ONAL SITU] Ic}
ACCELERATING URBAN
RENEWAL WITH
DIGITALIZATION
ane en wen oa)
SECC ale ia ase eee eso
ere eDiets nent
Peete emcee keslceec ty
with town services, decision-makers and
CNet
OUTCOMES
Town planners
used Autodesk
Reece UNS LOL say
ee eee ae
eee et
solutions to
Silva trclel ae (6 10 GY ou else Cth
paneer eerie
Hae Leen (beech Berar cia
process time by 75%
fraWorks [enables me to] avoid
. manual work [and] concentrate on
activities which could bring real
s added value to the teams.”
Batre) SMa aa
Berne ee ease
ao Nm S1 aed
HOW THEY DID IT
eR ROS UO
THE JOURNEY
VALUES ADDED
Capture the area with airborne
aio
a 20 points/m2 scatter EOD LCR Cees Bre)
nea ret
SAMMI THIELE
a r
Sens ee
ca 3 Biss)
pe et
Serer et Seer
Transition from 3ds Max to InfraWorks
enabling design contribution from
project start
saving time and money in updating reference data
Sareea
Poem ered
MI Collaborate on Revit eee ees
ampere
cad
See ere ne
Coe ens
Pe
THE BOTTOM LINE
POM eure me RRC Hee Mare
con:
Dae DI acy eaten COUN a ICN SL A ee
FOR PROJECT ANALYSIS DECISION-MAKING RD Rae U RT ACROSS SECTORS
“Today, we have an accurate representation of the
physical features of the area [...] which provides
all business services access to the existing
conditions data they need for their projects.”
Phillipe Slisse, 3D GIS Project Manager, City and Eurometropolis of Strasbourg
cir Unmet) aed
A AUTODESK