Katerra is transforming
through technology -
every process and every
product.
Katerra was founded due to an overwhelming
need for change within the industries that
create our built environment.
2 katerra.com
Our Approach is Different Katerra Integrated Services
Katerra is a technology company at Technology
heart. We are on a mission to optimize Katerra is an end-to-end building services provider. As a full-service partner for
every aspect of building design and developers and architects, we can provide everything you need to deliver the
construction. highest quality building projects.
Construction Design
1. Vertically Integrated
We are fully integrated, providing end-to-end building services
as a single partner, with robust technology systems connecting Mass Timber
everything together. Manufacturing Procurement
Finish Items
Benefits
Floor to ceiling, inside and out, Katerra can provide the highest quality
Increased Labor Productivity Improved Jobsite Efficiency materials for every aspect of your interior and exterior finish needs. Across
every product category in our curated catalog of finish items, we are able
Less Waste Quality Control to offer extremely competitive pricing thanks to our ability to aggregate
demand for all of our clients and projects.
Highly Skilled Workforce Advanced Technology
4 katerra.com 5
Realized Construction should never come at the cost of
Envisioned Design Listen
6 katerra.com 7
Virtual Design and Block Scheduling
Construction (VDC) Our five main goals are:
At Katerra, we believe in an integrated and 1. Use BIM to virtually construct the At Katerra, we have developed a scheduling system, internally known as the
building in its entirety – Enable clash “Block Schedule,” to allow us to maintain trade flow, minimize crew sizes
collaborative project delivery approach, utilizing detection
the Virtual Design and Construction (VDC) process and identify with certainty the end date of the project. Our project team will
and Building Information Modeling (BIM) as Lean 2. Create a collaborative environment work closely with all trades to develop a five-day work plan, sequencing
based on a common platform –
tools to deliver a safe, cost-effective, timely, and Reduce RFI’s
workflow to produce a predictable production rate with known manpower
complete project. Katerra is unique in that we while days six and seven are used to adjust to stay on schedule.
3. Manage change – Minimize schedule
create a Single Source of Truth Model (SSTM) for impacts
each of our projects, populated by BIM information
4. Manage construction documents –
as early as the civil, structural and landscaping Reduce costs
phases. This ensures complete coordination at
5. Minimize risk exposure – Increase
the earliest stages and prevents costly schedule
Safety
disruptions. Through a transparent, collaborative
approach, we can lower the costs of project
delivery while increasing efficiency and profitability
for our partners.
8 katerra.com 9
Project Management Systems At Katerra, we are fully integrated with standardize our processes. Procore Katerra is at the forefront of S-curve
Procore. Procore is a widely used construction is a drawing-centric application. It
management software that helps us places everything our team needs
our industry - we implement
Katerra utilizes S-curve analysis for
boost project accountability and efficiency (photos, punch lists, RFIs, submittals) performance analytics schedule validation and compliance.
Simplifies project financial reporting by mobilizing and streamlining project into the current drawing set to enable
and data measurement Our wide array of multifamily
documentation and communication. This real- every team member to access and performance curves give us standard
Clears punch lists more quickly time data and accessibility reduces expensive use them when they need it. throughout construction metrics that allow us to measure our
delays and risks while boosting reliable results. team’s actual performance. High-
Keeps drawings central to the project Katerra works diligently to remain All of our historical project data is rises, wood framing-over-podiums,
The software facilitates unlimited collaboration on the leading edge of remote fed into our business intelligence garden style walk ups and projects
Minimizes rework with real-time access to enabling us to work with anyone, from connectivity and presence. With our software. The data is then analyzed with parking below grade have
the most updated drawings out in the field anywhere, in real time. It is a collaborative Plus Trailers, remote site cameras, for typical benchmarks and leading specific cost characteristics as all
and mobile all-in-one platform designed and telepresence technologies like indicators for project health. building types cross the time/cost
Resolves information gaps or conflicts and to streamline our construction project Microsoft Skype for Business and threshold at different stages.
increase RFI response time management. Zoom, the jobsite and Katerra are just
The software offers what we need to a click away no matter your location.
