Date: Mar 2022 HSE Monthly Performance

Total Ave. Manpower:2,295 Total Man-hours:11,567,573 LTI Frequency Rate


No. of LTI x 1,000,000 / Total Man-hours
PROJECT MAN-HOURS W/O LTI 7,628,205
1950
DIRECT 0.275
9,954,663
0.272
INDERECT MAN-HOURS 1,612,910 0.27
3,932,898 LTI
345 9-March-2022
PROJECT TARGET HOURS PROJECTED
0.265
START 20,000,000 HRS
DIRECT MANPOWER INDIRECT MANPOWER RE-START 7,628,205 HRS W/O LTI 16,000,000 HRS
0.259345673
0.26

HSE ACCIDENT/INCIDENT THIS MONTH: Lagging Indicators 0.255

0.25
Feb-22 Project Projected LTI F/R 0.40 Mar-22
Fatalities
7
Severity (S) F/R
Serious Injuries No. of days lost x 100,000 / Total Man-hours
4 4 0.55
3 0.545 0.544847
Minor Injuries 2 0.54
0 0 0 0 0 0 0 0.535
0.53
Near Misses 0.525
0.518691345
0.52
0.515
Unsafe Act /
Unsafe Condition 0.51
0.505
Feb-22 Mar-22

Page 1 to 12
Date: Mar 2022 HSE Monthly Performance
Activity Involves in Accident / BODY PARTS AFFECTED BY WORKS
Incident
Accident Incident Location INJURIES
HEAD

4 4 2

SHOULDER
2 FACIAL
2 2 0
1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Crane Backfilling Shuttering Shifting of Pedestrian Coring MEP Block Works Haulling
HAND NECK
Icon B-900 P-500 B-300 B-801 B-102 B-200 T-400 P-300 P-700 QIN Road
Lifting Doka Concrete Tower
4 0

Accident and Incident Injuries and First Aid Cases


ARM
BODY SYSTEMS
Category 0
0

WRIST
0
LEG
3 5
1 KNEE
Falling Objects 0
Riad Traffic 3

7 Caught in Between ANKLE


2 FOOT
0 0 0
0
FIRST AID MEDICAL TREATMENT

Previous New Cases

QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 2 to 12
Date: Mar 2022 HSE Monthly Performance
RCA Safety Officers Internal Safety Observation Raised: 153

26

15

8 9 8
7 7 7 7 6 6 6 6
4 4 4 5
2 3 2 3 2 3 2
0 1 0 0 0 0

AMMOS ATTIBA DAVID JOHNSON JUSTIN PETER SAMUEL SHAKAWAT SREEJIT VIVEK
Good Closed Open

IOR Site Engineer Close-out and Good Practices Performance


14
12
11
10
9 9 9
8 8 8 8
7
6
5
4 4
3 3 3 3
2 2 2 2
1
0 0 0 0 0 0 0 0 0 0 0

DHAMIKA ENG. ABDEL RAOF ENG. ABDUL ENG. FRANCIS ENG. IHAB ENG. JAWAD ENG. JOE ENG. KAMAL ENG. MAHDY ENG. MOATH ENG. ROBBI ENG. RYAN
KHADER Good Closed Open

QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 3 to 12
Date: Mar 2022 HSE Monthly Performance
IOR Site Engineer Close-out and Good Practices Performance
15

11
10
9
8
6 6 6
5 5 5 5
4 4 4
3 3 3 3 3 3
2 2 2 2 2 2 2 2 2
1 1 1 1 1 1 1 1 1 1 1 1 1
1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

ABBAR ABDUL RASAK ADEL BIJU BILAL CHANAKA HAMDI IBRAHIM JABELL JABER JASIM MAHMOUD KHALID MANOJ OMAR RAJESH RAM PATHAK RUSSEL SAMAWI SHERIFF SANDU VIJAY
Good Closed Open

ISOR Engineer Foreman and Site Safety Officers Good Practices / Reactive Observation %
No. of Observation Raised Contributed to

1 1
Internal Safety Internal Safety number of
Observation Observation Reactive Observation Internal
Raised Raised observation
safety

1 Internal Safety
Observation
Closed
1 Internal Safety
Observation
Open
observation

No. of Observation Raised Contributed to


number of
Good Practices Internal
observation
safety
observation

QIN PROJECT No. 285 Prepared by RCA H&S Manager RBD. Page 4 to 12
Date: Mar 2022 HSE Monthly Performance
Opportunities / Threat Analysis Strength / Weakness Analysis
Activity / Risk Activity / Behavior ISOR Amplifier
Damage Good
Housekeeping
Scaffolding Material Housekeeping
Standard
Work at Height Imposing Scaffolding 9 22
Fire Controls of Working at Height
Housekeeping
Housekeeping Access and Egress
Hit by Protruding Up right to
Plant & Equipment Object Resolve issues
Electrical Working from Height 14 14
Excavation Planning Work Plant and Equipment
Slip Trip and Fall
Access
Hot work Scaffolding
Incomplete Good Housekeeping 22 11
Void Spaces Scaffolding Supervision
3% 9%
1%
Improper Organized work
2% 2% 1% Erecting Areas
Plant & Equipment 2 9
16%
Missing Fall
10% 8% 1% Arrest FBH 27%
10% No Safe Excavation 1 9
17% 24% 1% Access 35%
27% 42% CORE
13% Unsecured
10% 1% Material
STRENGTH
6% Electrical 2 5

