INSTEEL ENGINEERS PVT LTD is an ISO 9001:2008 certified company for Engineering
Consultancy Services established in the year of 2008. We are leading & recognized
engineering service provider for Structural Steel Design and Detailing, Rebar and BBS
Design and Detailing, Building Information and Modeling (BIM), Insteel Projects
(Fabrication and Erection Works).
Our brand is built on our commitment to total quality, timely delivery and customer
satisfaction. With a strong capable team, we handle all types of projects and deliver
highest quality of error free construction drawings. We use the latest software & hardware
to provide best services to ever increasing expectations of our clients.
Insteel Engineers’ strength lies in its knowledge, experience and skilled manpower with
exposure to international standards. Our strong quality policy is geared towards global
needs. A positive approach coupled with best services has gained confidence of our
clients. We are committed to create and maintain strong customer relations through
professional approach. Customers get back to us with repeat orders because of our
commitment to quality & delivery.
Quick response, quality work, timely delivery and cost effective solution make us a
desirable destination amongst the Engineering & Detailing firms. We aim to create
mutually beneficial and long term business relation with our clients.
Insteel Engineers Pvt. Ltd is a member of AISC (American Institute of Steel Construction)
and NISD (National Institute of Steel Detailing)
Corporate office:
Regional office:
Scope:
Exclusion:
Clause 7.3 is excluded from scope of this manual as process design is by client and the
construction is as per drawings provided by clients. All other clauses of ISO 9001:2008
quality Management System are applicable to the current level of operations of the
organization.
Documentation is developed in line with the requirements of standard. This consists of:
• Quality Objectives
• Procedure Manual
Documents of external origin but followed by the organization are also addressed as part
of documentation. The details are as shown under '4.2.2 - Quality manual'
The organization has established, documente4 implemented and maintained the quality
management system as per ISO 9001:208 requirements. The quality manual cross refers
to all the supporting procedures, work instruction and related records.
Level- 4: Forms, Formats & Registers used for recording measurements, observations and
other Quality related data
Documentation Pyramid:
The organization has identified Marketing Purchase, Store, site execution and Quality
Assurance as processes needed for the quality management system. The system has
been implemented throughout the organization.
• Sequence and interaction of the process are identified and given with this Quality
Manual [Annexure l] this shall take care of the control of processes effectively.
• All documents are approved by the director for adequacy prior to issue. Changes
to documents are reviewed, approved / re approved and updated as per this
manual.
• All changes and current revision status is identified and available in ARS. Relevant
documents are available at point of use.
• Documents are legible and readily identifiable by its unique identification number
and revision Number
Quality system records in the company are maintained in relevant formats, registers and
files etc. using suitable identification nos. MR / Concerned departments generating these
records own responsibility for keeping it legible and retrievable. The procedure for
controlling these records is documented [IEPL/P/02].
10 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/11, Rev.0, 14. 06.2018
Management Commitment
5.1 MANAGEMENT COMMITMENT
The Top Management of INSTEEL ENGINEERS PVT LTD is committed to the policies set forth
in this manual and supporting documentation. This commitment is demonstrated by
continual use of the Quality Policy and Quality Objectives as guiding principles in the
conduct of the routine and strategic business.
The management is also ensures that while keeping customer satisfied the regulatory and
legal requirements are complied. The means of setting objectives, providing resources,
directing, monitoring, and controlling the organization in a continual improvement model
based on PDCA principle and as described in this manual. A structured way of
discharging above intent is shown in organization chart of INSTEEL ENGINEERS PVT LTD.
• Identifying the requirements of the customers and fulfilling them with the aim of
enhancing customer satisfaction.
11 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/13, Rev.0, 14. 06.2018
Quality Policy
5.3 QUALITY POLICY
We, at Insteel Engineers Private Limited (IEPL), dedicate our resources and
engineering proficiency coupled with latest technology for satisfying our
Customers by providing excellent Structural Engineering Consultancy services as
desired.
आमचे गण
ु व�ा धोरण
ईनस्टील इंिजिनअसर् कंपनी मध्ये कायार् िन्वत असणारे आम्ही सवर् जण आमच्या सवर् ग्राहकांना
उच्च दजार् च्या संरचना अिभयांित्रक� सेवा प्रदान क�न त्यांच्या प्रकल्पांच्या यशस्वी पत
ू �साठी
आिण त्यायोगे त्यांच्या समाधानासाठी वाह� न घेण्यास वचनबध्द आहोत.