Saves time by organizing and locating our
submittals faster
SOFTWARE BY PHASE PRE-DESIGN SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCS BIDDING CONSTRUCTION WARRANTY + CLOSEOUT
Virtual Meetings
Estimates
Constructibility Reviews
Design Review Comments
Value Options
BIM Coordination
Issue Tracking
Clash Detection
Visualization
Scheduling
Project Management
24/7 LIVE WEBCAM
Document Control
10 katerra.com 11
Collaborative, Open Book Process Transparency begins with
understanding…
Bid Solicitation
We assemble a list of preferred subcontractor bidders for each
trade of the project. Once this list is complete, we sit down with
Our preconstruction approach is to work
collaboratively with the architect during design At Katerra, we take special care the ownership team to review and refine the sub invitation list
review, performing constructibility reviews as detail to ensure a wholly transparent Bid Scoping
is added to the drawings. We approach this review experience from beginning to
As bids are received and tabulated, we invite the ownership
with the goal of helping the architect create a more end. Our open-book process team to join us in this process. Each bidder is contacted and a
“biddable” set of drawings. Our estimators evaluate invites our customers’ input detailed review of what’s in their scope begins. Lower bidders
are fully check listed and vetted, until, at the end of this phase,
the drawings by quantifying different scopes of work and encourages dialogue to all bids are “apples-to-apples”.
from the perspective of a subcontractor pricing the reach a price that satisfies all
parties based on a thorough Master Bid Analysis Review
project (such as masonry, steel or drywall).
understanding of what makes When all bids have been posted and abstracted, it is time
to begin the final review of each individual bid tabs. Once
These observations are then collected by our team as up that price. Once a fair price again, we invite the owner to participate in the final step
Design Review Comments, which will be thoroughly is determined, Katerra owns the of determining the ultimate GMP. The agreed-upon firm is
selected, and the spreadsheet posts him automatically as the
reviewed with the architect. After the architect makes responsibility of delivering the
low bidder on the Top Sheet. This process continues until all
Construction of The Stewart
the DRC modifications, our preconstruction team will project at that price. subcontractors have been selected. Now attention moves to
the Top Sheet. What the owner will see here is a subtotal of
again review the revised documents to make sure direct costs (the sum total of all the selected subcontractors).
each item was properly addressed. Post-Tension Concrete As we create and Following the direct costs are the indirects such as Fee, SDI
Experience update estimates, qualify (or bond), Sales Tax and Contractor’s Contingency. General
Conditions will likewise be reviewed and once agreed upon,
Our clients appreciate our constructibility process subcontractors and abstract Katerra is willing to lock in the GC’s. Together, these will form
Katerra’s post-tensioning experience
because it consistently produces tangible results: their bid proposals, every the basis of the GMP and the Schedule of Values (SOV).
can be found on a wide range of
prestigious projects nationwide. We line item, clarification and
More competitive subcontractor bids - Our approach during these important points of preconstruction
Details needed for tighter bidding are on the
have successfully put in place more assumption will be shared with
than a 10,000,000 SF of PT. We recently provide a transparent, collaborative platform that assures the
drawings.
completed two large (14 story +) the owners’ group. As the final owner complete visibility as to the final disposition of every
post-tensioned structures in record GMP is prepared, no line item construction dollar.
Fewer subcontractor change orders -
time, cycling a 25,000 SF floor every The Link’s rooftop amenity deck
Drawings are more concise for scoping and
week. Owners value us for delivering
or element will be beyond the
contracting.
on our promise of dependability, our owner’s right to review and
high level of technical expertise, and
Reduced RFIs during construction - The comprehend. To aid in the
our ability to navigate complicated
project is built as drawn, jobsite production process, we invite any and all
structural and construction challenges.
maintained.
Katerra executives make regular visits of the owner’s team to sit
to every PT project we build. In the
Constructibility reviews will be performed twice end, our responsibility—on each and with us in our conference
during the preconstruction services process, at the every project—is to assure exceptional room as we perform sub bid
product quality, competitive pricing and
80% design-development and 80% construction- timely delivery that results in the best
analytics and document GMP
drawing phases. value for our clients. clarifications.
12 katerra.com 13
Solutions Across The Building Life Cycle Senior Housing Construction Experience
Katerra has developed a highly-diversified offering, allowing us to provide a
wide variety of client services.
Katerra’s senior housing construction projects shape and define the communities they
As a full-service partner for developers, architects, general contractors, and
are built in. Katerra believes in the transformative value of the buildings that we help plan,
subcontractors, Katerra can provide every product and service needed to
deliver the highest quality building projects. design, engineer and build and their positive long-term effect on the people that populate
them. Katerra has an unrivaled commitment to innovation.
Markets We Serve Senior Living Using a collaborative preconstruction process, cutting edge VDC/BIM technology, Lean
Construction techniques, a deep roster of experienced builders and an impressive global
Multifamily Industrial
supply chain, Katerra offers a one of a kind partner laser-focused on your schedule and
Student Housing Retail budget.
Masterplan Development Hospitals Our construction team’s deep experience across a wide variety of markets, combined
Commercial Schools with our unique approach, means that we can provide greater assurance and
transparency from feasibility and design all the way through project completion.
