You are on page 1of 27

PT.

SUGITY CREATIVES
SURYA CIPTA PLANT-3 PROJECT
TENDER DRAWING

FEBRUARY, 26 2024
DRAWING LIST A-00
TBC
TBC
W/5.0=t DEC
S
K
E
TLG
BV
A
E
.LDRGIHI - W/5.0=tDECS
K
E
TLG
BV
A
E
.LD
RGIHI - 5.0=tDEC
S
K
E
TLG
BV
O
A
E
.LD
R
W
I- 5.0=tDEC
S
K
E
TLG
BV
O
A
E
.LD
R
W
I- 5.0=tDEC
S
K
E
TLG
BV
O
A
E
.LD
R
W
I- 5.0=tDEC
S
K
E
TLG
BV
O
A
E
.LD
R
W
I-
42Y TDENSI05=G tO
AS
LNW
SU
AITLOOL 42Y TDENSI05=G tO AS LN
W
SU
AITLOOL
LN
U
ALO
FM
R
W
IEM+IE+SH
m3/gk R
FP+LN U
ALO
FM
R
W
IEM
+IE
+SHm3/gk
W
ASPHATR
ELW
O
R
PC
+O
N/G
FOIF- 0@ W
.G
01H
56S
=TKIYL
08C
=N
O
TGNP
tC
IRET

IEP-PWARAC
PE
/T- 4.0=t H
0D
3=ECO
KC
O
C
O
R
LS.TR
A
-E
TD 4.0=t H
0D
3=ECO
KC
O
C
O
R
LS.TR
A
-E
TD -EXPA
O
G
H
TW
A
FS
U
O
E
C
D
TIR
UT N
U
ALC
M
O
PAN
IM
ELTPO
-SI N
U
ALC
M
O
PAN
IM
ELTPO
-SI
4.0=t H 0D
3=ECO
KCO
C
OR
LS.TR
A
-E
TD

IEM
P
O
B
-LC
O
A
K
W
LRA
TR
/- IEM
P
O
B
-LC
O
A
K
W
LRA
TR
/:0H 1<- IEM
P
O
B
-LC
O
A
K
W
LRA
TR
/- - CO
U
S
LE
TM
R
LU
NCU
TO
RV
-ERED IEM
P
O
B
-LC
O
A
K
W
LRA
TR
/-
COC
DO
E
C
O
R
LS
K
E
TR
A
LE
T:D
0H
1>- N
U
ALC
MO
IM
W PA
O
N
/E
S
LT
GHTILWLARFP+4.0=TH 03=

SM
OPO
W
RA
TR
-/ SM
OPO
W
RA
TR
-/ SM
OPO
W
RA
TR
-/ SM
OPO
W
RA
TR
-/ SM
OPO
W
RA
TR
-/ SM
OPO
W
RA
TR
-/

R
FU
A
M
N
U
ALIM
Em
6I=W
m
/tGN
AS
LE
TDIT- R
FU
A
M
N
U
ALIM
Em
6I=W
m
/tG
N
AS
LE
TDIT- - - - R
FU
A
M
N
U
ALIM
Em
6I=W
m
/tG
N
AS
LE
TDIT-
N
WD
P
SO
MFIWR
LA(N
C
D
G
N
)O
E
.R
AITIF POW N
C
D
G
N
OE
.R
AITIF POW N
C
D
G
N
OE
.R
AITIF
R
FU
A
M
N
U
ALIM
Em
8I=W
m
/tGN
AS
LE
TDIT-
N
W
D
G
O IW
P
BO
IFW)R(NC
D
G
NO
E
.R
AITIF
N
P
U
A
O
LD
M
O
W
(IO
N
C
R
D
G
O
-ER
)AIT SOPW SH
/U S
E
TR
L-
SOPW R
F/A
D
M
O
SE
TO
LE
N
R- - - SOPW
R
F/A
D
M
O
SE
TO
LE
N
R-
RAISEM
RF(A
D
IM
O
SE
TO
LE
N
R- RAISEMR
F(A
D
IM
OSE
TO
LE
N
R- GH)TIRAISEM(I
SOPW/GH)TI SOPW/GH)TI
2N
U
A
O
LxM
4UV
-IRE - - - -
-

- - - - - -

5.0=tDEC
S
K
E
TLG
BV
O
A
E
.LD
R
W
I- 5.0=t DEC
S
K
E
TLG
BV
A
E
.LD
R
G
IHI - - - - -
CA
S
N
M
O
LA
(PY) CAN
G
OP
B
Y
I)(

N
D
B
R
O
A
R
FIXP- N
D
B
R
O
A
R
FIXP- N
D
B
R
O
A
R
FIXP- N
D
B
R
O
A
R
FIXP- N
D
B
R
O
A
R
FIXP- N
D
B
R
O
A
R
FIXP-

GU
R
FE
TP
R- GU
R
FE
TP
R- GU
R
FE
TP
R- GU
R
FE
TP
R- GU
R
FE
TP
R- GU
R
FE
TP
R-

SE
TLGV
A.L+SOPW PE
/PIPVC- SUPS
O
E
TLRTGV
A.L+SOPW
PE
/PIPVC- SUPS
O
E
TLRTGV
A.L+SOPW
PE
/PIPVC- SUPS
O
E
TLRTG
SV
O
A.LP+W
PE
/PIPVC- SUPS
O
E
TLRTGV
A.L+SOPW
PE
/PIPVC- SUPS
O
E
TLRTGV
A.L+SOPW
PE
/PIPVC-
PE)PID
O
E
SUP
S
T(IORT
SU
G
PO
V
ALRTS.TW PE/PIGV A.LS.T-
PE)PIDENSII(

- SE
TLW MG O
N
APE
/TO
SQ
AITLUVE
INIT- - - - -
R
FS A O
M PE
W/5.0=t DECS
K
E
TLG BV
A
E
.LD
RGIHI -
- - - - -
42Y TDENSI05=G tO AS LN
W
SU
AITLOOL
R
FP+LN U
ALO
FM
R
W
IEM +IE +SHm3/gk
W
G0H
56S
=TKIYL

25°
WEST KARAWANG
INTERCHANGE KIB
LA
T
WATER DISTRIBUTION TANK

TOLL GATE
JAKARTA - CIKAMPEK TOLL ROAD

N
C
WATER DISTRIBUTION N
R
E
AZ
GL A
INA SI
CH DONE
IN IA
K
PHASE II PHASE I I
P
M NK A
PP
A O LI
GE NTAR
SA
NU
N I C I MITSUI ART METAL
PLASCSS
E N
RIK
PE
HO
E ST

TO
MA
ING
KA
EA

TS
UR
CAP

U MO
SA
CT
FA
PAKO NU LOGY N
PG

TO
. MA NO

KER
AKUIN CH CH
A INDOSAT A TE TE
APRIN SANTOS JAYA ABADI MEIWA IYOD
UK
I
US TENMA CH

A
P. UZ
CO
WIKA O TS

WAN
MI ST
BETO A IZU
N JIM MI
KA IZU
NA
CK MA O TOLL GATE

G
R J A RA
PAKO PA
AKUIN FUKUYAMA PA UN
O CH
IND

EKA ABAD
A

KAR I
NO

MA
EAST KARAWANG

TAMA

LIM
CRAND

SANTOS JAYA ABADI

A TE
KART
ECH BETA SPN PERTAMINA
INTERCHANGE
A D

TO
ATSU

KN
YO
MITEC PHARMACON C

O
PLASTICS
M

DIES
JV
ELEVATION. B
A ELEVATION. C

MITSUBISHI
NEW FACTORYMOTOR
CONSTRUCTION
KRAMA YUDHA INDONESIA

TYPICAL & PLAN


(GUARDHOUSE 2 )DETAIL AW - 17

JONAN CHUHATSU NI S

.
KEMASAN
SPARTA KU GIE
LA VIDA
HITAC MUSAS HERCULON KIYO OLO
HI N
AUTO HI CH
PA TE M
INDON RTS AP DA
MA Y
ESIA AR
ER

TO
T
A ERT B AT
BEK GS

KER
NT PISTON RING TOLL GATE

K
BEKAERT

PE
BRIDGESTONE

AWA
AM
JTEKT

CIK
SUMATERA
L

NG
HAKARINDO YA
RO STIES

TO
TVS MO
TO U
NEST R COMP IND

TO
LE ANY
NRC

KER
ASIA CITRA PRATAMA

SANKO GOSE
SURYA TRANSFORMER
INDONESIA
SUPER STEEL
NIPRO

AW
MEIDOH

ANG
RA

I
GIU
SU
1 - 58
9.3379 1 - 59 D W A
5.1331 O
I - 4098
SH
3.4225
SOLD IN
METINDO SH

SYN TOBA
1 - 61 TS
3.8119 AR
OP
MEKAR ARMADA JAYA OT
1 - 62 A
TR
3.2688
AS
TIA
ER

MA
IN PHASE I

A
UT
1 - 63
3.3637 E-2
1 - 44
22.6862
5.4768

E-3
7.9280

U-8
6.7883
1-60D
3.3637

I - 65A Comercial
GREEN
20.000 6.0485
4.12563
I - 65A2
I-66G 20.000
2.0000
I-60D

GREEN 3.3637 I - 65B


5.3473
I-65F 60.0000
2.0000 Comercial

I-69C 66A 12.7997


I-
29
3.9637 I-66E 5.10
B
2.0000 I - 66
736
6.5
66C
I-69B I-
7.48
83 66F
3.9637 I-63B I-
2.0000 66D 3.63
05
I-
42
7.04 66G
I-
50
4.39
I-69A I-63C 66E
I- 66H
l 1.9872 73 I-
Comercia 3.4183 7.47 50 ER
Y
RS
4.5805 4.39 NU
0
2.770
66I
A I-
I - 68 50 I - 67A
1 4.39
I - 60B 4.583 3.4507
I - 68C 4.4188 66J
I-
I - 68D 4.7222 37 I - 67B
5.56 4
l 7.142
Comercia 4.7094
2.4504 I- 68E
864 67C
I - 68F 4.5 I-
84
I - 68G 4.7542 8.37
I - 68h 4.4000
l I - 67D
GREEN Comercia 4.3872 7
9.321
7.7728 3.0344 E
I - 67
I - 67F 1
7.594
I - 67G 2.6178

I - 67H 3.2392
I - 67I 3.8770

I - 67I 4.5636

5.1143

DESIGN OUTLINE A-01


FLOOR BASE BOARD WALL(COLUMN) CEILING CURTAIN
FLOOR (AREA) ROOM CH FL SL TRIMMING(CORNICE) FIXTURE AND OTHERS
FINISHED WATERPROOF FINISHED HEIGHT FISNISHED BASE FINISHED BASE BOX
OFFICE (1FL)
1FL=GL+200 LOBBY +5000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN RECEPTION COUNTER
600x600 600x100 (EXTERIOR SIDE) SOP TABLE (INCLUDED)
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 MEETING +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
ROOM 1 600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 MEETING +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
ROOM 2 600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 MEETING +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
ROOM 3 600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 MEETING +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
ROOM 4 600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 MEETING +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
ROOM 5 600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12 mm on LGS
FRAME W/ SOUNDPROOF
INSULATION (INTERIOR
AREA)
1FL=GL+200 TOILET (F) +2500 1FL-20 1FL-50 CERAMIC TILE 400x400 CERAMIC TILE 200x400 ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP TOILET FIXTURES
(NON-SLIP) (EXCLUDED)

1FL=GL+200 TOILET (M) +2500 1FL-20 1FL-50 CERAMIC TILE 400x400 CERAMIC TILE 200x400 ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP TOILET FIXTURES
(NON-SLIP) (EXCLUDED)

1FL=GL+200 TOILET (M) +2500 1FL-20 1FL-50 CERAMIC TILE 400x400 CERAMIC TILE 200x400 ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP TOILET FIXTURES
(NON-SLIP) (EXCLUDED)

1FL=GL+200 PANTRY +3000 1FL±0.00 1FL-30 CERAMIC TILE 400x400 CERAMIC TILE 400x100 H=100 EP-II - ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP UPPER AND LOWER
(TOILET SIDE) CABINET (INCLUDED)
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 SERVER +3000 1FL±0.00 1FL-100 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP
ROOM 600x600 600x100 (TOILET SIDE)
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 OFFICE +3000 1FL±0.00 1FL-100 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 CORRIDOR +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP
600x600 600x100 (EXTERIOR SIDE)
- GB-R t=12mm ON
LGS FRAME

FINISHING SCHEDULE ABBREVIATIONS


MATERIALS PAINT / COATING DOOR,WINDOW,ETC. LIGHTING FIXTURES SANITARY FIXTURES OTHERS
S : STEEL TB : TERRAZZO BLOCK FLG : FLOAT GLASS/CLEAR GLASS HG : HEAT ABSORBING GLASS SOP : SYNTHETIC RESIN OIL PAINT CLQ : CLEAR LACQUER WD : WOODEN DOOR FH : FLOOR HINGE AT : AIR TIGHT SSGR : STAINLESS STEEL LOUVRE FL : FLUORESCENT L : LAVATORY BOWL RD : ROOF DRAIN
AL : ALUMINIUM CLB : CONCRETE LOUVER BLOCK FG : FIGURED GLASS LEG : LOW E-GLASS EP-I : EMULSION PAINT (EXTERIOR) ST : STAIN SD : STEEL DOOR FSD : FIRE STEEL DOOR SAT : SEMI AIR TIGHT (GRILL) IL : INCANDESCENT G : CLOSET BOWL OF : OVER FLOW
SS : STAINLESS STEEL IB : CONC.INTERLOCKING BLOCK TG : TEMPERED GLASS SG : STAINED GLASS/ART GLASS EP-II : EMULSION PAINT (INTERIOR) ZC : ZINC COATING/ANTI RUST SWD : STEEL WOODEN DOOR FSH : FIRE SHUTTER WS : WOODEN SCREEN MF : MERCURY FIXTURE U : URINAL FD : FLOOR DRAIN
BR : BRONZE GB-R : GYPSUMP BD - REGULAR PG : PAIRED GLASS LEP : LATEX EMULSION PAINT WX : WAX AD : ALUMINIUM DOOR SH : SHUTTER SS : STEEL SCREEN DL : DOWN LIGHT EV : ELEVATOR
LGS : LIGHT GAUGE STEEL GB-D : GYPSUMP BD - DRESSED/ PSG : POLISHED GLASS VEP : VINYL EMULSION PAINT SSD : STAINLESS STEEL DOOR QSH : QUICK/HIGHSPEED SHUTTER AS : ALUMINIUM SCREEN CL : CEILING LIGHT ES : ESCALATOR
FB : FLAT BAR GYPTILE BOARD PWG : WIRED POLISHED GLASS AP : ACRYLIC RESIN PAINT TGD : TEMPERED GLASS DOOR WW : WOODEN WINDOW SS : STEEL SCREEN B : BRACKET DS : DUCT SPACE/SHAFT
PC : PRESTRESSED CONCRETE GB-W : GYPSUMP BD - WATER PROOF HWG : WIRED HEAT ABSORBING VP : VINYL RESIN PAINT SLD : SLIDING DOOR SW : STEEL WINDOW SSS : STAINLESS STEEL SCREEN CP : CORD PENDANT PS : PIPE SPACE/SHAFT
PCa : PRECAST CONCRETE MFB : MINERAL FIBRE BOARD/ GLASS FP : PHTHALIC ACID RESIN PAINT FD : FOLDING DOOR AW : ALUMINIUM WINDOW WGR : WOODEN LOUVRE (GRILL) LS : LED STRIPPING EPS : ELECTRICAL SPACE/SHAFT
ALC : AUTOCLAVED LIGHTWEIGHT ACCOUSTIC BOARD LG : LAMINATED GLASS LQ : COLORED LACQUER PD : PARTITION DOOR SSW : STAINLESS STEEL WINDOW SGR : STEEL LOUVRE (GRILL) FL(R) : RECESSED FLUORESCENT SGP : STEEL GALVANIZED PIPE
CONCRETE CSB : CALSIUM SILICATE BOARD/ GB : GLASS BLOCK PVCD : PVC DOOR SF : STEEL FRAME AGR : ALUMINIUM LOUVRE (GRILL) FL(S) : SURFACE MOUNTED OA-FL : RAISED ACCESS FLOOR
CB : CONCRETE BLOCK KALSI BOARD RG : HEAT REFLECTIVE GLASS OD : OVERHEAD DOOR CW : CURTAIN WALL PGR : PLASTIC LOUVRE (GRILL) FLUORESCENT
HL : HAIRLINE EPL : EXPLOSIVE PROOF LIGHTING
FIXTURE

INTERIOR FINISHING SCHEDULE 1 A-02A


FLOOR BASE BOARD WALL(COLUMN) CEILING CURTAIN
FLOOR (AREA) ROOM CH FL SL TRIMMING(CORNICE) FIXTURE AND OTHERS
FINISHED WATERPROOF FINISHED HEIGHT FISNISHED BASE FINISHED BASE BOX

