4. Issuance of Certificate of Compliance {COC}_ _ _ _ _ _ _ _ _ ___.

Issuance of license to a person or entity that operates a power plant or other


entities used in the generation of electricity pursuant to Section 6, R.A 9136 and
Section 4 of the Implementing Rules and Regulations of the Act.

Office or Division: Market Operations Service - Licensing


and Market Monitoring Division (MOS-
LMMD)

Classification: Highly Technical

Type of Transaction: Government-to-Business (G2B)

Who may avail: Generation Companies (GENCOs),


Self-Generating Facilities (SGFs) and
Qualified End-Users (QEs)

Checklist of Requirements Where to Secure


Checklist of Requirements 2 for New
CCC Application For Generation
Companies (GENCO)
A General Requirements

1. Application Form ERC Website (www.erc.gov.ph)


(COC Form No.1); and/or at LMMD Front Desk at the
ERC Head Office
2. Company Profile
(COC Form No.2);

B. COC Application Fee


Generation Company
3. P10,000.00

C. Technical Qualification

4. General Plant Description (Form ERC Website (www.erc.gov.ph)


No.7); and/or at LMMD Front Desk at the
ERC Head Office

5. Location Map;

6. Connection Agreement between National Grid Corporation of the


the Grid Owner (NGCP) and the Philippines (NGCP); Distribution

2
All documents must be submitted upon filing of the license application.
44
Checklist of Requirements Where to Secure
Existing Generation Facility or Utility (DU)
Interconnection plans/details with
the high voltage backbone
transmission system/grid or
Distribution System (for
Embedded Generators) and/or
Transmission/Distribution
Service Agreement, if available;3
For point to point interconnection
facilitylies, operated by:
NGCP
Generation Company
Distribution Utility

7. PGC, PDC and WESM


Requirements:

7.1 Electrical/Mechanical Plans and Generation Company or EPC


Diagrams; Contractor

7.2 Preliminary Plant Specifications NGCP or Manufacturer's Data


such as Minimum Stable Load,
Maximum Stable Load, Ramp
Up Rate and Ramp Down Rate,
including plant efficiency and
Heat Rate, if applicable;

7.3 Technical Description of the Generation Company


Load to be served (for those in
isolated Areas and those serving
dedicated loads);

7.4 Details of its Communication and Generation Company


SCADA Requirements, if
applicable;

7.5 Certification issued by NGCP to NGCP or Accredited Third Party


Generation Company or
Generation Facility attesting to
its compliance with the approved
connection scheme

3
For justifiable reasons, the Commission may allow the submission of all documents written in BOLD ITALICS
at a later date which may be during the evaluation process, and immediately upon receipt thereof from the
appropriate agency.
45
Checklist of Requirements Where to Secure
provided in the Grid Impact
Study (GIS), Facility Study (FS)
Connection Agreement (CA)
and Transmission Service
Agreement (TSA), if applicable;

7.6 Certificate of Technical NGCP or Accredited Third Party


Requirements Compliance
issued by NGCP or Third Party
to a Generation Company or a
Generation Facility confirming a
generating unit's capability to
operate within its registered
parameters and its capability to
meet the requirements of the
PGC through the conduct of
Generating Unit Capability Test;
and

7. 7 Certification issued by the DU or Accredited Third Party


Distribution Utilities (DUs) for
Embedded Generating
Facilities, attesting to its
compliance with the approved
connection scheme provided in
the Distribution Impact Study
(DIS).

8. Sworn Statement that each of the ERC Website (www.erc.qov.ph)


Facilities will comply with the PGC and/or at LMMD Front Desk at the
and PDC for the duration of the COC ERC Head Office
(Form No.4);

9. Sworn Statement that the company and ERC Website (www.erc.gov.ph)


its Generating Facilities will comply and/or at LMMD Front Desk at the
with the Wholesale Electricity Spot ERC Head Office
Market (WESM) Rules and Manuals
for the duration of the COC, upon its
registration with the WESM, when
applicable (Form No. 5);

10. Management and/or lease contracts Generation Company or Operator


in force (in case the plant is
operated, leased and/or managed by
an entity other than the owner);

