Professional Documents
Culture Documents
Requirements:
Asynchronous Quizzes
Research Work/s
Drawing Activities/Exercise
Research Works/Projects
Major Written Exam/s
Topics:
Topic 1: LAYOUT & EXCAVATION (STAKING OUT)
Preparation for Construction
a. Staking-Out the Building
b. Laying & Shoring
c. Construction Tools & Equipment’s
d. Major Parts of a Building
e. Foundation Bed
f. Site Investigation
g. Soil mechanics
h. Excavation & Earth working
i. Site Drainage
j. Slope Protection and Retaining Structures
k. Pavements
Page 1 of 5
Department of Architecture
Requirements:
RSW No. 1 Preparation for Construction
Quiz No. 1 LAYOUT & EXCAVATION (STAKING OUT) (_PTS)
Requirements:
a) RSW No. 02: Wood Material
Quiz No. 02: Wood Materials (___PTS)
Requirements:
a) RSW No. 03 Cement, Concrete & Processed Concrete Materials
b) Quiz No. 03 Cement, Concrete & Processed Concrete Materials (___PTS)
Page 2 of 5
Department of Architecture
Topic 4: Metals
1. Types of Metals
a) Aluminum
b) Iron
c) Steel
d) Copper
e) Tin
f) Zinc
g) Brass
h) Bronze
i) Chromium
j) Nickel
k) Lead
2. Methods of Joining Metals
a) Soldering
b) Brazing
c) Welding
d) Rivets
3. Metals For Concrete Reinforcement
a) Steel Bars
b) Wire Fabric
c) Expanded Mesh
d) Laths
4. Storage and Care for Metal Reinforcement
5. Structural Steel Construction
a) Structural Steel Shapes
b) Structural Steel Framing
c) Steel Columns & Connections
d) Open-web Steel Joist
e) Metal Decking
f) Steel trusses and Rigid Frames
g) Structural Steel Framing Systems
Requirements:
a) RSW No. 04 Metals
b) Quiz No. 04 Metals (___PTS)
Requirements:
a) RSW No. 05 Plastic & Synthetic Products
b) Quiz No. 05 Plastic & Synthetic Products (___PTS)
Page 3 of 5
Department of Architecture
Topic 7: Hardware’s
1. Types of Rough Hardware
a. Nails
b. Screws
c. Bolts
2. Types of Finish Hardware
a. Hinges
b. Latches and Locksets
c. Closers
d. Pivots
e. Panic Hardware
f. Push Plates and Pull Bars
g. Door Stops and Bumpers
h. Astragal
i. Bolts and Fasteners
j. Automatic Door Bottoms
k. Weather Stripping
l. Thresholds
m. Furniture Hinges
n. Cabinet Knobs
o. Lid Stays
p. Drawer Runners
q. Locks
r. Shelf Support
Requirements:
a) RSW No. 07 Hardware’s
b) Quiz No. 07 Hardware’s (___PTS)
Topic 9: FINISHES
1. Concrete Surface Finishes
a. Stucco or Cement Plaster
b. Rubbed Finish
Page 4 of 5
Department of Architecture
c. Brushed Finish
d. Tooled Finish
e. Sand-blast Finish
f. Exposed Aggregate
g. Wood Float Finish
h. Steel Trowelled
i. Integral Colored Cement Finish
2. Granolithic Finish
a. Granolithic
b. Terrazzo
3. Tile Finishes
a. Cement Tile
b. Ceramic Tile
4. Resilient Floor Finish
a. Asphalt tile/Sheet
b. Vinyl Tile/Sheet
c. Rubber Tile/Sheet
d. Linoleum Sheet
5. Wood Floor Finish
a. Strip Flooring
b. Plank Flooring
c. Parquet Tile Floor
6. Ceiling Finishes
a. Ceiling Board
b. Acoustic Tile
Page 5 of 5