1|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
TOTAL: 60 PERIODS
2|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
3|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
Project concepts refer to the fundamental principles and ideas that guide
the planning, execution, and management of a project. These concepts
include, but are not limited to, the following:
Temporary: A project has a definitive start and end date.
Unique: A project’s work is different from the ongoing work required
to maintain the business and operations.
Team, Budget, Schedule: A project has an assigned team, budget, and
schedule.
Goal: A project is done when the project goals are met.
1.3. Generation and screening of project ideas
The generation and screening of project ideas is a crucial phase in
the project management and development process. It involves identifying
potential project opportunities, creating a pool of ideas, and then
evaluating and selecting the most viable ones for further development.
Here's a breakdown of the two main aspects:
1. Generation of Project Ideas:
- Brainstorming: This is a creative process where a group of individuals
generates a large number of ideas in a free-flowing and non-critical
environment. The goal is to encourage creativity and diverse thinking.
- Mind Mapping: Visual representation of ideas and their relationships
helps in exploring various dimensions of a project. It helps in identifying
potential opportunities and connections between different concepts.
- SWOT Analysis: Analyzing Strengths, Weaknesses, Opportunities, and
Threats can help in identifying areas where projects could be initiated.
Opportunities and strengths may indicate potential project ideas.
2. Screening of Project Ideas:
- Feasibility Analysis: Assess the technical, economic, legal, operational,
and scheduling feasibility of each project idea. This involves evaluating
whether the project is possible and practical.
4|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
6|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
7. Documentation:
- Documenting the identified projects, including their purpose, scope,
potential benefits, and initial feasibility assessment. This documentation
serves as a basis for further evaluation and decision-making.
8. Project Charter:
- In some cases, a project charter may be developed during the
identification phase. A project charter outlines the high-level information
about a potential project, including its objectives, scope, stakeholders, and
initial risks.
9. Decision-Making:
- The final step involves making a decision on whether to proceed with a
project. This decision is often based on the alignment of the project with
organizational goals, feasibility, and the availability of resources.
Project identification is a critical step that sets the foundation for the
entire project management process. It helps organizations prioritize and
select projects that are strategically aligned and have the potential to
deliver value. Successful project identification involves collaboration
among various stakeholders and a thorough understanding of the
organization's context and objectives.
1.5. Preliminary Analysis, Market, Technical, Financial, Economic and
Ecological of a project
Conducting a comprehensive analysis of a project is essential for
making informed decisions and ensuring its success. The analysis
typically involves several dimensions, including market, technical,
financial, economic, and ecological considerations. Here's an overview of
each aspect:
1. Preliminary Analysis:
• Purpose and Objectives: Clearly define the purpose and
objectives of the project. Understand the problem or opportunity
7|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
8|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
9|Page
CN4102 - PROJECT FORMULATION AND APPREAISAL
often revisited and refined as more information becomes available and the
project progresses.
1.6. PreFeasibility Report and its Clearance
A Pre-Feasibility Report (PFR) is a document that provides an initial
assessment of the feasibility of a proposed project. It serves as a
preliminary study to determine whether the project should proceed to the
detailed feasibility analysis stage. The PFR includes key information that
helps stakeholders make an informed decision about whether the project is
viable and worth pursuing. Here are the key components typically found
in a Pre-Feasibility Report:
1. Executive Summary:
- Briefly outlines the purpose, objectives, and scope of the project.
- Summarizes key findings and recommendations.
2. Project Description:
- Provides a detailed description of the project, including its nature, size,
and location.
- Outlines the project's goals and objectives.
3. Market Analysis:
- Assesses the demand for the product or service in the market.
- Analyzes the target market, competitors, and potential customers.
- Identifies market trends and potential risks.
4. Technical Analysis:
- Evaluates the technical feasibility of the project.
- Describes the technology and equipment required.
- Considers any technical challenges or constraints.
5. Financial Analysis:
- Estimates the project's initial and operating costs.
- Projects revenues based on market analysis.
10 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
12 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
2. Revenue Estimates:
• Projected income or revenue streams generated by the project.
This could include sales revenue, service fees, or other income
sources.
3. Cash Flow Projections:
• A detailed breakdown of the expected cash inflows and outflows
over the project's lifespan. This helps in understanding the timing
of expenditures and receipts.