46
Checklist of Requirements Where to Secure

D. Financial Capability

11. Complete set of Audited Financial Generation Company and/or Any


Statements (AFS) covering the two professional accounting services
(2) most recent twelve (12) month firm
periods, (i.e., balance sheet, income
statement, statement of cash flows,
..
notes, audit op1n1on and the
statement of management's
responsibility on the financial
statements). For a Generation
Company which has been in
operation for less than two (2) years,
the AFS of the parent company shall
be required in lieu of the above,
covering the two (2) most recent
twelve (12) month periods, if
available;

12. Schedule of liabilities, to include the Generation Company


following information: name of
creditor, type of credit, credit terms;
and

13. Five (5) year financial plan. Generation Companie's Authorized


Financing Officer

E. Ownership/Control

14. Articles of Incorporation/Partnership Philippine Securities and


(for Corporation I Partnership) with Exchange Commission (SEC)
Certificate of Registration;

15. Business Name Registration Local Government Unit


Certificate (for Single
Proprietorship);

16. Latest General Information Sheet SEC


(GIS) of the applicant- Securities and
Exchange Commission (SEC) Form;

17. Sworn Statement that the applicant ERC Website (www.erc.qov.ph)


complies with and will continue to and/or at LMMD Front Desk at the
comply with the provisions on cross ERC Head Office
ownership and market share

47
Checklist of Requirements Where to Secure
restrictions under Republic Act No.
9136, its Implementing Rules and
Regulations, and these Revised
Rules for the duration of the COC
(Form No.6);

18. Duly attested comprehensive and Generation Company


complete listing of Affiliates and
Related Groups, including ownership
and management structure; and

19. Compliance with ERC Resolution No. Generation Company


9, Series of 20114, as amended by
ERC Resolution No. 04, Series of
20195

F. Other Requirements

20. List of Power Supply Agreement(s), Generation Company and/or


if applicable; Distribution Utility/Customer

21. Memorandum of Agreement on the Department of Energy (DOE)


Establishment of Trust Accounts
by the Generation Company
and/or the Energy Resource
Developer and the Department of
Energy on Benefits to Host
Communities pursuant to Rule 29
of the IRR of
R.A. 91366;

4
A resolution adopting the rules requiring Generation Companies and Distribution Utilities which are not publicly
listed to offer and sell to the public a portion of not less that fifteen percent (15%) of their common shares of
stock pursuant to Section 43 (t) of Republic Act No. 9136 and Rule 3, Section 4 (m) of its Implementing Rules
and Regulations (IRR);
5
A resolution amending Resolution No. 9, Series of 2011 requiring Generation Companies and Distribution
Utilities which are not publicly listed to offer and sell to the public a portion of not less that fifteen percent
(15%) of their common shares of stock pursuant to Section 43 (t) of Republic Act No. 9136 and Rule 3, Section
4 (m) of its Implementing Rules and Regulations (IRR);
6
Amended by DOE Department Order (DO) No. 2019-01-0001 (Providing the Internal Guidelines and Procedures
for the Transfer of Existing Funds in Relation to the Financial Benefits Under ER 1-94) and DOE Department
Circular (DC) No. 2018-08-0021 (Providing for the Amendments to Rule 29 Part (A) of the Implementing Rules
and Regulations of Republic Act No. 9136). Thus, the COC requirement on the submission of MOA on the
Establishment of Trust Accounts by the Generation Company and/or the Energy Resource Developer and the DOE
on Benefits to Host Communities pursuant to Rule 29 of the IRR ofRA 9136 shall not in the meantime be required
as the Commission is seeking clarification on the status of its implementation from the DOE in its (Commission)
letter dated 14 October 2019 and to determine the document to be required in lieu of the subject document.

