Surname MPAPA
N/A Gender
Other names
Male ☒ Female ☐
None
E-mail Phone No
Injured person(s) classification
but Occupation Industrial Engineer Employee No KKN-J0519
KKM-JV
Employer
Contact details 59105834
Surname Name
Visitor ☐
Host name
Public person ☐ Name (if provided) Add more sheets, if required
Surname Telephone No
4. Incident details:
Date of event 13/04/2024 Time of event 11:00
Site Polihali Specific location Polihali–Workshop
Describe the incident (add more sheets, if required): Welding machine that was connected at power box Power Box 3 near
mechanical department storage, the machine oozes smoke and produces a blasting sound. The earth leakage circuit breaker
feeding the leakage also trips. The same time welding machine 3 at power box PB1 cable entry point produced a loud sound
from the same power box and a 3 phase (see through) circuit breaker connecting an unused drilling machine, in off position
seemed black within and both welding machines that malfunctioned are of the same size and brand. Printer from site clerk
office emitted smoke and produced a hissing sound quickly cuts power from the distribution board, resulting in damage to
the printer and plugs malfunctioning.
Page 1 of 4
INCIDENT REPORT
REFERENCE FLASH REPORT
P2W-4021-OSH-0078-00_ELI P2W-4021-FLA-0078-00_ELI
POLIHALI TRANSFER TUNNEL PROJECT
5. Injury/Illness details
Nature of injury/illness Asthma or other respiratory illness ☐ Amputation ☐
or symptom Bruise, contusion or crushing injury ☐ Burn ☐
6. Sign and forward report to injured person’s (or area) supervisor/line manager
Supervisor/line manager N/A
Elimination control
☐ Substitution ☐ Engineering X Administration ☐ PPE
☐
control control control
Detail of immediate response actions: Main switch at Power Box 1 and all earth leakage circuit breaker fed from it were
turned off.
N/A
N/A
Corrective Action Report (CAR) reference
Page 2 of 4
INCIDENT REPORT
REFERENCE FLASH REPORT
P2W-4021-OSH-0078-00_ELI P2W-4021-FLA-0078-00_ELI
POLIHALI TRANSFER TUNNEL PROJECT
N/A N/A
Supervisor/line manager name
N/A Date
Signature
N/A
Elimination control
☐ Substitution control
☐ Engineering ☐ Administration ☐ PPE
☐
control control
Detail of immediate response actions:
N/A
N/A
Corrective Action Report (CAR) reference
Supervisor/line manager N/A N/A
name
N/A Date
Signature
Page 3 of 4
INCIDENT REPORT
REFERENCE FLASH REPORT
P2W-4021-OSH-0078-00_ELI P2W-4021-FLA-0078-00_ELI
POLIHALI TRANSFER TUNNEL PROJECT
Occurs once per month Likely Moderate ☐ High ☐ High ☐ Extreme ☐ Extreme ☐
Occurs once per year Possible Low ☐ Moderate ☒ High ☐ Extreme ☐ Extreme ☐
Occurs once every 10 Unlikely Low ☐ Low ☐ Moderate ☐ High ☐ Extreme ☐
years
Occurs once in a lifetime / Rare Low ☐ Low ☐ Low ☐ Moderate ☐ High ☐
100 years
Risk Level Investigation Requirements
Low Risk Casual Incident Investigation Supervisor
Moderate Risk Casual Incident Investigation Line Management
High Risk RCAT Investigation Middle/Senior Management
Extreme Risk RCAT Investigation Senior Management / MD
2. FOLLOWING PROCEDURE/PRACTICES/RULES/STANDARDS – Failure to test for standing faults circuit by circuit on all
energized power boxes.
ROOT CAUSES: Blown components in the welding machines which are electronics that safely dissipate large
amounts of surge energy over voltages.
CORRECTIVE ACTIONS
1. Ensure all power boxes and distribution boards are fitted with Plant Manager MR Langano
surge protection devices as per SANS 10142-1
Page 4 of 4
INCIDENT REPORT
REFERENCE FLASH REPORT
P2W-4021-OSH-0078-00_ELI P2W-4021-FLA-0078-00_ELI
POLIHALI TRANSFER TUNNEL PROJECT
Signature
PHOTOGRAPHIC EVIDENCE