Hospitality Malls
Hospital Expansions
Hospitality Commercial
14 katerra.com 15
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Revel Scottsdale consists of 157-units plus 2 guest Project Details This new Nevada senior community is located Project Details
suites and includes a clubhouse complete with a on a four acre site within the entitled 141-acre
resort-style pool and spa, state-of-the-art fitness Status Under Construction Rancharrah master planned community. Katerra Status Under Construction
center, modern club room, and media lounge. is providing all materials and construction
In addition to outstanding amenities, Revel will Number of Units 157 Units + 2 Guest Suites services for the project, which was designed by Partner Architect Todd & Associates, Inc.
provide innovative menus with multiple dining Todd & Associates, Inc. This premier property is
options including a variety of restaurants, a private Construction Type Wood Frame strategically located in Southwest Reno, Washoe Number of Units 146 Units
dining room and at-home dining. The community County’s most affluent submarket, directly
is conveniently located and will have 270-degree adjacent to Reno’s main transportation corridors, Construction Type Wood Frame
unobstructed views to the west, north, and east providing future residents with quick access to
of Camelback, Mummy, McDowell, and the the surrounding areas and amenities. The 146-unit
Superstition mountains. community will include a full independent living
suite of amenities including a commercial kitchen,
enclosed resort-style swimming pool and spa, state-
of-the-art fitness center, and large open courtyards.
The building will feature elevators and conditioned
interior amenity spaces and corridors.
16 katerra.com 17
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Revel Southbay is a 2.41-acre site located in Project Details This unique independent senior living facility in Project Details
Torrance, CA. Katerra is providing all materials and the woods will have a strong connection to nature
construction services for the project, which was Status Under Construction through the use of trails and stand-alone amenity Status Under Construction
designed by Architects Orange. The proposed buildings accessed through compelling landscape
mid-rise independent living senior development will Partner Architect Architects Orange design. The 150-unit five-story building will include Partner Architects Runberg Architects & LRS Architects
be a four-story property with one level of podium floor panels from cross-laminated timber (CLT) to
parking situated on the northwest corner of the Del Construction Type Wood Frame complement its beautiful forested surroundings. Number of Units 150 Units
Amo Financial Center (“Del Amo”), a 1960-vintage, Katerra is coordinating the team of Runberg
360,000-square foot office park. The Del Amo is Architects and LRS Architects to ensure both the Construction Type Wood Frame over Concrete Podium
undergoing an upgrade to include conversion of Kirkland Apartments and Revel Kirkland Senior
one office building into medical office suites, new Living buildings are designed to complement each
shops, restaurants and construction of a health other as one cohesive “campus” that enhances
club. Intended community attributes include a the “Urban Living in Nature” theme. These podium
commercial kitchen serving three meals daily, buildings are being designed to be assembled from
resort-style swimming pool and spa, state-of-the-art a limited yet flexible set of consistent components
fitness center and aerobics, lounge areas, theater, to better control costs and optimize these buildings
wellness center, salon, art studio, and roof-top deck for manufacturing while still allowing for site-
social spaces. sensitive design.
18 katerra.com 19
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Developed by Landmark Properties, The Mark is Project Details Hub II is a luxury 7 story, 160,000 SF cast in place Project Details
comprised of 154 units and 595 beds in 1 eight- concrete podium and wood frame housing project
story, 1 five-story, 2 four-story, and 1 three-story Completed July, 2019 adjacent to the main gate at the University of Completed July, 2016
buildings for University of Arizona students. The Arizona. There are 113 residential units with 310
project architect is Dwell Design Studio. The project Client Name Landmark Properties beds, a rooftop pool and an above grade parking Client Name Core Campus
broke ground in May of 2017 and was completed garage. The project architect was Antunovich
May of 2019. Partner Architect Dwell Design Studio Associates. The project broke ground in April of Partner Architect Antunovich Associates
2015 and was completed in July of 2016.
