Stakeholder Management and Communication Management Plan on E-


Government Project

Conference Paper · November 2023


DOI: 10.1109/CITSM60085.2023.10455566

CITATIONS READS

0 22

5 authors, including:

Shafira Fatimah Azzahra Muhammad Fakhrul Safitra


Telkom University Telkom University
4 PUBLICATIONS 7 CITATIONS 30 PUBLICATIONS 104 CITATIONS

SEE PROFILE SEE PROFILE

Muharman Lubis Sinung Suakanto


Telkom University Telkom University
264 PUBLICATIONS 1,564 CITATIONS 39 PUBLICATIONS 215 CITATIONS

SEE PROFILE SEE PROFILE

All content following this page was uploaded by Muhammad Fakhrul Safitra on 18 March 2024.

The user has requested enhancement of the downloaded file.


Stakeholder Management and Communication
Management Plan on E-Government Project
1st Shafira Fatimah Azzahra 2nd Titisari Ramadhane 3rd Muhammad Fakhrul Safitra
Department of Information Systems Department of Information Systems Department of Information Systems
Telkom University Telkom University Telkom University
2023 11th International Conference on Cyber and IT Service Management (CITSM) | 979-8-3503-0596-8/23/$31.00 ©2023 IEEE | DOI: 10.1109/CITSM60085.2023.10455566

Bandung, Indonesia Bandung, Indonesia Bandung, Indonesia


shfrazzhrid@student.telkomuniversity.ac.id ramadhane@student.telkomuniversity.ac.id fakhrulsafitra@telkomuniversity.ac.id

4th Muharman Lubis 5th Sinung Suakanto


Department of Information Systems Department of Information Systems
Telkom University Telkom University
Bandung, Indonesia Bandung, Indonesia
muharmanlubis@telkomuniversity.ac.id sinung@telkomuniversity.ac.id

Abstract— The use of stakeholder management is crucial for manage stakeholder engagement in decision-making
achieving success in projects, specifically within the domain of processes and project activities [1]. Communication
e-government project consulting. The aforementioned Management Plan is a process taken at the management stage
procedure encompasses the identification of persons, in an organization, before the organization decides or
organizations, or entities that possess the capacity to exert implements what form of communication is best to do in
influence over a project, comprehending their expectations, and carrying out a project [2].
evaluating the probable consequences of their involvement. The
development of effective management strategies involves the Stakeholder Engagement in a project by communicating
engagement of stakeholders in decision-making processes, the effectively and well can increase support for project
establishment of ongoing contacts, and the resolution of implementation in an organization which usually results in
challenges, all with a focus on prioritizing their needs and project success, communication with stakeholders can be done
expectations. Communication Management Plans are of utmost in writing or verbal [1]. Stakeholder management is very
importance as they serve to ensure the implementation of impactful with the running of the project [2], the
effective communication methods that facilitate the alignment Communication Management Plan is the exchange of
between stakeholders and project objectives. Within the realm information regarding a project with a focus on establishing
of e-government consulting, the process entails actively communication between sender and recipient. This is reflected
involving diverse stakeholders, including IT Governance simultaneously into an indispensable tool for systematically
Boards, Project Managers, and other relevant parties. This is
managing project resources. The use of coordination and
achieved by the use of different techniques, such as the regular
dissemination of reports on a weekly basis, conducting surveys,
collaboration in communication is a prevalent strategy
carrying out interviews, and facilitating group discussions on employed for the purpose of scheduling, organizing, and
dedicated forums. Stakeholder mapping is an effective method regulating projects, whereby contributors work together to
for addressing typical obstacles encountered in stakeholder establish concrete outcomes. Engaging in communication
management. This tool facilitates the classification of with stakeholders is often necessary in order to establish and
stakeholders according to their degrees of interest and power, maintain solid relationships, as well as to effectively assess the
hence enabling the development of customized engagement operational efficiency of individual project tasks. The
strategies. The successful execution of projects, particularly implementation and alignment of a unified vision across
intricate endeavors such as e-government, relies heavily on projects heavily relies on the use of an efficient
thorough stakeholder management and well-defined communication strategy [3]. Method, time, and frequency are
communication protocols. The capacity to discern essential one of the considerations in making a Communication
stakeholders, comprehend their issues, and develop efficient Management Plan.
lines of communication is crucial in attaining project success.
E-government is a form of public service through
Keywords—communication management, E-Government, information technology [4]. E-government project consulting
stakeholder management is a project carried out to create a basic framework that
describes the integration of business processes, data and
I. INTRODUCTION information, e-government infrastructure, e-government
The practice of stakeholder management is essential in applications, and e-government security to produce e-
order to identify individuals, groups, or entities that may be government services which is integrated in each OPD in a
subject to influence by a given project. This process involves government. PT. XYZ is a consulting company engaged in IT
analyzing the expectations of stakeholders and assessing their e-government consultants that has several problems in
potential impact on the project. Furthermore, it entails the managing communication with stakeholders, where this
development of appropriate management strategies that problem starts from stakeholders who have different wishes
effectively engage stakeholders in decision-making processes and opinions, changing project requirements,
and project implementation. Also, it focuses on maintaining miscommunication, information that is not evenly divided,
continuous interactions with stakeholders in order to get and PT XYZ has also not determined the key stakeholders
insight into their requirements and expectations. It aims to where this will be the strategies for stakeholder management.
effectively resolve any issues that may arise, as well as This research was conducted to analyze how the influence of