4. Financial Metrics:
• Return on Investment (ROI): Calculates the profitability of the
project by comparing the net gain to the initial investment.
• Payback Period: Indicates the time it takes for the project to
recoup its initial investment.
5. Risk and Contingency Planning:
• Identification of potential risks and uncertainties that may impact
project costs and revenues.
• Incorporation of contingency plans to address unforeseen
challenges.
2. Techno-Economic Feasibility Report:
Definition: The Techno-Economic Feasibility Report is a comprehensive
document that combines technical and economic analyses to assess the
feasibility of a project. It goes beyond the preliminary analysis and
provides more detailed insights into the technical requirements and
economic viability of the project.
Key Components of a Techno-Economic Feasibility Report:
1. Technical Feasibility:
• Technology Assessment: An in-depth evaluation of the
technology required for the project.
13 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
15 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
16 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
17 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
19 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
20 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
21 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
22 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
24 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
7. Accrual Accounting:
- Use accrual accounting principles to recognize expenses when they are
incurred, rather than when they are paid. This provides a more accurate
representation of the project's financial status.
8. Regular Reporting and Communication:
- Establish a system for regular reporting on project costs. Communicate
financial information to stakeholders, including team members, project
managers, and executives, to keep everyone informed about the project's
financial health.
9. Consistent Costing Methods:
- Use consistent costing methods across the project to ensure uniformity
and comparability of financial data. This is particularly important when
dealing with different project phases or components.
10. Life Cycle Costing:
- Consider the entire life cycle of the project when estimating and
managing costs. This includes costs associated with planning, design,
construction, operation, and maintenance.
11. Vendor and Contract Management:
- Effectively manage vendor relationships and contracts to control costs
associated with external suppliers. Ensure that contracts are clear and that
vendors deliver value for money.
12. Continuous Improvement:
- Regularly review and assess project costing processes. Implement
lessons learned from previous projects to improve accuracy in future cost
estimations and management.
These principles contribute to effective project costing, helping
organizations manage their resources efficiently, control project costs, and
deliver projects within budgetary constraints. Successful project costing is
crucial for the financial health of the project and the overall success of the
organization.
25 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
26 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
5. Standard Costing:
- Description: Based on predetermined standard costs for labor,
materials, and overhead. Actual costs are compared against these
standards to identify variances.
- Example: Manufacturing projects with well-defined production
standards.
6. Marginal Costing:
- Description: Focuses on variable costs, separating fixed and variable
costs to determine the contribution margin. Fixed costs are treated
separately from variable costs.
- Example: Projects with significant variable costs and relatively stable
production levels.
7. Life Cycle Costing:
- Description: Considers all costs associated with a project throughout
its life cycle, including planning, design, construction, operation, and
maintenance.
- Example: Infrastructure projects, where costs extend beyond the
construction phase.
8. Full Absorption Costing:
- Description: Allocates all direct and indirect costs to the product or
service. It includes both variable and fixed costs in the project costing.
- Example: Comprehensive project cost allocation for financial reporting
purposes.
9. Target Costing:
- Description: Determines the desired profit margin and sets the target
cost based on market conditions. The project team then works to achieve
this target cost.
- Example: Product development projects in competitive markets.
27 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
28 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
3. Risk and Uncertainty: New projects tend to have a higher level of risk
and uncertainty, as they are untested ventures.
Examples:
- Launching a new product line.
- Expanding into a new geographic market.
- Introducing a novel technology or service.
2. Replacement Project:
Definition:
A replacement project involves replacing or upgrading an existing asset,
facility, or system within the organization. The goal is to enhance
efficiency, reduce operational costs, or address obsolescence by
substituting an older asset with a newer or more advanced one.
Key Characteristics:
1. Asset Replacement: Replacement projects focus on replacing an
existing asset or system.
2. Efficiency Improvement: The primary purpose is often to improve
efficiency, productivity, or maintain competitiveness.
3. Known Systems: Replacement projects deal with known systems or
assets, and there is a degree of predictability.
Examples:
- Upgrading manufacturing equipment to improve efficiency.
- Replacing an outdated software system with a newer version.
- Installing energy-efficient lighting systems to replace older ones.
Key Differences:
1. Nature:
- New Project: Introduces something entirely new to the organization.
- Replacement Project: Involves replacing or upgrading an existing
asset.
