You are on page 1of 8

Proscenium theatre

+0.00
In a proscenium theatre, the stage is located at one end of the
auditorium and is physically separated from the audience space by
a proscenium wall. This is sometimes called

A
R
A

A
E
R

A
E
a “two-box” arrangement—the auditorium and stage occupy two

N
R
G

E
E
N
R
E
E

+3.0M
separate “boxes” or rooms. The stage box (stagehouse) provides

TOILET
CHANGING
TOILET TOILET

ROOM
REHERSAL

+1.5M
HIS HER

fly space and wings and permits a wide variety of scenic and

LOBBY
+0.6M
ROOM

+6.0M
EXIT
lighting effects. The auditorium box is the audience chamber, which

CHANGING

AREA
GREEN
ROOM
may take many forms— fan-shaped, courtyard, lyric, etc.

GREEN ROOM

+1.8
It is the most common form of theatre stages. In this particular

WINGS
stage, the audience is positioned in one area facing towards the
main stage, there is a distinct division between the audience and

TOILET
the stage. This division is created through the form of an arch or
some sort of frame- hence the name, Proscenium Arch.

TOILET

ENTRANCE LOBBY
A A'

GREEN ROOM
• Gives the audience a clear view and the one main focus points

BACK STAGE

CYCLORAMA

BACK STAGE

+0.00
+0.6M
+0.6M
towards the performers.

STAGE

APRON

PORCH
+0.6
+1.8
• Allows much more realism and special effects/ lightingtricks and
effects can easily be concealed.

+1.8
OFFICE

WINGS

+1.8
TO FLYING GALLERIES
STORE ROOM

GREEN
AREA
PROP ROOM

+6.0M
+1.5M
+0.6M

LOBBY
A.H.U.

+3.0M
EXIT

TOILET
A
R
A

A
R

E
A
E

N
R
G

E
E
N
R
E
E
PLAN OF AUDITORIUM

+0.00
(PROSCENIUM TYPE)
SCALE : 1:150

7.0 GIRDERS
STAGE TOWER
CATWALK

CRY
2.0 ROOM
FLYING GALLERIES

20.0

PROJEC
-TOR 3.5

ROOM

9.0

GREEN ROOM

OFFICE 6.0
TICKET
STORE COUNTER
3.0 ENTRANCE
1.2 LOBBY
2.0

0.3

SECTION AT AA'
SCALE : 1:150

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

AUDITORIUM FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


+6.0M

AREA
GREEN

+1.8
CRY ROOM

ENTRANCE LOBBY
A A'

CRY ROOM
FLYING GALLERIES

+0.00
+0.6M
+0.6M

PORCH
STAGE

+1.8

CRY ROOM

+1.8
TO FLYING GALLERIES

GREEN
AREA
PLAN AT BALCONY

+6.0M
(PROSCENIUM TYPE)
SCALE : 1:150

CATWALK LAYOUT
SCALE : 1:150

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

AUDITORIUM FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


AIR GAP 25 mm MINERAL FIBRE
(Density 36kg/m3)
GLASS WOOL

WIRE MESH

12 MM FLOAT GLASS

FLOATING FLOOR WITH 25 mm T & G BOARDING


AND INTEGRAL RESILIENT FOAM

SINGLE "H" COMPRESSION


TYPE PERIMETER SEAL 18 mm T & G COMPOSITE BOARDING
SKIRTING
& RETAINER
SPACER BLOCKS
HEIGHT

GLASS WOOL

WIRE MESH
DOOR

SEALANT
COMPOSITE FLOOR
BRICK WALL OF AUDITORIUM
BEAM WITH FIRE
RESISTANT INSULATORS 30 mm FIRE RESISTANT INSULATION
FINISHED

LONG SLOTTED
HEX WASHER HEAD SMS
GLASS PARTITION BEAM WITH SHEAR CONNECTORS
WELDED TO TOP FLANGE

OVERLY SUPER "H"