Authorized licensed use limited to: UNIVERSITAS GADJAH MADA. Downloaded on March 18,2024 at 10:46:09 UTC from IEEE Xplore. Restrictions apply.
stakeholder management and communication management stakeholder mapping stage, stakeholders are grouped by role,
plans in PT. XYZ. level of power, and influence of their decisions [17].
II. LITERATURE REVIEW III. RESEARCH METHODOLOGY
A. Communication Management This research uses a case study method, conducting case
studies across different e-government projects or across
Communication Management processes include the
different countries can provide deep insight into how
essential activities required to guarantee the timely and
stakeholder management and communications are
appropriate planning, gathering, creation, dissemination,
implemented, with analyze project documents, conduct
storage, retrieval, control, management, monitoring, and final
interviews with stakeholders and project team members, and
disposition of project information [5] which is intended to
examine related data to gain a better understanding of best
oversee and control the project data process from the
practices and add value to information related to the
collection, categorization, dissemination, equipment
definition, scope, model, concept and implementation of
utilization, and decision making [6]. A successful project
stakeholder management and communication management
consists of good, clear, and effective communication between
plans.
the stakeholders, the client, and the project team [7]. Any
communication made must be directed to the goals of the Document Analysis of project documents, such as the
organization and stakeholders [8]. Poor communication can project management plan, communications plan, progress
lead to project failure [9]. The importance of effective reports, and relevant policies, can provide insight into the
communication cannot be overstated, particularly in light of practices used in stakeholder management and
the need to convey the expectations of stakeholders at various communications. Method to performing the Monitor
organizational levels [10]-[13]. Stakeholder Management Process [18] can be seen in Fig. 2.
Project Managers must be able to build a good team
culture in order to create a high-performing team. If a Project
Manager doesn't monitor the project well the consequences
are, the project could not run as scheduled, increase in cost,
ineffective communication between project managers and
teams. In managing communication between project
managers and stakeholders, there is always some relationship
between internal and external companies.

Fig. 1. The Relationship Between Project Managers and Stakeholders


Fig. 2. Method to performing the Monitor Stakeholder Management
Communicating with stakeholders can build relationships Process
which could lead to trust with project managers and team,
which will facilitate the search for solutions if there are With this method, it can analyze how the influence of
problems in the process of running the project [2]. Support stakeholder management and communication management
from stakeholders can lead to project success [14]. plans in PT. XYZ. Based on this method, this research
analysis is carried out to obtain research formulations sourced
B. Stakeholder Management
from various data sources. The facts and realities of the case
Stakeholder management encompasses the requisite study are then realized using methods to determine the
procedures for identifying individuals, groups, or entities that influence of stakeholder management and communication
possess the potential to exert influence on or be impacted by management plans in PT. XYZ.
the project. It involves scrutinizing stakeholder expectations
and assessing their ramifications on the project, as well as IV. RESULTS AND DISCUSSIONS
formulating suitable management strategies to actively
involve stakeholders in project decision-making and A. E-Government Project Consulting
implementation [15], [16]. In addition, it also prioritizes E-government project consulting refers to the
continuous communication with stakeholders in order to gain implementation of a comprehensive framework that
an understanding of their requirements and expectations, deal encompasses the integration of business processes, data, and
with problems as they arise, resolve conflicts of interest, and information technology, as well as e-government
promote proper stakeholder participation in project decisions infrastructure, applications, and security measures. The
and activities [1] . Improving the quality of projects can be objective is to develop cohesive e-government services within
influenced by good stakeholder management. One form of each OPD in a government. Stakeholders in this e-
analyzing stakeholders is by stakeholder mapping to identify government project consulting include:
stakeholders who will be prioritized in a project. Prior to the

