Instruction : Show your complete solution on each problem. Please submit your answers on time. LATE submissions and DIRECT MESSAGING of answers will no longer be accepted.
1. A circular channel of 1.5 m diameter is laid on a slope 1 to 1000. Find the
maximum discharge through this channel. Assume C=55. 2. A circular channel of 1.8 m diameter is laid on slope 1 to 1500. Find the discharge through the channel when velocity of flow is maximum. Take n=0.018. 3. A trapezoidal channel having side slope (1:1) is required to discharge 13.75 m3/s of water with a bed slope (1 to 1000). If this channel is unlined and the value of C=44 and when channel is lined with concrete the value of C= 56. The cost per cubic meter of excavation is four times the cost per square meter of lining. The channel is to be the most efficient one find whether the lined channel will be cheaper. What will be the dimensions of the economical channel?