आम्ही आमच्या सेवा प्रणालीचे सतत पुनिवर् लोकन-समी�ा क�न त्या प्रणालीत सवर् ग्राहकांना
सेवा समाधान प्रदान करण्यासाठी अखंिडत सुधारणा घडवुन आणन ू या कंपनीला संरचना
अिभयांित्रक� सेवा प्रदान करणार्या आदशर् संस्थांमध्ये समािव� करण्यासाठी सतत प्रयत्न
शील आहोत.
(राजू जगताप)
व्यवस्थापक�य संचालक
12 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
• Craft all the services and activities assigned by the company are in
accord with our customer requirements.
• Sustain the entire quality system requirements, are being satisfied and that
the system is persistently reviewed in order to progress its values.
R.P. Jagtap
Managing Director
13 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/14, Rev.0, 14. 06.2018
Quality Objectives
5.4.1 QUALITY OBJECTIVES
14 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/15, Rev.0, 14. 06.2018
Quality management system planning
15 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/16, Rev.0, 14. 06.2018
Responsibility and Authority
The responsibility and authority for processes and services will be clearly defined in the
organization documentation. Management will ensure that responsibility and authority
commensurate with the scope of each job title. Organization chart is as given below.
16 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/17, Rev.0, 14. 06.2018
Management Representative
• Planning and organizing management review meetings and ensure that meeting
is conducted to discuss agenda as per standard.
Top to Bottom Communication is carried out by the way of informal daily meetings with
employees and the director. Since the organization has limited number of employees,
the employees have direct access to the top management and interact directly for any
of the operational issues. Management is accessible and bottom to top communication
is carried out on specific request of the employee with the
Director, Peer to Peer communication is carried out through informal discussion email /
phone etc. Effectiveness of communication is assessed through internal audits and in
MRM.
17 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/19, Rev.0, 14. 06.2018
Management Review
The management review is done through management review meetings which are
chaired by the director and attended by all process owners. M.R. organizes the
management review meetings for reviewing quality system, improvements, its continuing
suitability and effectiveness at least once in six months. Management review findings and
recommendations are recorded in Doc: IEPL-R-O2.
The meetings also reviews customer complaints, trends in achieving quality objectives,
review training Process , resources planning , internal audit results, supplier performance,
customer complaints & feedback, process performance, corrective and preventive
action taken.
Review Input:
The points for discussion during the Management Review Committee shall as a minimum,
include the following:
Review output:
18 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/20, Rev.0, 14. 06.2018
Provision of Resources
6.1 PROVISION OF RESOURCES
The top Management ensures the availability of resources i.e. Man, Material, Machine,
Method
Environment, and Infrastructure for:
H.R. Manager under guidance of the Regional head / Director is overall responsible for
implementation of this procedure.
HR Manager is responsible for guiding and advising the organization on human resource
matters as well as maintaining personnel records.
19 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/21, Rev.0, 14. 06.2018
Competence Training and Awareness
The main focus is to increase the competency level of the employees within the
organization. To achieve this, the following shall be carried out:
• Determine the required competency level for all jobs affecting quality before
allocating the job to personnel.
• Ensure that the personnel are aware of the relevant objectives and the achieve
them.
20 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/22, Rev.0, 14. 06.2018
Infrastructure & Work Environment
6.3 INFRASTRUCTURE
The infrastructure (workspace, hardware, software, tools, standard communication and
facilities) required to satisfy the organization's products and services are determined. The
infrastructure requirements are established. Resources are identified and are provided so
as to ensure optimum performance of the organization and ensuring a productive work
environment for the employees.
21 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/23, Rev.0, 14. 06.2018
Planning for product realization
7.1 PLANNING FOR PRODUCT REALIZATION
Top management plans processes needed for product / service realization. Project
Planning is carried out by the planning engineers:
On the basis of work order received from the customer, the planning engineer studies the
customer requirement, drawings and other details provided. Based on this material
requirement and manpower requirement is assessed for completion of contracted work.
On the basis of planning the customer is informed the proposed completion date by
forwarding a schedule for execution of the work. The purchasing process is also initiated
if required for the work order. The complete flow process chart for the product realization
is given in Annexure A.
The director and marketing in-charge are overall responsible for this customer related
processes.
It is ensured that the job requirements are adequately defined documented and
checked whether feasible and required.
Design and drawings and other specifications related to the project are obtained from
the customer in writing either through email or in paper form. In case customer quotes
the same verbally the same is to be confirmed with the customer by sending a
confirmation email or suitable communication.
Statutory and regulatory requirements if any are addressed properly and arc met with
and required license are obtained where ever required.