1FL=GL+200 OHBEYA ROOM +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 QUALITY ROOM +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR MFB 1200x600 ON T-BAR STEEL SOP WOODEN
600x600 600x100 (EXTERIOR SIDE) SOP
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 CANTEEN +5000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR GB-R t=9 w/ EP-II W/ ON M-BAR STEEL SOP WOODEN
150x1200 (WOODEN 600x100 (EXTERIOR SIDE) DROP CEILING + SOP
PATTERN) - GB-R t=12mm ON INDIRECT LIGHTING
LGS FRAME
1FL=GL+200 CANTEEN +3200 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR GB-R t=9 w/ EP-II W/ ON M-BAR STEEL SOP WOODEN
MGR 150x1200 (WOODEN 600x100 (EXTERIOR SIDE) DROP CEILING + SOP
PATTERN) - GB-R t=12mm ON INDIRECT LIGHTING
LGS FRAME
1FL=GL+200 WASHING +3000 1FL±0.00 1FL-30 CERAMIC TILE 400x400 CERAMIC TILE 400x100 H=100 EP-II ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP DRAIN PIT + GALVANIZED
AREA (NON-SLIP) GRATING (INCLUDED)
W=200 H=200, L=5000
1FL=GL+200 SC MART +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP
600x600 600x100 (EXTERIOR SIDE)
- GB-R t=12mm ON
LGS FRAME
1FL=GL+200 MOSQUE +5000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II - ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP WOODEN
600x600 600x100 (EXTERIOR + ABLUTION) SOP
- GB-R t=12 mm ON LGS
FRAME
1FL=GL+200 ABLUTION +3000 1FL-20 1FL-50 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 H<1200 CERAMIC TILE ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP
600x600 600x100 400x400
H>1200 EP-II
1FL=GL+200 CLINIC +3000 1FL±0.00 1FL-30 HOMOGENEOUS TILE HOMOGENEOUS TILE H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP WASH BASIN INSIDE
600x600 600x600 ROOM 1 PCS
(EXCLUDED)
1FL=GL+200 LOCKER (M) +3000 1FL±0.00 1FL-30 CERAMIC TILE 400x400 CERAMIC TILE 400x100 H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP

1FL=GL+200 LOCKER (F) +3000 1FL±0.00 1FL-30 CERAMIC TILE 400x400 CERAMIC TILE 400x100 H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP

FACTORY
1FL=GL+200 FACTORY AREA EXP 1FL±0.00 1FL±0.00 EPOXY PAINT 300µ SOP H=100 EP-II H<1000 ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE COLUMN CORNER
H>1000 COOR. COLOR SOP (EXPOSED PROTECTION W/ STEEL
COATED STEEL DECK H=30
CEILING) ANGLE SOP H=1000
t=0.4
1FL=GL+200 PAINTING EXP 1FL±0.00 1FL±0.00 EPOXY PAINT 300µ SOP H=100 EP-II RC WALL t=150 (UP TO RUSTROOF PAINT + EXPOSED STRUCTURE
STORAGE SOFFIT) SOP (EXPOSED
CEILING)
1FL=GL+200 PAINTING EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II RC WALL t=150 (UP TO RUSTROOF PAINT + EXPOSED STRUCTURE
CIRCULATION SOFFIT) SOP (EXPOSED
ROOM CEILING)
1FL=GL+200 LIQUID WASTE EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II RC WALL t=150 (UP TO RUSTROOF PAINT + EXPOSED STRUCTURE
ROOM SOFFIT) SOP (EXPOSED
CEILING)
1FL=GL+200 CRUSHING EXP 1FL±0.00 1FL±0.00 EPOXY PAINT 300µ SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE
ROOM SOP (EXPOSED
CEILING)
1FL=GL+200 PUMP ROOM EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE UNDERGROUND TANK
SOP (EXPOSED CAPS: 126 m3
CEILING) (6x10,5x2 m)

FINISHING SCHEDULE ABBREVIATIONS


MATERIALS PAINT / COATING DOOR,WINDOW,ETC. LIGHTING FIXTURES SANITARY FIXTURES OTHERS
S : STEEL TB : TERRAZZO BLOCK FLG : FLOAT GLASS/CLEAR GLASS HG : HEAT ABSORBING GLASS SOP : SYNTHETIC RESIN OIL PAINT CLQ : CLEAR LACQUER WD : WOODEN DOOR FH : FLOOR HINGE AT : AIR TIGHT SSGR : STAINLESS STEEL LOUVRE FL : FLUORESCENT L : LAVATORY BOWL RD : ROOF DRAIN
AL : ALUMINIUM CLB : CONCRETE LOUVER BLOCK FG : FIGURED GLASS LEG : LOW E-GLASS EP-I : EMULSION PAINT (EXTERIOR) ST : STAIN SD : STEEL DOOR FSD : FIRE STEEL DOOR SAT : SEMI AIR TIGHT (GRILL) IL : INCANDESCENT G : CLOSET BOWL OF : OVER FLOW
SS : STAINLESS STEEL IB : CONC.INTERLOCKING BLOCK TG : TEMPERED GLASS SG : STAINED GLASS/ART GLASS EP-II : EMULSION PAINT (INTERIOR) ZC : ZINC COATING/ANTI RUST SWD : STEEL WOODEN DOOR FSH : FIRE SHUTTER WS : WOODEN SCREEN MF : MERCURY FIXTURE U : URINAL FD : FLOOR DRAIN
BR : BRONZE GB-R : GYPSUMP BD - REGULAR PG : PAIRED GLASS LEP : LATEX EMULSION PAINT WX : WAX AD : ALUMINIUM DOOR SH : SHUTTER SS : STEEL SCREEN DL : DOWN LIGHT EV : ELEVATOR
LGS : LIGHT GAUGE STEEL GB-D : GYPSUMP BD - DRESSED/ PSG : POLISHED GLASS VEP : VINYL EMULSION PAINT SSD : STAINLESS STEEL DOOR QSH : QUICK/HIGHSPEED SHUTTER AS : ALUMINIUM SCREEN CL : CEILING LIGHT ES : ESCALATOR
FB : FLAT BAR GYPTILE BOARD PWG : WIRED POLISHED GLASS AP : ACRYLIC RESIN PAINT TGD : TEMPERED GLASS DOOR WW : WOODEN WINDOW SS : STEEL SCREEN B : BRACKET DS : DUCT SPACE/SHAFT
PC : PRESTRESSED CONCRETE GB-W : GYPSUMP BD - WATER PROOF HWG : WIRED HEAT ABSORBING VP : VINYL RESIN PAINT SLD : SLIDING DOOR SW : STEEL WINDOW SSS : STAINLESS STEEL SCREEN CP : CORD PENDANT PS : PIPE SPACE/SHAFT
PCa : PRECAST CONCRETE MFB : MINERAL FIBRE BOARD/ GLASS FP : PHTHALIC ACID RESIN PAINT FD : FOLDING DOOR AW : ALUMINIUM WINDOW WGR : WOODEN LOUVRE (GRILL) LS : LED STRIPPING EPS : ELECTRICAL SPACE/SHAFT
ALC : AUTOCLAVED LIGHTWEIGHT ACCOUSTIC BOARD LG : LAMINATED GLASS LQ : COLORED LACQUER PD : PARTITION DOOR SSW : STAINLESS STEEL WINDOW SGR : STEEL LOUVRE (GRILL) FL(R) : RECESSED FLUORESCENT SGP : STEEL GALVANIZED PIPE
CONCRETE CSB : CALSIUM SILICATE BOARD/ GB : GLASS BLOCK PVCD : PVC DOOR SF : STEEL FRAME AGR : ALUMINIUM LOUVRE (GRILL) FL(S) : SURFACE MOUNTED OA-FL : RAISED ACCESS FLOOR
CB : CONCRETE BLOCK KALSI BOARD RG : HEAT REFLECTIVE GLASS OD : OVERHEAD DOOR CW : CURTAIN WALL PGR : PLASTIC LOUVRE (GRILL) FLUORESCENT
HL : HAIRLINE EPL : EXPLOSIVE PROOF LIGHTING
FIXTURE

INTERIOR FINISHING SCHEDULE 2 A-02B


FLOOR BASE BOARD WALL(COLUMN) CEILING CURTAIN
FLOOR (AREA) ROOM CH FL SL TRIMMING(CORNICE) FIXTURE AND OTHERS
FINISHED WATERPROOF FINISHED HEIGHT FISNISHED BASE FINISHED BASE BOX

1FL=GL+200 SILO VACUUM EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE
ROOM SOP (EXPOSED
CEILING)
1FL=GL+200 RESIN EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE
MATERIAL SOP (EXPOSED
WAREHOUSE CEILING)

1FL=GL+200 ELECTRICAL EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE FIRE RATED STEEL
ROOM SOP (EXPOSED DOOR (APPLIED)
CEILING)
1FL=GL+200 CLEANING JIG EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-I ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE DRAIN GUTTER W=200
SOP (EXPOSED H=200 CLOSED W/ GALV.
CEILING) GRATING 500x500 d=500

1FL=GL+200 TOILET (F) +2500 1FL-20 1FL-50 CERAMIC TILE 400x400 CERAMIC TILE 200x400 ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP TOILET FIXTURES
(NON-SLIP) (EXCLUDED)

1FL=GL+200 TOILET (M) +2500 1FL-20 1FL-50 CERAMIC TILE 400x400 CERAMIC TILE 200x400 ALC BLOCK MORTAR GB-W t=9 w/ EP-II ON M-BAR STEEL SOP TOILET FIXTURES
(NON-SLIP) (EXCLUDED)

1FL=GL+200 IN HOUSE EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-I ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE
SOP (EXPOSED
CEILING)
1FL=GL+200 CANOPY EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 REFER TO FACTORY REFER TO FACTORY RUSTROOF PAINT + EXPOSED STRUCTURE
DELIVERY WALL SPEC WALL SPEC SOP (EXPOSED
CEILING)
GUARD HOUSE & RAINWATER STORAGE
1FL=GL+200 GUARD HOUSE I +2700 1FL±0.00 1FL±0.00 CERAMIC 400x400 CERAMIC 400x100 H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP

1FL=GL+200 GUARD HOUSE II +2700 1FL±0.00 1FL±0.00 CERAMIC 400x400 CERAMIC 400x100 H=100 EP-II ALC BLOCK MORTAR GB-R t=9 w/ EP-II ON M-BAR STEEL SOP

1FL=GL+200 RAINWATER EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL SOP H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE -UNDERGROUND
STORAGE SOP (EXPOSED WATER TANK CAPS:
CEILING) 87,32 m2 (7,4x5,9x2 m)
-UNDERGROUND
WATER TANK CAPS:
25,96 m2 (2,2x5,9x2 m)
RUBBISH BIN
1FL=GL+200 RUBBISH BIN EXP 1FL±0.00 1FL±0.00 CONCRETE TROWEL CERAMIC 400x100 H=100 EP-II ALC BLOCK MORTAR RUSTROOF PAINT + EXPOSED STRUCTURE DRAIN PIT + GALVANIZED
SOP (EXPOSED GRATING (INCLUDED)
CEILING) W=200 H=100, L=5000

FINISHING SCHEDULE ABBREVIATIONS


MATERIALS PAINT / COATING DOOR,WINDOW,ETC. LIGHTING FIXTURES SANITARY FIXTURES OTHERS
S : STEEL TB : TERRAZZO BLOCK FLG : FLOAT GLASS/CLEAR GLASS HG : HEAT ABSORBING GLASS SOP : SYNTHETIC RESIN OIL PAINT CLQ : CLEAR LACQUER WD : WOODEN DOOR FH : FLOOR HINGE AT : AIR TIGHT SSGR : STAINLESS STEEL LOUVRE FL : FLUORESCENT L : LAVATORY BOWL RD : ROOF DRAIN
AL : ALUMINIUM CLB : CONCRETE LOUVER BLOCK FG : FIGURED GLASS LEG : LOW E-GLASS EP-I : EMULSION PAINT (EXTERIOR) ST : STAIN SD : STEEL DOOR FSD : FIRE STEEL DOOR SAT : SEMI AIR TIGHT (GRILL) IL : INCANDESCENT G : CLOSET BOWL OF : OVER FLOW
SS : STAINLESS STEEL IB : CONC.INTERLOCKING BLOCK TG : TEMPERED GLASS SG : STAINED GLASS/ART GLASS EP-II : EMULSION PAINT (INTERIOR) ZC : ZINC COATING/ANTI RUST SWD : STEEL WOODEN DOOR FSH : FIRE SHUTTER WS : WOODEN SCREEN MF : MERCURY FIXTURE U : URINAL FD : FLOOR DRAIN
BR : BRONZE GB-R : GYPSUMP BD - REGULAR PG : PAIRED GLASS LEP : LATEX EMULSION PAINT WX : WAX AD : ALUMINIUM DOOR SH : SHUTTER SS : STEEL SCREEN DL : DOWN LIGHT EV : ELEVATOR
LGS : LIGHT GAUGE STEEL GB-D : GYPSUMP BD - DRESSED/ PSG : POLISHED GLASS VEP : VINYL EMULSION PAINT SSD : STAINLESS STEEL DOOR QSH : QUICK/HIGHSPEED SHUTTER AS : ALUMINIUM SCREEN CL : CEILING LIGHT ES : ESCALATOR
FB : FLAT BAR GYPTILE BOARD PWG : WIRED POLISHED GLASS AP : ACRYLIC RESIN PAINT TGD : TEMPERED GLASS DOOR WW : WOODEN WINDOW SS : STEEL SCREEN B : BRACKET DS : DUCT SPACE/SHAFT
PC : PRESTRESSED CONCRETE GB-W : GYPSUMP BD - WATER PROOF HWG : WIRED HEAT ABSORBING VP : VINYL RESIN PAINT SLD : SLIDING DOOR SW : STEEL WINDOW SSS : STAINLESS STEEL SCREEN CP : CORD PENDANT PS : PIPE SPACE/SHAFT
PCa : PRECAST CONCRETE MFB : MINERAL FIBRE BOARD/ GLASS FP : PHTHALIC ACID RESIN PAINT FD : FOLDING DOOR AW : ALUMINIUM WINDOW WGR : WOODEN LOUVRE (GRILL) LS : LED STRIPPING EPS : ELECTRICAL SPACE/SHAFT
ALC : AUTOCLAVED LIGHTWEIGHT ACCOUSTIC BOARD LG : LAMINATED GLASS LQ : COLORED LACQUER PD : PARTITION DOOR SSW : STAINLESS STEEL WINDOW SGR : STEEL LOUVRE (GRILL) FL(R) : RECESSED FLUORESCENT SGP : STEEL GALVANIZED PIPE
CONCRETE CSB : CALSIUM SILICATE BOARD/ GB : GLASS BLOCK PVCD : PVC DOOR SF : STEEL FRAME AGR : ALUMINIUM LOUVRE (GRILL) FL(S) : SURFACE MOUNTED OA-FL : RAISED ACCESS FLOOR
CB : CONCRETE BLOCK KALSI BOARD RG : HEAT REFLECTIVE GLASS OD : OVERHEAD DOOR CW : CURTAIN WALL PGR : PLASTIC LOUVRE (GRILL) FLUORESCENT
HL : HAIRLINE EPL : EXPLOSIVE PROOF LIGHTING
FIXTURE

INTERIOR FINISHING SCHEDULE 3 A-02C


6000 145370 6000

QIBL
BOUNDARY LINE 25°

AT
PC FENCE H=2500 +BARBED WIRE H=500

8000

N
2390
SET BACK LINE (8m)

60000
(FUTURE EXTENSION)

(PC FENCE H=2500 +BARBED WIRE H=500)


RUBBISH BIN

SET BACK LINE (6m)


BOUNDARY LINE
26000
163390
11
Toilet CLEANING
(M) Toilet INHOUSE
JIG
10 (F)
PUMP
10000 ROOM
CRUSHING

(PC FENCE H=2500 + BARBED WIRE H=500)



ROOM
9 Ⓡ
10000

SILO VACUUM

SET BACK LINE (6m)


ROOM

BOUNDARY LINE
8 HOIST CRANE 30T
PARKING MOLD
10000

FACTORY AREA
7 LL=2T/M2
FL±0.00=GL+200
10000
75000

TANGKI
TSOP7 NAT

Wipping Booth
6 Oven Conveyer Drive
Storage Conveyer Drive
COOLING
10000

TOWER,
(Under oven Storage 43Unit)
CHILLER &
PH CONTROL
5 Booth Conveyer Drive
Tour Space Earth check
6850 50003150 10000

ELECTRICAL
TOTAL SITE AREA = 34,761,46 m2

ROOM
TP切替BOX 操作盤 TP切替BOX 操作盤 TP切替BOX 操作盤 TP切替BOX 操作盤
ステージ盤 &TP 情報 ステージ盤 &TP 情報 ステージ盤 &TP 情報 ステージ盤 &TP 情報

