Integrating the Industry Library into your SIMATIC PCS 7 project allows you to
operate and visualize PCS 7 system sections. Here are the steps to achieve this integration:
1. Introduction:
o The goal is to integrate operator panels into your PCS 7 project.
o Configuration should closely match the PCS 7 standard.
2. Solution Overview:
o The Industry Library provides specific technological functions according to the APL
standard.
o It ensures a consistent look and feel throughout the entire plant, making handling easier
and reducing the risk of operational failures.
4. Additional Resources:
o For detailed instructions, refer to the official documentation: Integration of Operator
Panels in SIMATIC PCS 7 via the Industry Library1.
Remember to follow the guidelines provided in the documentation for a successful integration. If