Potential Floor Opening 4%


Threat 11% 4%
Access and egress 3 4
Lone Worker 17%
6% 4%
11% Illumination 0% 50% 100%
8% (lighting)
21%
Good Practice Reactive

Page 5 to 12
Date: Mar 2022 HSE Monthly Performance
Engineer Close-out Consultant Report Ext. Report
Ext. Report Closed Out %
Closed Out %
120%
HSE-IR-0137, 100%
100% HSE-IR-0140, 75%
80% HSE-IR-0141, 75%
HSE-IR-0139, 75%
60%
HSE-IR-0142, 50% HSE-IR-0143, 50%
40%

20% HSE-IR-0138, 25%

-1
0%
0 1 2 3 4 5 6 7 8 9
20%
Open Observation

CONSULTANT RAISED and CLOSED-OUT REPORT

80%
277
241

Closed Observation
147
136

16 15 13 23 15
8

NCN HSE LEADERSHIP SITE WALK HSE INSPECTION REPORT NON HSE OBSERVATION SEE AND ACT OBSERVATION
REPORT REPORT
ISSUED REPORT CLOSED REPORT

Page 6 to 12
Date: Mar 2022 HSE Monthly Performance

Safety Induction Training Conducted


RIGGING & SLINGING 25

CONFINED SPACE 35
TOTAL NO. SAFETY INDUCTED 7248
SCAFFOLDING ERECTION 197

WORKING AT HEIGHT 1150

FIRST AID 11
MARCH SAFETY INDUCTED 204
DEFENSIVE DRIVING 28

0 200 400 600 800 1000 1200 1400

Training Hours Used Toolbox talk Permit To Work

WORKING AT HEIGHT 9200 ELECTRICAL SAFETY 1480


COLD WORK 218

SCAFFOLDING 4728 SCAFFOLDING SAFETY &


1430
HOUSEKEEPING AT SITE

WORKING AT HEIGHT 147


CONFINED SPACE 280 MANDATORY USE OF PPE AT SITE 1415

SAFETY PLEDGE (EMPLOYEE


RIGGING & SLINGING 200 1390
COMMITMENT HOT WORK 81

Page 7 to 12
Date: Mar 2022 HSE Monthly Performance

STARRT Briefing Raised Subcontractor STARRT Briefing Raised


RAJESH 4
NEW HORIZON – 16 16
HAMDY 8 TECHNO STEEL – 24 24
YASIR 32 SIMLEISURE – 22 22
IBRAHIM 24 VISUAL – 384 384
WHITEWATER 144
KHALED 24
QEMG 580
SAMAWI 64
ADK 216
ABBAR 31 EVERSSENDAI 124
ABDUL RAZAK 32
0 100 200 300 400 500 600 700
SHERRIFF 49

MAHMOUD 66

MUHAMMUD
KHALID 26
28
STARRT CARD RCA / Subcontractor
VIJAY 44

JABER 28

INERJITH 40 RCA 748

MADAN 68

ABDUL RAZAK 16

RASSEL 4
SUBCONTRACTORS 1510
RAMPATAK 24

MANOJ 136

Page 8 to 12
Date: Mar 2022 HSE Monthly Performance

RAMs Reviewed 241 Penalties issued Sub-con Penalties Issued Individual


228
9

4
4

11 1 1

APPROVED AS NOTED RESUBMITTED FOR INFORMATION ACCUMULATIVE PRESENT MONTH ACCUMULATIVE PRESENT MONTH

HSE MEETINGS TOOLS AND EQUIPMENT INSPECTED

2
39

25
1 1 21
12

LIFTING GEARS POWER TOOLS PLANTS & EQUIPMENT FBH


HSE STAFF MEETING HSE SITE LEAD WALK LOGISTIC MEETING

Page 9 to 12
Date: Mar 2022
HSE Monthly Performance
NUMBER OF REPORT RAISED RCA HSE & CONSULTANT HSE REPORT CONSTELLATION
2,622
1%
ATKINS NCN 73%
ATKINS
REPORT HSE Inspection
Report /Audits Report
5%
Leadership
Site Walk
293

ACCUMULATED REPORT THIS MONTH REPORT

Accident/Incident Action Close-out

15 9%
RCA Safety
Observation Report

CLOSED OPEN 12% HSE Observation ATKINS Engineers


Page 10 to 12
Date: Mar 2022 HSE Monthly Performance

HSE Emergency Evacuation Drill HSE STAFF REQUIREMENT


30 120%
24
25 100%
3 20 80%
15 60%

2 10 40%
5 1 1 2 1 1 20%
0 0%
HSE MANAGER SAFETY OFFICERS SITE DOCTOR NURSE ENVIRONMENTAL ENVIRONMENTAL
0 MANAGER ENGINEER

SITE OFFICES PROJECT SITE NEW DRILLS Series1 Series2

PROJECT SAFETY PERFORMANCE

84% 100% 80% 94% 100% 93%

INTERNAL OBSERVATION INT/EXT MEETINGS CONSULTANT REPORT - CLOSED RAMS REVIEW WEEKLY TBT HSE STAFF
Page 11 to 12
Date: Mar 2022 HSE Monthly Performance

TOOLBOX TALK SAFETY INSPECTION

LIFTING GEARS POWER TOOL


INSPECTION INSPECTION

PLANT /
FBH INSPECTION EQUIPMENT
INSPECTION

GOOD PRACTICES AWARDS (ICON ISLAND)

Sharing food to
HOUSEKEEPING STARRT MEETING Workers
Page 12 to 12