Server KDB = 11.958,94 m2 = 34,40% <60%


4 PAINTING
Painting Circulation Room
Liquid Waste Room Pantry Meeting Meeting
Toilet MATERIAL Room Toilet Meeting Room Toilet
3 (M) STORAGE 5 Toilet (M) Room Room KLB = 11.958,94 m2 = 34,40% <240%
(M) 4 3
LOCKER (F)
2 WASHING GREEN RATIO = 16.129,18 m2 = 46,40% >10%
SC MART

LOCKER (F)
Ablution

MOSQUE AREA QUALITY OHBEYA OFFICE Meeting


(M) 87 21 110 PERSON
CANTEEN
ROOM ROOM
LOBBY Meeting Room
MGR Room
CLINIC 1 AREA CALCULATION
CANTEEN 2
1
NO LAND USE AREA (M2) PERCENTAGE (%)
I. BUILDING AREA
1. FACTORY, OFFICE & WELFARE BUILDING 9296,50 26,74%
2. BUILDING CANOPY 1836,60 5,28%
34500

3. GUARD HOUSE 1 + CANOPY 55,60 0,16%


Security Flag 4. GUARD HOUSE 2 + CANOPY , RAINWATER 249,91 0,72%
gate Guest pole RAINWATER STO
& TREATMENT
STORAGE, MGR PARKING CANOPY
49500

· FACTORY: Car
Parking MGR 5. RUBBISH BIN 30,00 0,09%
1FL = GL +200 Car
VIP 6. MRS GAS STATION 18,00 0,05%
Parking GH 2
Employee
· OFFICE: Future
Motorcycle Parking Guest Car Parking Area 7. GARDU ELECTRIC PLN 12,00 0,03%
Motorcycle Parking drop off 10 unit
1FL = GL +200 45 unit 8. PEDESTRIAN CANOPY 39,80 0,11%
MRS 45 unit PLN
GAS STATION SET BACK LINE (15m) 3x4 9. SECURITY GATE 31,50 0,09%
3x6 1,12%
10. PARKING CANOPY 389,03
15000

LEGEND: Employee Car Parking Area Future Car Parking SUB TOTAL 11.958,94 34,40%
GH 1
25 unit 20 unit
NEW BUILDING AREA
II. GREEN AREA
PEDESTRIAN W=2000 BOUNDARY LINE (BRC FENCE H=2000) SUB TOTAL 16.129,18 46,40%
III. PAVEMENT AREA
PAVEMENT (RC - HEAVY DUTY)
1. PAVING BLOCK 484,82 1,40%
GREENERY (GRASS) 2. HEAVY DUTY RC PAVEMENT 6.188,52 17,80%
MAIN ROAD
SUB TOTAL 6.673,34 19,20%
SECURITY LINE (BRC FENCE H=2000) TOTAL (I + II + III) 34.761,46 100,00%

24000 24000 24000 24000 20000 7500


21500 123500 12370
A B C D E F G H I J K L M N O P Q R S T U SITE PLAN 1 : 1000
SITE PLAN A-03
QIBL
25°

AT
N
A-06

A-06
D
B
7500 72000 24000 20000 7500
6000 12000 6000 4000 3500
CANOPY LINE
SUMP PIT 500 x 500

6000
12000

11
DELIVERY CANOPY
6000

6000
CLEANING
Toilet Toilet INHOUSE
JIG
(M) (F)
10
10000

10000
PUMP
CRUSHING ROOM
ROOM

9 Ⓡ

SILO VACUUM
10000

10000
ROOM

40000
8
PARKING MOLD
HOIST CRANE 30T

RESIN
10000

10000
MATERIAL
WAREHOUSE

7
FACTORY AREA
FLOOR: EPOXY PAINT 300µ
10000

10000
LL=2T/M2
FL±0.00=GL+200
75000

TANGKI
TSOP7 NAT

Wipping Booth
6
Oven Conveyer Drive
Storage Conveyer Drive
BRC FENCE H=2000
COOLING TOWER,
10000

10000
(Under oven Storage 43Unit) CHILLER &
PH CONTROL
A-06
C
Booth Conveyer Drive Earth check
5 Tour Space
CANOPY LINE

ELECTRICAL
10000

10000


ROOM
PAINTING MATERIAL Liquid Waste
ステージ盤
TP切替BOX
&TP
操作盤
情報 ステージ盤
TP切替BOX
&TP
操作盤
情報
Painting Circulation Room
ステージ盤
TP切替BOX
&TP
操作盤
情報 ステージ盤
TP切替BOX
&TP
操作盤
情報
MAINTENANCE M/E STAIR
STORAGE Room (ST. GALV) W=700
4 Toilet Server
3150

Pantry
(F) Toilet (M) Room Meeting Meeting

6000
Meeting Toilet
3 Toilet Room Room
2000

Room 5 Toilet (M)


CORRIDOR (M) (F) 4 3
5000

2000
LOCKER
6000

15000
2 (F) WASHING OFFICE
A LOCKER
SC MART

21 MOSQUE
Ablution

A-06
(M) 87 AREA QUALITY OHBEYA LOBBY
CANTEEN Meeting

7000
6850

110 PERSON ROOM ROOM Meeting


MGR 1FL±0.00=GL+200 Room
Room
3850

CANTEEN 2
CLINIC 1
1
4700 2050

ST. GALV.

6800
RAINWATER PIPE

4500
Ø150 COVER W/ GB-R
AMBULANCE PARKING
W/ CANOPY

7650 2400 13950 3700 20300 8100 7600 8300 14300 9700 2500 5000 2500 5000 5000
6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 10000
24000 24000 24000 24000 20000 7500
12000 123500
A B C D E F G H I J K L M N O P Q R S T U

)TS
O
IFO
TU
P( I IE
P
-w/ 051=tW
R
C
LA:
PLAN 1 : 500

1FL =GL+200

PLAN A-04
1. STAGE WALKWAY PLAN 2. LIVE LOAD PLAN 3. FLOOR FINISHING PLAN

7500 72000 24000 20000 7500 7500 72000 24000 20000 7500 7500 72000 24000 20000 7500

11 11 11

7500

7500
7500

Toilet Toilet CLEANING Toilet CLEANING

6000

6000
CLEANING

6000
INHOUSE (M) Toilet INHOUSE (M) Toilet INHOUSE
(M) Toilet JIG JIG JIG
(F) 10 (F) 10 (F)
10
PUMP PUMP

10000

10000

10000

10000
PUMP
10000

10000
ROOM ROOM ROOM

CRUSHING CRUSHING CRUSHING


FACTORY AREA ROOM
9
ROOM
9
ROOM
9 FLOOR: EPOXY PAINT 300µ

10000

10000

10000
10000
10000

10000
LL=2T/M2
SILO VACUUM SILO VACUUM
FL±0.00=GL+200 SILO VACUUM

40000
40000
ROOM ROOM

40000
ROOM
8 8 8 HOIST CRANE 30T
HOIST CRANE 30T
LL=5 t/m²

10000
10000

10000

10000
LL=5 t/m²
10000

10000
FACTORY AREA FACTORY AREA
STAGE WALKWAY W=1500 FLOOR: EPOXY PAINT 300µ FLOOR: EPOXY PAINT 300µ
7 (1FL+4140) 7 LL=2T/M2 7 LL=2T/M2
FL±0.00=GL+200 FL±0.00=GL+200

10000

10000

10000

10000
10000

10000

75000

75000
75000

STAGE WALKWAY W=1500


(1FL+4140)
6 6 6
STAGE WALKWAY W=1500 COOLING COOLING COOLING

10000

10000

10000

10000
10000

10000
(1FL+4140) TOWER, TOWER, TOWER,
STAGE WALKWAY CHILLER & CHILLER & CHILLER &
(BY OWNER) PH CONTROL PH CONTROL PH CONTROL

5 5 5
STAGE WALKWAY W=1500

10000
10000

10000

10000
10000
10000

ELECTRICAL ELECTRICAL ELECTRICAL


(1FL+2520)
ROOM ROOM ROOM
Server Server Server
PAINTING 4 PAINTING 4 PAINTING

6850 31505000

6850 31505000
4 Painting Circulation Room Room Pantry Meeting Meeting Painting Circulation Room Room Pantry Meeting Meeting
6850 31505000

Toilet Painting Circulation Room Room Pantry Meeting Room Meeting Meeting Toilet MATERIAL Meeting Room Toilet Toilet MATERIAL Meeting Room Toilet
MATERIAL Toilet Toilet Toilet Toilet
(M) 5 Toilet (M) Room Room (M) STORAGE 5 Toilet (M) Room Room (M) STORAGE 5 Toilet (M) Room Room
STORAGE (M) 3 (M) 4 3 3 (M) 4 3
3

15000

15000
4 3 (F) (F)

15000
LOCKER (F) LOCKER LOCKER
2 WASHING 2 WASHING

SC MART
LOCKER (F)

SC MART
2 WASHING LOCKER (F)
SC MART

LOCKER (F)

Ablution

Ablution
MOSQUE QUALITY OHBEYA MOSQUE QUALITY OHBEYA
Ablution

MOSQUE QUALITY OHBEYA AREA OFFICE Meeting AREA OFFICE Meeting


(M) 87 21 CANTEEN AREA OFFICE LOBBY Meeting Room
Meeting (M) 87 21 110 PERSON
CANTEEN
ROOM ROOM
LOBBY Meeting Room (M) 87 21 110 PERSON
CANTEEN
ROOM ROOM
LOBBY Meeting Room
110 PERSON MGR ROOM ROOM Room MGR Room MGR Room
1 CLINIC 1 CLINIC 1
CLINIC CANTEEN 2 CANTEEN 2 CANTEEN 2
1 1 1

6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 5000 5000 6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 5000 5000 6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 5000 5000
24000 24000 24000 24000 20000 7500 24000 24000 24000 24000 20000 7500 24000 24000 24000 24000 20000 7500

123500 123500 123500

A B C D E F G H I J K L M N O P Q R S T U A B C D E F G H I J K L M N O P Q R S T U A B C D E F G H I J K L M N O P Q R S T U

MAPPING-3- FLOOR FINISHING 1 : 1500

MAPPING-2 - LIVELOAD 1 : 1500 LEGEND :


LEGEND :
LEGEND : EPOXY PAINT 300 µ CERAMIC TILE 400X400 CONCRETE TROWELL
LL 0.5T/m² (SLAB ON PILE) LL 6T/m² (SLAB ON PILE )
HOMOGENEOUS TILE 600 x 600 (NON-SLIP)
STAGE WALKWAY W/ ST. STRUCTURE FRAME W/ LL 2T/m² (SLAB ON GRADE) LL 10T/m² (SLAB ON PILE)
SUS CHECKER PLATE FLOOR FINISH + SUS HOMOGENEOUS TILE 150 x 1200 CERAMIC TILE 400X400
HANDRAIL W/ ACRYLIC & SANDBLAST COVER LL 2T/m² (SLAB ON PILE) LL 10.9T/m² (SLAB ON PILE W/ GAP) (WOODEN PATTERN)
LL 2T/m² (SLAB ON PILE W/ GAP)

4. PEDESTRIAN CANOPY 5. UNDERGROUND WATER TANK 6. MAINTENANCE ROOF CATWALK PLAN


QIBLAT

25°
N

ROOF: LOW RIBBED ROOF LOW RIBBED


GALV. STEEL DECK t=0.5 GL+5200 GALV. STEEL DECK t=0.5
200

CEILING: ACP

SLOPE
FRP GUTTER 1
W=200 H=100 ROOF 30
GL+3700
200
640

7500 72000 24000 20000 7500 12000 96000 20000 7500


4500
5200
5000

5000

3700
3500
3000

2900

12000
11 UNDER GROUND WATER TANK 11
7500

Toilet CLEANING 130 m² 7x10x2 W/CEMENT BASED WP

6000
INHOUSE
500

GL GL GL
(M) Toilet JIG
150

10 (F) 10
1 PUMP

10000
10000

10000

10000
ROOM
2200 8500 4700
ROOF FACTORY
KEYPLAN NTS
CRUSHING
1 1 2 3 ROOM

SECTION 2
9 9
10000

10000

10000

10000
Server
PAINTING
Room Pantry

40000

40000
Toilet Painting Circulation Room Meeting Room Meeting Meeting ROOM
MATERIAL Toilet Toilet
(M) STORAGE 5 Toilet (M) Room Room 8 8
(M) 4 3 HOIST CRANE 30T
15000

LOCKER (F) LL=5 t/m²


10000

10000

10000

10000
WASHING
FACTORY AREA
SC MART

LOCKER (F)
Ablution

MOSQUE AREA QUALITY OHBEYA OFFICE LOBBY Meeting


(M) 87 21 CANTEEN Meeting Room
110 PERSON MGR ROOM ROOM Room FLOOR: EPOXY PAINT 300µ
CLINIC 1
CANTEEN 2 7 LL=2T/M2 7
FL±0.00=GL+200
10000

10000

10000
10000
75000

75000
49500

6 6
COOLING

10000
10000

10000

10000
TOWER,
CHILLER &
34500

PH CONTROL
Security Flag 5 5
Guest pole RAINWATER STO
gate
6850 50003150 10000

10000

10000

10000
Car & TREATMENT
ELECTRICAL
Parking MGR
ROOM
VIP Car
Parking Server
Future Employee GH 4 PAINTING
Painting Circulation Room Room Pantry Meeting Meeting
4
Motorcycle Parking Guest Car Parking Area Toilet MATERIAL Meeting Room Toilet
drop off 3 Toilet 3
Motorcycle Parking
45 unit 10 unit (M) STORAGE 5 Toilet (M) Room Room
45 unit (M) 4 5

15000

15000

15000
MRS LOCKER (F)
GAS SET BACK LINE (15m) PLN WASHING
2 2
SC MART

LOCKER (F)
Ablution

STATION MOSQUE AREA QUALITY OHBEYA OFFICE LOBBY Meeting


(M) 87 21 110 PERSON
CANTEEN
ROOM ROOM Meeting Room
15000

MGR Room
CLINIC 1
GH Employee Car Parking Area Future Car Parking CANTEEN 2
25 unit 20 unit 1 1

BOUNDARY LINE BRC FENCE H=2000

6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 5000 5000
MAIN ROAD 2 24000 24000 24000 24000 20000 7500
3 123500
24000 24000 24000 24000 20000 7500
21500 123500 12370 4 5 A B C D E F G H I J K L M N O P Q R S T U

A B C D E F G H I J K L M N O P Q R S T U

24000 24000 24000 24000 20000 7500


21500 123500 12370
LEGEND : MAPPING-6 - RC WALL PLAN 1 : 1500

A B C D E F G H I J K L M N O P Q R S T U
PEDESTRIAN CANOPY MAPPING-4- PEDESTARIAN CANOPY 1 : 1500
LEGEND :

1. UNDER GROUND WATER TANK 3. RECYCLE WATER UNDER GROUND WATER TANK 5. SUMP PIT (1.5X1.2X3) : MAINTENANCE ROOF CATWALK W/ EXPANDED METAL
(7X10.5X2) W/CEMENT BASED WP (2X5.9X2) W/CEMENT BASED WP
2. RAIN WATER UNDER GROUND WATER TANK 4. SEWAGE TREATMENT PLANT : RC ROOF ASPHALT WP + TOPPING CONCRETE T=80 (LOAD 500T/m2)
(5.9X7.4X2) W/CEMENT BASED WP (5.6X3.1X2.3)
: SAFETY LIFE LINE (ROPE ONE STEEL FRAME TO HOOK BODY HARNES)

MAPPING PLAN A-04B


QIBL
25°

AT
N
CANOPY ROOF : HIGH RIBBED GALV.
12000 STEEL DECK t=0.5 96000 20000 7500
CANOPY ROOF : HIGH RIBBED GALV. STEEL DECK 4000 3500
t=0.5

1
SLOPE 30
12000
11

DS Ø 100 DS Ø 100 DS Ø 100 CANOPY GUTTER FRP W=500, H=100 DS Ø 100 DS Ø 100 DS Ø 100 DS Ø 100 DS Ø 100 MAINTENANCE
LADDER DS Ø 100
W/ DOWNSPOUT Ø100
10
GUTTER FRP W=300, H=300-400 W/
DS Ø 200 DS Ø 100
DOWNSPOUT Ø100
10000

1
FRP SKYLIGHT W=650 FRP SKYLIGHT W=650 MAINTENANCE 30
LADDER SLOPE
DS Ø 100 DS Ø 100

9
ROOF MONITOR: HIGH RIBBED GALV. STEEL DECK t=0.5 ROOF MONITOR: HIGH RIBBED GALV. STEEL DECK t=0.5
W/ GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 + W/ GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 + GUTTER FRP W=300, H=300-400 W/
DS Ø 200 DOWNSPOUT Ø100
WIREMESH + ALUMINUM FOIL WIREMESH + ALUMINUM FOIL
10000

