GENERAL BUILDING CONSTRUCTION CAT

1. Describe three methods of levelling a building site (6mrks)


2. With the aid of sketches describe the following methods of setting out;(10mrks)
i. Builders square
ii. 3:4:5 method
3. State four functions of a fire place (4mrks)
4. Outline four requirements of a wall (4mrks)
5. Describe the following processes;(6mrks)
i. Site clearing
ii. Setting out the building
iii. Establishing the datum point

CONCRETE TECHNOLOGY CAT


1. Explain the uses of concreting plants (6mrks)

2. Sketch a centrifugal pump (5mrks)

3. Explain the working principle of a centrifugal pump (4mrks)

4. Explain the term striking as used in formwork (2mrks)

5. Explain five functions of admixtures and additives (5mrks

6. With aid of sketches distinguish between surface vibrators and needle vibrators(8mrks)