Professional Documents
Culture Documents
EXT-220507 XSIZE Case Study 3 - v04
EXT-220507 XSIZE Case Study 3 - v04
Power Optimization
Note: The well had a water cut of approximately 95 percent, so there would need to be a significant increase to
boost income.
3,500
Bottomhole Flowing Pressure (PSI)
3,000
2,500
2,000
1,500
1,000
500
As more and more E&Ps embrace the benefits of big data in decision
making, XSIZE does exactly that. It incorporates and manages
THE CONCLUSION extensive well data, then compares that with its deep database of
pump information to show operators a range of options, from which
they can then make an informed decision.
Extract
12502 E 55th St
Tulsa, OK 74146