey Location Chocolate St - Bonifacio St - National Rd

Direction Total System Traffic


Date March 22, 2024
Time 06:00AM - 10:00PM

Traffic Flow and Turn Movement

7,605
16,560
7,649

D
B
3,574
16,044
3,128

AM Peak Traffic Time 7AM 8AM


Approach Dim LT Thru RT TOT PT % VCR LOS PV
Bonifacio St 3.0 485 250 251 986 44.2% 0.44 C L-M
National Rd SB 3.0 505 1250 564 2319 22.3% 1.07 F H
Chocolate St 2.7 252 260 559 1070 49.3% 0.89 E H
National Rd NB 3.0 238 1237 236 1710 31.8% 1.09 F H
Total 1480 2996 1610 6086 36.9% DOS 0.803
PM Peak Traffic Time 7PM 8PM
Approach Dim LT Thru RT TOT PT % VCR LOS PV
Bonifacio St 3.0 543 231 264 1037 47.1% 0.53 C L-M
National Rd SB 3.0 524 1416 593 2533 23.1% 1.18 F H
Chocolate St 2.7 244 264 566 1073 41.6% 0.89 E H
National Rd NB 3.0 270 1302 228 1800 30.2% 1.14 F H
Total 1580 3213 1650 6443 35.5% DOS 0.870
Off Peak Traffic Time 10PM - 11PM
Approach Dim LT Thru RT TOT PT % VCR LOS PV
Bonifacio St 3.0 432 157 172 761 30.0% 0.33 B L
National Rd SB 3.0 415 648 411 1473 20.6% 0.64 C M
Chocolate St 2.7 169 150 448 767 22.8% 0.61 C M
National Rd NB 3.0 160 647 134 941 29.7% 0.51 C M
Total 1176 1601 1165 3941 52.0% DOS 0.502

You might also like