Professional Documents
Culture Documents
23 23 This drawing is the property of L&T Construction ,B&F-EDRC and must not be passed on to any person or body not authorised by
us to receive it nor be copied or otherwise made use either in full or in part by such person or body without our prior permission
in writing.
FFB 1 FFB 1
R N
(300 x 900) (300 x 900)
31
150 THK
(160 x 800)
(160 x 800) (160 x 800)
(160 x 750)
150 THK
150 THK
23 23
150 THK
H H
3820
WINDOW
150 THK
150 THK
150 THK
OPENING
150 THK
*
100
150 THK
125
(160 x 750)
(160 x 800)
(200 x 900) (300 x 900)
(160 x 800) (160 x 800)
*
(300 x 900)
150 THK
FFB 6a FFB 2
FFB 2
FFB 6a
75
950
(200 x 900) +877.900M +877.900M
750
Q DOOR +877.900M TOC TOC
OPENING
250
(200 x 900)
TOC
(200 x 900)
(200 x 900)
(200 x 900)
+877.900M
(300 x 900)
185
(200 x 900)
600
150 THK
FFB 8a
FFB 4
1725
FFB 6
TOC
FFB 4
FFB 3
FFB 3
50
150 THK
31
*
22 22 32 32 22 22
550
125
600
125
100
900
FFB 6a
800
150 THK
25
90 8a
900
P
550
(300 x 900)
75
0)
0 x FB
75
125
(200 x 900)
FFB 8
900
150 THK
100
FFB 6a
(20 F
150 THK
(200 x 900) 160 160 160
300 160 TOWER-3
175
75
(160 x 900)
(160 x 900)
3515
FFB 5
SECTION 4-4
FFB 5
SECTION 1-1 SECTION 2-2
150 THK
150 THK
*
150 THK
150 THK
150 THK
150 THK
150 THK
150 THK
G DOOR G
O
150 THK
150 THK
150 THK
150 THK
150 THK
150 THK
160 160
*
OPENING
150 THK
150 THK
(300 x 900)
160 +877.900M
1250
24 +877.900M
24
950
TOC
FFB 7
160
3515
24 +877.900M TOC
24 24 TOC FILLING
150 THK
600
125
250
*
150 THK
*
150 THK
900
550
125
600
150 THK
150 THK 150 THK
150
N
150 THK
900
RC WALL
125
150 THK
150 THK
100
*
650
24
150 THK
160
SECTION 26-26
SECTION 29-29
3820
KEY PLAN
SECTION 3-3
F F
+877.900M DOOR
750
M TOC OPENING
100
LEGEND:
1200
+877.900M
160
160
550
160 - 160 THK. WALL
125
600
+877.900M
125
950
800
800
- 50mm BALCONY
525
+877.900
550
550
TOC
TOC 200
900
SUNKEN SLAB
350
75
4640
125
100
(200 x 900)
(200 x 900) 160
725
MID LANDING SUNKEN SLAB
FFB28
FFB28
160
900
- 100mm TOILET
RC WALL
FFB 29 FFB29
300 SECTION 17-17 SUNKEN SLAB
(200 x 900) (200 x 900) - 200 THK WALL
L - 300 THK WALL
5 5
(160 x 900)
RC UPSTAND
SECTION 5-5 SECTION 6-6
(160 x 900)
FFB27
FFB27
450
TOC
2755
FFB12
E E
FFB13
FFB30
125
17 FFB14 FFB15 (200x900) (160 x 900) FFB 23 WINDOW 100 600
V1 14 100
75
FFB11
(160 x 900) OPENING WINDOW 75 - 300 THK WALL FROM 1st FLOOR
J (160 x 800) GC12 (235 x 900) 125
OPENING
(160 x 900)
11 RC WALL
150
GC12 D4 - RC UPSTAND
1725
GC17
(200x900)
FFB25
RC WALL
FFB 31
160
75
DW1 300
1250
950
200
1250
4 D4 SW1 4 16 - WALL STOPPED
(200 x 900)
SW1
1050
CW2 25 +877.900M DOOR
H +877.900M +877.900M
FFB24
D4 W3 FFB35 FD3 TOC OPENING - CUTOUT
D3 TOC
(300 x 900)
150
DW3 SD1 TOC
150
(160x575)
FFB22
FD1
FFB39
(200 x 600)
(200 x 600)
2485
11 DN UP 75 75
600
17 1 GC11 FFB - FIRST FLOOR BEAM
600
125
FFB 21
900
125
900
75
900
75
150
150
D3 CW3 LD
G 16 600
FFB 36 (160x1250)
160 300
75
160
D2 D2 14
SECTION 9-9
(200 x 600)
SECTION 7-7 SECTION 8-8 +877.900M
2690
(200 x 600)
D2 FFB44 150 THK RC WALL
FFB 20
D (200 x 600) FFB 18 D
6 6 FFB 19 FFB19
(200 x 600)
FFB43a (200x600)
WINDOW
F 600
900
OPENING NOTES :
100
75
D1 SW3 SW3 125 75
(200 x 600)
21 V1 3
150
3
2160
+877.900
FFB 17
FD4 19 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS ARE IN METRES UNLESS OTHERWISE SPECIFIED
29 160
75
13 13
950
FFB37 2. DETAILS OF CUTOUTS REFER RELEVANT PHE AND ELECTRICAL DRGS.
