INSTRUCTIONS:
03. After defining bill of quantities (BOQ), highlights its 6 functions of BOQ? (5
marks)
04. There are two ways that are commonly used to draw a network diagram for
a project, Differentiate them (2 marks)
05. Highlights some 3 rules that need to be followed when constructing an AOA
network diagram (3 marks)
1
09. Differentiate early start time from late finish time (2 marks)
Calculate the duration of the activity considering the steel-fixer as the critical
resource (7 marks)
12. Sometimes, project may delay due to various reasons. Identify at least five
causes which may results into project delay (5 marks)
13. Explain the types of activities relationships? /4marks
14. Briefly discuss the situation in which situation dummy activity is used (5
marks)
15. Draw AOA and AON diagrams for the following project (4 marks)
Project 1
Activity Predecessor
A -
B A
C A
D A
E A,B,C
16. Explain why critical activities deserve the special attention of project
manager? (3 marks)
2
17. In 5 ways, make comparison between AOA from AON (5 marks)
18. Highlight six (6) steps that may be used as a guideline or checklist to
develop a project plan. (3 marks)
20. If the daily production rate for a crew that works in an activity is
175m3/day and the total crew cost per day is 1800Rwf. The material needed
for daily work is 4.5m3 at 100Rwf/m3. (10 marks)
a. Calculate the time and cost it takes the crew to finish 1400m3
3
22. What is the duration in days to install 6000 square feet of walls shuttering
if: a) crew of 2 carpenters is used with output of 200 square feet/day
Success!!!!!!!!!