PITC/G-224(60)/05-2021
Section/
Sr. PITC/G-224(60)/05-2021 Questions/ Suggestion Clarifications
Clause
The bidder shall furnish, as
part of its bid, a bid
security as mentioned at
Sr. No 6 of clause 1.5 in
PKR, in the shape of pay
order/demand draft/call
The Bid Security shall also be
1 Bid Security deposit in the name of CEO
acceptable in shape of bank Yes
Clause 3.3.6 PITC, WAPDA House,
guarantee.
Lahore. The unsuccessful
bidder’s bid security shall
be discharged or returned
soon after the
announcement of
successful bids.
The bid shall remain valid
for 90 days after the date
Tender validity should be maximum
Bid Validity of opening of technical bid
60 days keeping in view the
2 Clause as prescribed by PITC. A bid As per RFP
fluctuation of prices of raw material
3.3.7 having validity for a shorter
over the time.
period shall be rejected by
PITC as non-responsive.
iv) While making a price
quote, trend/inflation in The price escalation formula must
the rate of goods and be included in the tender
services in the market documents as per SRO 805(1)/2008
Bid Prices should be kept in mind. No under section 27 of PPRA ordinance,
3 As per RFP
Clause 3.3.2 request for increase in instruction of Planning and
price due e to market Development Division, PEC Rules
fluctuation in the cost of and Regulation, PPRA Rules, PEPCO
goods and services shall be instruction and ECNEC decision.
entertained.
What will be the duration of SLA? Duration is up to the contract
What PITC mean by alternate period.
A Service level agreement equivalent machine?
(SLA) between the Alternate machine will be
Instructions
indenter/consignee and What Performance levels like provided by PITC for standby
to Bidders
successful bidder will be guaranteed response time, backup.
Clause
4 signed to ensure defined availability of alternate equipment
3.6.4, sub
call logging procedure, machine is required from the 99.99 % services up time
clause iii
guaranteed response time, bidder? Response time will be maximum
Page[31]
availability of alternative Please provide draft SLA to of 24 hours after logging the
equivalent machine. understand PITC’s exact complaint including public
expectations from the Bidder? holidays. SLA will be provided to
the successful bidder.
Instructions A joint inspection One time Inspection of complete lot
5 to Bidders (sampling) of the of 3000 AMR meters shall be carried As per purchase Order
Clause 3.7.1 equipment being supplied out instead of multiple Inspections
Clarification Regarding Questions Against Tender No. PITC/G-224(60)/05-2021
Installation of new AMR Newly installed meter but if 5. The consignee will be
Meters along-with supply successful bidder found any responsible.
and installation hardware defects during installation then
such as painted mild PITC will replace defective
steel frame, insulated CTs/PTs. Please confirm?
glands, PVC insulated 6. Please share tentative quantity 6. As per RFP
copper control cables of AMR meters to be installed on
(2.5mm2 and 4mm2). nuts. Incoming and Outgoing panels?
washers, cable ties, sealing
wire/bits including
transportation of material
and installation of meters
on
when and where required
basis over a period of 12
months from the date of
signing of contract (at
all Grid stations) of all
DISCO’s.
Note 1:
Following activities are pre-
requisite to of meters at
Grids;
allocation to meters
testing
-with
latitude and longitude
before and after
installation
incoming/outgoing
feeders, feeder code, CT
ratio, PT ratio and grid
personnel contact numbers
Note 2:
Clarification Regarding Questions Against Tender No. PITC/G-224(60)/05-2021
are manufacturer
themselves, it is requested to delete
this clause.
Page no: 22 Relevant and qualified
What is minimum requirement to
16 Clause: technical staff to fulfill the Please see the Clarification at
meet the criteria?
2.3.1 (vii) assignment. Sr.# 34
As all the operations including As per RFP
manufacturing, installation
Page no: 22 & O&M services can be managed
Offices in Lahore and
17 Clause: through single office, it is
Rawalpindi/Islamabad
2.3.1 (viii) suggested to remove the clause. It
will escalate the cost of
project without any added benefit.
Single Stage One Envelope
procedure will be followed
The bid shall comprise a
which states,
single package containing
“Each bid shall comprise one
two separate
Page no: 25 Does this procedure fall under single single envelope containing,
sealed envelopes. Each
18 Clause: stage single separately, financial proposal
envelope shall contain
3.2.2 envelope? Please confirm. and technical proposal (if any).
separately the
All bids received shall be opened
Financial Bid and the
and evaluated in the manner
Technical Bid;
prescribed in the bidding
document.”
Clause 4 refers to the supplies of As per Clause 7 Evaluation
Page no: 25 equipment. There is no Criteria.
All certificates as per clause
19 Clause: list/requirement of certificates
4
3.3.1 (iii) mentioned there. Please
explain this requirement.
Forms available in DDS Agreed
Document (Annexure F and
Forms to be filled under Annexure F
Annexure G),
and Annexure G of
Page no: 25 need to be filled in by the
tender document have no relevance
20 Clause: vendor. Any conflicting
with DDS
3.3.1 (iv) value in DDS
specifications. Please explain this
document will be
requirement.
superseded by PITC Tender
Document.
The bidder shall quote unit
Page no: 26 price (inclusive of all taxes As per RFP
Price should be inclusive of GST too.
21 Clause: and duties where
Please confirm
3.3.2 (i) applicable) as per price
schedule
duly authorized by
Page no: 26 Manufacturer/Principal of
This clause is in contradiction with
22 Clause: Leading Brands Already clarified at 15
clause 1. Please remove.
3.3.5 (Authorization Letter shall
be provided)
Clarification Regarding Questions Against Tender No. PITC/G-224(60)/05-2021
to be provided bifurcating
in following Slabs:
< than 50 million (7 marks)
50 million to 100 million
(15 marks)
> 100 million (20 marks)
Additional Features, if any, 1 mark will be awarded for 1
Page no: 36
Other than mentioned in How many additional features will additional feature.
33 Clause: 7.3
DDS be awarded full marks?
(vi) ii
Standards
Qualified Staff Position of 2 marks for 1 principal certified
Page no: 36 What is the minimum number of
Firm (attach list), Certified employee and
34 Clause: 7.3 staff members to get full
with principal will be given 1 mark for not principal certified
(viii) marks?
preference. employee.
AMR meters data must be
compliant to latest Please issue the UDIL checklist for
universal data this project with reply to Please see Clarification at Sr.# 7
Page no: 42
35 integration layer (UDIL) these questions for preparation of a
Annex C
specification developed by comprehensive
PITC for technical proposal.
multivendor compliance.
In partial modification of Acceptance certificate will be
the provisions, OEM issued after successful
Page no: 64 warranty period of installation of AMR meter.
What will be the procedure for
Annex J the supplied goods which
36 issuance of acceptance
Warranty shall be 3 (Three) Years, as
certificate?
per BOQ,
from the date of
acceptance of the supplies.
The period for correction As per requirement of
Please define the procedure for
Page no: 64 of defects in the warranty Consignee.
37 replacement of faulty
Annex J period is 15
meters
(Fifteen) days.
Clarification Regarding Questions Against Tender No. PITC/G-224(60)/05-2021
Signature: -------------------------------------------------
Designation: ---------------------------------------------
Date: -------------------------------------------------------
Official Stamp: ------------------------------------------