Introduction
This report includes analysis performed on the pressure buildup data collected from well
XXXX1-6 in February 7-11, 2009. This well which is located in Jebel field was
completed by perforating
The 7’’ through the interval 7854-7842 ft.
Following its completion, well XXXX1-6 could not sustain flow.
Summary of Events
When well was opened to flow at choke size of 32/64’’ only bubbles were observed at
surface.
Several buildups were conducted, with the second build-up being the longest in duration.