48
Checklist of Requirements Where to Secure

22. Environmental Compliance Department of Environment and


Certificate (ECC) duly approved by Natural Resources (DENR)
the Department of Environment and
Natural Resources (DENR);

23. Temporary Permit to Operate (TPTO) DENR


I Permit to Operate (PTO) duly
issued by the Department of
Environment and Natural Resources
(DENR);

24. Department of Energy (DOE) DOE


Endorsement indicating that the
Power Plant Project is consistent
with the Power Development
Program of the Government or
with the Missionary
Electrification Development
Program (MEDP) for power plant
project located in isolated grids;7

25. In the case of a Generation Company


operating an Renewable Energy
(RE) plant that intends to avail of the
Feed-In Tariff (FIT):

25.1 DOE issuance of Confirmation


of Commerciality confirming
the commercial viability of the
project;

25.2 DOE Confirmation of


DOE
Electromechanical
Completion;s and

25.3 DOE Certificate of


Endorsement for FIT
Eligibility.9

26. Such other information or document Generation Company


that the ERC may require. Any

7
For justifiable reasons, the Commission may allow the submission of all documents written in BOLD
ITALICS at a later date which may be during the evaluation process, and immediately upon receipt thereof from
the appropriate agency;
8
Ibid;
9
Ibid.
49
Checklist of Requirements Where to Secure
additional technical information may
be required by the ERC upon prior
notice to the applicant.
Checklist of Documents/Information
Required for Generation Companies
Applications for COC Renewal
A General Requirements

1. Application Form (Form No. 1); ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No. 2); and ERC Head Office

3. Five (5) Year Operational History


(Form No.3), if applicable.

B. COC Application Fee

4. PhP1 0,000.00 Generation Company

C. Technical Qualification

5. Sworn Statement that the Generation


Company and its Generation
Facilities comply with and will
continue to comply with the PGC and
PDC for the duration of the COC
(Form No. 4);

6. Sworn Statement that the Generation


Company and its Generation ERC Website (www.erc.gov.ph)
Facilities comply with and will and/or at LMMD Front Desk at the
continue to comply with the ERC Head Office
Wholesale Electricity Spot Market
(WESM) Rules and Manuals for the
duration of the COC, when
applicable (Form No. 5);

7. General Plant Description (Form No.


7), if there are any changes; and

8. PGC, PDC and WESM


Requirements

(8.1) Electrical/Mechanical Plans Generation Company


and Diagrams, if there are

50
Checklist of Requirements Where to Secure
any changes;

(8.2) Details of its Communication Generation Company


and SCADA Requirements, if
there are any changes; and

(8.3) Certificate of WESM Wholesale Electricity Spot Market


membership or Application
for WESM Membership, as
may be applicable.

9. Report on the conduct of capability NGCP, DU or Accredited Third


test if there is an addition, Party
replacement or repowering of
units

D. Financial Capability
10. Duly attested updated schedule of Generation Company
liabilities, to include the following
information: name of creditor(s), type
of credit, credit terms and applicable
interest rate(s); and
11. Five (5) year financial plan, if
Generation Company
applicable.
E. Ownership/Control
12. Articles of Incorporation/Partnership SEC
(for Corporation I Partnership) with
Certificate of Registration, if there
are any changes;
13. Latest General Information Sheet
SEC
(GIS) of the Company (SEC Form);
14. Sworn Statement that the Generation ERC Website (www.erc.qov.ph)
Company complies with and will and/or at LMMD Front Desk at the
continue to comply with the ERC Head Office
provisions on cross-ownership and
market share restrictions under
Republic Act No. 9136, its
Implementing Rules and
Regulations, and these Revised
Rules for the duration of the COC
(Form No.6); and

15. Duly attested updated and Generation Company


comprehensive listing of Affiliates
and Related Groups, including
51
Checklist of Requirements Where to Secure
ownership and management
structure.

16. Compliance with ERC Resolution Generation Company


No. 9, Series of 2011 10 , as
amended by ERC Resolution No.
04, Series of 201911 ;

F. Other Requirements

17. Power Supply Agreements; Generation Company and


Distribution Utility

18. Latest Permit to Operate (PTO) with DENR


Stack Emission Test Results duly
issued by the Department of
Environment and Natural Resources
(DENR), if applicable;

19. Waste Water Discharge Permit duly DENR


issued by DEN R;