DOOR BOTTOM
IN SOUND/LIGHT 230 mm SOLID MASONARY BLOCK
WITH 15 mm PLASTER BOARD

FLOOR FINISH CONTROL ROOM

COMPOSITE FLOORING DETAIL


VERTICAL SECTION OF 9 MM CARPET

25 MM STONE TILE
SOUND PROOF DOOR 25 MM SCREEDING

WIRE MESH TO HOLD THE


RESILIENT MATERIAL
GLASS WOOL
M.S. HANGER
TUNGSTEN HALOGEN LIGHT
CONCRETE FLOOR SLAB
PLYWOOD CASING
AIR GAP

WIRE MESH

DETAIL OF FLOORING
GLASS WOOL

BRK. WALL PERFORATED FIBRE BOARD

AIR GAP GYPSUM BOARD REFLECTOR


DETAIL SHOWING
FRAME INSIDE
SUSPENDED PANELS
RUBBER CHORD BRK. WALL

ACOUSTICAL WIRE HANGER


GLASS WOOL PLASTER 12MM THK

HINGE AIR GAP


TUNGSTEN WIRE CLIP 'C' CHANNEL
HALOGEN LIGHT
DETAIL OF JOINT
OUTSIDE
WIRE MESH
PLYWOOD
BETWEEN HANGER
GLASS WOOL

PLAN OF THE DOOR PERFORATED FIBRE BOARD AND CEILING


PLYWOOD CASING
TREATMENT
ACCOUSTIC CEILING
SOUNDPROOF DOOR DETAILS
DETAIL PLAN OF
SIDE PANELS

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

AUDITORIUM FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


TEMPERED GLASS MASK TYPE SUSPENDED FREE SPACE BETWEEN
GIRDER BEAM AND GLASS TEMPERED GLASS NEOPRENE
FROM 10 mm
GRAY

CURTAIN WALL SYSTEM THREAD SCREW


6mm glass EXAGONAL HEAD

1:25 scale UNION OF TWO CRYSTALS


DETAIL 1
SIMPLE FIXING OF
PARAPET
WITH DOUBLE FIXATION
TO THE ROOF FRAME OF
screwing CONCRETE

(INTERIOR) (EXTERIOR)

STRUCTURAL COLUMN TO
BEAM COLUMN OF AESTHETIC
DETAIL X

SEE DETAIL X
SPECIFICATIONS
C
PROJECTION OF PROJECTION OF - THE POINTS OF THE PROJECT WILL BE OF
REAR BEAM REAR BEAM N.P.T. +9.34m N.P.T. +9.34m COLORLESS TEMPERED GLASS 6mm
.15 1.38 .15 1.38 .15 2.00 .15 1.38 .15 1.38 .15
- VERIFY MEASURES ON SITE
- THE PIVOTING LEAVES WILL HAVE ACCESSORIES
CUT A-A LATCH TYPE FIXING
SEE DETAIL X
SEE DETAIL 1 SEE DETAIL 1 SEE DETAIL 1

Beam cont.
.15

DETAIL 1 ALUMINUM PROFILE


1.21 1.21 SIMPLE ATTACHMENT to
6mm TEMPERED GLASS 6mm TEMPERED GLASS
column to plate
1.24
HALF PLATE HALF PLATE Fixed Sheet PIVOTING BLADE
6mm GLASS
3.45

.15
DETAIL 3
ALUMINUM PROFILE GLASS
SEE DETAIL 2 2 "x 1" BLACK SIMPLE ATTACHMENT to
PROJECTION OF PROJECTION OF
REAR MASK REAR MASK 1.21 1.21 ALUMNI PROFILE
Pivoting Blade

FIXED SHEET
SEE DETAIL 2
1.24
6mm GLASS

PROJECTION OF
REAR MASK Fixed Sheet
SEE DETAIL 2
DETAIL Y
.15

1.21 1.21
SEE DETAIL X

PROJECTION OF PROJECTION OF
REAR BEAM REAR BEAM N.P.T. +5.02m N.P.T. +5.02m
1.24

ACCESSORIES - GLASS JOINTS


7.94
FIXED GLASS
PLATING
.70

.15 UPPER FIXATION:


Peralte de viga
PIVOTING BETWEEN FIXED GLASS

.99
1.21 1.21
PROJECTION OF SEE DETAIL 2
REAR MASK
SEE DETAIL X SEE DETAIL X
AND DETAIL E AND DETAIL E

4.09
.15

DETAIL 2
.81
UNION OF CRYSTALS WITH
1.09
6mm TEMPERED GLASS DOUBLE FIXATION TO plates
6mm TEMPERED GLASS
HALF PLATE 1.21 AND / OR TO THE CEILING
HALF PLATE

.15

1.21

.81
SEE DETAIL 1 SEE DETAIL 1 SEE DETAIL 1 1.09

H=20cm H=20cm

LOWER FIXATION:
.40
N.P.T. +0.70m N.P.T. +0.70m
.15
DETAIL 1 PIVOT WITH INSURANCE
POSITIONS BETWEEN CRYSTAL
SWING AND WALL
SIMPLE GLASS FIXATION
TO BEAM AND PARAPET DETAIL 3
C

ELEVATION OF CURTAIN WALL SECTION AT C-C


SYSTEM 6mm GLASS 6mm GLASS
1:25 SCALE 1:25 SCALE

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

CURTAIN WALL
SECCION TIPICA 6
ESCALA 1/5

FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


STAIR TOWER TOP
LEVEL +9300 MID LANDING
26 +2100 27
14 14
12MM STONE ON 13
12
15
16
TREAD 11 17
12MM NOSING 10
9
18
19
8 20
T=300 7 21
6 22 LIVING
R=150 25 MM DIA &
12MM 12MM THICK LIVING UP 5 23 +625
900MM HIGH S.S LANDING 4
W=1200 +625
RAILING 1200MM WIDE STONE ON MORTER BED T=300
R=150

SECOND FLOOR 44 W=1200

LEVEL +6600
W
42
43 RISER
41 12MM THICK BATH LOBBY
-25

BATH
40 BED ROOM LOBBY
39 12MM STONE
ON TREAD
PLASTER +625
-25
+600 +625 -25 +625 +600 -25
BED ROOM
38 +625

MID LANDING 37 WAIST SLAB WC


-25 -25

WC
1200MM WIDE 36 12MM STONE ON +600 OPEN TO OPEN TO +600
35 RISER SKY
VARANDAH
SKY
34
33
32 WC WC
31 +600 +600
30
29 TREAD RISER DETAIL
-25 -25

BATH LOBBY LOBBY BATH


28 BED ROOM D2 -25
+625 +625 -25 BED ROOM
27 +600 +600 +625
25MM DIA & 26 (SCALE-1:15) +625
-25

FIRST FLOOR 900MM HIGH S.S 25 -25

W RAILING 24 D1 D1
LEVEL +3600 23
22 4 +600
21 3 +450
20 2 +300
19 12MM STONE LIVING UP 1 +150
18 ON TREAD +625 T=300 +0.0 LIVING
MID LANDING 17 R=150 +625
16 W=1200
1200MM WIDE 15 12MM STONE ON
14 RISER
13
12
11
10
9
QUARTER ROUND P SCHEDULE OF OPENING

100MM THICK
8
7
6
(5MM RADIUS) D
D1
1.20 X 2.10
0.90 X 2.10
MAIN DOOR
DOOR
E KEY GROUND FLOOR PLAN
P.C.C (1:3:6) 5 D2 0.75 X 0.90 FLUSH DOOR
4 SCALE- NTS
12MM 12MM W 1.80 X 1.20 WINDOW
V 0.61 X 0.61 VENTILATOR
NOSING THICK
25,26,27,28

GROUND
LEVEL +0.0
Y=+13575mm

MORTER
SECTION CC' BED
COL-

(SCALE-1:40)
I
27
COL- 26
4a x=+8845mm
MID
DN
20RISER UPTO
SECOND FLOOR
THREADED BOLT
LANDING
+5100 T=300
LVL
12MM THICK 12MM STONE ON
C
14 15 16 17 18 19 20 21 22 23 24 R=150
W=1200 PLASTER TREAD
W C'
14 13 32 31 30 29 28 27 26 2524 900MM HIGH
NOSING DETAIL S.S RAILING
COL- 27
UP
(SCALE -1:5)
5 x=+11575mm 12MM
25,26,27,28