22 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
Any differences in the offering of the organization and expectations of the customers are
suitably reviewed and are resolved / amended on a case to case basis and it is made
sure that no work order is accepted before detailed discussions with technical and
commercial employees are carried out about economic and technical feasibility of the
requirements.
References: IEPL -P- 07: Customer feedback and customer complaint procedure.
This clause is not applicable and exclusion is claimed as work is carried out as per
the design/drawing given by customers.
23 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/28, Rev.0, 14. 06.2018
Design & Developments
7.4 PURCHASING
Purchasing Process:
Raw material purchase and non-trading purchases are made from the approved
suppliers, A List of approved supplier is prepared. Vendors are classified into three
categories namely Au B and C. This classification is based on track records and suitability
with the organization.
A system is being used to evaluate 'A' listed supplier every year.
Purchasing Information:
Purchasing information states the details of the requirements, specifications and delivery
dates etc.
Products
All the consumables / parts / sub-assemblies / components are procured from the list of
approved suppliers and parameters for verification of purchased products are identified.
Whenever a purchased product arrives, inspections are carried out either at supplies
workshop/ go down or site.
Evaluation criteria are quality of supply and timely supply of required resources etc. as
per the supplier evaluation form. Records are maintained as detailed in the procedures.
References:
24 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/29, Rev.0, 14. 06.2018
Control of Production and service provision
In fabrication and construction of pipeline and piping project, products are produced
at project site. The quality of the product is controlled by the control of processes,
which develops the product. A brief is given below.
Sr.
Process Description Responsibility Reference Documents
No.
Site Mobilization Project manager
Labour license and statutory Labour License,
Site/ HO Admin
norms Statutory Documents
Welding process
qualification Welder QA-QC Engineer WPS, PQ& WPQ
qualification
WPS, PQ& WPQ,
NDT techniques QA-QC Engineer
QAP,ITP
Inspection of inward, in
QA-QC Engineer QAP, ITP
process, final product
QA-QC Engineer, site
Project Testing of the pipe loops test pack files
1 engineer
Execution
Safety Induction of labor,
Safety officer Safety Manual
staff
Safety committee
formation, lob hazard
analysis, tools tackles
Safety Manual, SOP for
inspection, housekeeping, Safety officer
safety,
Observation and
rectification of unsafe act,
unsafe condition
Registers soft copies of
inward outward material
Storekeeper inward outward
Record, inventory records
material status
Drawings, QAP, ITP,
Execution of the
Site Engineer, project Work Instruction
mechanical and related
manager manual, Procedure
construction work
manual
25 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/30, Rev.0, 14. 06.2018
Validation of processes
Validation for the special processes is carried out by the project manager/QA/QC. In
most of the cases approval for the processes and personnel [welders] is certified by the
customer and/or consultant.
The overall responsibility for implementation of this clause lies with the QA/QC and the
store In-charge.
In the store area, all the products are kept at a pre-determined area designated area as
material awaiting inspection inspected and rejected.
Items are given a unique id and can be traced using that id number. All the products are
marked with sticker / label / hand written information / dot hard punching.
Traceability is maintained wherever necessary.
Since the nature of the organization involves construction on the basis of design and
drawings provided by the client, it is ensured that proper care is taken of the property
belonging to the customer and no damage is done to the same.
All the employees are given special orientation training on how to deal with customer's
property safely.
In case of some damage caused to the customer's property by any of the employee of
the organization because of mistake on the part of the organization, records are
maintained for the same.
26 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/33, Rev.0, 14. 06.2018
Preservation of Products
All the products are stored in a well maintained place so as to protect it from the physical
electrical or mechanical damage, heat and rain. Proper packaging is ensured for
deliveries [if any] through road / air / sea transport to avoid any damage in transit.
The organization maintains a list of measuring and monitoring devices having impact on
the quality. A calibration schedule for these instruments is prepared and it is ensured that
the instruments are calibrated as per the calibration schedule. Status of calibration is
displayed on instruments and equipment.
Where ever possible measurements are carried out in areas for analyzing improvement
opportunities. We firmly believe that if you can't measure you can't improve and
therefore in such areas data is collected is analyzed to take up improvement projects.
27 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/36, Rev.0, 14. 06.2018
Customer Satisfaction
8.2.1 CUSTOMER SATISFACTION
INSTEEL ENGINEERS PVT LTD defines processes for the measurement of customer
satisfaction in the procedure IEPL-P-07. Customer satisfaction is monitored and measured
through regular interaction with the customers by the project manager / MR through
direct interactions. The records of the customer feedback are maintained.