20. Water Permit from National Water NWRB


Resources Board (NWRB); if
applicable; and

21. Such other information or Generation Company


document/s that the ERC may
require

10
A resolution adopting the rules requiring Generation Companies and Distribution Utilities which are not
publicly listed to offer and sell to the public a portion of not less that fifteen percent (15%) of their common
shares of stock pursuant to Section 43 (t) of Republic Act No. 9136 and Ru1e 3, Section 4 (m) of its
Implementing Rules and Regulations (IRR);
11
A resolution amending Resolution No. 9, Series of 2011 requiring Generation Companies and Distribution
Utilities which are not publicly listed to offer and sell to the public a portion of not less that fifteen percent
(15%) of their common shares of stock pursuant to Section 43 (t) of Republic Act No. 9136 and Rule 3, Section
4 (m) of its Implementing Rules and Regulations (IRR);
52
Checklist of Requirements Where to Secure
Checklist of Requirements for COC
Application SGF with total Installed
Capacity of 1 MW and above (for New
and Renewal)
A General Requirements

1. Application Form (Form No. 1); ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No. 2); and ERC Head Office

3. Five (5) Year Operational History


(Form No. 3), if applicable.

4. DENR-EMB Permit to Operate DENR


(PTO);

B. COC Application Fee

5. PhP1 0,000.00 Generation Company

C. Additional Requirements

6. Securities and Exchange SEC


Commission Registration and Articles
of Incorporation;

7. Latest General Information Sheet SEC


(GIS) of the Company (SEC Form);

8. Other Document/s that ERC may DENR


require from time to time (e.g. DENR
Environmental Compliance
Certificate)
Checklist of Requirements for COC
Application SGF with total Installed
Capacity of below 1 MW (for New and
Renewal)
A General Requirements

1. Application Form (Form No.1); and ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No.2). ERC Head Office

53
Checklist of Requirements Where to Secure

B. COC Application Fee

3. PhP1 ,500.00 (For aggregate


installed capacity of 100 kW and
below)

4. PhP5,000.00 (For aggregate


installed capacity of 101 kW- 500 Generation Company
kW)

5. PhP7,500.00 (For aggregate


installed capacity of 501 kW- 999
kW)

C. Additional Requirements

6. Other Document/s that ERC may DENR, DU, or Any Accredited


require (e.g. DENR Environmental Third Party
Compliance Certificate, Distribution
Impact Study I Distribution Asset
Study, if applicable)
Checklist of Requirements for CCC
Application for QEs
A General Requirements

1. QE-COC Application Form; ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
ERC Head Office

2. Net-Metering Agreement; Distribution Utility

3. DU Certification that QE is technically Distribution Utility


compliant with the ERC's Net
Metering Interconnection Standards

B. COC Application Fee

4. PhP1 ,500.00 Generation Company

54
Checklist of Requirements Where to Secure
Checklist of Requirements for an
Amendment of CCC Application for
Change of Location of Generation
Facilities/ Business Address
A General Requirements

1. Application Form/ Amendment of


COC for Change of Location (COC ERC Website (www.erc.qov.ph)
Form No.1) and/or at LMMD Front Desk at the
ERC Head Office
2. Company Profile (COC Form No. 2);

3. PhP3,000.00; Generation Company

4. SEC-Amended Articles of SEC


Incorporation/ Amended Certificate
of Registration

5. Other information that may be Generation Company


required by the Commission
Checklist of Requirements for an
Amendment of COC Application for
Change of Name
A General Requirements

1. Application Form (Form No. 1); ERC Website (www.erc.qov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No.2); and ERC Head Office

B. COC Application Fee

3. PhP3,000.00 Generation Company

C. Technical Qualification

4. Sworn Statement that the Generation ERC Website (www.erc.qov.ph)


Company and its Generation and/or at LMMD Front Desk at the
Facilities comply with and will ERC Head Office
continue to comply with the PGC and
PDC for the duration of the COC
(Form No. 4);

5. Sworn Statement that the Generation ERC Website (www.erc.qov.ph)


Company and its Generation and/or at LMMD Front Desk at the
Facilities comply with and will ERC Head Office
continue to comply with the

55
Checklist of Requirements Where to Secure
Wholesale Electricity Spot Market
(WESM) Rules and Manuals for the
duration of the COC, when applicable
(Form No.5);

6. Complete set of Audited Financial Generation Company and/or Any


Statements (AFS) covering the two professional accounting Services
(2) most recent twelve (12) month
periods, (i.e., balance sheet, income
statement, statement of cash flows,
..
notes, audit op1mon and the
statement of management's
responsibility on the financial
statements), in the amended name, if
available.

7. SEC-Amended Articles of SEC


Incorporation/ Amended Certificate of
Registration.