Authorized licensed use limited to: UNIVERSITAS GADJAH MADA. Downloaded on March 18,2024 at 10:46:09 UTC from IEEE Xplore. Restrictions apply.
TABLE I. STAKEHOLDER POSITION b) Survey: The communication management that has
Stakeholders Key Concern been implemented in this project starts from
conducting a survey of several OPDs in certain
I&T Governance Board The role inside the organization entails the
evaluation of IT operations, proposals, and
governments. The survey was conducted for
projects with the purpose of providing approximately 2 weeks
guidance to the CIO on matters pertaining to
demand management, strategy alignment, c) Interview: The interview was conducted within 2
value delivery, policy and procedure weeks, by conducting interviews directly to each
creation, as well as risk management specific service in the government, from the results of
to the business context. communication produced existing data and
Board Director It is a body that represents the interests of architectural GAPs regarding the application of
shareholders and is responsible to them for a electronic government in the government. The data
specific set of tasks, including defining the
company's strategy and corporate
obtained includes service data, SOPs, data and
philosophy, oversight of management, and information, business processes, applications,
the implementation of internal controls. infrastructure, security, governance, and management.
Project Manager A position on the company responsible for d) Forum Group Discussion: The group discussion forum
leading and developing projects from initial was carried out between stakeholders, namely OPD
concept to development, specifications, and
construction documents. and IT consultants, 2-way communication was carried
out to validate the data that had been obtained and
Developer The position in charge of designing a proposed. FGD is carried out 2 times during the project
products or services, usually in the form of
software,
period, first when finished recapturing existing data,
application, or website. and secondly after making proposals regarding service
data, SOPs, data and information, business processes,
IT Government Consultant as an analyst to input the data that
Consultant has been obtained after interviews with each
applications, infrastructure, security, governance, and
OPD, the consultant is also tasked with management.
making proposals for services, SOPs, data
and information, business processes, TABLE II. COMMUNICATION MANAGEMENT
applications, infrastructure, security,
governance, and management. Communication Methods Frequent Deliverables
Type
e-Government Project The position in charge of conducting project Weekly Report Online Once a Week MoM &
Analyst analysis, which includes several documents and Project Task Meeting Report
such as: business processes, data and Review Progress
information, e-government infrastructure, e-
government applications, and e-government Survey Online 2 Weeks Before Surveys
security to produce integrated e-government Surveys The Project Starts Answers
services Interview Online 2 Weeks Before Data
Meeting The Project Starts
Surveyors The position in charge of conducting a Forum Group Online After received Data
survey or collecting data that will be taken at Discussion Meeting existing data, and Validated
all predetermined agencies or OPDs made proposal
Internal User Users of the internal company consisting of
managers, leaders, as well as employees
interested in the company.
B. Stakeholder Mapping
Customer (Organisasi An organization or person who uses certain Every project have obstacles or problems, in this research
Perangkat Daerah(OPD)) services or products and makes payments for
the services or products used. the problems we face are stakeholders who have different
desires, stakeholder changes project requirements in the
Regulator Perform or implement a series of regulations middle of the project, the presence of stakeholders is
or arrangements that exist in an organization
or company. incomplete during meetings, differences of opinion between
stakeholders with each other, stakeholders are not open to
System Admin The position responsible for maintaining the share all information, miscommunication with stake holders,
existing network of a company.
lack of project team strategy to manage stakeholders, project
Helpdesk A responsible position to assist in answering team does not determine key stakeholders (priorities). From
customer questions of a technical nature. the problems we face, one solution is to create a stakeholder
map matrix.
Communication Management includes the processes TABLE III. STAKEHOLDER LEVEL PARAMETER
necessary to ensure timely and appropriate planning,
Power High Keep Satisfied Key Players
collection, manufacture, distribution, storage, retrieval,
control, management, monitoring, and final disposition of pr Low Minimal Effort Keep Informed
information. Communication Management on this project Low High
includes:
Level of Interest
a) Weekly Report and Project Task Review:
Communication management that has been
implemented in this project by conducting weekly
reports as progress that has been worked on in each job
role.