FRP SKYLIGHT W=650 FRP SKYLIGHT W=650


1
30 DS Ø 100
SLOPE DS Ø 100

40000
8

DS Ø 200 1 ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5


30 W/ GLASSWOOL INSULATION t=50 DENSITY
CANOPY GUTTER FRP W=500, H=100
10000

SLOPE 24 kg/m3 + WIREMESH + ALUMINUM FOIL


GUTTER FRP W=500, H=500-600

GUTTER FRP W=500, H=500-600


FRP SKYLIGHT W=650 FRP SKYLIGHT W=650

DS Ø 100
W/ DOWNSPOUT Ø100

W/ DOWNSPOUT Ø200

W/ DOWNSPOUT Ø200
ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/
GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3
7 + WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT
1
30 W=650 @10.000 1
DS Ø 200 SLOPE 30 GUTTER FRP W=300, H=300-400 W/
SLOPE
10000

DOWNSPOUT Ø100
FRP SKYLIGHT W=650 FRP SKYLIGHT W=650 MAINTENANCE
LADDER
75000

DS Ø 100

6 ROOF MONITOR: HIGH RIBBED GALV. STEEL DECK t=0.5 ROOF MONITOR: HIGH RIBBED GALV. STEEL DECK t=0.5
W/ GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 + W/ GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 +
DS Ø 200 WIREMESH + ALUMINUM FOIL WIREMESH + ALUMINUM FOIL
10000

10000
13000

13000
FRP SKYLIGHT W=650 FRP SKYLIGHT W=650

DS Ø 100 ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5


W/ GLASSWOOL INSULATION t=50 DENSITY
24 kg/m3 + WIREMESH + ALUMINUM FOIL
5
GUTTER FRP W=300, H=300-400
DS Ø 200 2400 101300 2500 5000 W/ DOWNSPOUT Ø100
10000

10000
FRP SKYLIGHT W=650 FRP SKYLIGHT W=650 1
30
SLOPE
DS Ø 100
DS Ø 100 DS Ø 100 DS Ø 100 DS Ø 100 DS Ø 100
4
1
3150

SLOPE 30
DS Ø 200 DS Ø 100
3
GUTTER FRP W=300, H=300-400 DS Ø 100 MAINTENANCE MAINTENANCE STAGE W/ STAIR
W/ DOWNSPOUT Ø100 LADDER EXPANDED METAL ON ST. ACESS
FRAME ABOVE ROOF
15000

15000
1 DS Ø 100 DS Ø 100 DS Ø 100 DS Ø 100 1
2 SLOPE 30 SLOPE 100
11850

1 1 ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/


30 DS Ø 100
SLOPE 100 SLOPE GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 + RC ROOF W/
STAIR
WIREMESH + ALUMINUM FOIL ASPHALT WP +
ACESS
DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 DS Ø 150 TOPPING CONCRETE
t=80
1
DS Ø 150
GUTTER FRP W=300, H=400-500

7500
W/ DOWNSPOUT Ø150 @12000 1 CANOPY ROOF : LOW RIBBED
SLOPE 30
RC ROOF W/ DS Ø 100 DS Ø 100 GALV. STEEL DECK t=0.5
ASPHALT WP +
TOPPING CONCRETE
t=80 2000 6000 2000
6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 10000
24000 24000 24000 24000 20000 7500
12000 123500
A B C D E F G H I J K L M N O P Q R S T U

ROOF PLAN 1 : 500


: SAFETY LIFE LINE

ROOF PLAN A-05


QIBL
25°

AT
9

N
C

A
1

A L
KEYPLAN

D
B
ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5
W/ GLASSWOOL INSULATION t=50 DENSITY 24
kg/m3 + WIREMESH + ALUMINUM FOIL ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/ ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/
GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3
+ WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT + WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT
W=650 W=650
N
GA
S
LH
FI
8500 13000 17000 13000 8500
1500 10000 1500 1500 10000 1500 IE
P
-MO
BLO
C
W
K
C
R
A
LT/00H
1<
H>1000 COOR COLOR COATED STEEL
DECK H=30 T=0.4 + FRP WALL LIGHT

2000

2000

1500
1FL+14071

550

2000
1FL+122071 750 150
AA
FS
C
I
COOR COLOR COATED ST. DECK H=30 t=0.4 150 600 120
1500 1 CA
N
OR
P
O
Y
:O
F 30
1 30 BEDR
IG
HI
DETAIL- B 30 SLOPE
5.0=TD
E
C
KTS
ELGV
A
,L

14071
SLOPE
2600

1FL+5700 1500

12071
1FL+4140
FACTORY AREA COOR COLOR COATED STEEL DECK

7000

6000
200 5700

FLOOR: EPOXY PAINT 300µ H=30 T=0.4 + FRP WALL LIGHT


CH=3000

4140
QUALITY LL=2T/m² DETAIL- A

30
1FL±0.00 CORR FL±0.00=GL+200 1FL±0.00
ROOM

200

1300
GL=1FL-200 GL=1FL-200 FLASHING
11850

1000
6850 5000 10000 10000 10000 10000 10000 10000 MOSQUITO NET
3150
IR
E
FW
P
-A
M
G
Lm
S
E
O
9/=m
NtC
S
B W/ STEEL FRAME SOP
75000 12000 ALC BLOCK
MORTAR W/ EPI
1 2 3 4 5 6 7 8 9 10

SECTION B 1 : 500

I IE
P
-w/ 051=tW
R
C
LA: DETAIL - A 1 : 40

ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5
W/ GLASSWOOL INSULATION t=50 DENSITY 24 W/ GLASSWOOL INSULATION t=50 DENSITY 24
kg/m3 + WIREMESH + ALUMINUM FOIL kg/m3 + WIREMESH + ALUMINUM FOIL
:AA
FS
C
I COOR COLOR COATED ST. DECK H=30 t=0.4
RC ROOF W/ ASPHALT WATERPROOF RC ROOF W/ ASPHALT WATERPROOF W :LA
RS
A
TICE
S IE
P
-M
O
B
LO
C
W
K
C
R
A
LT/
AA
FS
C
I RS
A
TICE
S 1FL+7650
COOR COLOR COATED ST. DECK H=30 t=0.4

200 5700 1950


2600
1FL+5700
W
:LA

7650
IE
P
-M
O
B
LO
C
W
K
C
R
A
LT/

5500

5000
CANTEEN MOSQUE

3000
Meeting Meeting LOBBY OHBEYA QUALITY WASHING LOCKER
OFFICE SC MART 110 PERSON 1FL±0.00
Room 2 Room 1 ROOM ROOM AREA (M) 87
N
EILS
A
U
E
FY
O
TPO
RR
TG
V
A
.LS
.T
GL=1FL-200

7500 5000 5000 10000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6850 6850 4300 6000
123500

U T S R Q P O N M L K J I H G F E D C B A EXPANDED METAL ON
ST. FRAME

1100
(GALVANIZED)

R
O
C
OFP
O
N
E
D
R
.C
IL
SECTION A 1 : 500

800

DETAIL - B 1 : 40

SECTION 1 A-06A
9

A
1

A L
KEYPLAN

D
B
C
A
N
O
RP
O
Y
:O
F ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/
BE
DR
IG
HI GUTTER FRP W=500, H=500-600 GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3
GUTTER FRP W=500, H=500-600
5.0=TD
E
C
K
TS
ELG
V
A
,L W/ DOWNSPOUT Ø200 + WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT
1 1 W/ DOWNSPOUT Ø200
30 W=650 30
4800 2400 40800 SLOPE SLOPE 60500 2500 5000 IE
P
-M
O
B
LO
C
W
K
C
R
A
LT/00H
1<
1FL+16471 H>1000 COOR COLOR COATED STEEL
2000

2000
1FL+14471 DECK H=30 T=0.4 + FRP WALL LIGHT

2000

1500
1FL+13000
571 2400

1FL+12071

2000
1FL+11000

2471
2000

1FL+10071 875 18600 875

1000
SAFETY SLING HOIST CRANE 30T
SAFETY SLING
EXPANDED METAL FLOOR EXPANDED METAL FLOOR

13000
12071

FOR MAINTENANCE FOR MAINTENANCE

11000

11000
10000

10000
10071
9500

1FL+4140
FACTORY AREA

8000
6000

347

FLOOR: EPOXY PAINT 300µ

5000
1500

4140
LL=2T/m²
1FL±0.00 FL±0.00=GL+200 1FL±0.00
200

200
GL=1FL-200 GL=1FL-200
BRC FENCE H=2000

24000 24000 24000 24000 20000


12000 116000

A E I M Q T
SECTION C 1 : 500

ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5


W/ GLASSWOOL INSULATION t=50 DENSITY 24
kg/m3 + WIREMESH + ALUMINUM FOIL ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/ ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5 W/
GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3
+ WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT + WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT
W=650 W=650
NGA
S
LH
FI
8500 13000 17000 13000 8500
IE
P
-M
O
B
LO
C
W
K
C
R
A
LT/00H
1<
1500 10000 1500 1500 10000 1500
H>1000 COOR COLOR COATED STEEL
DECK H=30 T=0.4 + FRP WALL LIGHT
2000

2000

1500
1FL+14071

550

2000
1FL+122071
AA
FS
C
I
COOR COLOR COATED ST. DECK H=30 t=0.4

1 CA
N
OR
P
O
Y
:O
F
30

14071
SLOPE BEDR
IG
HI
2600

1FL+5700 1500

12071
5.0=TD
E
C
KTS
ELGV
A
,L
1FL+4140
FACTORY AREA

6000
200 5700

FLOOR: EPOXY PAINT 300µ


CH=3000

4140
LL=2T/m²
1FL±0.00 OFFICE IN HOUSE 1FL±0.00
FL±0.00=GL+200

200
GL=1FL-200 GL=1FL-200
11850 3150
15000 10000 10000 10000 10000 10000 10000
IR
E
FW
P
-A
M
G
Lm
S
E
O
9/=m
NtC
S
B
75000 6000

1 2 3 4 5 6 7 8 9 10

SECTION D 1 : 500

SECTION 2 A-06B
QIBL
25°

AT
10

N
1

A U
KEYPLAN
C
B B
C A B
O A Q A L
A O
L
1FL+15357 B 1FL+15357
1FL+13757 1FL+13757

B B
D
C P
M M J
C D
J

1FL+5000

1FL±0.00 1FL±0.00

GL=1FL-200 H E F H GL=1FL-200
E E E E K H F
10 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 9 10

SOUTH ELEVATION 1 : 500 NORTH ELEVATION 1 : 400

B
A B
O C 1FL+15357
A
1FL+13757

J M
M
C J
D D D
A A
1FL+5000
LEGEND:
ROOF: HIGH RIBBED GALV. STEEL DECK t=0.5
1FL±0.00 1FL±0.00 A W/ GLASSWOOL INSULATION t=50 DENSITY 24 kg/m3 +
WIREMESH + ALUMINUM FOIL + FRP SKYLIGHT W=650
GL=1FL-200 GL=1FL-200
F E C E F H COOR COLOR COATED STEEL DECK
B
H=30 T=0.4 + FRP WALL LIGHT
U T R Q O M K I G E C A
C IEP-MW
O
B
LC
R
A
/K
TC
A
L
WEST ELEVATION 1 : 500

5.0=TD
E
C
KLTDG
TE
S V
,A
LB
E
DR
IG
HH
IC
A
N
O
PY
:R
O
O
F

S
O
PW/G
H IES
)TITRA E
M
I(R
FA
M
EE
S
LTD
O
N
O
RE
S
LT

F STEEL SHUTTER W/ SOP

A A ALUMINUM DOOR (POWDER COATING) W/ TINTED


C B C B B A A G GLASS t=8mm
TINTED GLASS t=6mm W/ ALUMINIUM FRAME FIN.
1FL+15357
N
H POWDER COATING
1FL+13757
I TINTED GLASS t=8mm W/ ALUMINIUM FRAME FIN.
M POWDER COATING (FOR BIG WINDOW)
J Q
M J J D
O
W
P
S
V
O
CW
PN
S
P
O
/U
T
D
K BRC FENCE H=2000

L W
05G
6=H
TIS
K
Y
LR
FP

MW
05G
6=H
TILW
LR
A
FP
1FL±0.00
N G
NC
O
S
ILG
M
O
P
A
N
Y
GL=1FL-200
E H I G
O EDZ)GVANLI(ADLERESLT
A B C D E F G H I J K L M N O P Q R S T U
PEDZ)GVANLI(RAISTNETANM
C
EA
I
EAST ELEVATION 1 : 500

E
D I( 002Q
Z)A
N
O
D x004E
ZS
I ELG
N
U
R
M
IA
LI

ELEVATION A-07
QIBL
25°

AT
1 2 3
NOTE :

N
ROOF
LOW RIBBED GALV. STEEL DECK T=0.5
1
(ROOF STR. LOAD CONSIDER SOLAR PANEL)

2 COOR. FRP WALL

3 BRC FENCE H=2000 LOCATION


GL
4 ST. COLUMN W/SOP E D C B A

WEST ELEVATION 1 : 200

KEYPLAN NTS

FLASHING FLASHING
1 2 2 1 1
ROOF
ROOF ROOF

4 2 2 4 2 4

2000
3 3

GL GL GL
1 2 2 1 A B C D E

NORTH ELEVATION 1 : 200 SOUTH ELEVATION 1 : 200 EAST ELEVATION 1 : 200

LOW RIBBED GALV. STEEL DECK T=0.5 LOW RIBBED GALV. STEEL DECK T=0.5 FLASHING LOW RIBBED GALV. STEEL DECK T=0.5 FLASHING
SLOPE (ROOF STR. LOAD CONSIDER SOLAR PANEL) SLOPE (ROOF STR. LOAD CONSIDER SOLAR PANEL) (ROOF STR. LOAD CONSIDER SOLAR PANEL)
1 1
ROOF 30 ROOF 30 ROOF
1000

1000
3250

3250
3000

3000

3000
2000

2000

MOTORCYCLE PARKING MOTORCYCLE PARKING


PEDESTRIAN 45 UNIT PEDESTRIAN EMPLOYEE DROP OFF
45 UNIT EMPLOYEE DROP OFF
GL GL GL

1700 6500 2700 1700 6500 2700 5900 5900 5900 13000
30700
2 1 2 1
A B C D E

SECTION A 1 : 200 SECTION B 1 : 200 SECTION C 1 : 200


1700

1700
A B
- -
2 2
36
EMPLOYEE DROP OFF

1 8 15 22 29 39 LOW RIBBED GALV. STEEL DECK T=0.5


6500

6500

(ROOF STR. LOAD CONSIDER SOLAR PANEL)


C

SLOPE
-
MOTORCYCLE PARKING

30
45 UNIT
4 11 18 25 32 42

1
1 1
7 14 21 28 35 45
2700

2700

5900 5900 5900 13000 5900 5900 5900 13000


30700 30700

A B C D E A B C D E

PLAN 1 : 200 ROOF PLAN 1 : 200

PARKING CANOPY 1 DETAIL A-08A


QIBL
13700 25°

AT
8000 5700
NOTE :

1 G
HIG
HSA
TE
L-VD
E.5LE=0C
.tK

N
4 GUTTER FRP W=300, H=300-400
W/ DOWNSPOUT Ø100 2 ALUM
-NU
IM
COMPOTPS
EAINFEALSA
CI

3 ALB
CLO
-CM
KORTAE
W
R
IP-/

LOW RIBBED 4 DO
ST.O-S
W
R
OP/
LOCATION
GALV. STEEL DECK t=0.5
8000

NTIEG
D
-L=A6m
StSm
OA
NLM.
5
POWDEC ROANTG
IW
ND
IOW
ACP FASCIA

SLOPE
6 CO-UNTETR
ABLE

30
1
7 SU
PG
TC
.YR
I-G
SEI"N
A
VT"E'IS
KEYPLAN NTS
16000

3
TOP ROOF 2 1 3 TOP ROOF 1 2 3
4300

1
SLOPE
30

5 4
2 LOW RIBBED 6
GALV. STEEL DECK t=0.5 6
3700

1FL±0.00
GUTTER FRP W=300, H=300-400
W/ DOWNSPOUT Ø100
1 GL GL
D C B A 1 2 3 4

8000 5700 8300 WEST ELEVATION 1 : 200 NORTH ELEVATION 1 : 200

22000

A B C D

ROOF PLAN 1 : 200 7

TOP ROOF 1 3 2 TOP ROOF 1 2 3

PT. SUGITY CREATIVES


13700 3025 5000
8000 5700
5 5
00
B
0
R3
-

4
1FL±0.00

GL GL
RAIN WATER STORAGE A B C D 4 3 2 1
5000

& TREATMENT
1FL±0.00=GL+200
EAST ELEVATION SOUTH ELEVATION
8000

8000

1 : 200 1 : 200
UNDERGROUND TANK
5.9m x 7.4m x 2m
(BY CIVIL)
GUTTER FRP W=300, H=300-400
W/ DOWNSPOUT Ø100
2500

ST.COLUMN:
COVER W/ ACP HIGH GALV. STEEL DECK t=0.5

HIGH GALV. STEEL DECK t=0.5


16000

TOP ROOF TOP ROOF SLOPE SLOPE


3 1 1
UNDERGROUND TANK
30 30
700

700
2000

MANAGER CAR 5.9m x 2m x 2m


400
2500

500
PARKING (BY CIVIL)
4300

CAP. 5 UNIT
CH=5000 CH=5000
2300

ALM. SPANDREL ALM. SPANDREL


6200

6200

5000
CEILING CEILING
2500

4800
5100

CH=3000 CH=3000 CH=3000 CH=3000


2
A
RAIN WATER STORAGE
- DRIVER ROOM GUARD HOUSE
DRIVER ROOM GUARD HOUSE & TREATMENT GUARD HOUSE
3700

3700

1FL±0.00 1FL±0.00 1FL±0.00


2500

1FL±0.00 1FL±0.00 1FL±0.00=GL+200 1FL±0.00

200
GL GL UNDERGROUND TANK
5.9m x 7.4m x 2m
1 (BY CIVIL)
5700 2300 1700 4000
8000 5700 8300
8000 2000 2300 3700
5700 2300 1700 4000 22000
16000
8000 5700 8300
22000 A B C D
4 3 2 1
A B C D SECTION A 1 : 200

