1
3 Participatory Technology Development
a Participatory evaluation 3.45 All the components Started in June-2004 and ongoing.
and refinementof IPM ongoing
practices in rice
b Utilisation of native 3.10 Commenced-November-2004 and
organisms as bio control ongoing. It has been reported that if
agents for rice the project period can be extended
for one more season the trials could
be conducted in the fields more
effectively based on the findings of
the station trials. No extra funds
requested by the agency for the
extended period.
2
RSVY Palakkad
INTEGRATED FARMING SY
July 31st,2006
7.97
Aug-06
6.77
c Post planting 1.50
operations NIL 0.25
d Bamboo in 0.00 Nil
homesteads
e Agro Forestry 0.00
f Training and 3.50
awareness 3.50
2 Documentation and 2.00 0.36
other expenses
Grand Total 20.00 20.00 17.50 15.59
ULTIVATION
178 SHGs formed. Area 6.12 2006 March The project will be
covered under cultivation- completed by March-06
1571.46hectares
1161 loans availed and full amt 158.62* * inclusive of .07 lks for
expended. credit interaction workshop
and 0.30lks for bankers
workshop.
• The average volume of
transaction done- 2426.817MT- 29.01 Work of 2 centres complete
veg-1108.978MT and banana- and the bal in progress in
1317.839MT as on June end. all the six centres
6.15
196.96
53.38
6.94
0.50
It is reported that 12,200 grafts
of mango @ Rs. 27/graft,
1,900 pomogranate grafts @
Rs. 10/graft,365 pomogranate
@ Rs. 15/ graft 6,150 grafts of
gooseberry@ Rs. 25/graft,
1125 grafts of sapota @
Rs.32/graft,500 grafts of
sapota @ Rs.20/graft and
14,800 grafts of drumstick @
Rs. 5 / graft, 35 guava grafts @
Rs.15/graft were distributed to
355 farmers.
The total area covered is
reported to be323.36 acres
7.81
258.15
RSVY Palakkad
Floriculture through women group
July 31st,2006
c Seed variety@ Rs. 1000/ 8.50 8.50 975 units 975 units
batch
0.38
To be affected
0.59
105 wells dug under the 18.84
scheme. 174 pump sets, 377
head lights and 307 sprayers
distributed.
4.00 In progress
Vermicomposting unit
complete.Planting of bush
jasmine complete.The site
identified to dig the bore
well was not yielding,
therefore permitted to
revitalise the well in the
hostel compound for
irrigation purpose.The
green house for the
anthurium and orchid
cultivation in progress
4.79 Complete
3.24
135.51
RSVY Palakkad
SETTING UP OF MODERN RICE MILL COMPLEX.
July 31st,2006
Completed. 10.25 NA
Completed. 8.65 NA
Completed. 8.5 NA
36.04
RSVY Palakkad
Promotion of modern breeds of goats
July 31st,2006
Sl. No. Details as per AS Amount Funds Physical Achievement Status of work
as per AS Received Target Physical
Component Amount
Provided
2.08
0.38
3.17
15.00
RSVY Palakkad
Rural Micro Enterprises & Leased Land Farming
July 31st,2006
183 batches 17
892.26HA 78
347.74
RSVY Palakkad
Reservoir Fisheries
July 31st,2006
a Malampuzha 23.88
b Meenkara 2.12
2 Purchase of fishing 5.28
implements & maintainance
Complete 0.80
Complete 1.94
0.27
39.99
RSVY Palakkad
Technology Development for Agricultur
July 31st,2006
RSVY Palakkad
Kunnamkattupathy Drinking Water Scheme for Kozhinampara, Erutheampathy and Vada
May 31st,2006
Sl. Details as per AS Amount Funds Status of work
No. as per AS received Physical
Component Amount
Provided
1 Construction of regulator 69.00 69.00
2 Construction of abutment wing wall, 53.00 53.00
return etc
3 Construction of flood protection wall 205.00 205.00
4 Fabrication of shutters/ construction of 231.00 231.00
generator room
GRAND TOTAL 558.00 558.00 287.96
ad
ha, Mangalam, Pothundy.
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
273.00
392.19
665.19
Completed
73.67
119.83
193.50
Work completed
145.84
106.02
ad
, Erutheampathy and Vadakarapathy Panchayats
,2006
Amount Probable Remarks
Expended month of
completion
Nov-06
288.94
RSVY Palakkad
Ground Water Development
July 31st,2006
RSVY Palakkad
LOCAL LEVEL WATER RESOURCES
July 31st,2006
Sl. Project Details Amount as Funds Status of work Physical
No. per AS received
Component Amount
Provided
a Clearing thick 10.38 10.38 Work completed in 6 ponds and the
jungle,dismantling of balance to start.
existing riprap,
excavation and all civil
works
b Cost of Kunissery 3.12 3.12 This component complete
Cherukulam and
Padeitty scheme.
