Professional Documents
Culture Documents
08
01 02 03 04 05 06
11400 11400 11400 11400 11400
A"
5885
E_ULDB-1 MET-9
A
E_LDB-1
? E_ULDB-2
3050
P04-01
E_LCP-1
B
E_ADDB-1
E_LDB-2
5885
A"
1669
2095 2400 750 1300 MET-8
750 800 2650 9600 1000 7000 1700 400
5885
200
2200 C"
450
1590 400
1000
1000
400
749 1200
400
1969
WASTE WATER 3900 4000 1500
985 800 1804 P02-1 2316 2500 999 347 3153 E_ULDB-12
560
PANEL--1
MET-2
B P06-2 UNA P10-1
1585
1000
1000
MET-6 CAP.PANEL-1 ECS-PANEL-1
650 1125
E_LCP-5
E_RTU
2600
E_HT PANEL
1860
1380
25kv PANEL E_TR
760 900
E_BC E_BATT BANK 1 E_BATT BANK 1A
2264
2561
SMALL POWER
PL06-02 A"
1420
E_BATT BANK PANEL-1LIGHTING PANEL-1
5885
MET-4 CET-1
200 1300 1015 1975 899 2050 1300 3500
1200
1000 2400 1000 2400 651
1900
600
MET-1
225
E_ISOLATER E_ISOLATER
400
MET-2A
E_DCDB-1
MET-1A E_ACDB-1 199 2400 200 2400 1515
5885
WASTE WATER
PANEL--2
C"
1665
C' MET-7
B P06-1
3050
5885
C"
ROOM SCHEDULE:
C12 C11 C10 C09 C08 C07 C06 C05 C04 C03 C02 C01 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
RETAIL RETAIL
SEEWAGE SEEPAGE
SUMP SUMP
A S02
ABOVE S04
ABOVE
OTE
DUCT
ABOVE
LIFT
PIT ESC
PIT
ABOVE
S04
ABOVE
S03
ABOVE
OTE
DUCT
ABOVE
S02
ABOVE
FHC48
FHC41 OTE
DUCT
ABOVE FHC42
FHC45
FHC43
S06 ES12
ACCESS P10-1 ES10 MS3 L06
P14 C/L OF P11
HATCH TR ACK C/L OF
B
SEWAGE P02-1 P03-1 S07 EL01 P01 ST10 SE7 PL01-2 S04a
ABOVE PL01 TR AC K P13
SU MP ABOVE SE5 ABOVE P02-2 P06-3
SE4 P04-1 EL01-2
ROOM FHC46 C57
P13-2 P10-2
FHC55 FHC49
OTE
±5
DUCT S04
S04a
S04 ABOVE ABOVE
(ABOVE)
C
S02 ABOVE
ABOVE S02
S03 ABOVE
ABOVE
N
CRD SUBMISSION
REFRENCE DRAWINGS: General Consultants : E 30-10-2019 MK FOR LDC DD CLEARANCE Consultant : Contractors : CLIENT
SKV DA SM MUMBAI METRO RAIL CORPORATION LTD.
MAPLE MUMBAI METRO LINE-3 D 16-08-2019 MK REVISED AS PER GC COMMENTS SKV DA SM NaMTTRI Building, Plot No. R-13, 'E' - Block,
STRUCTURE DWG NO. UGC-01-SCP-STR-1250-001-B_26-11-2019 GENERAL CONSULTANTS Bandra kurla Complex, Bandra (East), Mumbai 400051
C 07-06-2019 MK FOR GC SUBMISSION SKV DA SM
DRAWING TITLE
ARCHITECTURE DWG NO. UGC-01-SCP-ARP-1041-001-E_24-07-2019 Notification : B 20-12-2018 MK FOR GC SUBMISSION SKV DA SM in Associotion with :
CUFFE PARADE STATION - ELECTRICAL
SKV DA SM
A B C B3 27-11-2018 MK FOR LDC SUBMISSION
ASS AND DB ROOM LAYOUT
As noted in the DSR No. ________________________________________ B2 21-11-2018 MK FOR LDC SUBMISSION SKV DA SM Project Title :
PLATFORM LEVEL PLAN
dated __________________________ MUMBAI METRO LINE - 3
B1 15-11-2018 MK REVISED AS PER NEW ARCHITECTURAL DRAWING SKV DA SM SHEET 1 OF 2
A : Objection. A complete resubmission is required CONTRACT UGC-01 - DESIGN AND CONSTRUCTION OF
B : No Objection with comments. A 06-10-2017 MK REVISED AS PER LDC COMMENTS SKV DA FK UNDERGROUND STATION AND ASSOCIATE TUNNELS L&T – STEC JV MUMBAI DRG.NO. REV. DWG STATUS
A1 (594x841+2mm)
C : Notice of No objection
A2 18-09-2017 MK REVISED AS PER LDC COMMENTS SKV DA FK Designed Checked Approved UGC-01-MEP- SCP-1191-001 F1 C
Assessor Engineer SKV DA FK
Discipline Leader A1 12-07-2017 MK FIRST ISSUE SKV DA FK P-Preliminary, D-Definitive, C-Construction Reference A1
Scale Drawn Date
Rev. Date Drawn Description Designed Checked Approved MK 12-07-2017 CAD File Name : UGC-01-MEP-SCP-1191-001
AS SHOWN