100 650 100 1100 SF 100 Reviewed By: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
60
0x
480 AF 580 AF C3 B3S E2P
KEY PLAN
60
Signature: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
0
BLOCK 3 Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
850
855
885
Checking is only for general compliance with design concept and
1100 100 Contract Documents. The Contractor remains responsible for the
correctness of dimensins and details, compatibility & techniques of
350 285 375 construction, coordination of the work with all other trades and the
1500
1495
satisfactory performance of the work.
1455
FT
1600
D2DK The Comments/Corrections made on this shop drawing does not
B2S A3S A1 relieve the Contractor of his contractual obligations & responsibilities
100
650 2200 AF 521 from compliance to Contract Documents, Plan, Specifications and
Authorities' requirements.
FW
1060 2850 SF 521
C2 This Shop Drawing has been inspected by:
A1 B4S
10
2590x2985
530 AF
455
750 AF
00
MASTER BEDROOM Rankine & Hill (S) Pte Ltd
W1
x1
800
585
00
BLOCK 5
0
and is returned as follows:
______________________________________________
2905 AF
CL
910
No exception taken
R-5-5a Make correction noted. No resubmission required
260
210 340 To amend and resubmit
A/C LEDGE
6
2910 SF
______________________________________________
LOW WALL 10 5 7 Where Re-submission is required, submit revised drawings for re-
350
BELOW
9 11 8 inspection before proceeding with the work.
12 _______________________________________________
205
This inspection does not attend to setting out of work and it does not
1295 AF
1300 SF
1300 SF
relieve the Contractor of Responsibilities.
1360
MASTER BATH
855 C.O
325
1000 S.O
1280 AF
Work shall confirm also to the specification, other Drawings and Job
900 D3 Discussions, and also to all the Requirements of the Builders.
1014x2350 _______________________________________________
530
+0
800
D1
Signature: _ _ _ _ _ _ _ _ _ _ Date: _ _ _ _ _ _ _ _ _ _
1010x2350
_______________________________________________
1810 +0 Drawing No. Revision
165
75
AC AC
40 100 45
100
90
850 C.O TOW +1100 from LIVING ROOM FFL
SUMMIT
380 AF
1500 SF
W REVISED AS PER CONSULTANT'S
725
W WASHER/DRYER
1455
1 10.03.2023 Ericka
COMMENT
HS HOUSEHOLD SHELTER
REV DATE BY DESCRIPTION
ST STORAGE
DB DISTRIBUTION BOARD LAND OWNER & DEVELOPER
20
2565 F.S
2595 S.O
3RD STOREY 13.975m One Raffles Quay 9 Raffles Place
1 3
SCUPPER DRAIN
South Tower #22-10 #12-01 Republic Plaza
RC KERB
2790 AF
2800 SF
4
2790 AF
4TH STOREY 17.125m SINGAPORE 048583 SINGAPORE 048619
5TH STOREY 20.275m TEL : 6238 1121 TEL : 6877 8228
R-5-5b 6TH STOREY 23.425m
1065 S.O
FD1
855 C.O
ARCHITECT:
13
1031x2400 LIVING
00
+0 2565x2440
DDPARCHITECTS
50
-40
0
1685 AF
1300 SF
CABINET LINE 13TH STOREY 45.475m
1255
1504 AF 14TH STOREY 48.625m
150
FT
17TH STOREY 58.075m TW-ASIA consultants pte ltd
DINING
645 AF
650 AF
F
268 170 18TH STOREY 61.225m
615
19TH STOREY 64.375m No. 28 SING MING LANE #04-137 MIDVIEW CITY
350
250 AF
115 125 70
20TH STOREY 67.525m SINGAPORE 573972 TEL : 6291 6292 FAX : 6293 2196
130 75
DB/ST
205
21ST STOREY 70.675m
125
4450 SF 3550 SF 125 75 250 75 FW
40
22ND STOREY 73.825m MECHANICAL & ELECTRICAL CONSULTANT :
100
ARCHITRAVE HEIGHT
DOOR OUTER ARCHITRAVE SIZES (WxH) DRAWING TITLE
BOTTOM S.O OF LEVEL FROM UNIT FFL
UNIT FFL
BLOCK 5
UNIT TYPE A1
W CEILING PLAN
ALUMINIUM WINDOW / DOOR MARK
WINDOW FRAME SIZE (WxH) CHECKED BY: BERNARD/ZAW SIGNATURE :
H
CHECKED BY: KANG XIN SIGNATURE :
BOTTOM OF ALUMINIUM FRAME LEVEL FROM FFL
CHECKED BY: VINCENT SIGNATURE :
Lb
UNIT FFL
DRAWN BY: ERICKA DATE : 01.12.2023