SECTION B 1 : 200
PLAN 1 : 200

PARKING CANOPY 2,
A-08B
RAINWATER STORAGE, & GUARD HOUSE 1 DETAIL
FLASHING

QIBL
ROOF LOW RIBBED
GL+5200 GALV. STEEL DECK t=0.5 25°

AT
200

N
SLOPE
ROOF 1 PARKING MOLD

30
GL+3700

200
TANGKI
TSOP7 NAT

Wipping Booth
Oven Conveyer Drive
Storage Conveyer Drive

(Under oven Storage 43Unit)

Booth Conveyer Drive Earth check


Tour Space

4500

TP切替BOX 操作盤 TP切替BOX 操作盤 TP切替BOX 操作盤 TP切替BOX 操作盤


ステージ盤 情報 ステージ盤 情報 ステージ盤 情報 ステージ盤 情報
&TP &TP &TP &TP
5200
5000

5000
LOCATION

3700
3500
GL+150 GL+150
500

GL GL

KEYPLAN NTS

SECTION C 1 : 100

1000 8500 4700 2050 LOW RIBBED


SECURITY
OFFICE GALV. STEEL DECK t=0.5
GATE
1 2 3 1 OFFICE BUILDING
SLOPE
1
OFFICE OFFICE
ROOF 30
GL+5200
1 1
2050

2050
EMPLOYEE
ENTRANCE

3 3

4500
5200

5000
LOW RIBBED
GALV. STEEL DECK t=0.5
A

1
SLOPE
-

30
4700

4700

500
GL

AMBULANCE
PARKING AREA
2 2
3000

B C
SECTION B 1 : 100

LOW RIBBED
ROAD FLASHING GALV. STEEL DECK t=0.5
ACCESS ROOF
GL+3700

200
B
- LOW RIBBED
8500

8500

GALV. STEEL DECK t=0.5


SLOPE
ZEBRA

3000
1

3700
CROSS

3500
30

FROM
SECURITY GATE GL+150

500
GL GL

1 C 1 5000 3000
-
1000

A B C

SECTION A 1 : 100

PLAN 1 : 100
5000 3000 ROOF PLAN 1 : 100
3000

A B C A B

PARKING CANOPY 3 A-08C


QIBL
25°

AT
C

N
ROOF
SECURITY GATE B

400
D LOCATION

2500
GUTTER FRP W=200, H=100
GL+150
W/ DOWNSPOUT Ø100
KEYPLAN NTS
750

GL

2
1 2

30
1
ROOF: LOW RIBBED SOUTH ELEVATION 1 : 100

GALV. STEEL DECK t=0.5


4500

3000

A
1
30

1
ROOF
750

LEGEND :
GUTTER FRP W=200, H=100
W/ DOWNSPOUT Ø100 D B A ACP FASCIA

B ST. COLUMN COVER W/ ACP

2200 9000 750 C SECURITY GATE SIGN

11950
D BRC FENCE H=2000

A B GL+150

GL
ROOF PLAN 1 : 100

A B

WEST ELEVATION 1 : 100

BRC FENCE
H=2000 GATE FENCE
B
-
CANOPY LINE
750

CEILING: ACP ROOF: LOW RIBBED CEILING: ACP


2 ROOF: LOW RIBBED GALV. STEEL DECK t=0.5
GUTTER FRP
GALV. STEEL DECK t=0.5
SECURITY DOOR SLOPE W=200, H=100
1 W/ DOWNSPOUT Ø100
GL+3300 30
GL+3300

690

690
4500

3000

SECURITY GATE A
GL+150 -

BRC FENCE
H=2000
3300

3300
1

3000

3000
2900

2900
750

CANOPY LINE
SECURITY GATE SECURITY GATE
GATE FENCE GL+150 GL+150
GL+150 GL+150
150

150

150

150
GL GL

2200 9000 1000 2200 9000 750 750 3000 750

12200 11950 4500

A B A B 2 1
PLAN 1 : 100 SECTION A 1 : 100 SECTION B 1 : 100

SECURITY GATE DETAIL A-08D


QIBL
AT
25°

N
2 2
1FL+5690 1FL+5690

1
LOCATION
3 4 3 3 3 3 3 3
1 N
5

FL±0.00 FL±0.00 KEYPLAN NTS

GL GL

A B C D D C B A

EAST ELEVATION 1 : 200 WEST ELEVATION 1 : 200

GUTTER FRP W=300, H=300-400


W/ DS Ø100
600

3 2 2
1FL+5690 1FL+5690
NOTE :

LOW RIBBED 1 ALB


CLOCM
KORTAE
W
R
IP-/
4000

GALV. STEEL DECK GUTTER FRP W=300, H=300-400


t=0.5 W/ DS Ø100 1
2 FALS
UA
C
M
:N
IU
IM
COMPOTPS
EAINEL
SLOPE 30 3 3 3
1 4 ST. COLUMN COVERED W/
2 3
ROOF: LOW RIBBED ALUMINUM COMPOSITE PANEL
5

4500
2200

GALV. STEEL DECK t=0.5


NTIEG
DL=A6m
StSm
OANLM.
4
POWDEC ROA NTG
IW
ND
IOW
30 SLOPE FL±0.00 FL±0.00
1
1000

1 5 COUNTETR
ABLE
GL GL
ROOF: LOW RIBBED
6
GALV. STEEL DECK t=0.5
3800 8700 6000
3 2 1 1 2 3
600 18500 1000
SOUTH ELEVATION 1 : 200 NORTH ELEVATION 1 : 200

A B C D

ROOF PLAN 1 : 200

FASCIA: FASCIA:
A GUTTER FRP W=300, H=300-400 ALM. COMPOSITE ALM. COMPOSITE
- ROOF: LOW RIBBED ROOF: LOW RIBBED FASCIA:
W/ DS Ø100 PANEL PANEL
GALV. STEEL DECK t=0.5 GALV. STEEL DECK t=0.5 ALM. COMPOSITE
600

ROOF
3 ROOF SLOPE
1 1FL+5100 CEILING PANEL
1FL+4915

940

940
30 1FL+4850
2000
4000

GUARD
2000

HOUSE 2

4500

4500
5100
4915

4850
8000 1000 5000

5000

5000
FL±0.00
2 CH+2500
CANOPY
4200
2200

B
GUARD HOUSE FL±0.00 FL-50 GUARD FL±0.00 FL±0.00 GUARD
-

250

250
GL

500
HOUSE 2 HOUSE 2

100
250
300

1
1000

GL

2500 1300 8200 500 500 5000 500


2000 2000
3800 8700 6000
3800 8700 6000
600 4000 2200 1000
600 18500 1000
600 18500 1000
A B C D 3 2 1
A B C D
PLAN 1 : 200

SECTION A 1 : 200 SECTION B 1 : 200

GUARD HOUSE 2 DETAIL A-08E


LOCATION

QIBL
25°

AT
NOTE :

N
1 ROOF : LOW RIBBED GALV. STEEL DECK H=40 t=0.5

FASCIA + WALL :
2
LOW RIBBED GALV. STEEL DECK H=30 t=0.5

3 ALC BLOCK MORTAR W/ EP-II

4 ST. DOOR W/ SOP

5 PVC DOWNSPOUT Ø100 W/ SOP

FRP GUTTER
W=200 H=100 4
W/DOWNSPOUT Ø100 2 3 3 2 KEYPLAN NTS

2 ROOF ROOF
2500

SLOPE
ROOF : LOW RIBBED

30
GALV. STEEL DECK t=0.5

1
5
1

FL±0.00 FL±0.00

GL GL
6000 6000
12000 2 1 C B A
2
A B C SOUTH ELEVATION 1 : 100 5 WEST ELEVATION 1 : 100

3 1

ROOF PLAN 1 : 100

ROOF

A
FL±0.00
-
DOWNSPOUT Ø100 DOWNSPOUT Ø100 DOWNSPOUT Ø100
DRAIN PIT W=200 H=100
W/ STEEL GALV. GRATING GL

A B C
2 ROOF : LOW RIBBED
GALV. STEEL DECK t=0.5
FRP GUTTER EAST ELEVATION 1 : 100

RUBBISH SUMP PIT 500 x 500 W=200 H=100


2500

B W/DOWNSPOUT Ø100
- BIN SLOPE ROOF : LOW RIBBED
1 ROOF ROOF GALV. STEEL DECK t=0.5
FASCIA + WALL : 30
LOW RIBBED 1FL+3000 1FL+3000
GALV. STEEL DECK
H=30 t=0.5
1

3000

3000
RUBBISH RUBBISH
FL±0.00 FL±0.00
6000 6000 BIN BIN

300

300
12000
GL GL
A B C
PLAN 1 : 100

2500 6000 6000

2 1 A B C

SECTION A 1 : 100 SECTION B 1 : 100

RUBBISH BIN A-08F


QI

10

11
1

3
4

9
BL
AT
49500 163390 8000
15000 34500 75000 26000 60000 2390
CB (A1-0) CB (A2-2) CB (A2-0)
6850 50003150 10000 10000 10000 10000 10000 10000 CB (A6-0) BOUNDARYCBLINE (A7-0)
DR (A1-1) DR (A2-3) DR (A2-1) DR (A3-1)
DR (A4-1) DR (A5-1) DR (A6-1) (PC FENCE H=2500
DR (A7-1) +BARBED WIRE H=500)

GAS STATION
CB (A3-0)

GH 1

MRS
3x6
END A
DR (A16-3) DR (A13-3)
SET BACK LINE (6m)
21500

DR (B3-1) CB (A16-2)
DR (B10-1)
DR (B14-1)

CB (B15-0) CB (B17-0) CB (B20-2) CB (B20-0) CB (B21-4) CB (B21-2) CB (B22-4) CB (B22-2)

CYCLE 1

CYCLE 1
CB (B4-2) CB (B4-0) DR (A16-1) DR (A13-1)

PALLET

PALLET
EMPTY

EMPTY
CYCLE 2

CYCLE 2
DR (B4-3) DR (B4-1) CB (B11-0) DR (B15-1) DR (B17-1) DR (B20-3) DR (B20-1) DR (B21-5) DR (B21-3) DR (B21-1) DR (B22-5) DR (B22-3) DR (B22-1)
END B
CB (A16-0)
A

LOCKER (F)
(M) 87 21
DR (B1-1) CB (B1-0) DR (B11-1) DR (B16-1)

CLINIC

Toilet (M)
DR (B5-1) DR (B12-5) CB (B16-0)

LOCKER
Motorcycle Parking
CB (B6-0) DR (B18-3)

CHILD PARTS STORE


Security gate
DR (A17-5)
B

DR (B6-1) CB (B12-4)

27
26
45 unit

Future

TAKAGI S/A
DR (B7-7)

1
DR (B12-3)
24000

25
C

Oven Conveyer Drive


CB (B7-6) CB (B12-2) CB (B18-2)
Ablution

24
CB (A17-4)

MATERIAL
STORAGE

PAINTING
DR (A14-1)

110 PERSON

23
DR (B7-5)

Booth Conveyer Drive


MOSQUE
D

1858.1

DR (B18-1)

8
22
CB (B7-4) DR (B12-1) DR (A17-3)

21
ステージ盤
&TP
TP切替BOX
Thin

10
Motorcycle Parking

操作盤
情報

20
E

CB (B18-0) CB (A17-2)

Clear1

BUMPER TAKAGI & SUB ASSY


Employee Car Parking Area

PUNCH
19
SC MART
45 unit

DR (B7-3)

Clear2

54
18

(606.3 m 2 )
Hardner1

17
DRYER for
TANK for
CLEAR

CLEAR
F

DR (B19-5) DR (A17-1)

Hardner2

DRYER for
TANK for
25 unit

BASE-2

BASE-2
DR (B2-1)

B1
24000

50
CB (B7-2)

Storage Conveyer Drive


B2
Painting Circulation Room

60
CANTEEN
G

CB (B19-4) CB (A17-0)

B3

(Under oven Storage 43Unit)

FACTORY AREA
16
ステージ盤
B4
BOUNDARY LINE (BRC FENCE H=2000)

FL±0.00=GL+200
&TP
TP切替BOX

PC FENCE H=2500 +BARBED WIRE H=500


DR (B13-1)

20
Employee

WIP & BCP


drop off

B5 B6

(630 pcs )
6 HOURS
DR (B7-1)

操作盤
DR (A15-1)

情報
H

DR (B19-3) DR (A18-5)

LL=2T/M2
15

Tour Space
B7 B8

65

Color Check
14
SET BACK LINE (15m)

SET BACK LINE (8m)


B9 B 10

Un-Masking +
WASHING AREA QUALITY

Cleaning OS

(FUTURE EXTENSION)
13
CB (B19-2) CB (A18-4)
I

B11 B12
MAIN ROAD

ステージ盤
&TP
CB (B7-0)

TP切替BOX
CANTEEN

Appearance

BOUNDARY LINE
Check FR
B13 B14

40
MGR

操作盤
DR (B19-1)

情報
DR (B8-1)

12
余余余余

Appearance
Check RR
DR (A18-3)
J

11

205,000Unit/Y
For solvent
Guest Car Parking Area

PEAK PEAK PEAK

CHILD PART
8 HOURS
(325 m2)
30
10

Un-Loading
POINT POINT
P1

Polish +
POINT
24000

DR (C24-1)

DRYER for
TANK for
BASE-1

BASE-1
P2
ROOM
123500

Un-Loading
Polish +

OK Parts
DRYER for
TANK for
10 unit

PRIMER

PRIMER
K

CB (C24-2) CB (A18-2)

Force
Task
P3

33

Repair
Parts
DR (B9-1)

Earth check

Skid Repair
PEAK

Setting
Jig
7
POINT
OHBEYA

Waste Room

DR (A18-1)
500

6
L

DR (C24-3)
ROOM

ステージ盤
&TP
TP切替BOX
Liquid

Jig Storage
CB (A18-0)
廃廃

操作盤

loading
情報

TOUCH UP
5

DR (C34-1)

(60 m2)
STORE
M

CB (C18-0)

SPD
CB (C24-4)

Toilet
PEAK


4

(M) Toilet
PEAK POINT DR (C14-1)
Pokayoke camera

POINT
CONVEYOR

CONVEYOR
DRYER for
TANK for

DR (C18-1)

(F)
UP +1115mm
Air Blow
2

Wipping Booth
DR (C24-5)
OFFICE
N

OASIS
CB (C18-2)
24000

INHOUSE CLEANING JIG


CB (C29-0) CB (C30-0)

D26A STORE 8 HOURS


CB (C23-0)
O

Future Car Parking

INPANEL
(236 m2)
DR (C30-1) DR (C18-3)
Server
Room Pantry


ATTACK CENTER
20 unit

Parking

CB (C18-4)
Guest

Toilet
VIP

Car

DR (C31-1)
(M)

DR (C37-1) DR (C23-1)
P

CB (C31-0) DR (C18-5)
LOBBY
Q

DR (C32-3) CB (C23-2)

SPARE PARTS
Meeting Room

CB (C17-0)

AREA

MOLD
SPARE PARTS AREA
UTILITY AND

DR (C17-1)

MOLD MAINTENANCE AREA


Flag
pole

DR (C29-1) DR (C13-1)
5

CB (C32-2) DR (C23-3)
HOIST CRANE 30T

CB (C17-2)
CB (C12-0)
20000

PARKING MOLD

DR (C32-1)
R

CB (C23-4)
Toilet (M)

DR (C12-1)
(F)

DRYER for
Ⓡ & S/ A
TANK for

Ⓡ & S/ A

DR (C17-3)
COMPRESSOR AREA

DR (C23-5) CB (C12-2)
Meeting

Toilet
Room

CB (C32-0)
Parking

Meeting Room
S

1
MGR

CB (C23-5A)
Car

RAIN WATER
DR (C36-1) CB (C17-4)

