Drill 5 - Finals

Instruction : Show your complete solution on each problem. Please submit your
answers on time. LATE submissions and DIRECT MESSAGING of answers will no
longer be accepted.

1. A circular channel of 1.5 m diameter is laid on a slope 1 to 1000. Find the


maximum discharge through this channel. Assume C=55.
2. A circular channel of 1.8 m diameter is laid on slope 1 to 1500. Find the discharge
through the channel when velocity of flow is maximum. Take n=0.018.
3. A trapezoidal channel having side slope (1:1) is required to discharge 13.75 m3/s
of water with a bed slope (1 to 1000). If this channel is unlined and the value of
C=44 and when channel is lined with concrete the value of C= 56. The cost per
cubic meter of excavation is four times the cost per square meter of lining. The
channel is to be the most efficient one find whether the lined channel will be
cheaper. What will be the dimensions of the economical channel?