THE CHALLENGE
The wet processing faclty atthe Dix Pt site was required as a previous ste lease was expiring
The plant at ths ste was cry rushing and screening CAD waste to produce materia for low:
valie aopications such as cover andl genera fil
mate advanced wet processing system. We know that there was a need fr investment In
advanced recycling technology for CAD wast in the Oxford area and nave fought fo te ast
five years to have this recognised” says Chris Sheshan, Managing Director, The Sheahan Group.
Ldemaltion waste recycing infrastructure in Oxford fllowing a multemilion pound investment
Ina naw wet processing plan from COE Global Persistence was te key to success in tis
Instance asthe result ofan extended planning and appeals process. The Shechan Grou
coriinaly proposed the new waste recyeting plant in May 2006 ard the plant was finaly
"while we regret the loss 500,000 tonnes of CAD waste recycling due tothe planning
process we ae now pleasel to say thatthe new plant offers our customers a greatly Improved
ntipsutmwcegroup.convaboutlease-studesisheehan-group-england 21845124, 327 AM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
€DE
ntipsutmwcegroup.convaboutlease-studesisheehan-group-england 38495124, 327 aM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
range of eaified
industry
hitps:lwwn.cdegroup.comlaboutlease-studies/sheshan-group-england 4845124, 327 AM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
€DE
The enhanced recycling capability that our new washing plant offers
enables us to progress this material up the waste hierarchy and offer
a real alternative to virgin aggregates.”
THE RESULTS
All of the C&D waste material that The Sheehan Group handle is new processed trough the
‘ew CDE washing pant at Ox Pit with the cence permiting 100,000 tonnes per yeu
In adeition to the 60,000 tonnes af material processel a the previous ste an adltional
50,000 tonnes was being sent to lancfil each year asa result ofthe limited capabilty of the
Crushing ane dry serening plant. "Getting the washing plant up and running earior woul
have saved us sending this large volume of material fo lanai forthe last S year” says Chis
‘Sheehan. "The advanced processing methods tnat we have introduced maximise material
recovery when compared to ory aroceasing which is why we fought eo nard 9 win he night
‘he instal te new pla
‘The primary source of feed materlal forthe Dix Pit plant is withn Oxfordshire with smaller
amount coming from surrounding counties such as Buckinghamshire, Extemal haulers ae
brinaina material for she fringes of Greater Londen.
‘The CDE installation has helpe! the Sheehan Group integrate reeycld products into the
company’s construction projets. Far example, the Sheehan Group now produces conerete
blocks and ready-mbeed concrete using recycle sand and aggregates whieh were formerly
viewed as waste materials. The company is recycling 100% of their material withthe fer cake
Used to engineer lanai calls andl cap landfl sites,
ntpsulmvewccdegroup.convabowicase-studesisheehan-group-england45124, 327 AM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
€DE
. a a
4
< Pci
Se ee
YOU MAY BE INTERESTED IN THESE PROJECTS.
JA. JACKSON
England
Tonnage Material
200t—h ‘CAD Waste
output
(0-2mm and O-4mm sand | 10mm, 10-20mm, 20-40mm and an oversized aggregate | iter cake
1A. Jackson bulls @ sustalnable future with CDE wash plant
ntipsutmwcegroup.convaboutlease-studesisheehan-group-england 6845124, 327 AM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
ASH AGGREGATES
Enolend
Tonnage Material
1soteh ‘CAD Waste
output
2 Sands |3 Sized £2 Oversized Aggregates
Fra use
‘Construction Products
ASH Group oxtonds sustainable waste management offering with
Investment in new CDE wash plant
VIEW CASE STUDY >
AF DECOM
Norway
Fonnage Materia!
250th ‘cap Waste
output
‘O-zmm & o-4mm recycled sand | 410mm & 10-20mm recycled aggregates
‘Concrete Production, shoterete, Asphalt, Road Base, Road Gut
250tph Indoor C&O waste recycling plant to enable AF Decom to
process recycled construction & demelition waste throughout the
ntipsutmwcegroup.convaboutlease-studesisheehan-group-england 71845124, 327 AM ‘Sheohan Group C&D Waste Recycling Plant in England - CDE Projects | CDE
€DE
START SPEAKING TO AN EXPERT
Ler's talk about your materials challenges today.
ENQUIRE Now
APPLICATIONS. PRobucTS
sour suppoRT
ntipsutmwcegroup.convaboutlease-studesisheehan-group-england 88