8. Sworn Statement that the Generation ERC Website (www.erc.gov.ph)


Company complies with and will and/or at LMMD Front Desk at the
continue to comply with the provisions ERC Head Office
on cross-ownership and market share
restrictions under Republic Act No.
9136, its Implementing
Rules and
Regulations, and these Revised
Rules for the duration of the COC
(Form No.6)

9. Such other information or document Generation Company


that the ERC may require
Checklist of Requirements for an
Amendment of CCC Application for
Change of Ownership
A General Requirements

1. Application Form (Form No. 1); and ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No.2); ERC Head Office

B. COC Application Fee

3. PhP3,000.00 Generation Company

56
Checklist of Requirements Where to Secure

C. Technical Qualification

4. Sworn Statement that the Generation ERC Website (www.erc.gov.ph)


Company and its Generation and/or at LMMD Front Desk at the
Facilities comply with and will ERC Head Office
continue to comply with the PGC and
PDC for the duration of the COC
(Form No.4);

5. Sworn Statement that the Generation ERC Website (www.erc.qov.ph)


Company and its Generation and/or at LMMD Front Desk at the
Facilities comply with and will ERC Head Office
continue to comply with the
Wholesale Electricity Spot Market
(WESM) Rules and Manuals for the
duration of the COC, when applicable
(Form No.5);

6. Complete set of Audited Financial Generation Company and/or Any


Statements (AFS) covering the two professional accounting services
(2) most recent twelve (12) month firm
periods, (i.e., balance sheet, income
statement, statement of cash flows,
notes, audit opinion and the
statement of management's
responsibility on the financial
statements), in the amended name, if
available.

7. Five-year Financial Plan Generation Company

8. SEC-Amended Articles of SEC


Incorporation/ Amended Certificate of
Registration.

9. Latest General Information Sheet of SEC


the applicant SEC Form.

10. Sworn Statement that the Generation ERC Website (www.erc.qov.ph)


Company complies with and will and/or at LMMD Front Desk at the
continue to comply with the provisions ERC Head Office
on cross-ownership and market share
restrictions under Republic Act No.
9136, its Implementing
Rules and
Regulations, and these Revised

57
Checklist of Requirements Where to Secure
Rules for the duration of the COC
(Form No.6)

11. Such other information or document Generation Company


that the ERC may require
Checklist of Requirements for an
Amendment of CCC Application for
Change of Technical Specifications
A General Requirements

1. Application Form (Form No.1); ERC Website (www.erc.gov.ph)


and/or at LMMD Front Desk at the
2. Company Profile (Form No.2); and ERC Head Office

B. COC Application Fee

3. PhP3,000.00 Generation Company

C. Technical Qualification

4. General Plant Description (COC ERC Website (www.erc.gov.ph)


Form No.7); and/or at LMMD Front Desk at the
Head Office

5. PGC, PDC and WESM Requirement NGCP, Manufacturer's Data and/or


on Plant Specifications such as Any Accredited Third Party
Minimum Stable Load, Maximum
Stable Load, Ramp Up Rate, Ramp
Down Rate including plant efficiency
and Heat Rate, if applicable.

6. Third (3rd) Party Capacity and NGCP, DU and/or Any Accredited


Performance Test Reports. Third Party

7. Application Form/ Amendment of ERC Website (www.erc.gov.ph)


COC for Change of Nameplate and/or at LMMD Front Desk at the
Rating (COC Form No.1); ERC Head Office

8. Such other information or document Generation Company


that the ERC may require

*For the Amendment of COC Application, please be informed that the existing
COC shall still be valid for five (5) years pursuant to Section 1, Article V and
Section 5, Article Ill of the 2014 Revised Rules for the Issuance of COCs for
Generation Companies, Qualified End-Users and Entities with Self-Generation
Facilities (2014 Revised COC Rules).

58
Checklist of Requirements Where to Secure
I
However, if the new owner wishes to amend the existing COC in favor of its name;
the new owner may do so by requesting for an amendment of COC and paying
the corresponding fee of P3,000.00 pursuant to ERC Guidelines on Fees and
Charges, as amended, which was promulgated on 17 July 2007.
All COC Applications must be filed in two (2) hard copies and one (1) soft copy
(hard drive or USB Flash Drive), to LMMD Officer of the Day and/or any
authorized LMMD Officer.

