Dear Sir 

Please, provide us with the interpretation  result for well


XXXX1-6 bulid up test and investigate the boundary
nearby this well, it is Exploration well and based on this
test result we are planning to drill another well or maybe
not, and the fault around will be major factor in our
Decision (oil trapping), also may Pual give his input in
this regard.
(This test data in the Dropbox).

Introduction
This report includes analysis performed on the pressure buildup data collected from well
XXXX1-6 in February 7-11, 2009. This well which is located in Jebel field was
completed by perforating
The 7’’ through the interval 7854-7842 ft.
Following its completion, well XXXX1-6 could not sustain flow.

Summary of Events
When well was opened to flow at choke size of 32/64’’ only bubbles were observed at
surface.
Several buildups were conducted, with the second build-up being the longest in duration.

Main Test Results


Thank you.

Beat Regards

      Masoud Mahmoud


Acting Reservoir Engineering Superintedent
               Site Oil Company- Marsa El-Brega
       P. O. Box 385 Tripoli-Libya
   Tel: +218213600376  Ext. 22343