Integrating the Industry Library into your SIMATIC PCS 7 project allows you to
operate and visualize PCS 7 system sections. Here are the steps to achieve this integration:

1. Introduction:
o The goal is to integrate operator panels into your PCS 7 project.
o Configuration should closely match the PCS 7 standard.

2. Solution Overview:
o The Industry Library provides specific technological functions according to the APL
standard.
o It ensures a consistent look and feel throughout the entire plant, making handling easier
and reducing the risk of operational failures.

3. Configuration and Project Planning:


o Configure the control program:
 Create or extend a panel data block.
 Configure the APL block.
 Configure the panel block of the Industry Library.
o Configure multiple control room operation:
 Define input level names.
 Configure the “UsrM” block.
 Connect the “UsrM” block.
 Set the input level for interface blocks related to panels.
o Compile and load the S7 program.
o Configure the operating system (OS):
 Create the operating image.
 Define the input level for the OS.
o Hardware configuration in the TIA Portal:
 Import AS data.
 Configure the panel.

4. Additional Resources:
o For detailed instructions, refer to the official documentation: Integration of Operator
Panels in SIMATIC PCS 7 via the Industry Library1.

Remember to follow the guidelines provided in the documentation for a successful integration. If
you encounter any specific issues during the process, feel free to seek further assistance. 🛠️🔧