RUBBISH BIN
STORAGE & DR (C23-5A)
DR (C33-1)
4

CB (C28-0) TREATMENT
CRUSHING

DR (C12-3)
RAINWATER STO

ELECTRICAL
T

CB (C23-6)
SILO VACUUM
DRYER

DRYER

MB

MB

CB (C35-0)
500Kg

500Kg

ROOM
Meeting Room

PH CONTROL

SYSTEM
& TREATMENT

DR (C17-5) DRAIN SPLIT LOCATION


CHILLER &
7500

Meeting

ROOM

COOLING

TSOP7 NAT

ROOM
TANGKI
TOWER,
Room

CB (C36-0) CB (C19-0)
GH 2

DR (C23-7)
3

ROOM
PUMP
25 0 0 K V A

25 0 0 K V A

CB (C21-0)
TR A FO 2

TR A FO 1

EMPTY

EMPTY

EMPTY

EMPTY

EMPTY

EMPTY

IN CB (C15-0) CB (C12-4) TYPE 1 (CB GRATING COVER)


U

DR (C35-1) OVERFLOW
DR (C12-5)
DR (C20-1) DR (C21-1) DR (C22-1) DR (C25-1) DR (C26-5) DR (C26-3) DR (C26-1) DR (C27-5) DR (C27-3) DR (C27-1) DR (C15-1) CB (C12-6)
12370

DR (C28-1) DR (C19-1)
CB (C20-0)
CB (C22-0) CB (C25-0) CB (C26-4) CB (C26-2) SET BACK LINE
CB (C26-0) (6m)
CB (C27-4) CB (C27-2) CB (C27-0) TYPE 2 (CB OPEN)
DR (C12-7)
PLN
3x4

END C DR (C4-1) DR (C5-1) DR (C6-1) DR (C7-1)


TYPE 4 (CB CONCRETE COVER)
CB (C3-0) CB (C6-0) CB (C7-0)
BOUNDARY LINE
DR (C1-1) DR (C2-1) DR (C3-1) (PC FENCE H=2500 + BARBED WIRE H=500)
TYPE 5 (DR GRATING)
CB (C1-0) CB (C2-0)
TYPE 6 (DR UDITCH CONCRETE COVER)

TYPE 7 (DR BOX CULVERT)


REFERENCE LEVEL ◬ GL±0.00
DR/CB KEYPLAN NAME TYPE 8 (DR U DITCH OPEN)

DRAINAGE KEYPLAN A-09A


CB TYPE 1 (CATCH BASIN W/ STEEL GRATING) CB TYPE 2 (OPEN BASIN) CB TYPE 4 (CATCH BASIN CONCRETE COVER)
OPEN
STEEL GRATING COVER TOP OF GROUND NO COVER CONCRETE COVER
TOP OF GROUND
HEAVY DUTY (AT ROAD)
TOP OF GROUND

(350)
(300)

d
d d

(200)
(200) (200)
"
" " W " " SIZE
" W " " W " CODE d (FROM
W
REF LEVEL)
CB (C20-0) 800 1190
CB (C21-0) 700 1140
SIZE SIZE SIZE SIZE SIZE SIZE CB (C22-0) 700 1095
CODE d (FROM CODE d (FROM CODE d (FROM CODE d (FROM CODE d (FROM CODE d (FROM CB (C23-0) 300 862
W W W W W W
REF LEVEL) REF LEVEL) REF LEVEL) REF LEVEL) REF LEVEL) REF LEVEL) CB (C23-2) 300 882
CB (A16-2) 300 750 CB (A1-0) 1000 1345 CB (B12-2) 300 602 CB (C31-0) 300 744 CB (A16-0) 300 791 CB (B20-0) 600 935 CB (C23-4) 300 902
CB (B16-0) 300 646 CB (A2-0) 1000 1302 CB (B12-4) 300 610 CB (C32-0) 300 581 CB (A17-0) 300 713 CB (B20-2) 600 951 CB (C23-5A) 300 910
CB (C32-2) 300 655 CB (A2-2) 1000 1300 CB (C1-0) 1000 1245 CB (C35-0) 300 731 CB (A17-2) 300 737 CB (B21-0) 600 870 CB (C23-6) 300 922
CB (A3-0) 1000 1245 CB (C2-0) 1000 1185 CB (C36-0) 300 559 CB (A17-4) 300 761 CB (B21-2) 600 890 CB (C24-2) 300 628
CB (A6-0) 700 962 CB (C3-0) 1000 1198 CB (A18-0) 300 614 CB (B21-4) 600 910 CB (C24-4) 300 652
CB (A7-0) 700 882 CB (C6-0) 800 904 CB (A18-2) 300 637 CB (B22-2) 400 791 CB (C25-0) 700 1035
CB (A9-0) 600 659 CB (C7-0) 700 908 CB (A18-4) 300 661 CB (B22-4) 400 811 CB (C26-0) 600 970
CB (B1-0) 700 1110 CB (C9-0) 600 709 CB (B4-2) 700 1070 CB (C15-0) 300 706 CB (C26-0) 600 970
CB (B4-0) 700 1070 CB (C12-0) 500 787 CB (B15-0) 600 1027 CB (C17-0) 300 700 CB (C26-0) 600 970
CB (B6-0) 300 648 CB (C12-2) 500 787 CB (B17-0) 600 969 CB (C17-2) 300 700 CB (C26-2) 600 990
CB (B7-0) 300 557 CB (C12-4) 500 787 CB (B18-0) 300 825 CB (C17-4) 300 701 CB (C26-4) 600 1010
CB (B7-2) 300 589 CB (C12-6) 500 787 CB (B18-2) 300 849 CB (C18-0) 300 625 CB (C27-0) 500 770
CB (B7-4) 300 619 CB (C28-0) 300 879 CB (B19-2) 300 633 CB (C18-2) 300 642 CB (C27-2) 500 790
CB (B7-6) 300 634 CB (C29-0) 300 822 CB (B19-4) 300 651 CB (C18-4) 300 658 CB (C27-4) 500 810
CB (B11-0) 700 989 CB (C30-0) 300 798 CB (B19-6) 300 669 CB (C19-0) 800 1232

DR TYPE 5 (DR GRATING) DR TYPE 6 (DR CONCRETE COVER) DR TYPE 7 (DR BOX CULVERT) DR TYPE 8 (DR U DITCH OPEN)

CULVERT w/ STEEL GRATING U DITCH w/ BOX CULVERT


TOP OF GROUND
U DITCH
HEAVY DUTY(AT ROAD) TOP OF GROUND CONCRETE COVER TOP OF GROUND UNDER ROAD/GROUND TOP OF GROUND

(300)
(300) (350)

d d d
d

" " "


"
" W " " W " " W "
" W "

SIZE SIZE SIZE SIZE SIZE SIZE SIZE


CODE d (FROM CODE d (FROM REF CODE d (FROM REF CODE d (FROM REF CODE d (FROM CODE d (FROM CODE d (FROM
W W W W W W W
REF LEVEL) LEVEL) LEVEL) LEVEL) REF LEVEL) REF LEVEL) REF LEVEL)
DR (B3-1) 300 434~465 DR (B7-7) 300 434~442 DR (A16-1) 300 591~550 DR (C18-3) 300 442~458 DR (A1-1) 1000 1145~1155 DR (B12-1) 300 374~402 DR (C36-1) 300 359~340
DR (C35-1) 300 531~569 DR (B12-3) 300 402~410 DR (A16-3) 300 550~508 DR (C18-5) 300 458~475 DR (A2-1) 1000 1102~1100 DR (B12-5) 300 410~426 DR (C37-1) 300 248~353
DR (B18-1) 300 625~649 DR (A17-1) 300 513~537 DR (C19-1) 800 1032~968 DR (A2-3) 1000 1100~1098 DR (B13-1) 300 269~330
DR (B18-3) 300 649~675 DR (A17-3) 300 537~561 DR (C20-1) 800 990~1011 DR (A3-1) 1000 1045~1055 DR (B14-1) 300 295~305
DR (B19-1) 300 418~433 DR (A17-5) 300 561~587 DR (C21-1) 700 940~960 DR (A4-1) 900 970~1030 DR (B17-1) 600 769~731
DR (B19-3) 300 433~451 DR (A18-1) 300 414~437 DR (C23-3) 300 682~702 DR (A5-1) 800 862~938 DR (C1-1) 1000 1045~1055
DR (B19-5) 300 451~481 DR (A18-3) 300 437~461 DR (C26-1) 600 770~790 DR (A6-1) 700 762~838 DR (C2-1) 1000 985~1015
DR (B19-7) 300 469~481 DR (A18-5) 300 461~485 DR (C26-3) 600 790~810 DR (A7-1) 700 682~718 DR (C3-1) 1000 998~941
DR (B20-1) 600 735~751 DR (B4-1) 700 870~870 DR (C26-5) 600 810~830 DR (A13-1) 500 530~551 DR (C4-1) 900 914~965
DR (B20-3) 600 751~767 DR (B4-3) 700 870~871 DR (C27-1) 500 570~590 DR (A13-3) 500 551~570 DR (C5-1) 900 794~886
DR (C22-1) 700 895~906 DR (B15-1) 600 827~773 DR (C27-3) 500 590~610 DR (A14-1) 400 472~528 DR (C6-1) 800 704~777
DR (C23-1) 300 662~682 DR (B16-1) 300 446~454 DR (C27-5) 500 610~630 DR (A15-1) 400 322~377 DR (C7-1) 700 708~703
DR (C23-5) 300 702~710 DR (B21-1) 600 670~690 DR (C28-1) 300 679~720 DR (B1-1) 700 910~890 DR (C12-1) 500 572~585
DR (C23-5A) 300 710~722 DR (B21-3) 600 690~710 DR (C32-1) 300 381~455 DR (B2-1) 300 235~365 DR (C12-3) 500 627~585
DR (C23-7) 300 722~739 DR (B21-5) 600 710~730 DR (C32-3) 300 455~529 DR (B5-1) 300 512~527 DR (C12-5) 500 627~613
DR (C24-1) 300 420~428 DR (B22-1) 400 570~591 DR (B6-1) 300 448~471 DR (C12-7) 500 627~644
DR (C24-3) 300 428~452 DR (B22-3) 400 591~611 DR (B7-1) 300 357~389 DR (C13-1) 500 473~527
DR (C24-5) 300 452~480 DR (B22-5) 400 611~631 DR (B7-3) 300 389~419 DR (C14-1) 400 364~436
DR (C25-1) 700 835~867 DR (C15-1) 300 506~494 DR (B7-5) 300 419~434 DR (C29-1) 300 622~679
DR (C17-1) 300 500~500 DR (B8-1) 300 358~343 DR (C30-1) 300 598~601
DR (C17-3) 300 500~501 DR (B9-1) 300 275~325 DR (C31-1) 300 544~555
DR (C17-5) 300 501~501 DR (B10-1) 300 293~306 DR (C33-1) 300 289~311
DR (C18-1) 300 425~442 DR (B11-1) 700 789~851 DR (C34-1) 300 269~330

DRAINAGE LIST A-09B


QIB
25°

NL AT
7500 72000 24000 20000 7500
6000 12000 6000 4000 3500 8000
13700
5700
3025 5000

0 SD

RAIN WATER
00

TREATMENT
STORAGE &
R3
PC-04
SUMP PIT 500 x 500
6000

AW AW
12000

5000
1-009 1-010

8000

8000
11

TOILET (M)

2500
TOILET (F)
AW AW SAT SAT AW SAT AW SAT AW AW SAT AW SAT AW AW
STD SD STD SD STD SD STD SD STD SD SD STD
6000

6000
SD SD

16000
1-003 1-004 S1-06 1-009 S1-07 1-010 1-005 S1-08 1-011 1-006 S1-09 1-012 1-007 1-008 S1-10 1-013 1-011 1-014 S1-11 1-012 1-013
CLEANING JIG PC-01 PC-02

2000
DRIVER ROOM

2500
INHOUSE AW

4300
AW WD PC-01

2300
10 PC-07 PC-03

2500
SAT
SD AW
SD SD SD GUARD HOUSE
1-008 STD PC-06
1-055 1-054 1-053

3700

3700
2500
S1-12 GH TOILET
PUMP ROOM
10000

10000
AW AW AW AW
STD
PC-05 PC-04 PC-03 PC-02
S1-05
CHILD PARTS STORE MOLD
5700 2300 1700 4000
SPARE PARTS CRUSHING 8000 5700 8300
ROOM 22000
AREA
BUMPER TAKAGI & SUB ASSY Ⓡ

9 2
(606.3 m ) CHILD PART INPANEL
8 HOURS
(325 m2)
SPD
STORE
D26A STORE 8 HOURS PARKING CANOPY
AW (236 m2)
(60 m2) SILO VACUUM
1-002 ROOM
10000

10000
CYCLE 1 CYCLE 2
TAKAGI S/A MOLD MAINTENANCE AREA

AW
1-001
SD

40000
1-052
8 SAT
SD PARKING MOLD

600
STD AW
1-007 AW
S1-13 GH-04
EMPTY 1-039
PALLET
10000

10000

2000
STD

GH TOILET
S1-04 Task
Force OASIS SD

4000
PUNCH AW
SAT GH-01
WIP & BCP TOUCH UP 1-040 SD STD
EMPTY 6 HOURS 1-015 S1-14 WD

2000
PALLET
(630 pcs ) Repair
GH-02
7 OK Parts
Parts

EMPTY

EMPTY AW AW AW
MB

MB
EMPTY 1-015 GH-02 GUARD HOUSE GH-03
10000

CYCLE 1 CYCLE 2

10000
EMPTY

2200
STD DRYER
500Kg
S1-03 EMPTY
75000

Skid Repair DRYER EMPTY


AW AW
SAT
Color Check Un-Masking +
Cleaning OS
Appearance
Check FR
Appearance
Check RR
Polish +
Un-Loading FACTORY AREA
Polish +
Un-Loading
Setting
Jig
loading
500Kg
GH-01
SD 1-016

1000
Wipping Booth
1-006
6 SAT
8 60 65

SD Oven Conveyer Drive


Storage Conveyer Drive
1-005 For solvent
205,000Unit/Y BRC BRC FENCE H=2000 1500
Jig Storage 1-016
COOLING 2500
10000

10000
1 54 50 40

STD 10 TOWER
(Under oven Storage 43Unit)
S1-02 UP +1115mm
CHILLER & PH
CONTROL 600
27 20 30 33 1

Air Blow

Booth Conveyer Drive Earth check GUARD HOUSE


1858.1

5 Tour Space
2

TR AF O 1
25 00 KV A

STD 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3
10000

10000
500
S1-01 Pokayoke camera
DRYER for
Ⓡ & S/A
TR AF O 2

ELECTRICAL
25 00 KV A

ATTACK CENTER SD
TANK for

SD AW AW UTILITY AND
Ⓡ & S/A

1-028 COMPRESSOR AREA ROOM SAT


SD SD 1-046 SD
DRYER for
CLEAR
DRYER for
BASE-2
DRYER for
BASE-1
DRYER for
PRIMER
SD 1-060
DRYER for
CONVEYOR
1-059 SPARE PARTS AREA FSD
AG SAT TP切替BOX
操作盤
TP切替BOX
操作盤
TP切替BOX
操作盤
TP切替BOX
操作盤

1-050 PANTRY WD SD 1-017 MAINTENANCE M/E STAIR


FSD
ステージ盤 ステージ盤 ステージ盤 ステージ盤

1-044 1-045 1-047


&TP &TP &TP &TP
情報 情報 情報 情報

SD TANK for TANK for TANK for TANK for TANK for

1-027 1-056 FL+3240 TOILET (F) TOILET (M)


SERVER ROOM
CLEAR BASE-2 BASE-1 PRIMER CONVEYOR

G1-01
1-004 1-051 (ST. GALV) W=700
4 TOILET (F) PAINTING PAINTING
3150

AW SD SD MEETING MEETING MEETING


MATERIAL CIRCULATION 廃廃
FSD
TOILET (M) B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 余余余余 P1 P2 P3 1-049 PFSD PANIC FIRE STEEL DOOR FSTD

6000
Thin Clear1 Clear2 Hardner1 Hardner2
1-036 STORAGE 1-048 ROOM 1-030 ROOM 5 ROOM 4 ROOM 3 AW FIRE STEEL SHUTTER
3 SD SD SD
2000

SAT AW SAT SAT SAT


SD SD WD WD WD 1-017
CORRIDOR 1-040 1-039 1-037 TOILET (M)
1-037
5000

1-003 1-031 WD 1-025 1-022 1-021


SD SD FSD FIRE STEEL DOOR STD
1-026 STEEL SHUTTER

2000
WD 1-035 1-034 SAT
AW LOCKER (M) SD SD SD AD WD WD SD
6000

WD

15000
1-043 1-036 OFFICE 1-029 1-024 1-018
1-032 1-023
2 1-035 LOCKER (F) 1-038 1-033
SAT SD QSH
ABLUTION

SAT STEEL DOOR


WD
MOSQUE SC MART
WASHING AREA WD WD QUICK SHUTTER
1-042 CANTEEN QUALITY ROOM OHBEYA ROOM 1-020 1-019

7000
6850

AW
LOBBY
MGR CANTEEN 1-018
3850

WD MEETING MEETING LSD


ROOM 1 ROOM 2 LIGHT STEEL DOOR OHD OVERHEAD SHUTTER
CLINIC 1-041

1
4700 2050

SAT SSD STAINLESS STEEL DOOR ACW ALUMINUM CURTAIN WALL


SD
AD

6800
1-002
AW AW AW AW AW ACW AW AW AW

4500
AW AW AW AW AW AW AW AW AW AW AW AW AW AW 1-001 AW
1-058 1-057 1-056 1-055 1-054 1-053 1-052 1-051 1-050 1-049 1-029 1-028 1-048 1-047 1-046 1-045 1-044 1-043 1-042 1-022 1-041 1-021 1-020 1-019
SWD STEEL WOODEN DOOR AW ALUMINUM WINDOW

