You are on page 1of 2

FACULTY OF CIVILENGINEERINGTECHNOLOGY

ASSIGNMENT 4: SAFETY AND RISK MANAGEMENT

CPS: WP1/WK7 & WP6 & WP7


(WP1/WK7; Depth of knowledge required on environmental and sustainability
principle (WP6: Involve diverse groups of stakeholders with widely varying needs)
(WP7: Are high level problems including many component parts of sub problems)

SEM 2 2023/2024

AMJ40302 - PROFESIONAL ENGINEER

Question

Figure below shows the scenario taken place at a construction site. Using the Hazard
Identification, Risk Assessment and Risk Control (HIRARC) form, identify and analyze
FIVE (5) relates hazards.
(50 marks)

Individual Assignment

Submission date no later than 5.00 pm, 23 April 2024 via email hafizizakaria@unimap.
edu.my.