AECOM accepts no responsibility, and denies any liability whatsoever, to any party that uses or relies on this drawing without AECOM's express written consent.
3. ALLEVELSAREQNHDLEVELS.
03 4. ALLPP IEOPENNIGS A,CCESSOPENN IGSANDDUCTOPENN IGSSHALLBE
VERFIE
ID
AGAN ISTMECHANC IALANDELECTRC IALDRAWN IGSPRO IRTO
CONSTRUCTO IN.
5. CONCRETEGRADEC405/0SHALLBEUSED.
6. ALLFOUNDATO INSAREDESG INEDBASEDONNETALLOWABLEBEARN IG
CAPACT IYOF110kPaANDSHALLBEFOUNDEDONCOMPETENTGROUND
ORENGN IEEREDBACKFLILASPERGEOTECHNC IALRECOMMENDATO INS.
D ON HOLD D
ELEVATION AT GRID LINE 1&3 (PARAPET WALL ELEVATION)
03 17 MAY 22 SHOP DRAWING S.G. A.A. A.B.
02 30 APR 22 SHOP DRAWING S.G. A.A. A.B.
01 16 FEB 22 SHOP DRAWING S.G. A.A. A.B.
00 21 DEC 21 SHOP DRAWING S.G. A.A. A.B.
ON HOLD
Rev. Date Revision Details Drawn Chkd. Appd.
E E
PA
This drawing has been prepared for the use of AECOM's client. It may not be used, modified, reproduced or relied upon by third parties, except as agreed by AECOM or as required by law.
PROJECTS AFFAIRS
Supervision Consultant :
Contractors: Approved:
Smadi
SA048-SD-TC-SIB-GN-ST-GA-0002 03