WD WOODEN DOOR SSW STAINLESS STEEL WINDOW


7650 2400 13950 3700 20300 8100 7600 8300 14300 9700 2500 5000 2500 5000 5000
AD ALUMINUM DOOR AG
6000 4300 6850 6850 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 10000 10000 ALUMINUM LOUVER
24000 24000 24000 24000 20000 7500
PVC PVC DOOR M = MAGNET SENSOR
12000 123500 C = CARD LOCK
A B C D E F G H I J K L M N O P Q R S T E = ELECTRIC LOOCK
BRC BRC FENCE DOOR F = FINGER PRINT ACCESS
A = AUTOMATIC DOOR
L = LATTICE
SF STEEL FRAME H = HOTEL LOCK

1FL DOOR WINDOW KEYPLAN A-100


INTERNAL SIZE OF DOOR
MARK ROOM NAME FRAME FRAME DOOR GLASS GRILL DOOR SILL LOCK KEY HANDLE HINGE

MASTER KEY GROUP

DOOR CLOSER TYPE


DIMENSION

TYPE(FROM ROOM)
SAME KEY GROUP
SUB PANEL WxH

MEETING STILE
TYPE OF DOOR

CLEAR HEIGHT

LOCKING TYPE

DOOR STOPER
GLASS BEAD
CLEAR WITH

THICKNESS

SILL TYPE
HEIGHT

HEIGHT
DEPTH

WIDTH

WIDTH
MATERIAL & DOOR OPENING MATERIAL & MATERIAL & MATERIAL & LOCKING SECURITY MATERIAL & MATERIAL &

TYPE

TYPE
UNIT

W1

W2

H1

H2
LEVEL TYPE NO FROM ROOM TO ROOM FINISHING TYPE FINISHING MATERIAL FINISHING FINISHING OPERATION REQUIRMENT FINSIHING TYPE SIZE & QTY REMARKS

D
1FL ±0.00 STD S1-01 10A FACTORY AREA EXTERIOR 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-02 10A FACTORY AREA EXTERIOR 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-03 10A EXTERIOR FACTORY AREA 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-04 10A EXTERIOR FACTORY AREA 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-05 10A EXTERIOR FACTORY AREA 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-06 10A FACTORY AREA EXTERIOR 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-07 10A FACTORY AREA EXTERIOR 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-08 10A EXTERIOR FACTORY AREA 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-09 10A EXTERIOR FACTORY AREA 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-10 10A FACTORY AREA INHOUSE 1 5000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-11 10A EXTERIOR FACTORY AREA 1 4000 - 5000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-12 10A EXTERIOR PUMP ROOM 1 4000 - 4000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-13 10A EXTERIOR SILO VACUUM ROOM 1 3000 - 3000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 STD S1-14 10A EXTERIOR FACTORY AREA 1 5000 - 4000 - - - - - - - STL,PL,1.2mm/SOP - - - - - - - G SS/HL NO LOCK SH KEY - - - - - No AUTOMATIC OPERATION

1FL ±0.00 AD 1-001 3C LOBBY EXTERIOR 1 2000 - 2100 50 - 50 - 100 D AL. POWDER AL. POWDER 40 E SG + ASF 8 2000 1900 A C SS/HL THUMB-KEY D SS/HL PULL-PULL SS/FLOOR HINGE 2 SETS PARALLEL No FLUSH BOLT, SEMI AIRTIGHT
COATING COATING
1FL ±0.00 SD 1-002 4C CORRIDOR EXTERIOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 E SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS PARALLEL No FLUSH BOLT, SEMI AIRTIGHT

1FL ±0.00 SD 1-003 4C EXTERIOR CORRIDOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 E SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS PARALLEL No FLUSH BOLT, SEMI AIRTIGHT

1FL ±0.00 SD 1-004 4D FACTORY AREA EXTERIOR 1 1200 - 2100 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY D SS/HL PULL - PULL HANGER - SEMI AUTO No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-005 4A EXTERIOR FACTORY AREA 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-006 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-007 4A EXTERIOR FACTORY AREA 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-008 4A EXTERIOR FACTORY AREA 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-009 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-010 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-011 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-012 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-013 4A FACTORY AREA INHOUSE 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-014 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 SD 1-015 4A FACTORY AREA EXTERIOR 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT

1FL ±0.00 BRC 1-016 9C EXTERIOR EXTERIOR 1 2000 - 2000 25 15 25 15 100 C STL,PL,1.6mm/SOP STL,PL,1.6mm/SOP 40 - - - - - - E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS - No -

1FL ±0.00 FSD 1-017 1C EXTERIOR ELECTRICAL ROOM 1 2000 - 2500 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.6mm/SOP 40 E - - - - - E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS PARALLEL No AUTO FLUSH BOLT, DOOR SELECTOR, SEMI
AIRTIGHT, 90 MINUTES FIRE RATED
1FL ±0.00 SD 1-018 4C LOBBY EXTERIOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 E SG 5 150 900 A E SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS PARALLEL No FLUSH BOLT, SEMI AIRTIGHT

1FL ±0.00 WD 1-019 4A MEETING ROOM 2 LOBBY 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - SG 5 150 900 A F SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -, SEMI AIR TIGHT

1FL ±0.00 WD 1-020 4A LOBBY MEETING ROOM 1 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - SG 5 150 900 A F SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -, SEMI AIR TIGHT

1FL ±0.00 WD 1-021 4A LOBBY MEETING ROOM 3 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - SG 5 150 900 A F SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -, SEMI AIR TIGHT

1FL ±0.00 WD 1-022 4A LOBBY MEETING ROOM 4 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - SG 5 150 900 A F SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -, SEMI AIR TIGHT

1FL ±0.00 WD 1-023 1A LOBBY TOILET (M) 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 WD 1-024 1A LOBBY TOILET (F) 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 WD 1-025 4A LOBBY MEETING ROOM 5 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - SG 5 150 900 A F SS/HL LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -, SEMI AIR TIGHT

1FL ±0.00 WD 1-026 1A LOBBY TOILET (M) 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 WD 1-027 1A LOBBY PANTRY 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - - - LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

INTERNAL SIZE OF DOOR FRAME DOOR OPEN TYPE DOOR FRAME TYPE WINDOW JAMB TYPE DOOR SILL TYPE MEETING STILE TYPE GLASING LOUVER TYPE LOCKING OPERATION AND LOCKING TYPE HANDLE TYPE DOOR CLOSER ABBREVIATION
BEAD
INTERNAL EXTERNAL

SINGLE DOOR A B C A B C A B C A B A B C LOCK CYLINDER K : KEY IN KNOB LOCK WITH DOOR KNOB PULL LOCK SD : STEEL DOOR STD : STEEL SHUTTER AW : ALUMINIUM WINDOW SG : CLEAR/ FLOAT GLASS STL : STEEL
W1W2 CASEMENT DOOR
A
30mm
(KEY HOLE) DEAD BOLT AD : ALUMUNIUM DOOR RRD : RAPID ROLLING DOOR ACW : ALUMINIUM CURTAIN WALL SWG : CLEAR WIRED GLASS AL : ALUMINIUM
LEVER HANDLE MORTISE HANDLE SND : STEEL NET DOOR OHD : OVERHEAD SHUTTER AG : ALUMINIUM GRILL FG : FIGURED/ FROSTED GLASS PL : PLATE
H1 UNDER CUT LOCK CYLINDER M : MOSTISE LOCK PARALLEL
10

SWING DOOR SLD : SLIDING DOOR QSH : QUICK SHUTTER SSW : STAINLESS STEEL WINDOW LNG : LAMINATED GLASS HL : HAIR LINE (FINISH)
H2 D E F WINDOW SILL TYPE D E F C D B D E F
(THUMB TURN) D : DEAD BOLT ASD : AUTO SLIDING DOOR PSD : PANIC STEEL DOOR HG : HEAT ABSORBING GLASS MR : MIRROR (FINISH)
D H REVOLVING DOOR
NO LOCK MOSTISE LOCK
PUSH PLATE NO HANDLE
A B C HD : HANGING DOOR FSD : FIRE STEEL DOOR RG : REFLECTIVE GLASS ASF : ANTI SHATTERED FILM
W
10

(DOOR HEIGHT) SLIDING DOOR R : RIM LOCK DOOR PULL PANIC HANDLE STANDARD FD : FOLDING DOOR PFSD : PANIC FIRE STEEL DOOR TG : TINTED GLASS
(DOOR WIDTH) SHUTTER ND : STEEL NET DOOR FSTD : FIRE STEEL SHUTTER TPG : TEMPERED GLASS SOP : SYNTHESIS RESIN OIL PAINT
h G D E G H E F C G H I NOTE : LOCKING OPERATION " KEY - THUMB " NOTE : HANDLE TYPE " LEVER - LEVER "
PAD : PANIC ALUMINUM DOOR CSG : CHEMICALLY STRENGTHENED GLASS CLQ : CLEAR LACQUER PAINT
OPENING
"FROM ROOM" LOCKING OPERATION IS "KEY", "FROM ROOM" HANDLE TYPE IS "LEVER", FRG : FIRE RATED GLASS OS : OIL STAIN PAINT
FOLDING AND "TO ROOM" LOCKING OPERATION IS "THUMB" AND "TO ROOM" HANDLE TYPE IS "LEVER"
OFG : OBSECURE FILM GLASS

DOOR LIST-1 A-101


INTERNAL SIZE OF DOOR
MARK ROOM NAME FRAME FRAME DOOR GLASS GRILL DOOR SILL LOCK KEY HANDLE HINGE

MASTER KEY GROUP

DOOR CLOSER TYPE


DIMENSION

TYPE(FROM ROOM)
SAME KEY GROUP
SUB PANEL WxH

MEETING STILE
TYPE OF DOOR

CLEAR HEIGHT

LOCKING TYPE

DOOR STOPER
GLASS BEAD
CLEAR WITH

THICKNESS

SILL TYPE
HEIGHT

HEIGHT
DEPTH

WIDTH

WIDTH
MATERIAL & DOOR OPENING MATERIAL & MATERIAL & MATERIAL & LOCKING SECURITY MATERIAL & MATERIAL &

TYPE

TYPE
UNIT

W1

W2

H1

H2
LEVEL TYPE NO FROM ROOM TO ROOM FINISHING TYPE FINISHING MATERIAL FINISHING FINISHING OPERATION REQUIRMENT FINSIHING TYPE SIZE & QTY REMARKS

D
1FL ±0.00 SD 1-028 4A FACTORY AREA LOBBY 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A - - LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS PARALLEL Yes -

1FL ±0.00 AD 1-029 3C OFFICE LOBBY 1 1600 - 2100 50 - 50 - 100 D AL. POWDER AL. POWDER 40 F SG + ASF 8 1600 1900 A - - LOCK-LOCK D SS/HL PULL-PULL SS/FLOOR HINGE 2 SETS PARALLEL Yes FLUSH BOLT
COATING COATING
1FL ±0.00 FSD 1-030 1A OFFICE SERVER ROOM 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.6mm/SOP 40 - - - - - - - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes SEMI AIRTIGHT, 90 MINUTES FIRE RATED

1FL ±0.00 SD 1-031 4C OFFICE CORRIDOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 5 150 900 A - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS PARALLEL Yes FLUSH BOLT

1FL ±0.00 SD 1-032 2C CORRIDOR OHBEYA ROOM 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 6 600 900 A - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS STANDARD Yes FLUSH BOLT

1FL ±0.00 SD 1-033 2C CORRIDOR QUALITY ROOM 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 6 600 900 A - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS STANDARD Yes FLUSH BOLT

1FL ±0.00 SD 1-034 4B MGR CANTEEN CORRIDOR 1 1200 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS PARALLEL Yes FLUSH BOLT

1FL ±0.00 SD 1-035 4C CANTEEN CORRIDOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 5 150 900 A - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS PARALLEL Yes FLUSH BOLT

1FL ±0.00 SD 1-036 4A CANTEEN WASHING AREA 1 600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - FG 5 150 900 A - - NO LOCK - SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-037 4C CORRIDOR CANTEEN 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 5 150 900 A - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS STANDARD Yes FLUSH BOLT

1FL ±0.00 WD 1-038 1A CANTEEN CANTEEN 1 600 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - - - NO LOCK - SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS - Yes -

1FL ±0.00 SD 1-039 4A CORRIDOR CANTEEN 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-040 4A CORRIDOR SC MART 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - FG 5 150 900 A - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 WD 1-041 1C CLINIC CORRIDOR 1 1600 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 F - - - - - - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS STANDARD Yes FLUSH BOLT

1FL ±0.00 WD 1-042 1A LOCKER (M) CORRIDOR 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS PARALLEL Yes -

1FL ±0.00 WD 1-043 1A CORRIDOR LOCKER (F) 1 900 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-044 1A FACTORY AREA TOILET (F) 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-045 1A FACTORY AREA TOILET (M) 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-046 2C CORRIDOR FACTORY AREA 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 F SG 6 600 900 A - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x6 SETS STANDARD Yes FLUSH BOLT

1FL ±0.00 SD 1-047 2D PAINTING MATERIAL STORAGE FACTORY AREA 1 1200 - 2100 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 6 1000 900 A - - THUMB-KEY D SS/HL PULL - PULL HANGER - SEMI AUTO No -

1FL ±0.00 SD 1-048 2D PAINTING CIRCULATION ROOM PAINTING MATERIAL STORAGE 1 1200 - 2100 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 6 1000 900 A - - THUMB-KEY D SS/HL PULL - PULL HANGER - SEMI AUTO No -

1FL ±0.00 SD 1-049 2D PAINTING CIRCULATION ROOM PAINTING CIRCULATION ROOM 1 1200 - 2100 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 6 1000 900 A - - THUMB-KEY D SS/HL PULL - PULL HANGER - SEMI AUTO No -

1FL ±0.00 SD 1-050 2D PAINTING CIRCULATION ROOM FACTORY AREA 1 1200 - 2100 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 6 1000 900 A - - THUMB-KEY D SS/HL PULL - PULL HANGER - SEMI AUTO No -

1FL ±0.00 FSD 1-051 4D FACTORY AREA ELECTRICAL ROOM 1 1200 - 2100 25 - 25 - 170 C STL,PL,1.6mm/SOP STL,PL,1.6mm/SOP 40 - SG 5 150 900 A - - KEY-THUMB D SS/HL PULL - PULL HANGER - SEMI AUTO No SEMI AIRTIGHT, 90 MINUTES FIRE RATED

1FL ±0.00 SD 1-052 2C SILO VACUUM ROOM FACTORY AREA 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 6 700 900 A - - THUMB-KEY M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS PARALLEL Yes -

1FL ±0.00 SD 1-053 1D FACTORY AREA CRUSHING ROOM 1 2500 - 3000 25 - 25 - 170 G STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - - - - - - - - KEY-THUMB D SS/HL PULL - PULL HANGER - SEMI AUTO No -

1FL ±0.00 SD 1-054 1A FACTORY AREA TOILET (F) 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD 1-055 1A FACTORY AREA TOILET (M) 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

1FL ±0.00 SD GH-0 4A GUARD HOUSE EXTERIOR 1 800 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS PARALLEL No -, SEMI AIR TIGHT
1
1FL ±0.00 WD GH-0 1A GUARD HOUSE GH TOILET 1 600 - 2100 25 15 25 15 170 C TEAKWOOD w/HPL TEAKWOOD w/SOP 40 - - - - - - D SS/HL NO LOCK - SS/HL PUSH-PULL SS/BUTT HINGE 4"x3 SETS - Yes -
2
1FL ±0.00 SD PC-0 4A EXTERIOR DRIVER ROOM 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS STANDARD No -, SEMI AIR TIGHT
1
1FL ±0.00 SD PC-0 4A EXTERIOR GUARD HOUSE 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A E SS/HL KEY-THUMB M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x3 SETS STANDARD No -, SEMI AIR TIGHT
2
1FL ±0.00 WD PC-0 1A GUARD HOUSE GH TOILET 1 600 - 2100 25 15 25 15 170 C TEAKWOOD w/SOP TEAKWOOD w/SOP 40 - - - - - - - - KEY-THUMB M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS - Yes -
3
1FL ±0.00 SD PC-0 4C RAIN WATER STORAGE & EXTERIOR 1 1600 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 E SG 5 150 900 A E SS/HL THUMB-KEY M SS/HL LEVER-LEVER SS/BUSH HINGE 4"x6 SETS PARALLEL No FLUSH BOLT, SEMI AIRTIGHT
4 TREATMENT
1FL +3240 SD 1-056 4A LOBBY FACTORY AREA 1 900 - 2100 25 15 25 15 170 C STL,PL,1.6mm/SOP STL,PL,1.2mm/SOP 40 - SG 5 150 900 A - - LOCK-LOCK M SS/HL LEVER-LEVER SS/BUTT HINGE 4"x3 SETS STANDARD Yes -