Authorized licensed use limited to: UNIVERSITAS GADJAH MADA. Downloaded on March 18,2024 at 10:46:09 UTC from IEEE Xplore. Restrictions apply.
Table III is a stakeholder level parameters, here is the Customer An organization or person who uses certain Keep
explanation: (Organisasi services or products and makes payments Satisfied
Perangkat for the services or products used.
1) Key Players, for those who have a high level of Daerah
(OPD))
importance in business and have a large role in
decision making. Regulator Perform or implement a series of Keep
regulations or arrangements that exist in an Satisfied
2) Keep Satisfied, for those who have a high level of organization or company.
interest in business and high level of decision making. System The position responsible for maintaining Minimal
Admin the existing network of a company. Effort
3) Keep Informed, for those with a high level of
importance in business and a low level of decision Helpdesk A responsible position to assist in Minimal
making, and answering customer questions of a Effort
technical nature.
4) Minimal Effort, for those with a high level of
importance in business is low and the role is low in V. CONCLUSIONS
decision making. Stakeholder Map Matrix which
serves to identify stakeholders in their involvement in In summary, the significance of good stakeholder
the architecture, influence on engagement, and key management and communication management for project
questions, issues, or key issues to be addressed. success is underscored in the presented material. Stakeholder
Stakeholder mapping is carried out on stakeholders in management is the process of identifying and actively
the PT. XYZ. Stakeholder mapping based on position involving people, organizations, or entities that possess the
and level of interest in the PT. The XYZ can be seen in ability to exert influence on the project. This process
the table below. encompasses the examination of expectations, the resolution
of challenges, and the sustenance of ongoing relationships in
TABLE IV. STAKEHOLDER MAPPING MATRIX order to get a comprehensive understanding of their
requirements. Additionally, communication management
Stakeholders Key Concern Level
plans are of utmost importance in developing efficient
I&T A position in the company responsible for Key communication strategies among stakeholders, thus laying a
Governance reviewing IT operations, proposals, and Player solid groundwork for the achievement of project objectives. In
Board projects to advise the CIO on demand
management, strategic alignment, value the realm of e-government project consulting, it is important
delivery, policy/procedure development, to engage a wide range of stakeholders, such as IT Governance
and per-business risk management. Boards, Board Directors, Project Managers, Developers,
Board It is a body that represents the interests of Key Consultants, and other relevant parties, in order to ensure a
Director shareholders and is responsible to them for Player smooth and efficient implementation of the project. In order
a specific set of tasks, including defining to guarantee alignment between project objectives and
the company's strategy and corporate stakeholder expectations, many effective communication
philosophy, oversight of management, and
the implementation of internal controls. strategies are used, including the use of weekly reports,
surveys, interviews, and forum group discussions.
Project A position on the company responsible for Key Stakeholder management is needed for developing
Manager leading and developing projects from initial Player
concept to development, specifications, and management strategies. We use comparative method of case
construction documents. studies so it can analyze how the influence of stakeholder
management and communication management plans in PT.
Developer The position in charge of designing a Keep
products or services, usually in the form of Informed XYZ. From the problems we face in PT. XYZ project, one of
software, the solutions is to create a stakeholder map matrix.
application, or website. Stakeholder mapping based on position and level of interest in
IT Consultant as an analyst to input the data Keep
the project PT. XYZ.
Government that has been obtained after interviews with Informed Stakeholder mapping, as shown by the matrix, is an
Consultant each OPD, the consultant is also tasked with
making proposals for services, SOPs, data essential technique for effectively resolving typical
and information, business processes, difficulties encountered in stakeholder management. This
applications, infrastructure, security, approach facilitates the classification of stakeholders
governance, and management. according to their degrees of interest and influence, so
e- The position in charge of conducting Keep allowing project teams to customize their engagement tactics
Government project analysis, which includes several Informed in a targeted and efficient manner. In conclusion, the effective
Project documents such as: business processes, data implementation of projects, especially those of a complex
Analyst and information, e-government
infrastructure, e-government applications, nature such as e-government initiatives, necessitates the
and e-government security to produce adoption of a complete strategy that covers stakeholder
integrated e-government services management and the implementation of clear communication
Surveyors The position in charge of conducting a Keep standards. The identification of important stakeholders,
survey or collecting data that will be taken Informed comprehension of their problems, and establishment of
at all predetermined agencies or OPDs effective lines of communication are crucial elements in
Internal User Users of the internal company consisting of Keep attaining project success.
managers, leaders, as well as employees Informed
interested in the company.