26
STONE ON
Y=+13575mm

QUARTER ROUND
FIRST FLOOR PLAN
(SCALE-1:40)
(5MM RADIUS) RISER 12MM THICK FINIS
COL-

I PLASTERED SURFA
12MM NOSING
27 WAIST SLAB
4a COL- 26
x=+8845mm
CLAMPING RING
MID 20RISER UPTO
FIRST FLOOR LVL
LANDING
12MM THICK
+2100
14 15 16 17 18 19 20 21
T=300
R=150
22 23 24 W=1200
DETAIL AT P MORTER BED
C W C' (SCALE -1:1)
14 13 12 11 10 9 8 7 6 54 RAILING DETAIL
UP (SCALE-1:10)
COL- 27
5 x=+11575mm
25,26,27,28

26
Y=+13575mm

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP


GROUND FLOOR PLAN
NAME : HITESH DINESH PATIL
COL-

(SCALE-1:40)
I STAIRCASE DETAIL FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


Waterproofing Top
Mortar repellant sand cement
Annealed red partition wall
seated with 1: 5 sand cement
mixture in common finish.
lvl. +9.78
Reinforced concrete slab
lvl. +9.60

.38

R.C.C Beam
2.26

OFFICE AREA
Top Wall Paint beige. for outside.
Silver aluminum channel Bracket

Waterproofing Top
11.30
14 cm lattice. wide, annealed red partition seated
with 1: 5 sand cement mixture in apparent finish. Mortar repellant sand cement
8.66
Curtain wall, 2mm thick glass. Annealed red partition wall
CERAMIC TILES seated with 1: 5 sand cement
mixture in common finish.
Silver aluminum channel Bracket Reinforced concrete slab

lvl. +6.60

.38

Top Wall Paint beige. for outside.


2.26
OFFICE
R.C.C Beam
AREA
Silver aluminum channel Bracket R.C.C Beam

11.30

14 cm lattice. wide, annealed red partition seated Top Wall Paint beige. for outside.
with 1: 5 sand cement mixture in apparent finish.
36.53 8.66

Curtain wall, 2mm thick glass.


CERAMIC TILES

Silver aluminum channel Bracket Silver aluminum channel Bracket

Floor slab
lvl. +3.60

Top Wall Paint beige. for outside.


2.26

R.C.C Beam 14 cm lattice. wide, annealed red partition seated


SHOPPING with 1: 5 sand cement mixture in apparent finish.
Silver aluminum channel Bracket
Curtain wall, 2mm thick glass.

CERAMIC TILES
11.30

Floor slab
8.66

Curtain wall, 2mm thick glass. R.C.C Beam


CERAMIC TILES
Top Wall Paint beige. for outside.
Silver aluminum channel Bracket

lvl. +0.60
Reinforced concrete reinforcement
.38

lvl. +0.00 Silver aluminum channel Bracket

Rolling Shutter
Natural terrain

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

FACADE DETAIL FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


BRICKWORK PLAN

LEGEND

120

120

120
280
NO. NAME

280
870
1. COUNTER TOP ARCHAEN GRANITE

750

750
470
2. HEALTH FAUCET @ 750 mm
6.

470
3. MIRROR WITH 12 mm PLYWOOD BACKING
12.
150

4. HOT & COLD CONCEALED DIVERTER

150
FALSE CEILING
20. 12. 20. 5. WATER CLOSET (WESTERN STYLE)
FALSE CEILING

BEAM AS/STR 6. FIXED FROSTED GLASS PARTITION


12.
BEAM AS/STR
7. PIVOTED FROSTED GLASS DOOR
14.
OVERHEAD RAINSHOWER TRAY
8.

1650
AS PER SELECTION @ 2100
3400

1500
17. 17. mm
2150

2150

2000

12.
18. 310 X 310 VITRIFIED 9. 18 mm THICK MARBLE TOP FOR CISTERN

TILE OF APPROVED 4. FIXED FROSTED GLASS


MAKE 10. FINISHING FLOORING
11. TEXTURE PAINT AS PER SELECTION

7. WALL IN ELEVATION 21. 12. 50 X 50 WOODDEN BATTERNS


15.
9. WALL IN ELEVATION
1. 13. NANI TRAP
16. WATER PROOFING AS
14.
2.
19.
PER SPECIFICATION WATER PROOFING 14. SHELF/TOWEL BAR
2. 14. AS PER SPECIFICATION
15. WASHBASIN (KOHLER) @ 900 mm