29 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
2. Purpose:
- New Project: Aims to create a new offering or venture for the
organization.
- Replacement Project: Aims to improve or replace an existing asset for
enhanced efficiency.
3. Risk and Uncertainty:
- New Project: Generally involves a higher level of risk and uncertainty.
- Replacement Project: Involves a more predictable environment as it
deals with existing systems.
4. Decision-Making Criteria:
- New Project: Decision criteria often include market potential,
innovation, and strategic alignment.
- Replacement Project: Decision criteria often revolve around cost-
effectiveness, efficiency gains, and technological advancements.
5. Timing:
- New Project: Initiated when the organization identifies a new
opportunity or strategic direction.
- Replacement Project: Initiated when an existing asset reaches the end
of its useful life or when technological advancements make replacement
advantageous.
Both new projects and replacement projects play crucial roles in an
organization's strategic planning and growth. The decision to pursue either
type of project depends on factors such as the organization's goals, market
conditions, and the need for innovation or improvement.
2.5. BIASES IN CASH FLOW ESTIMATION
Estimating cash flows for project costing is a critical aspect of
financial planning, and various biases can influence the accuracy of these
estimates. Here are some common biases in cash flow estimation for
project costing:
30 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
1. Optimism Bias:
- Description: Project stakeholders may have an overly positive
outlook on the project's future cash flows, expecting higher revenues and
lower costs than what might be realistic.
- Impact: Optimism bias can lead to the underestimation of project
costs and overestimation of revenues, potentially resulting in inaccurate
cash flow projections.
2. Availability Bias:
- Description: Decision-makers may rely on readily available
information or recent experiences when estimating cash flows,
neglecting other relevant data.
- Impact: Availability bias can lead to a narrow focus on certain
aspects of the project, potentially overlooking critical factors that could
affect cash flow.
3. Anchoring Bias:
- Description: Stakeholders may anchor their cash flow estimates to
initial figures or historical data, even if the project conditions have
changed.
- Impact: Anchoring bias can result in a reluctance to adjust
projections based on new information, potentially leading to inaccurate
cash flow estimates.
4. Confirmation Bias:
- Description: Individuals may seek information that confirms their
pre-existing beliefs about the project's cash flows and overlook
contradictory data.
- Impact: Confirmation bias can lead to a skewed interpretation of
information, potentially reinforcing overly optimistic or pessimistic
views.
31 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
5. Hindsight Bias:
- Description: Project managers may perceive past cash flow estimates
as having been more predictable than they actually were, leading to
overconfidence in future projections.
- Impact: Hindsight bias can result in the underestimation of the
uncertainty associated with cash flow estimates for similar projects.
6. Groupthink:
- Description: In a group setting, team members may conform to the
dominant view, suppressing dissenting opinions or alternative cash flow
scenarios.
- Impact: Groupthink can limit the diversity of perspectives and lead to
an overly optimistic or pessimistic consensus on cash flow projections.
7. Overconfidence Bias:
- Description: Project stakeholders may exhibit overconfidence in their
ability to accurately predict cash flows, underestimating the inherent
uncertainty and risks.
- Impact: Overconfidence bias can lead to a failure to adequately
account for potential challenges, resulting in overly optimistic cash flow
estimates.
8. Recency Bias:
- Description: Individuals may give more weight to recent events or
trends when estimating future cash flows, potentially overlooking
historical patterns or long-term factors.
- Impact: Recency bias can result in an overemphasis on short-term
changes and may lead to less accurate long-term cash flow projections.
Mitigating biases in cash flow estimation for project costing
involves adopting a systematic and disciplined approach. This includes
incorporating a range of scenarios, seeking diverse input, regularly
updating projections based on new information, and critically
32 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
𝑭𝑽
- Formula: 𝑷𝑽 =
(𝟏+𝒓)𝒏
where:
• PV is the present value,
• FV is the future value,
• r is the discount rate, and
• n is the number of time periods.
2. Future Value (FV):
- Future value is the value of a sum of money at a specific point in
the future, taking into account a specified interest rate. It represents
the compounded value of money over time.
- Formula: 𝑭𝑽 = 𝑷𝑽 × (𝟏 + 𝒓)𝒏
where:
• FV is the future value,
• PV is the present value,
• r is the interest rate, and
• n is the number of time periods.
