Lesson 8: Graphics
1. Creating and Opening a “Graphic Window”
2. ISA Symbols and Graphic Primitives
3. Modifying a Primitive
4. Exercise
Appendix
1. Field Bus Configuration
CENTUM VP SYSTEM CONFIGURATION LESSON 1
1
CENTUM VP Engineering
CENTUM VP SYSTEM CONFIGURATION LESSON 1
2
CENTUM VP Engineering
CENTUM VP SYSTEM CONFIGURATION LESSON 1
3
CENTUM VP Engineering
CENTUM VP SYSTEM CONFIGURATION LESSON 1
4
CENTUM VP Engineering
CENTUM VP SYSTEM CONFIGURATION LESSON 1
Remember, at this point all the engineer is doing is entering data for WHAT HAS BEEN ORDERED.
Working with Yokogawa engineers specific FCS and I/O will be ordered based upon the process to be
controlled.