BACK UP DATA PEKERJAAN TALUD RUAS FDP

PANJANG A B C D LUAS VOLUME


NO KETERANGAN
(m) (m) (m) (m) (m) (m2) (m3)
a b c d f g h i j

1 0.30 0.40 0.45 0.20 0.24


6.00 1.74
2 0.30 0.40 0.75 0.20 0.34
13.80 4.73
3 0.30 0.40 0.75 0.20 0.34
22.80 7.21
4 0.30 0.40 0.60 0.20 0.29
13.68 Lokasi 1

5 0.30 0.40 0.60 0.20 0.29


10.60 3.07
6 0.30 0.40 0.60 0.20 0.29

7 0.30 0.40 0.60 0.20 0.29


8.40 2.58
8 0.30 0.40 0.70 0.20 0.32
0.80 0.26
9 0.30 0.40 0.70 0.20 0.32

10 0.30 0.40 0.70 0.20 0.32


0.70 0.23
11 0.30 0.40 0.70 0.20 0.32
5.80 2.14
12 0.30 0.40 0.95 0.20 0.41
5.80 2.14
13 0.30 0.40 0.70 0.20 0.32
12.70 3.91
14 0.30 0.40 0.60 0.20 0.29
14.33 Lokasi 2

Total 28.00 m3