You are on page 1of 8

TOTAL DOC 104

VOP 0
CRS 95
RFC 1
Thursday, July 15, 2021 DRN 8
FICHTNER RequiredReplyDate10d
Latest Transmission Date Doc Code Title SEPCO-III Transmittal code Revision Discipline FICHTNER Reviewers DOC TYPE LOD/NON-LOD
10DAYS aysinTotalFichtner.

PIPING LAYOUT DRAWINGS - NORTH - Dammann, Jens-Uwe, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 4, 2021
R0100G-KEM-00-110000
PERIMETER ROAD
004899
00A MEC - Cc Abdullahi Abdulle, CRS -1 14-Jul-2021 LOD
INTERCONNECTIONS Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DMF SYSTEM - FILTER FLOOR 19SWCG30204-1-200-TX-
Monday, July 5, 2021
R10GEC-KEM-00-300101 GENERAL ARRANGEMENT 004900
000 MEC - Cc Abdullahi Abdulle, CRS 0 15-Jul-2021 LOD
Mohamed, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR RO PASS-1 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R00GEH-KE0-07-300126 SWRO SKID ERD INLET 004909
000 MEC
- Cc Muhammed, Sajjad, FI
CRS 1 16-Jul-2021 NON-LOD

- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR RO PASS-1 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R00GEH-KE0-07-300127 SWRO SKID ERD OUTLET 004910
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 16-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR RO PASS-2 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R00GEH-KE0-07-300133 BWRO SKID 004911
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 16-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- VENDOR DOCUMENT LIST FOR 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R32UST-KE0-DS-501901 WORKSHOP EQUIPMENTS 004912
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 16-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- DATASHEET & DRAWINGS FOR 19SWCG30204-1-200-TX-
Tuesday, July 6, 2021
R08GEM-KEM-DS-331029 EXPANSION BELLOWS 004914
001 MEC Mohamed, FI CRS 1 16-Jul-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, July 6, 2021
R11GEU-KEM-00-100000 FILTERED WATER TANK 004915
00C MEC - Cc Abdullahi Abdulle, CRS 1 16-Jul-2021 LOD
Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- SODIUM BISULPHITE SCRUBBER 19SWCG30204-1-200-TX-
Tuesday, July 6, 2021
R00GET-KEM-EF-100006 SPECIFICATION 004916
00C MEC - Cc Abdullahi Abdulle, CRS 1 16-Jul-2021 NON-LOD
Mohamed, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, July 6, 2021
R0000G-KEM-RG-100001
PIPING CLASSES SUMMARY
004917
003 MEC Mohamed, FI CRS 1 16-Jul-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Gogoshev, Petar, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, July 6, 2021
R000GE-KT0-RG-800002
Main Commissioning Documents List
004921
00A GEN - Cc Vega León, Jamil CRS 1 16-Jul-2021 NON-LOD
Gustavo, FI
- Abdullahi Abdulle,
ITP for NON METALLIC VALVES (Ball
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R01GCK-KEM-IT-300060
Valves/Pneumatic Ball Valves/Check
004922
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 16-Jul-2021 NON-LOD
Valves)
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
Test procedure for NON METALLIC
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 6, 2021
R01GCK-KEM-PR-300060
VALVES (Ball Valves/Pneumatic Ball
004923
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 16-Jul-2021 NON-LOD
Valves/Check Valves)
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - KEY 19SWCG30204-1-200-TX-
Wednesday, July 7, 2021
R0000G-KEM-00-100010 PLAN 004925
00A MEC - Cc Abdullahi Abdulle, CRS 2 17-Jul-2021 NON-LOD
Mohamed, FI
- Bertram, David, FI
19SWCG30204-1-200- DATASHEET & DRAWINGS FOR CIP 19SWCG30204-1-200-TX- - Cc Dammann, Jens-Uwe, FI
Wednesday, July 7, 2021
R13GEV-KEM-DS-300400 CARTRIDGE FILTER 004930
00B MEC
- Cc Abdullahi Abdulle,
CRS 2 17-Jul-2021 LOD

Mohamed, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR PASS- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEJ-KE0-07-300132 2BWRO 2ND STAGE CIP INLET 004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR FLUSHING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEE-KE0-07-332005
PUMP SUCTION LINE(FLUSHING
004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
SYSTEM)
- Cc Muhammed, Sajjad, FI
ISOMETRIC DRAWING FOR PASS-1 - Abdullahi Abdulle,
19SWCG30204-1-200- SWRO INTERCONNECTING 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEH-KE0-07-300123 PIPING(ERD&PUMP SUCT.FEED 004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD

HEADER STREAM-1) - Cc Muhammed, Sajjad, FI


- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR PASS-1
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEH-KE0-07-300124
SWRO SKID A10 PIPING (RO SKID
004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
FEED INLET )
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR PASS-1
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEH-KE0-07-300125
SWRO SKID A10 PIPING(RO SKID
004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
CONCENTRATE OUTLET)
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR RO PASS-2
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEJ-KE0-07-300128
BWRO INTERCONNECTING FEED
004931
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
HEADER (HPP INLET)
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R25GKA-KE0-07-332007
LIMESTONE CONTACTOR FACE
004932
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
PIPING DRAIN LINE
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEK-KE0-07-300146
NEUTRALIZATION PUMPS, PUMPS
004932
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
DISCHARGE LINE
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
ISOMETRIC DRAWING FOR RO PASS 2
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEK-KE0-07-300129
BWRO FEED INLET/PERMEATE
004932
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD
OUTLET
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR L/F AIR 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R25GKA-KE0-07-332004 BLOWER(STREAM 1A/1B) 004932
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR CIP 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 7, 2021
R00GEK-KE0-07-300144 TRANSFER PUMPS (SUCTION) 004932
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 17-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
DCS_FUNCTION DESIGN - Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Wednesday, July 7, 2021
R000GE-1J0-EF-350035
SPECIFICATION_OPERATOR
004933
00B I&C - Nayyar, Abu Mohammad, FI CRS 2 17-Jul-2021 NON-LOD
TRAINING STATION - Cc Arias, Leandro, FI

- Hammad, Sherif, FI
19SWCG30204-1-200- SEAWATER FEED PUMP INSTRUMENT 19SWCG30204-1-200-TX-
Thursday, July 8, 2021
R05GAF-1US-DS-900006 DATASHEETS 004940
001 I&C - Nayyar, Abu Mohammad, FI CRS 3 18-Jul-2021 LOD
- Cc Arias, Leandro, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- RO CIP PUMP SET - DATASHEET AND 19SWCG30204-1-200-TX-
Thursday, July 8, 2021
R20GEK-KEM-DS-300245 DRAWING 004942
002 MEC Mohamed, FI CRS 3 18-Jul-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- SERVICE WATER PIPING SUPPORT 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Saturday, July 10, 2021
R00GEA-KEM-04-100000 LAYOUT 004945
00C MEC
- Cc Abdullahi Abdulle,
CRS 5 20-Jul-2021 LOD

Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DAF SYSTEM - DISPERSION PIPE PIPES 19SWCG30204-1-200-TX-
Saturday, July 10, 2021
R09GEB-KEM-DS-300204 DATAXHEET AND DRAWINGS 004947
005 MEC - Cc Abdullahi Abdulle, CRS 5 20-Jul-2021 LOD
Mohamed, FI
SEAWATER INTAKE - MOTORIZED - Arias, Leandro, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R0700C-KED-13-100000
VALVES CONTROL ARCHITECTURE
004950
00B I&C - Hammad, Sherif, FI CRS 6 21-Jul-2021 LOD
(BUS) - Nayyar, Abu Mohammad, FI

FILTERED WATER TANK - MOTORIZED - Arias, Leandro, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R1100C-KED-13-100000
VALVES CONTROL ARCHITECTURE
004950
00B I&C - Hammad, Sherif, FI CRS 6 21-Jul-2021 LOD
(BUS) - Nayyar, Abu Mohammad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R060GB-KEM-00-100000 ELECTROCHLORINATION 004951
00B MEC - Cc Abdullahi Abdulle, CRS 6 21-Jul-2021 LOD
Mohamed, FI
- Dammann, Jens-Uwe, FI
PIPING LAYOUT DRAWINGS - PRE-
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Cc Abdullahi Abdulle,
Sunday, July 11, 2021
R31UXM-KEC-00-100001
TREATMENT CHEMICAL STORAGE
004952
00A MEC
Mohamed, FI
CRS 6 21-Jul-2021 LOD
TANKS
- Cc Muhammed, Sajjad, FI
POTABLE WATER TANK - Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R29BXC-KED-18-100000
INSTRUMENTATION CABLE TRAY
004953
000 I&C - Arias, Leandro, FI CRS 6 21-Jul-2021 LOD
ROUTINGS - Nayyar, Abu Mohammad, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R15BXC-KED-18-100230
DIRTY WATER CABLE TRAY ROUTINGS
004953
000 I&C - Nayyar, Abu Mohammad, FI CRS 6 21-Jul-2021 LOD
- Arias, Leandro, FI
- Abdullahi Abdulle,
Mohamed, FI
19SWCG30204-1-200- SODIUM BISULPHITE PREPARATION 19SWCG30204-1-200-TX- - Pocostales Buenavida, Juan
Sunday, July 11, 2021
R00GET-KEM-DS-100003 TANK AGITATOR DATASHEET 004954
004 MEC
Pablo, FI
CRS 6 21-Jul-2021 LOD