Construction Value $59 Million Construction Value $22 Million
Construction Type Wood Frame over Concrete Podium Construction Type Wood Frame over Concrete Podium
& Post Tension
20 katerra.com 21
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Proxy 333 is a 118-unit mid-rise apartment project. Project Details Oliver Station consists of two new residential Project Details
The six-story multi-façade building features 10 buildings situated above retail/commercial tenant
ground floor live-work apartments and 108 Completed 2016 spaces. The mixed-use development replaces Completed July, 2016
conventional market-rate units. The building the former New Copper Penny bar and a gas
includes a recreation facility, podium courtyard, wet Client Name Tilton Development & Goodman station, providing 126 units of affordable housing Client Name Palindrome Communities
deck and pool, bike storage and rooftop lounge and 19 market rate apartments. The ground floor
area. The architect was Seattle-based Studio Meng Partner Architect Studio Meng Strazzara includes a total of 31,000 SF of commercial retail Partner Architect Studio Meng Strazzara
Strazzara. space. Targeting LEED Platinum certification,
Construction Value $14 Million the development has plans for on-site water Construction Value $32 Million
management, drought-tolerant landscaping, low
Number of Units 118 Units flow water fixtures, LED lighting, electric vehicle Number of Units 126 Units
charging stations, and extensive rooftop solar arrays
Construction Type Wood Frame over Concrete Podium to power the building’s common areas. Construction Type Wood Frame over Concrete Podium
22 katerra.com 23
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Home2 Suites is a 132-suite hotel costing more Project Details Opened ahead of schedule in late 2019, the seven- Project Details
than $21 million on the Dallas campus of Baylor story, 127-room hotel will feature several upscale
University Medical Center which features a full- Completed 2018 amenities, including a rooftop pool and bar, spa- Completed June, 2019
service gym, an outdoor pool, meeting and event style bathrooms, contemporary and sophisticated
spaces and suites with separate sleeping and work Client Name Gatehouse Capital guest rooms, state-of-the-art fitness center, onsite Client Name True North Studio
spaces. dining featuring freshly made food, local craft beer,
Partner Architect BOKAPowell wine, and specialty cocktails, and multi-function Partner Architect Davis Architecture
The all-suites, extended-stay property was meeting space.
developed and is owned by Gatehouse Capital Construction Value $21 Million Construction Value $15 Million
and is being managed by Plano-based Aimbridge
Hospitality. The hotel offers modular furniture Number of Units 132 Units Number of Units 127 Units
and fully equipped kitchens, a mini-market,
complimentary breakfasts, a combined laundry and Construction Type Wood Frame Construction Type Concrete Podium
fitness area, and 5,000 square feet of meeting and
event space. The hotel has a staff that’s trained to
handle the special circumstances of guests who
may be dealing with family health crises.
24 katerra.com 25
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
Katerra recently completed the new Mountain Project Details The Texas Spine and Joint Hospital in Tyler, Texas Project Details
Park Health Center. Designed by architecture firm consists of a pain clinic, pain procedure suite,
SmithGroupJJR, this Mountain Park location is Completed December, 2014 associated prep / recovery spaces, food service Completed November, 2012
centrally located to provide access to affordable expansion, additional OR’s, a ten bed patient unit
healthcare for families living in the surrounding Client Name Mountain Park Health Center expansion and a revised site to accommodate the Client Name Texas Spine and Joint Hospital
neighborhoods. Mountain Park facilities provide an new buildings and parking. The expansion takes
emphasis on five core services — family medicine, Partner Architect Smith Group place on both ends of the hospital simultaneously Partner Architect HKS
pediatric services, women’s healthcare, pharmacy without interruption to ongoing hospital operations.
and dental care. In this new facility, you’ll find the Construction Value $5.9M Since its inception, The Texas Spine and Joint Construction Value $31 Million
space to feel open, bright and inviting. Hospital has been consistently ranked among the
Construction Type Steel Structure top facilities for Spine Surgery in the state. Katerra Construction Type Steel Structure
is proud to celebrate the beginning of an important
addition to the Tyler, TX community, a new
partnership with Texas Spine and Joint Hospital and
HKS Architects and consultants.
26 katerra.com 27
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
New ground-up diagnostic, treatment and Project Details In Phase I, Katerra completed an 11,000 SF addition Project Details
rehabilitation space for Barrow Neurosurgical and a 52,000 SF adaptive reuse conversion of
Associates including MRI and physical therapy Client Name Barrow Neurological Associates existing commercial office building to the new 68 Completed July, 2013
space. bed, Aurora Behavioral Health Hospital. Phase II
Partner Architect Architectural Nexus consisted of subsequent expansion, adding 63 Client Name Signature Healthcare Services
inpatient beds and increasing its outpatient services
Construction Value $5.2M capacity to help support the growing mental health Partner Architect In2it Architecture
and substance abuse needs in the Phoenix area for
Construction Type Steel Structure adults and adolescents. Aurora is privately owned Construction Value Phase I & II - $15.5M
by Signature Healthcare Services, Inc., based in
southern California and Las Vegas based In2it Construction Type Steel Structure
Architecture is the architect.”
28 katerra.com 29
Senior Living | Multifamily | Hospitality | Healthcare | Behavioral Healthcare | Restaurant
30 katerra.com 31
Arizona Construction Management Leadership
32 katerra.com 33
Arizona Construction Management Leadership
34 katerra.com 35
Let’s break new ground.
Together.
36 katerra.com
katerra.com 37