Understanding the time value of money is crucial in various
financial decisions, including investment analysis, loan calculations,
and financial planning. It allows individuals and businesses to make
informed choices by comparing the value of money at different points
in time and accounting for the impact of interest rates and the passage
of time on the value of cash flows.
2.7. PRESEND VALUE AND FUTURE VALUE DEFINISHION
• Present Value (PV):
Definition:
Present value (PV) is the current worth of a future sum of money,
discounted at a specific interest rate. It represents the value of a cash flow
34 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
35 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
36 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
Understanding and analyzing these single amounts are crucial for accurate
financial planning, budgeting, and decision-making in project costing. It
involves considering the timing, magnitude, and impact of these cash
flows on the overall financial health of the project. Financial metrics such
as present value, future value, and net present value are often used to
assess the significance of these single amounts in the context of the entire
project.
2.9. ANNUITY
An annuity is a financial product that provides a series of payments
made at equal intervals. These payments can be made monthly, quarterly,
annually, or at any other regular interval. Annuities are often used for
retirement savings and income planning, and they can be purchased from
insurance companies or other financial institutions.
There are different types of annuities, but they generally fall into two
main categories:
1. Fixed Annuities:
- Characteristics:
- The annuitant receives a fixed, guaranteed payment at regular
intervals.
- The interest rate is set by the insurance company or financial
institution.
- Provides a predictable income stream, making it easier for individuals
to plan for their financial future.
2. Variable Annuities:
- Characteristics:
- Payments to the annuitant vary based on the performance of
underlying investments, often mutual funds.
- The annuitant assumes some investment risk, as the value of the
annuity is tied to market fluctuations.
37 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
- Offers the potential for higher returns but comes with greater
uncertainty.
Annuities can also be classified based on the timing of payments:
1. Immediate Annuities:
- Payments begin shortly after a lump sum is paid to the insurance
company or financial institution.
- Suited for individuals who want to start receiving income immediately.
2. Deferred Annuities:
- Payments are deferred until a later date, allowing the annuity to
accumulate value through interest or investment returns.
- Suited for individuals who want to accumulate funds for retirement
and start receiving income at a future date.
Key terms associated with annuities include:
- Annuitant: The individual who receives the annuity payments.
- Annuitization: The process of converting the accumulated value of the
annuity into a series of periodic payments.
- Beneficiary: The person or entity designated to receive payments in the
event of the annuitant's death.
- Surrender Period: A period during which the annuitant may incur
charges or penalties for withdrawing funds from the annuity.
Annuities are often considered as part of retirement planning because they
can provide a steady income stream during one's retirement years.
However, it's important to carefully review the terms and conditions of
annuity contracts, including fees, surrender charges, and payout options,
before making a decision. Consulting with a financial advisor is
recommended to determine whether an annuity aligns with one's financial
goals and needs.
38 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
2. Cost of Equity:
- The cost of equity represents the return that equity investors
(shareholders) expect for investing in the company. It is often higher than
the cost of debt because equity investors bear more risk.
- Several methods can be used to estimate the cost of equity, with one
common approach being the Capital Asset Pricing Model (CAPM). The
formula for CAPM is:
𝑪𝑶𝑺𝑻 𝑶𝑭 𝑬𝑸𝑼𝑰𝑻𝒀
= 𝑹𝑰𝑺𝑲 − 𝑭𝑹𝑬𝑬 𝑹𝑨𝑻𝑬
+ (𝑩𝑬𝑻𝑨 𝑬𝑸𝑼𝑰𝑻𝒀 × 𝑹𝑰𝑺𝑲 𝑷𝑹𝑬𝑴𝑰𝑼𝑴)
where the risk-free rate is the return on a risk-free investment, Beta
measures the stock's volatility compared to the overall market, and the
equity risk premium is the additional return expected for investing in
stocks rather than risk-free securities.
