‫‪Organization Unit:‬‬ ‫إدارة الصيانة العامة‬ ‫الوحدة التنظيمية‪:‬‬

‫‪Form sheet title:‬‬ ‫نموذج التكليف المباشر‬ ‫اسم النموذج‪:‬‬

‫‪Doc Ref.‬‬ ‫رقم النموذج‪:‬‬

‫التا‪Ì‬يخ ‪08/03/2024 :‬‬ ‫الموضوع‪ :‬التكليف المباشر لمشروع رقم )‪( CDQ/24-10‬‬

‫اسم المشروع ‪ :‬أعمال نقل و تسوية الت‪Î‬بة لقطعة اﻷرض رقم ‪ 9130673‬إ‪ ƒ‬اﻷرض ‪ ʯ 9131414‬مدينة‬
‫‪Project Name:‬‬
‫هند ‪3‬‬
‫‪Location:‬‬ ‫مدينة هند ‪3‬‬ ‫انمىقع‪:‬‬

‫‪For (Contractor’s/Supplier’s) use‬‬

‫‪Contractor’s/Supplier’s Name‬‬ ‫‪PURE GOLDEN WRECKING & DEMOLITION WORKS LLC‬‬ ‫اسم انمقاول ‪ /‬انمىرد‬

‫‪Contractor’s/Supplier’s Price‬‬ ‫‪18006.25‬‬ ‫سعر انمقاول‪ /‬انمىرد‬

‫‪Provisional Sum‬‬ ‫انمبهغ اﻻحتياطي‬


‫‪VAT 5%‬‬ ‫‪900.3125‬‬ ‫ض‪3‬يبت انقيمت انمضافت‬
‫‪18906.5625‬‬
‫‪Total Price‬‬ ‫انمبهغ اﻹجما‪$‬‬

‫‪Project period‬‬ ‫‪ 25‬يوم‬ ‫مدة انمشروع‬


‫‪Project Engineer‬‬ ‫مهندس انمشروع‬
‫‪Amjad‬‬
‫‪Telephone Number‬‬ ‫‪0507485948‬‬ ‫رقم انهاتف‬
‫‪E-Mail Address‬‬ ‫‪pgdemolition@outlook.com‬‬ ‫انب‪3‬يد اﻹنكترو‪ʾ‬‬

‫‪Company Stamp and signature‬‬ ‫ختم وتىقيع انشركت‬

‫‪For/ General maintenance Dept. use‬‬ ‫ﻻستخدام إدارة الصيانة العامة‬

‫‪Project Engineer:‬‬ ‫دمحم عاصف‬ ‫مهندس انمشروع‬


‫‪Mobile Number:‬‬ ‫‪0503536503‬‬ ‫رقم انتىاصم‬
‫‪Manager of Section‬‬ ‫أحمد حسين رستم‬ ‫مدير انقسم‬

‫توجيهات ‪ /‬مدير اﻹدارة ‪:‬‬

‫التا‪Ì‬يخ ‪:‬‬ ‫التوقيع ‪:‬‬

‫بيانات مفتوحة ‪OPEN DATA /‬‬


Shifting of material and leveling work from Plot 9130673 to 9131414 at Madinat Hind 3
Note: -
1) The contractor shall obtain all the necessary NOCs from the concerned service authorities, including
Demarcation, building permit from DM Building Department through DM approved consultant appointed
by Contractor.
2) The contractor shall obtain RTA permissions, if any are required.

3) The contractor is responsible for the removal of any other debris as per the site requirements and
attached drawings by obtaining necessary required permissions and NOCs from the concerned
authorities, if any required.

4) The contractor shall submit shop drawings for each work and materials for Engineer Approval.
SCOPE OF WORK AND SPECIFICATION
NOTE: fill the following table
Item Item Description Unit Rate quantity Tender
No Amount
(Dhs)
2 Shifting of shifting of material and leveling work M3 10.75 1675 18006.25

material and from plot 9130673 to plot 9131414


Leveling at Madinat hind 3 as per DM engineer
work instruction

Total 18006.25

General Notes
1) The bidders in their own interest may visit the site in co-ordination with the Engineer, if required, to
assess the job requirements, site conditions and the infrastructure facilities available there, before
submission of the bids. The contractor shall be responsible for including all the items which are not
mentioned in the Scope of Work but are deemed to be considered important in order to complete
the installations.
2) The contractor submits workshop drawing for the approval of DM engineer before starting the work.
3) The samples of materials to be submitted for approval of DM Engineer before starting the work. No
material without the approval shall be used for this project.
4) The dimensions given are approximate. Actual dimensions to be taken at site.
5) The site should be cleaned properly after the end of each day’s work.
6) Coordinate with end user and site maintenance team and strict adherence to end user instructions
for execution of job, and adherence to all safety rules and regulations.

‫ﺑﻴﺎﻧﺎت ﻣﻔﺘﻮﺣﺔ‬OPEN DATA /


7) If any site constraints, existing structure, or existing systems obstruct execution of contract scope,
contractor at his own cost shall dismantle and reinstate the same safely without any damages.
8) All materials to be stored in the designated covered area with prior permission.
9) The completion period will be 25 days only.
10) Waste material to be taken to disposal site or/as directed by the Engineer.
11) Care should be taken to avoid inconvenience to the public/staff/environment/ traffic.
12) The quotation should be on a lump sum price basis.
13) Payment terms shall be on a monthly basis as per progress of work and subject to approval from
concerned D.M. Project engineer.
14) A warning sign inscribed “Work in Progress” shall be displayed wherever necessary.
15) If any damage to the fitting or accessories or any other property, whether public or private, occurs
during the execution, the Contractor shall make good the same at his cost. However, if the repair
work is found unsatisfactory in accordance with DM standards, DM has the right to stop the
Contractor and appoint another at the Contractor’s expense.
16) The contractor is also required to ensure a high degree of workmanship is achieved in all respects.
Fully qualified tradesmen shall execute every point of work.
17) DM reserves the right to accept any bid or reject any or all the bids without assigning any reason or
obligation.
18) Delay penalty will be imposed as per DM regulations.
19) The contractors shall deposit 10% bank guarantee if the contract price is
Dh. 100,000.00. (One hundred thousand) or exceeding within 7 days from the date of acceptance
letter issued to contractor.
20) Contractor shall carry insurance and submit documents effective prior to the commencement of any
work under this Contract, and such insurance shall be maintained in full force and effect at all times
work is performed and/or this Contract is in effect.
21) For any clarification and site inspection, please contact engineer Mohammad Asif
on mobile no. 0503536503 or communicate on Email MAFATEH@dm.gov.ae

THE CONTRACTOR IS NOT ALLOWED TO KEEP LABOURER ON SITE. THE DEFAULTORS WILL BE
PENALISED AS PER D.M. REGULATIONS.