c Management 1.50 1.50
TOTAL 15.00 15.00 9.00
RSVY Palakkad
MODEL WATERSHED
July 31st,2006
RSVY Palakkad
River Basin Planning Consultancies
July 31st,2006
RSVY Palakkad
Reconstruction of Kunnumpidari Eri
July31st,2006
RSVY Palakkad
RENOVATION OF MUTHUKOWNDER WIER
July 31st,2006
RSVY Palakkad
WATERSHED BASED MASTERPLAN
July 31st,2006
RSVY Palakkad
PARTICIPATORY IRRIGATION MANAGEMENT
July 31st,2006
RSVY Palakkad
STRENGTHENING OF SCHOOL LABS
July 31st,2006
RSVY Palakkad
Upgradation of Primary Health Centres and Taluk Hospital.
July 31st,2006
Sl. Project Details Amount as Funds Status of work Physical
No. per AS received
Component Amount
Provided
1 2 3 4 5 6
a PHC Kodumbu Complete
RSVY Palakkad
Rehabilitation Centre for disabled children and destitute car
July 31st,2006
RSVY Palakkad
Solid Waste Management and Organic Manure Production
July 31st,2006
RSVY Palakkad
Girivikas Ednl Complex for Tribal boys and girls
July 31st,2006
RSVY Palakkad
Capacity Building
July 31st,2006
2 Animal Husbandry
a Training to 0.75 0.75 0.75 Complete
Kudumbasree members-
8 camps
b AH Reference books 0.50 0.50 0.50 Complete
TOTAL 1.25 1.25 1.25
3 Cyber Extension
a Salaries and 3.91 3.91 3.91
emoluments
b CDIT
Documentation of RSVY The total number documented hours
project in Palakkad is reported to be 34. The number of
shooting days -44 and total number
of VCDs prepared till date –
5.Produced 4 CDs of
32mts,8mts,22mts & 30mts of
duration.
a Pre shoot 0.50
b Shoot
Pre project 1.50
mid project 1.50
post project 1.50
Post Shoot 1.50
c Misc. exp. 0.50
TOTAL 7.00 7.00 3.50
7 8 9
2.10 6-Mar The project not given due importance
by the Implementing agency. The
delay in the implementation and lack
of progress due to the dept. being
under staffed. The sites identified,
however, are the most suitable ones.
The Dist. Committee decided to call
back the balance amount owing to the
delay in implementation.
ad
ESOURCES
,2006
Amount Probable Remarks
Expended month of
completion
6.70
ad
HED
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
1.65 Project dropped
ad
nsultancies
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
8.45
ad
umpidari Eri
ad
OWNDER WIER
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
Project complete
14.57
ad
ASTERPLAN
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
Project complete
12.00
ad
N MANAGEMENT
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
1.45
0.53
1.20 The progress lagging as the water
resources dept. who have to prepare
the estimates are held up with their
work in RSVY canal maintainance.
The project however, will be complete
by August
0.25 In the rehabilitation stage. The
estimates prepared and
finalised.Meeting for signing the
agreement to be conducted after
Elections. The agreement being
signed and work to commence after
the water distribution. Work of
rehabilitation in the 29 samithies
complete. Joint bank account has
been opened by the President of the
Branch WUA and the Asst. Ex.
Engnn.WRD. The payments for the
works will be paid through this account
0.13
0.02
0.28
35.54
0.95
0.01
0.10
0.23
The implementing agency has
requested an extension for 3 months
to incorporate the component.If the
extension is not sanctioned the turn
over phase will be included in the
project of CWRDM.
0.20
40.89
ad
HOOL LABS
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
7 8 9
NA The supply of Biology specimen not
complete due to the non availability
with the suppliers.
160.04
ad
res and Taluk Hospital.
,2006
Amount Probable Remarks
Expended month of
completion
7 8 9
14.05
13.93
7.86
Civil works of the Taluk hospital
complete. The elctrification work to be
taken up by the Jilla Panchayat. The
works of PHC kadambazhipuram
complete and the electrification of
PHC Kodumba and Mankara to start.
44.05
ad
ildren and destitute care
7 8 9
30.00
15.42
kad
nic Manure Production
7 8 9
11.68 The project lagging behind schedule.
Unless done on war footing will not be
complete before the stipulated time.
6.61
10.38
0.53
0.74
1.73
0.85
37.00
2.33
2.12
11.68
5.04
83.66
7.47 Comlete
9.97
ad
bal boys and girls
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
NA Project was to be complete by March
2005 but delayed.
54.99
ad
ng
,2006
Amount in Rs. lakhs
Amount Probable Remarks
Expended month of
completion
4.00
Project complete
1.25
2.01
0.09
12.66
0.74
1.86
0.49
2.26
10.00
5.99
10.00
0.62
3.15
0.38
0.32
3.75
1.93
0.12
2.25
0.10
28.61
40.89