Professional Documents
Culture Documents
01-Global City Final Presentation - Mumbai V2 PVC
01-Global City Final Presentation - Mumbai V2 PVC
5 Value Proposition
6 Points of Discussion
Project Overview
Vision
“Creation of a self-sufficient business center on the Smart City – Walk to Work concept which will establish
itself as the new Central Business District of Gurugram”
World Class
Infra designed
Smart City Vibrant on best
concept- based Live, Work international
plan Transit practices Self- Enhanced
Oriented and Play Sustainability Governance
Strategic Ecosystem
Location – Walk to and
Work based Resilience
Project Objectives (1/2)
7 x
Revenue generation for the state in the medium to long term and
create financial value for HSIIDC in the short term
Project Location
Located over approx. 1003 acres and spans across parts of Sectors 36B, 37A and 37B of Gurugram.
NH44
Airport
IGI airport located
30 mins away via
NH48
NH9
Cyber City
20 mins drive
via NH48
Rajiv Chowk
15 minutes drive
via NH48
Hero Honda
Chowk
10 mins drive via
NH48 Pataudi Road
NH44
Project Accessibility
Dual accessibility from the Northern Peripheral Road (Dwarka Expressway) and Pataudi Road
Global
City
Approx. 400m wide frontage on
the 8- lane under construction
Northern Peripheral Road, also
known as Dwarka Expressway
(NH 248-BB)
Heliport
NH 48 (erstwhile NH 8) and
the Central Peripheral Road are
both easily accessible from the
project site
Dwarka Expressway to be
completed by June 2023
Project Components
HOSPITALITY ZONE
HEALTHCARE ZONE
Project Layout/ Masterplan
Division of Project Components
Green, Open Services
spaces 29%
36%
PSP
8% Residential
Commercial
23%
4%
Innovation / Start-Up /
17.66
Incubation Zone
Hospitality, ECC & Cultural 18.20
Knowledge Zone 41.75
Health Care Zone 8.83
Residential 9.45
Residential – Luxury -
Residential – Mid 9.45
Residential – Affordable -
Commercial 14.77
Retail-Dedicated -
Mixed Use 14.77
Public Semi Public 4.86
Schools 4.86
Phase 2
• Total BUA = 5.40 million square meters
Legend Saleable Land Uses Area (Acres)
Service Sector 157.63
Multi Tenanted Offices 19.51
IT/ ITeS/ FinTech 58.60
Innovation / Start-Up /
28.43
Incubation Zone
Hospitality, ECC & Cultural 13.42
Knowledge Zone 37.67
Health Care Zone
Residential 85.70
Residential – Luxury
Residential – Mid 59.93
Residential – Affordable 25.77
Commercial 14.58
Retail-Dedicated 14.58
Mixed Use
Public Semi Public 14.04
Schools 14.04
Phase 3
• Total BUA = 2.95 million square meters
Legend Saleable Land Uses Area (Acres)
Service Sector 16.93
Multi Tenanted Offices -
IT/ ITeS/ FinTech -
Innovation / Start-Up / -
Incubation Zone
Hospitality, ECC & Cultural -
Knowledge Zone 16.93
Health Care Zone -
Residential 133.54
Residential – Luxury 32.69
4
Pride of ownership
Global City project would emerge as a landmark in the NCR and over a period of time emerge as a highly
desirable complex providing a unique & strong differentiation to the owners
Unique world class infrastructure design…
Bollards Footpath
Pneumatic Waste Bins Greens
Signage Carriage Way On-Street Plot level
Parking Bay Information Kiosk Service Lane
Street-Light
Unique world class infrastructure design…
Main Street Information Kiosk Building
Bioswale Promenade
Service Lane Sitting Area
Table top crossing Plot level
Street Light passage area Retail Area
Unique world class infrastructure design…
Typical cross sections
Unique world class infrastructure design…
Unique world class infrastructure design…
Multi-level connections
Unique world class infrastructure design…
LANDSCAPE CONCEPT
Unique world class infrastructure design…
LANDSCAPE PLAN
Unique world class infrastructure design…
LANDSCAPE SECTIONS
As we ready ourselves to take off…
What land use development are you keen on – residential, commercial, institutional, retail or mix
3 use?
6 Are you comfortable with a master planned Global City with flexibility for internal planning within
your own area?
Your indulgence is sought on the following…
7 What all social infrastructure would you need apart from the ones already given?
8 Are you fine with the proportion of commercial, residential, mixed use, services and open areas
given in the masterplan?
10 What kind of interventions/support would you require from HSIIDC and Govt of Haryana?
11 Is the current infrastructure planning sufficient for Global City project? Any additional needs?
12 What timeframe do you anticipate in taking a final decision as regards your project in the Global
City?
And any other query/ information that you may deem necessary..
Joinus
Join us on
on this
this exciting
excitingjourney….
journey….
Email: globalcitygurugram@hsiidc.org.in
List of Activation Area (Phase I) plots…
Business Sites
Plot No./ID Plot Area (Acres) Total BUA with Podium (Sqm) FAR
Multi Tenanted Offices
MTO 3 5.4 222,850.26 10.15
MTO 4 5.7 157,541.79 6.84
MTO 6 4.8 135,950.94 7.07
MTO 7 3.1 91,599.14 7.20
Financial Centre- Campus LED
FC1.A 2.0 57,394.79 7.02
FC1.B 3.7 154,719.17 10.29
FC2.A 2.8 103,642.48 9.28
FC2.B 2.5 53,905.10 5.25
Innovation/Start-up/Incubation Zone
IIC1 4.8 192,659.10 9.97
IIC2.A 4.6 100,039.90 5.35
IIC 5.A 4.4 95,541.15 5.40
IIC 5.B 4.6 102,863.56 5.53
IIC 6.A 4.4 96,873.72 5.44
IIC2.B 4.3 95,656.44 5.50
IIC7 4.0 91,931.36 5.73
Knowledge Zone
KC1.A 6.6 84,461.14 3.16
KC1.B 5.0 5,3524.42 2.62
KC2.A 7.4 92,976.09 3.09
KC2.B 8.0 113,850.19 3.51
KC2.C 6.7 83,082.40 3.08
KC2.D 8.0 103,525.35 3.20
List of Activation Area (Phase I) plots…
Lifestyle Sites
Plot No./ID Plot Area (Acres) Total BUA with Podium (Sqm) FAR
Healthcare Zone
HC1.A 4.4 133,103.35 7.39
HC1.B 4.4 14,1773.39 7.99
Hospitality, ECC & Cultural
HO1.A 6.0 71,103.01 2.92
HO1.B 4.0 58,237.05 3.60
HO 1.C 4.4 50,530.47 2.85
HO 1.D 3.8 50,005.76 3.25
Residential – Affordable
RA1 6.1 136,822.16 5.50
RA2 4.2 61,185.60 3.60
RA3 3.4 48,484.21 3.54
RA4 7.9 123,672.80 3.89
RA5 3.4 57,438.41 4.15
RA6 3.8 58,181.11 3.81
Residential-MID
RM1 3.9 133,121.99 8.34
RM2 5.5 135,439.81 6.07
RM 3 10.9 270,937.35 6.16
School
PSP 1 B 4.9 29,352.47 1.49
PSP 1C 3.2 19,389.56 1.49