1000

1000
5.
BRICK BAT FILLING SUNKEN SLAB AS/STR
16. TOILET PAPER HOLDER @ 50 mm
500

500

5.
HAEMALITE FILLING
SUNKEN SLAB 17. HOOK AS PER SELECTION
10.
1070

10. 18. SWITCH BOARD @ 150 mm


450
570

570

100 mm THICK LOW LEDGE WALL

450
19. HT. UPTO 850 mm WITH MARBLE

570

570

570
TOP
120

20. LIGHTING FIXTURES AS PER THE SELECTION

120
21. SOAP DISH HOLDER

SECTIONAL ELEVATION A SECTIONAL ELEVATION B

187

1303

B
115
1500.00

73 310.00 310.00 310.00 310.00 215.00 401

SOIL PIPE
COLD WATER
DRESSING ROOM
(CUT IN SLAB) SUPPLY HOT WATER BATHTUB 1500 X 1200
BATHTUB AS PER SUPPLY TOILET
SELECTION GREY WATER PIPE 1800 X 1500
(CUT IN SLAB) 1200.00
19. VITRIFIED TILES
14.
13. 16. (ROUGH FINISHED)
6. 105.00
2. 310 X 310 mm
310.00
SLOPE
5. 7. lvl:+ 5850

W.C. WATER CLOSET


(WESTERN STYLE)
310.00

A A PIVOTED GLASS W.C. 3034

BATHTUB

700.00
1500.00

SHOWER AREA ENTRANCE AREA


310.00
DOOR 902

PLANTERS SLIGHTLY DOWN


FIXED FROSTED
1500

WASHBASIN
GLASS PARTITION BATHTUB
14. 6. 310.00
SHOWER AREA

15. WASHBASIN AS/ MASTER BEDROOM


ENTRANCE AREA
18. SELECTION 115 5500 X 3400
SLOPE
13.
14. 4. 21. 3. 1. 155 WASHBASIN
NANI TRAP
401

EXTERIOR PAVEMENT

DRESSING ROOM
72.00 310.00 310.00 311 311 215.00 1500 X 1200 BALCONY
1500.00
2800 X 1500

DETAIL PLAN PLUMBING PLAN


B
TOILET TO BE DETAILED (FLOOR PLAN LOCATION)

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

TOILET DETAILS FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020


SUNKEN LIGHT WITH FROSTED GLASS

SUNKEN LIGHT WITH FROSTED GLASS

2100
20cms x 3 cms thk. Wooden Panel
Or

450
Steel Box
50 50 100

1400
450

4650

4650
420

420
3200
LOGO

2750

2700

2550
50
200

2100

1920

1800

1500

1500
2250 2250 2250 5600 2250 500 5980 500
SECTION A A
20 mm squre box section
Textured Painting ELEVATION

150
Sunken Light with Frosted Glass

2100

1950
20cms x 3 cms thk. Wooden Panel
150 Or
200 Steel Box
150
1400

200

4650
150
200 200 200

200
3200

200
2700

2550
1700

1800

140
140

100 V
D1 2400 200
50 20 mm squre box section 50
500 1500 4370 500 D2

5980 150x190 TOILET


130x150
WATCHER'S POST A
240x300
4000

GATE DETAILS

100
50

500

450
350

50

50
ATM Machine
2250 500 5980 500 2450
300x190

1400

1400
A
Site Boundary Line
2250 2250 2250 6000

Site Boundary Line


PLAN

Gate Compound wall details

PRAVARA RURAL COLLEGE OF ARCHITECTURE, LONI DATE SIGN STAMP

NAME : HITESH DINESH PATIL

COMPOUND WALL DETAILS FOURTH YEAR B-ARCH

SUB: A.B.T.S.-2

ACADEMIC YEAR 2019-2020

You might also like