39 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
The overall cost of capital is a weighted average of the cost of debt and
the cost of equity, where the weights are based on the proportion of debt
and equity in the company's capital structure. The formula for the
weighted average cost of capital (WACC) is:
𝑉𝑎𝑙𝑢𝑒 𝑜𝑓 𝐷𝑒𝑏𝑡
𝑊𝐴𝐶𝐶 = ( × 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐷𝑒𝑏𝑡)
𝑇𝑜𝑡𝑎𝑙 𝑣𝑎𝑙𝑢𝑒 𝑜𝑓 𝑓𝑖𝑟𝑚
𝑉𝑎𝑙𝑢𝑒 𝑜𝑓 𝐸𝑞𝑢𝑖𝑡𝑦
+( × 𝐶𝑜𝑠𝑡 𝑜𝑓 𝐸𝑞𝑢𝑖𝑡𝑦)
𝑇𝑜𝑡𝑎𝑙 𝑣𝑎𝑙𝑢𝑒 𝑜𝑓 𝑓𝑖𝑟𝑚
Key Points:
• Preference shares pay fixed dividends to shareholders and have a claim
on earnings before common shareholders.
• The cost is calculated as the annual dividend divided by the net
proceeds from the issuance of preference shares.
• Unlike debt, dividends on preference shares are not tax-deductible.
40 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
42 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
43 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
5. Funding Structure:
- Financial institutions evaluate the project's funding structure, including
the mix of debt and equity. They assess the project's ability to service debt
and the impact of different financing instruments on the project's cash
flow.
6. Collateral and Security:
- Financial institutions consider the availability and quality of collateral
to secure the financing. The type and value of collateral play a crucial role
in determining the level of risk associated with the project.
7. Legal and Regulatory Compliance:
- Compliance with legal and regulatory requirements is a key
consideration. Financial institutions ensure that the project complies with
applicable laws, permits, and environmental regulations.
8. Use of Funds:
- Financial institutions assess the planned use of funds to ensure they
align with the project's objectives. They want to ensure that the funds are
allocated efficiently and effectively to support project development.
9. Project Management and Governance:
- Strong project management and governance structures are essential.
Financial institutions evaluate the project team's expertise, the quality of
project management practices, and governance structures to ensure
effective oversight.
10. Environmental, Social, and Governance (ESG) Factors:
- Increasingly, financial institutions consider ESG factors when
evaluating projects. They assess the project's impact on the environment,
social responsibility, and adherence to governance principles.
11. Exit Strategies:
- Financial institutions evaluate potential exit strategies for their
investment. This includes understanding how and when they can exit the
project and recover their funds.
44 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
45 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
48 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
Key Points:
1. Initial Investment: This represents the total cost incurred at the
beginning of the project, including capital expenditures, setup costs, and
any other initial expenses.
2. Annual Cash Inflow: This refers to the net cash generated by the project
each year. It includes the positive cash flows resulting from project
operations, such as sales revenue, minus any operating expenses and
taxes.
Interpretation:
- Shorter Payback Period: Generally, a shorter payback period is
considered more favorable. It suggests that the initial investment is
recovered quickly, and the project becomes self-financing sooner.
- Risk Consideration: While a short payback period is often desirable, it
doesn't consider the time value of money or the profitability of cash flows
beyond the payback period. Therefore, it is a relatively simplistic metric
and may not capture the full financial picture.
49 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
50 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
51 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
52 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
53 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
58 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
60 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
61 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
63 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
b. Strategic Alignment:
- The selected project should align with the organization's strategic
goals and objectives. It should contribute to the overall mission and
vision of the company.
c. Feasibility Studies:
- Before making a commitment to a project, feasibility studies are
conducted to assess technical, economic, legal, operational, and
scheduling feasibility. This helps in understanding whether the project
is viable and worth pursuing.
d. Cost-Benefit Analysis:
- Conducting a cost-benefit analysis helps in evaluating the financial
viability of the project. This involves comparing the expected costs and
benefits over the project's life.
e. Risk Identification in Project Selection:
- Preliminary identification of potential risks associated with the
project is done during the project selection phase. This initial risk
identification helps in understanding the uncertainties associated with
the project.
f. Stakeholder Involvement:
- Stakeholders, including project sponsors, team members, and end-
users, are involved in the project selection process. Their insights and
perspectives are valuable in ensuring that the selected project meets the
needs of all relevant parties.
2. Risk Analysis in Practice:
a. Comprehensive Risk Identification:
- A detailed risk identification process is carried out involving all
relevant stakeholders. This includes brainstorming sessions, reviewing
historical data, and using risk checklists.
b. Quantitative and Qualitative Analysis:
64 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
f. Continuous Monitoring:
- Risk analysis is not a one-time activity. It's an ongoing process.
