Site ID Date SubCon.

SubCon SMCoE SME Tab GSD CommStatus (1stSeverity GSD feedb


2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Cover Approve Record
Open Minor
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Cover The swap is notOpen Minor
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site The information
Open Minor
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site Need to rechecOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site Need to mentioOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site The feeder winOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site Need to rechecOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Access Need to mark stOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS Need to recheck
Open Major AQQY removed
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS Information of Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS AQQY (5G) detaOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS Proposed RRH hOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS The Rf antennaOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar BTS Need to rechecOpen Minor
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Power Need to correcOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Power Power Design nOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Power The AC and DC Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar RF The existing t Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar RF The Tilt (mech.)Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Planned Site c Need to correctOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Civil Need to rechecOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Layout Need to mention
Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Layout AQQY removedOpen
S Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Layout The tower is diOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Layout The GPS locatioOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site Preparatio The transmissiOpen Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar Site PreparatioNeed to provide
Open Major
2511 4-Apr Al-lewan Ahmad ghazalaRahul kumar HW & TransmisTransmission Da
Open Major
Status (2n Status (3rdStatus (4rdFinal StatuApproval date
Open Open Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Open Closed Rejected
Open Closed Rejected
Open Closed Rejected
Open Closed Rejected
Open Open Rejected
Open Open Rejected
Close Closed Rejected
Open Open Rejected
Open Closed Rejected
Open Open Rejected
Open Closed Rejected
Close Closed Rejected
Close Closed Rejected
Open Closed Rejected
Open Open Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Close Closed Rejected
Open Open Rejected