Authorized licensed use limited to: UNIVERSITAS GADJAH MADA. Downloaded on March 18,2024 at 10:46:09 UTC from IEEE Xplore. Restrictions apply.
REFERENCES Elsevier B.V., 2019, pp. 359–366. doi:
10.1016/j.procs.2019.11.134.
[1] Project Management Institute, A Guide to the Project Management [11] L. Pi, “Establishment and Application of Spatial Distribution Model
Body of Knowledge (PMBOK guide). 2017. of Roof Greening Based on GIS Technology,” Int. J. Informatics
[2] G. Francisco de Oliveira and R. Rabechini, “Stakeholder Inf. Syst., vol. 6, no. 1, pp. 1–7, Jan. 2023
management influence on trust in a project: A quantitative study,” [12] J. Prayitno, B. Saputra, S. A. Rahayu, and T. Hariguna, “Market
International Journal of Project Management, vol. 37, no. 1, pp. Basket Analysis Using FP-Growth Algorithm to Design Marketing
131–144, Jan. 2019, doi: 10.1016/j.ijproman.2018.11.001. Strategy by Determining Consumer Purchasing Patterns,” J. Appl.
[3] M. Lubis, “Analysis of Project Communication on Smart Card Data Sci., vol. 4, no. 1, pp. 38–49, Jan. 2023
Implementation in Higher Education Penelitian Dosen Pemula View [13] T. Bin Maalawi and A. Rahman Obaid, “Information and
project Information Security Awareness Maturity Model View Communication Technology and Knowledge Sharing: a Literary
project,” 2011. [Online]. Available: Referential Study”, Int. J. Appl. Inf. Manag., vol. 2, no. 4, pp. 73–
https://www.researchgate.net/publication/307577541 83, May 2022.
[4] M. I. Alhari, A. Amalia, and N. Fajrillah, “Enterprise Architecture: [14] N. P. Srinivasan and S. Dhivya, “An empirical study on stakeholder
A Strategy to Achieve e-Government Dimension of Smart Village management in construction projects,” in Materials Today:
Using TOGAF ADM 9.2,” 2022. [Online]. Available: Proceedings, Elsevier Ltd, 2020, pp. 60–62. doi:
www.joiv.org/index.php/joiv 10.1016/j.matpr.2019.05.361.
[5] M. Godse and B. Rajiv, “Improvement of Project Management [15] Y.-T. Song et al., 2016 IEEE/ACIS 14th International Conference
Knowledge Areas Using Scrum Technique,” 2019, pp. 133–150. on Software Engineering Research, Management and Applications
[Online]. Available: http://www.springer.com/series/15734 (SERA) : proceedings : June 8-10, 2016, Towson University,
[6] J. K. Crawford, “Project Management Maturity Model,” 2015. Balitmore, USA.
[7] M. T. Al Nahyan, A. Sohal, Y. Hawas, and B. Fildes, [16] A. Al-Saedi and J. Pasławski, “Influence of stakeholder
“Communication, coordination, decision-making and knowledge- management and communications management in choosing of the
sharing: a case study in construction management,” Journal of best product achieve quality by Analytic Hierarchy Process
Knowledge Management, vol. 23, no. 9, pp. 1764–1781, Nov. 2019, method,” in IOP Conference Series: Materials Science and
doi: 10.1108/JKM-08-2018-0503. Engineering, Institute of Physics Publishing, Jun. 2019. doi:
[8] A. Zerfass, D. Verčič, H. Nothhaft, and K. P. Werder, “Strategic 10.1088/1757-899X/518/2/022068.
Communication: Defining the Field and its Contribution to [17] S. Raum, “A framework for integrating systematic stakeholder
Research and Practice,” International Journal of Strategic analysis in ecosystem services research: Stakeholder mapping for
Communication, vol. 12, no. 4, pp. 487–505, Aug. 2018, doi: forest ecosystem services in the UK,” Ecosyst Serv, vol. 29, pp. 170–
10.1080/1553118X.2018.1493485. 184, Feb. 2018, doi: 10.1016/j.ecoser.2018.01.001.
[9] K. Muszyńska, “Communication maturity model for organizations [18] P. Sanghera, “Monitoring Stakeholder Engagement and
realizing EU projects,” in Procedia Computer Science, Elsevier Communication,” in PMP® in Depth, Apress, 2019, pp. 519–533.
B.V., 2018, pp. 2184–2193. doi: 10.1016/j.procS.2018.07.230. doi: 10.1007/978-1-4842-3910-0_14.
[10] E. W. Tyas Darmaningrat, F. A. Muqtadiroh, and T. A. Bukit,
“Communication management plan of ERP implementation