Regular monitoring of risks, reassessment of their likelihood and
impact, and updates to risk response plans are crucial to adapt to
changing project conditions.
g. Communication:
- Communication is key throughout the risk analysis process.
Stakeholders need to be informed about identified risks, their potential
impacts, and the strategies in place to address them. Clear
65 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
67 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
68 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
5. Risk Allocation:
- Risk allocation is a critical aspect of project financing. Various risks,
including construction, operational, and market risks, are identified and
allocated to the parties best equipped to manage them. This risk
allocation is typically outlined in legal agreements.
6. Cash Flow Repayment:
- Repayment of project loans is heavily dependent on the project's cash
flow. Lenders assess the project's ability to generate sufficient cash to
cover debt service obligations, operational expenses, and other financial
commitments.
7. Structured Financing:
- Project financing often involves structured financing arrangements,
where different layers of debt and equity are utilized to fund the project.
This may include senior debt, mezzanine financing, and equity
investment from various sources.
8. Government Support:
- Many infrastructure projects receive support from government
entities, either through direct funding, guarantees, or regulatory
frameworks that provide a stable and predictable environment for
investors and lenders.
9. Contractual Agreements:
- Various contractual agreements play a crucial role in project
financing. These may include construction contracts, supply agreements,
off-take agreements, and other legal documents that outline the terms
and conditions of the project.
10. Due Diligence:
- Due diligence is a rigorous process in project financing. Lenders and
investors conduct thorough assessments of the project's technical,
financial, legal, and environmental aspects to evaluate its feasibility and
potential risks.
69 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
70 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
71 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
9. Microfinance:
- Description: Microfinance provides financial services, including small
loans and savings accounts, to individuals or small businesses in low-
income or underserved communities.
- Sources: Microfinance institutions.
10. Public-Private Partnerships (PPPs):
- Description: PPPs involve collaboration between public and private
entities to finance and operate public infrastructure projects. The risks and
rewards are shared between the public and private sectors.
- Sources: Government funding, private investors.
11. Hedging and Derivatives:
- Description: Hedging involves using financial instruments such as
derivatives to manage and mitigate risks associated with currency
fluctuations, interest rates, or commodity prices.
- Sources: Financial institutions, derivatives markets.
12. Joint Ventures:
- Description: Joint ventures involve two or more entities coming
together to form a new business entity for a specific project or business
opportunity. They pool resources and share risks and profits.
- Sources: Partnering businesses.
13. Angel Investors:
- Description: Angel investors are individuals who provide capital to
early-stage businesses in exchange for equity ownership. They often
contribute not only funds but also mentorship and expertise.
- Sources: High-net-worth individuals.
Choosing the appropriate means of finance depends on the specific needs
and circumstances of the entity seeking funding. It often involves a careful
consideration of the cost of capital, risk tolerance, and the desired
financial structure.
72 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
74 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
77 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
78 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
80 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
- Description: Payback Period represents the time it takes for the project
to recover its initial investment. A shorter payback period is generally
considered favorable.
5. Net Present Value (NPV):
- Calculation: NPV = Σ(Cash Inflows / (1 + Discount Rate)^t) - Initial
Investment
- Description: NPV assesses the project's profitability by calculating the
present value of expected cash inflows minus the initial investment. A
positive NPV indicates a potentially viable project.
6. Internal Rate of Return (IRR):
- Calculation: IRR is the discount rate that makes the NPV of a project
zero.
- Description: IRR represents the project's expected rate of return. A
higher IRR is generally more attractive, and projects with an IRR
exceeding the discount rate are considered economically viable.
7. Benefit-Cost Ratio (BCR):
- Calculation: BCR = Present Value of Benefits / Present Value of Costs
- Description: BCR compares the present value of benefits to the present
value of costs. A ratio greater than 1 indicates that the project is expected
to generate more benefits than costs.
8. Sensitivity Analysis:
- Description: While not a ratio, sensitivity analysis involves assessing
how changes in key variables, such as cost estimates, revenue projections,
or discount rates, impact project metrics like NPV and IRR. It helps gauge
the project's resilience to variations in assumptions.
9. Operating Margin:
- Calculation: Operating Margin = (Net Operating Income / Revenue) x
100
- Description: Operating Margin measures the project's operating
efficiency by expressing the operating income as a percentage of revenue.