Description:
The company has established a procedure for carrying out "Internal Audit ". The Internal
Quality Audits are planned in such a manner that the entire Quality Management System
is audited once in six months by trained auditors independent of their activities. The Audit
Planning is carried out by Management Representative, by preparing schedules for
audits based on the status and importance of the activity. Internal audit can also be
conducted by external auditors if required.
The procedure requires audit reports to be documented. The reports of the audits form
the basis for suitable and timely corrective actions by the respective sections. All
corrective actions agreed upon as an outcome of the Internal Quality Audits are verified,
Implementation and effectiveness of corrective actions taken are recorded. The audit
findings that need attention of the Director or top management team are brought to
their attention by Management Representative through Management Review. In case
any significant changes are observed in the system i.e. Change in process or in case of
special assignment / Order, and then unscheduled audits may be carried out. The
Management Representative maintains the records of the Internal Quality Audits.
28 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/38, Rev.0, 14. 06.2018
Monitoring & Measurement of Process
INSTEEL ENGINEERS PVT LTD monitors and measures the processes to achieve planned
results by:
• Internal Audit
• Number of customer complaints.
• Number of non-conformity arising during product / service realization.
• Customer feed backs and supplier performance.
The data collected are used to take relevant corrective and preventive action and to
enhance the process and product realization process.
In order to monitor and measure the characteristics of the products supplied to the
customer, the raw materials / consumables are inspected upon arrival and in- process /
final inspection is carried out as per quality plans. In many cases customer and /or their
consultant monitor quality at every stage of construction.
The overall responsibility for implementation lies with the project manager and MR. The
responsibility for disposition/rectification of non-conformities also lies with the project
manager.
29 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/41, Rev.0, 14. 06.2018
Analysis of Data
Relevant and reliable data is collected and is to be reviewed and analyzed for the
continual improvement of the Quality Management System. The data is collected from
relevant management information systems including internal audits, corrective and
preventive action, non-conforming product/service, customer satisfaction reports etc.
The analysis of data is done in a graphical form wherever possible for clear representation
of the results and is appropriate to the various objectives set by the organization
The following will be used at the time of Management Review Meeting for continually
improving the Quality Management System and the business of the organization.
• Quality Policy
• Quality Objectives
I] Corrective Action
II] Preventive Action
30 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/43, Rev.0, 14. 06.2018
Corrective Action
8.5.2 CORRECTIVE ACTION
M.R. and concerned department head are over all responsible for implementation of this
requirement. A procedure has been established for corrective and preventive actions
with respect to Non- conformity. Through this procedure, it is ensured that the actual
cause of non-conformity relating to product process and quality system is investigated.
Potential causes of non-conformity are identified through customer complaints analysis
of operations, quality records, audit results etc.
Determining the need of suitable action. Identifying and implementing the action.
Record the action taken. Review the effectiveness of action taken to prevent recurrence
and or occurrence of any known non-conformities. The company attaches utmost
importance to the customer complaints. The Corrective and preventive actions are
attended urgently depending upon the gravity of non-conformity the concerned
functions are then advised on further course of action required to prevent Recurrence of
non-conformities and elimination of potential causes of non-conformities.
Reference: Procedure for Corrective and Preventive Action Ref: IEPL P-10
M.R. and concerned department head are over all responsible for this. A procedure has
been established for corrective and preventive actions with respect to nonconformity.
Through this procedure, it is ensured that Potential causes of non-conformity are identified
through, analysis of operations, quality records, audit results etc.
Based on analysis of data need for preventive action is identified and actions are
initiated suitably. Review the effectiveness of action taken to prevent occurrence of any
unknown nonconformities. The company attaches utmost importance to the suggestions.
The preventive actions are taken depending upon the possibility of problem.
31 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/45, Rev.0, 14. 06.2018
List of Procedures
LIST OF PROCEDURES:
ISO9001
Sr.No. Description CI Doc. Ref.
1 Index NA IEPL/C/01
32 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/46, Rev.0, 14. 06.2018
List of Formats
LIST OF FORMATS
33 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
24 Fire extinguisher checklist IEPL/F/SA/03 Safety
25 General work permit IEPL/F/SA/04 Safety
26 Incident investigation report IEPL/F/SA/05 Safety
27 Permit to work above 3 m height IEPL/F/SA/06 Safety
28 Crane inspection checklist IEPL/F/SA/07 Safety
34 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
IEPL/Q/47, Rev.0, 14. 06.2018
Annexure A
ANNEXURE A
35 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
36 | P a g e Approved by Director
Insteel Engineers Pvt. Ltd.
37 | P a g e Approved by Director