+877.900M
E
(200 x 1500) (200 x 1500) GC17 FD4 LD CW3 LD D5
300
+877.900M
150 TOC TOC
600
+877.900M SECTION 32-32 3. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE LATEST ARCHITECTURAL DRG
TOC
575
150
FFB 45 D1 29 D1
(160 x 900)
(200 x 600)
FFB 41
100
(200 x 600)
2335
75
100
27 V1 17
900
150
FFB 38
21 D4
900
900
19 DN 300 (W) x 150 (D)
150
RC WALL 0 ISSUED AS GOOD FOR CONSTRUCTION
FFB 32 STRIP SUNK
D (160 x 600) 18 FFB 34 18 26 26
D3 150 THK MPA 18.03.2022 PJB 19.03.2022 RAMG 03.06.2022 RGC 14.07.2022
D4 150 THK 200 200
GC15
GC15
(200 x 600)
(160 x 600)
D2 D2 FFB 33
FFB 40
D3
D3 SECTION 10-10 SECTION 11-11 SECTION 12-12 REVISIONS
STP SHAFT
C D3 (200 x 600) C
D2 D2 D2 PROJECT: CLIENT:
160
28
28 28 FFB 33a 160 THE Prestige Projects Pvt. Ltd.,
5595
(160 x 800) 30
2 +877.900M PRESTIGE PRESTIGE FALCON TOWER
650
No. 19, BRUNTON ROAD,
TOC
(160x575)
D4 TOC
FFB13a
200
(160 x 600) W2 +877.900M PHE, ELECTRICAL, HVAC & FIRE FIGHTING CONSULTANTS: PROJECT CONSULTANTS:
125
100
DW3 SD1
800
33 33 TOC
900
DW1 GC12 DesignTree Service Consultants
600
DW1
150
27 W2 Pvt Ltd Consulting Engineers RSP Design Consultants
A
(160 x 800)
FFB15a
600
2
FFB16
125
(160 x 800)
FFB15
FFB16
re
ca
FFB13
e
n W
(160 x 800)
desig
We
800)
7 FFB14 FFB15
(160x x800)
FFB13
250
TOC
950
+877.900M 160
1 2 3 4 5 6 7 9 14 15 17 19 20 21 +877.900M
TOC
TOC
L&T Construction - Buildings & Factories
TOWER - 3 RC WALL
800
600
900
900
75
600
50
75
125
LAYOUT & NUMERATION SETTING OUT DETAILS OF WALLS, SLAB, BEAM AT FIRST FLOOR LVL
150
125
175
(SLAB THICKNESS SHALL BE 125MM THK. UNLESS OTHERWISE SPECIFIED) 160
(ALL SERVICE SLABS ARE 100MM THK UNLESS OTHERWISE SPECIFIED)
SECTION 15-15 SECTION 33-33 JOB No : O21552
SECTION/
75
TOC +877.900M
TOC
NAME SIGN DATE AVALON PARK MARKING
200 200
+877.900M DSGN KHY 18.03.2022
200 DOOR
+877.900M TOC DRAWING
75 TOWER 3
150
+877.900M
+877.900M +877.900M TOC LAYOUT & NUMERATION SETTING OUT DETAILS OF
50
TOC TOC TOC +877.900M CHKD RAMG 03.06.2022 SCALE
100
600
1500
A A
900
1:100, 1:50
100
125
600
100
900
125
160 PROJECTION
600
600
850
125
75 SIZE REV
75
900
900
150
SECTION 27-27 SECTION 28-28 RELEASED FOR PRELIMINARY TENDER INFORMATION APPROVAL CONSTRUCTION
SECTION 19-19 SECTION 20-20 SECTION 21-21 SECTION 22-22 SECTION 23-23 SECTION 24-24 SECTION 30-30
12 11 10 9 8 7 6 5 4 3 2 1