81 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
82 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
project's life cycle. It's essential to use a consistent currency and time
frame.
3. Discount Cash Flows:
- Apply discounting to future cash flows to account for the time value
of money. Future benefits and costs are discounted to their present
value using an appropriate discount rate, reflecting the opportunity cost
of capital.
4. Calculate Net Present Value (NPV):
- NPV is a key metric in financial cost-benefit analysis. It is
calculated by subtracting the total present value of costs from the total
present value of benefits. A positive NPV indicates that the project is
expected to generate a net positive return.
7. Sensitivity Analysis:
- Assess the sensitivity of the analysis to changes in key assumptions.
This involves varying critical variables, such as discount rates or
83 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
5. Non-Market Valuation:
- Since many social costs and benefits are not traded in markets,
methods like contingent valuation, stated preference surveys, and
hedonic pricing are used to estimate their monetary values.
6. Opportunity Costs:
- SCBA emphasizes the concept of opportunity costs, recognizing
that resources used for a particular project or program could have
alternative uses. Evaluators consider the value of the next-best
alternative to the proposed intervention.
7. Comprehensive Impact Assessment:
- SCBA aims to provide a comprehensive assessment of all relevant
impacts, both positive and negative. This may include economic,
environmental, health, and social impacts.
8. Uncertainty and Sensitivity Analysis:
85 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
86 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
9. Regulatory Environment:
- A stable and predictable regulatory environment is essential for
attracting private investment. Clear rules and regulations provide
confidence to private investors and lenders.
10. Social and Environmental Considerations:
- Private sector participation should address social and environmental
concerns. This includes considerations for community impact,
environmental sustainability, and adherence to social standards.
11. Monitoring and Evaluation:
- Robust monitoring and evaluation mechanisms ensure that the private
partner complies with contractual obligations, maintains service quality,
and meets agreed-upon performance standards.
12. Capacity Building:
- Government agencies may need to enhance their capacity to manage
and oversee PPP projects effectively. This includes expertise in project
structuring, contract negotiation, and regulatory management.
Examples of successful private sector participation in infrastructure
projects include public-private partnerships in toll roads, airport
concessions, water treatment facilities, and energy generation projects.
Careful planning, a clear legal framework, and effective risk management
are critical for the success of such collaborations.
5.2. BOT, BOLT, BOOT-Technology Transfer and Foreign
Collaboration
BOT, BOLT, and BOOT are acronyms representing different models of
public-private partnerships (PPPs) in infrastructure development projects.
These models involve a collaboration between the public sector (usually
represented by a government entity) and the private sector to design,
finance, build, and operate infrastructure projects. Each model has distinct
characteristics in terms of ownership, responsibility, and the duration of
private sector involvement. Here's an explanation of each model:
89 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
3. BOOT (Build-Own-Operate-Transfer):
- Build: As in BOT and BOLT, the private sector is responsible for
designing and constructing the infrastructure project.
- Own: The private entity retains ownership of the project even after
completion, allowing it to generate revenue from operating the facility.
- Operate: The private sector operates and maintains the facility, often
for an extended period, during which it collects revenue from the project.
- Transfer: Eventually, ownership is transferred back to the public sector
at the end of the agreed-upon concession period. The public sector gains
control of the infrastructure without having incurred the initial
construction and operational costs.
- Technology Transfer: Similar to BOT and BOLT, technology transfer
may occur during the build and operate phases.
These models provide flexibility for structuring partnerships between the
public and private sectors based on the specific needs of a project and the
preferences of the involved parties. They enable governments to leverage
private sector expertise, funding, and efficiency while addressing
infrastructure development objectives. The success of these models
depends on well-defined contractual agreements, risk-sharing
mechanisms, and a conducive regulatory environment.
5.3. SCOPE OF TECHNOLOGY TRANSFER
Technology transfer refers to the process by which knowledge, skills,
technologies, methods, or intellectual property developed by one entity
are shared with and adopted by another entity. This transfer of technology
can occur between various actors, including businesses, research
institutions, governments, and international organizations. The scope of
technology transfer is broad and encompasses multiple dimensions, each
contributing to the diffusion of innovation and its application in different
contexts. Here are key aspects of the scope of technology transfer:
1. Knowledge Transfer:
91 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
92 | P a g e
CN4102 - PROJECT FORMULATION AND APPREAISAL
94 | P a g e