INTERNAL SIZE OF DOOR FRAME DOOR OPEN TYPE DOOR FRAME TYPE WINDOW JAMB TYPE DOOR SILL TYPE MEETING STILE TYPE GLASING LOUVER TYPE LOCKING OPERATION AND LOCKING TYPE HANDLE TYPE DOOR CLOSER ABBREVIATION
BEAD
INTERNAL EXTERNAL

SINGLE DOOR A B C A B C A B C A B A B C LOCK CYLINDER K : KEY IN KNOB LOCK WITH DOOR KNOB PULL LOCK SD : STEEL DOOR STD : STEEL SHUTTER AW : ALUMINIUM WINDOW SG : CLEAR/ FLOAT GLASS STL : STEEL
W1W2 CASEMENT DOOR
A
30mm
(KEY HOLE) DEAD BOLT AD : ALUMUNIUM DOOR RRD : RAPID ROLLING DOOR ACW : ALUMINIUM CURTAIN WALL SWG : CLEAR WIRED GLASS AL : ALUMINIUM
LEVER HANDLE MORTISE HANDLE SND : STEEL NET DOOR OHD : OVERHEAD SHUTTER AG : ALUMINIUM GRILL FG : FIGURED/ FROSTED GLASS PL : PLATE
H1 UNDER CUT LOCK CYLINDER M : MOSTISE LOCK PARALLEL
10

SWING DOOR SLD : SLIDING DOOR QSH : QUICK SHUTTER SSW : STAINLESS STEEL WINDOW LNG : LAMINATED GLASS HL : HAIR LINE (FINISH)
H2 D E F WINDOW SILL TYPE D E F C D B D E F
(THUMB TURN) D : DEAD BOLT ASD : AUTO SLIDING DOOR PSD : PANIC STEEL DOOR HG : HEAT ABSORBING GLASS MR : MIRROR (FINISH)
D H REVOLVING DOOR
NO LOCK MOSTISE LOCK
PUSH PLATE NO HANDLE
A B C HD : HANGING DOOR FSD : FIRE STEEL DOOR RG : REFLECTIVE GLASS ASF : ANTI SHATTERED FILM
W
10

(DOOR HEIGHT) SLIDING DOOR R : RIM LOCK DOOR PULL PANIC HANDLE STANDARD FD : FOLDING DOOR PFSD : PANIC FIRE STEEL DOOR TG : TINTED GLASS
(DOOR WIDTH) SHUTTER ND : STEEL NET DOOR FSTD : FIRE STEEL SHUTTER TPG : TEMPERED GLASS SOP : SYNTHESIS RESIN OIL PAINT
h G D E G H E F C G H I NOTE : LOCKING OPERATION " KEY - THUMB " NOTE : HANDLE TYPE " LEVER - LEVER "
PAD : PANIC ALUMINUM DOOR CSG : CHEMICALLY STRENGTHENED GLASS CLQ : CLEAR LACQUER PAINT
OPENING
"FROM ROOM" LOCKING OPERATION IS "KEY", "FROM ROOM" HANDLE TYPE IS "LEVER", FRG : FIRE RATED GLASS OS : OIL STAIN PAINT
FOLDING AND "TO ROOM" LOCKING OPERATION IS "THUMB" AND "TO ROOM" HANDLE TYPE IS "LEVER"
OFG : OBSECURE FILM GLASS

DOOR LIST-2 A-102


A SINGLE DOOR B SEMI DOBULE DOOR C DOUBLE DOOR D SINGLE SLIDE DOOR E DOUBLE SLIDE DOOR F ACCESS DOOR G SINGLE USUAL OPEN H SINGLE USUAL OPEN W/ SMALL DOOR I DOUBLE USUAL OPEN
1 1A W 1B W 1C W
1D W
1E W 1F W 1G W 1H W 1J W
NO GLASS

H H H H
H H H H H

2000-H
FL FL FL FL FL FL FL FL FL
2 2A W 2B W 2C W W W
2D 2E
WINDOW GLASS

wW wW wW wW wW

wH wH wH wH wH

H H H H H

FL FL FL FL FL
3 3A W W
3B W 3C W 3D 3E W
FRAME GLASS

H H H H H

FL FL FL FL FL
4 4A W 4B W
wW
4C W
wW
4D W
4E W
wW
wW wW
SILT GLASS

wH wH wH wH wH
H H H H H

FL FL FL FL FL
9 9B 9C
9A W
STEEL FRAME

W W

H
H
H

SINGLE BRC DOUBLE BRC


VOID
..
..

FRAME ONLY FL
10 10A W
SHUTTER

FL

*1: If ventilation is required, there is grill. If not required, there is no grill

DOOR LIST-3 A-103


TYPE OF WINDOW
CODE LOCATION SIZE(OUT OF FRAME) FRAME FLUSHING FITTING GLASS LOUVER
HEIGHT

THICKNESS
GLAZING

TYPE
DEPTH
WIDTH

JAMB
BLIND BOX MATERIAL & INSECT NET MATERIAL &
TYPE

TYPE
UNIT

SILL
NO. LEVEL E/I PLACE WIDTH H h MATERIAL & FINISHING SASH MATERIAL & FINISHING DEPTH MATERIAL & FINISHING DEPTH MATERIAL & FINISHING MATERIAL & FINISHING FINISHING FINISHING REMARKS
AW 1-001 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-002 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-003 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-004 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-005 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-006 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-007 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-008 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-009 1 1FL ±0.00 E TOILET (M) 4B 2150 500 1650 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-010 1 1FL ±0.00 E TOILET (F) 4A 1100 500 1650 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - - -
AW 1-011 1 1FL ±0.00 E FACTORY AREA 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-012 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-013 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-015 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-016 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-017 1 1FL ±0.00 E MEETING ROOM 3 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-018 1 1FL ±0.00 E MEETING ROOM 2 1B 4150 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-019 1 1FL ±0.00 E MEETING ROOM 2 1D 6200 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-020 1 1FL ±0.00 E MEETING ROOM 1 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-021 1 1FL ±0.00 E MEETING ROOM 1 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
ACW 1-022 1 1FL ±0.00 E LOBBY 3A 4200 2800.0 0.0 50 150 AL. POWDER COATING C E AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 8mm - - - -
AW 1-028 1 1FL ±0.00 E QUALITY ROOM 1A 2100 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-029 1 1FL ±0.00 E QUALITY ROOM 1A 2100 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-035 1 1FL ±0.00 E LOCKER (M) 4B 2150 500 1650 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - - -
AW 1-036 1 1FL ±0.00 E TOILET (F) 4B 2150 500 1650 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - - -
AW 1-037 1 1FL ±0.00 I TOILET (M) 4B 2150 500 1650 50 100 AL. POWDER COATING A B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 SG 6mm - - - - -
AW 1-039 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-040 1 1FL ±0.00 E FACTORY AREA 1A 2100 1600 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-041 1 1FL ±0.00 E LOBBY 3E 2100 2800 0 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-042 1 1FL ±0.00 E LOBBY 3E 2100 2800 0 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-043 1 1FL ±0.00 E LOBBY 3F 5175 2800 0 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-044 1 1FL ±0.00 E LOBBY 3F 5175 2800 0 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-045 1 1FL ±0.00 E OFFICE 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-046 1 1FL ±0.00 E OFFICE 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-047 1 1FL ±0.00 E OHBEYA ROOM 1H 5175 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-048 1 1FL ±0.00 E OHBEYA ROOM 1G 1075 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-049 1 1FL ±0.00 E MGR CANTEEN 1G 1075 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-050 1 1FL ±0.00 E MGR CANTEEN 1H 5175 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-051 1 1FL ±0.00 E CANTEEN 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-052 1 1FL ±0.00 E CANTEEN 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-053 1 1FL ±0.00 E CANTEEN 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-054 1 1FL ±0.00 E SC MART 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-055 1 1FL ±0.00 E MOSQUE 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-056 1 1FL ±0.00 E MOSQUE 1B 4150 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-057 1 1FL ±0.00 E CLINIC 1G 1075 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-058 1 1FL ±0.00 E CLINIC 1H 5175 2050 750 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW 1-059 1 1FL ±0.00 I OFFICE 1B 4150 2050 750 50 100 AL. POWDER COATING A B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 SG 6mm - - - -
AW 1-060 1 1FL ±0.00 I OFFICE 1B 4150 2050 750 50 100 AL. POWDER COATING A B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 SG 6mm - - - -
AG G1-01 1 1FL ±0.00 E FACTORY AREA 2A 4100 2100 7750 50 100 AL. ANODIZED B B - 30 AL. ANODIZED - - - - - H AL. ANODIZED - - -
AW GH-01 1 1FL ±0.00 E GUARD HOUSE 5A 1200 1100 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW GH-02 1 1FL ±0.00 E GUARD HOUSE 6A 1000 1100 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW GH-03 1 1FL ±0.00 E GUARD HOUSE 6A 1000 1100 1000 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW GH-04 1 1FL ±0.00 E GH TOILET 4A 600 400 2100 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-01 1 1FL ±0.00 E GUARD HOUSE 8A 2600 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-02 1 1FL ±0.00 E GUARD HOUSE 6A 1400 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-03 1 1FL ±0.00 E GH TOILET 4A 600 400 2100 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-04 1 1FL ±0.00 E DRIVER ROOM 6A 1200 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-05 1 1FL ±0.00 E DRIVER ROOM 6A 1400 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-06 1 1FL ±0.00 E DRIVER ROOM 6A 1400 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -
AW PC-07 1 1FL ±0.00 E DRIVER ROOM 6A 1400 1100 900 50 100 AL. POWDER COATING B B AL. POWDER COATING 30 AL. POWDER COATING - - SR-1 TG 6mm - - - -

INTERNAL SIZE OF DOOR FRAME DOOR OPEN TYPE DOOR FRAME TYPE WINDOW JAMB TYPE DOOR SILL TYPE MEETING STILE TYPE GLASING LOUVER TYPE LOCKING OPERATION AND LOCKING TYPE HANDLE TYPE DOOR CLOSER ABBREVIATION
BEAD
INTERNAL EXTERNAL

SINGLE DOOR A B C A B C A B C A B A B C LOCK CYLINDER K : KEY IN KNOB LOCK WITH DOOR KNOB PULL LOCK SD : STEEL DOOR STD : STEEL SHUTTER AW : ALUMINIUM WINDOW SG : CLEAR/ FLOAT GLASS STL : STEEL
W1W2 CASEMENT DOOR
A
30mm
(KEY HOLE) DEAD BOLT AD : ALUMUNIUM DOOR RRD : RAPID ROLLING DOOR ACW : ALUMINIUM CURTAIN WALL SWG : CLEAR WIRED GLASS AL : ALUMINIUM
LEVER HANDLE MORTISE HANDLE SND : STEEL NET DOOR OHD : OVERHEAD SHUTTER AG : ALUMINIUM GRILL FG : FIGURED/ FROSTED GLASS PL : PLATE
H1 UNDER CUT LOCK CYLINDER M : MOSTISE LOCK PARALLEL
10

SWING DOOR SLD : SLIDING DOOR QSH : QUICK SHUTTER SSW : STAINLESS STEEL WINDOW LNG : LAMINATED GLASS HL : HAIR LINE (FINISH)
H2 D E F WINDOW SILL TYPE D E F C D B D E F
(THUMB TURN) D : DEAD BOLT ASD : AUTO SLIDING DOOR PSD : PANIC STEEL DOOR HG : HEAT ABSORBING GLASS MR : MIRROR (FINISH)
D H REVOLVING DOOR
NO LOCK MOSTISE LOCK
PUSH PLATE NO HANDLE
A B C HD : HANGING DOOR FSD : FIRE STEEL DOOR RG : REFLECTIVE GLASS ASF : ANTI SHATTERED FILM
W
10

(DOOR HEIGHT) SLIDING DOOR R : RIM LOCK DOOR PULL PANIC HANDLE STANDARD FD : FOLDING DOOR PFSD : PANIC FIRE STEEL DOOR TG : TINTED GLASS
(DOOR WIDTH) SHUTTER ND : STEEL NET DOOR FSTD : FIRE STEEL SHUTTER TPG : TEMPERED GLASS SOP : SYNTHESIS RESIN OIL PAINT
h G D E G H E F C G H I NOTE : LOCKING OPERATION " KEY - THUMB " NOTE : HANDLE TYPE " LEVER - LEVER "
PAD : PANIC ALUMINUM DOOR CSG : CHEMICALLY STRENGTHENED GLASS CLQ : CLEAR LACQUER PAINT
OPENING
"FROM ROOM" LOCKING OPERATION IS "KEY", "FROM ROOM" HANDLE TYPE IS "LEVER", FRG : FIRE RATED GLASS OS : OIL STAIN PAINT
FOLDING AND "TO ROOM" LOCKING OPERATION IS "THUMB" AND "TO ROOM" HANDLE TYPE IS "LEVER"
OFG : OBSECURE FILM GLASS

WINDOW LIST-1 A-104


TYPE OF WINDOW

W
W W
1D W
1A 1B 1G
H
H H H

h h h h

2A

W W
3A W
3E
H
H H

W W
4A 4B W 3F W
1H
H H
W W W
5A 6A 8A
H
H
h h H H H

h
h h h

INTERNAL SIZE OF DOOR FRAME DOOR OPEN TYPE DOOR FRAME TYPE WINDOW JAMB TYPE DOOR SILL TYPE MEETING STILE TYPE GLASING LOUVER TYPE LOCKING OPERATION AND LOCKING TYPE HANDLE TYPE DOOR CLOSER ABBREVIATION
BEAD
INTERNAL EXTERNAL

SINGLE DOOR A B C A B C A B C A B A B C LOCK CYLINDER K : KEY IN KNOB LOCK WITH DOOR KNOB PULL LOCK SD : STEEL DOOR STD : STEEL SHUTTER AW : ALUMINIUM WINDOW SG : CLEAR/ FLOAT GLASS STL : STEEL
W1W2 CASEMENT DOOR
A
30mm
(KEY HOLE) DEAD BOLT AD : ALUMUNIUM DOOR RRD : RAPID ROLLING DOOR ACW : ALUMINIUM CURTAIN WALL SWG : CLEAR WIRED GLASS AL : ALUMINIUM
LEVER HANDLE MORTISE HANDLE SND : STEEL NET DOOR OHD : OVERHEAD SHUTTER AG : ALUMINIUM GRILL FG : FIGURED/ FROSTED GLASS PL : PLATE
H1 UNDER CUT LOCK CYLINDER M : MOSTISE LOCK PARALLEL
10

SWING DOOR SLD : SLIDING DOOR QSH : QUICK SHUTTER SSW : STAINLESS STEEL WINDOW LNG : LAMINATED GLASS HL : HAIR LINE (FINISH)
H2 D E F WINDOW SILL TYPE D E F C D B D E F
(THUMB TURN) D : DEAD BOLT ASD : AUTO SLIDING DOOR PSD : PANIC STEEL DOOR HG : HEAT ABSORBING GLASS MR : MIRROR (FINISH)
D H REVOLVING DOOR
NO LOCK MOSTISE LOCK
PUSH PLATE NO HANDLE
A B C HD : HANGING DOOR FSD : FIRE STEEL DOOR RG : REFLECTIVE GLASS ASF : ANTI SHATTERED FILM
W
10

(DOOR HEIGHT) SLIDING DOOR R : RIM LOCK DOOR PULL PANIC HANDLE STANDARD FD : FOLDING DOOR PFSD : PANIC FIRE STEEL DOOR TG : TINTED GLASS
(DOOR WIDTH) SHUTTER ND : STEEL NET DOOR FSTD : FIRE STEEL SHUTTER TPG : TEMPERED GLASS SOP : SYNTHESIS RESIN OIL PAINT
h G D E G H E F C G H I NOTE : LOCKING OPERATION " KEY - THUMB " NOTE : HANDLE TYPE " LEVER - LEVER "
PAD : PANIC ALUMINUM DOOR CSG : CHEMICALLY STRENGTHENED GLASS CLQ : CLEAR LACQUER PAINT
OPENING
"FROM ROOM" LOCKING OPERATION IS "KEY", "FROM ROOM" HANDLE TYPE IS "LEVER", FRG : FIRE RATED GLASS OS : OIL STAIN PAINT
FOLDING AND "TO ROOM" LOCKING OPERATION IS "THUMB" AND "TO ROOM" HANDLE TYPE IS "LEVER"
OFG : OBSECURE FILM GLASS

WINDOW LIST-2 A-105

You might also like