Client Steps Agency Action Fees to be Paid Processing Person


per Step Time Responsible

1. Register with 1. To assist the None Five (5) Guard on


the Guard on client minutes Duty
Duty MOS-
LLMD

2. Fill-out the 2. To endorse/ None Three (3) MOS' Desk


MOS refer to the minutes Officer of the
Customer concerned day
Action Form Division

3. Secure the 3. To make sure None Two (2) MOS- LMMD


application that the minutes Officer of the
form and secured Day and/or
checklist of application any
appropriate forms are authorized
requirements appropriate LMMD Officer
for coc for each
application at category as
the Licensing per coc
& Market Checklist of
Monitoring Requirements
Division
(LMMD) or
through
www.erc.gov.
Qh.

4. Accomplish 4. To assess the None Ten (10) MOS- LMMD


the forms and completeness minutes Officer of the
submit of the Day and/or
together with submitted any
the document authorized
appropriate
59
Client Steps Agency Action Fees to be Paid Processing Person
per Step Time Responsible
requirements LMMD Officer
in the
checklist, in
two (2) hard
copies and
one (1) soft
copy (USB
Flash Drive),
to any LMMD
Officer

5. Enter the said 5. To get None Five (5) MOS- LMMD


coc Statement of minutes Officer of the
Application in Account Day and/or
the Billing and (SOA) any
Revenue Number from authorized
System the Financial LMMD Officer
(BRS) for and
payment and Administrative
secure a Service (FAS)
Statement of and validate
Account signature of
(SOA) form in authorized
four (4) officials in the
copies from SOA
the LMMD
Officer of the
Day

6. Proceed to 6. To give 4 COC Application Ten (10) FAS-Cashier


the Cashier copies of the Fees: minutes Section
for the signed SOA to
payment of the
appropriate applicant 1. GENCO (New
coc and Renewal) -
application PhP1 0,000.00
fee in
accordance
with the fees 2. SGF (New and
and charges, Renewal)
as amended. - 1kW to 100kW-
The Cashier PhP1 ,500.00;
shall give the
applicant - 101 kW to
three (3) 500kW-

60
Client Steps Agency Action Fees to be Paid Processing Person
per Step Time Responsible
copies of the PhP5,000.00
Assessment
-501 kW to
Form and an
999kW-
Official
PhP7,500.00
Receipt
(O.R.) -above 1 MW-
PhP1 0,000.00

3. QEs (1kW to
100kW)-
PhP1 ,500.00

4. Amendment of
coc
Applications
-PhP3,000.00

7. Go back to 7. Verify OR None Five (5) MOS- LMMD


the LMMD duly signed minutes Officer of the
Officer of the by the Day and/or
Day and Cashier as any
submit two (2) proof of authorized
copies of the payment. LMMD Officer
Assessment Give client
Form duly the OR and
signed by the one (1) copy
Cashier and of SOA.
show proof of Retain one
payment i.e., (1) copy of
Official SOAfor
Receipt (OR) LMMD's file.
for verification
None
purposes. 7.1 coc MOS- LMMD
application is Officer of the
received Day= Clerk
officially for SGF and
QE;
IPP = ERO I
to Sr. ERO

Action - Total= 40
Assesses the minutes (if
completeness of all COG
the submitted Requiremen
61
Client Steps Agency Action Fees to be Paid Processing Person
per Step Time Responsible
document ts shall
have been
complied
with as per
COG
Checklist

Reminder/s:
- No
application
shall be
processed for
evaluation
unless all
documentary
requirements
and proof of
payment of
the
Application
Fee shall be
submitted and
presented by
the applicant
to the LMMD
Officer Day
and/or any
authorized
LMMD
Officer.
- Upon
submission of
all forms and
those listed in
the checklist
of
requirements
for coc
application,
and after the
conduct of
ocular
inspection for
GENCOs,

62
Client Steps Agency Action Fees to be Paid Processing Person
per Step Time Responsible
wait for the
Commission's
advice of its
action within
sixty (60)
calendar days
and thirty (30)
calendar days
for those
GENCOs who
have been
issued a
Certificate of
Energy
Project of
National
Significance
(CEPNS) by
the DOE.

63