Professional Documents
Culture Documents
Installation Instructions
Dimensional Data: Inches and [mm] are subject to manufacturing tolerances and change without notice.
C
A
D B
NOTES:
1. Before installing, remove panel and locate small slot in frame.
2. Install frame with small slot down only.
3. Panel can be attached to wall with adhesives (by others) or
screws provided.
ZURN PEX PLUMBING AND RADIANT HEATING SYSTEMS 1801 PITTSBURGH AVENUE, ERIE, PA, U.S.A. 16502 PHONE: 800/872-7277 FAX: 800/209-2148 www.zurn.com
IN CANADA: ZURN INDUSTRIES LIMITED 3544 NASHUA DRIVE, MISSISSAUGA, ONTARIO L4V 1L2 PHONE: 905/405-8272 FAX: 905/405-1292