- Bertram, David, FI
- Dammann, Jens-Uwe, FI
- Abdullahi Abdulle,
Mohamed, FI
19SWCG30204-1-200- SODIUM BISULPHITE STORAGE TANK 19SWCG30204-1-200-TX- - Pocostales Buenavida, Juan
Sunday, July 11, 2021
R00GET-KEM-DS-100004 AGITATOR DATASHEET 004954
004 MEC
Pablo, FI
CRS 6 21-Jul-2021 LOD

- Bertram, David, FI
- Dammann, Jens-Uwe, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID - PRETREATMENT DUAL MEDIA 19SWCG30204-1-200-TX- Pablo, FI
Sunday, July 11, 2021
R00GEC-KE0-06-300117 FILTER - FILTER B1& B20 004955
001 PCS
- Arias, Leandro, FI
CRS 6 21-Jul-2021 LOD

- Dammann, Jens-Uwe, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Pablo, FI
Sunday, July 11, 2021
R23GKG-KE0-06-333002
P&ID FOR DIESEL OIL TANK
004955
004 PCS
- Arias, Leandro, FI
CRS 6 21-Jul-2021 LOD

- Dammann, Jens-Uwe, FI
GENERAL ARRANGEMENT
DRAWINGS FOR ELECTRICAL - Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R270SM-1ML-00-453016
OVERHEAD CRANES OF PRODUCT
004956
00B MEC Mohamed, FI CRS 6 21-Jul-2021 NON-LOD
WATER PUMPS STATION CRANE - Cc Dammann, Jens-Uwe, FI
(00GEW02AE001)
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID - PRETREATMENT DUAL MEDIA 19SWCG30204-1-200-TX- Pablo, FI
Sunday, July 11, 2021
R00GEC-KE0-06-300116 FILTER - FILTER A1 & A20 004958
001 PCS
- Arias, Leandro, FI
CRS 6 21-Jul-2021 LOD

- Dammann, Jens-Uwe, FI
- Arias, Leandro, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Pocostales Buenavida, Juan
Sunday, July 11, 2021
R23GKG-KE0-06-333003
P&ID FOR BURNER GENERATOR
004959
00F PCS
Pablo, FI
CRS 6 21-Jul-2021 LOD

- Dammann, Jens-Uwe, FI
- Azimuddin, Warsi, FI
19SWCG30204-1-200- SEWAGE TREATMENT PLANT 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R37BXE-KEE-19-100001 GROUNDING LAYOUT 004960
00A ELE - Cc Purushothan, Jayaraman, CRS 6 21-Jul-2021 LOD
FI
- Azimuddin, Warsi, FI
19SWCG30204-1-200- PRETREATMENT NEUTRALIZATION 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R16BXE-KEE-19-100005 TANK STRUCTURE GROUNDING 004961
00A ELE - Cc Purushothan, Jayaraman, CRS 6 21-Jul-2021 NON-LOD
FI
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Azimuddin, Warsi, FI
Sunday, July 11, 2021
R01BXE-KEE-19-100000 GROUNDING LAYOUT 004962
00A ELE
- Purushothan, Jayaraman, FI
CRS 6 21-Jul-2021 NON-LOD

19SWCG30204-1-200- STORMWATER RETENTION POND 19SWCG30204-1-200-TX- - Azimuddin, Warsi, FI


Sunday, July 11, 2021
R01BXE-KEE-19-100020 GROUNDING LAYOUT 004962
00A ELE
- Purushothan, Jayaraman, FI
CRS 6 21-Jul-2021 NON-LOD
- Abdullahi Abdulle,
19SWCG30204-1-200- ITP for SEA WATER INTAKE SURGE 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R00UQG-1M0-IT-501212 VESSEL 004964
001 MEC Mohamed, FI CRS 6 21-Jul-2021 NON-LOD
- Muhammed, Sajjad, FI
- Azimuddin, Warsi, FI
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R01BXE-KEE-19-100001 LIGHTNING PROTECTION LAYOUT 004965
00A ELE - Cc Purushothan, Jayaraman, CRS 6 21-Jul-2021 NON-LOD
FI
- Azimuddin, Warsi, FI
19SWCG30204-1-200- CO2 PRODUCTION PLANT LIGHTNING 19SWCG30204-1-200-TX-
Sunday, July 11, 2021
R23BXE-KEE-19-100001 PROTECTION LAYOUT 004967
00A ELE - Cc Purushothan, Jayaraman, CRS 6 21-Jul-2021 LOD
FI
19SWCG30204-1-200- DIRTY WATER TANK FOUNDATION 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, July 11, 2021
R15GEG-KEC-00-100000 LAYOUT 004969
00A CIV
- Cc Wani, Muneer, FI
CRS 6 21-Jul-2021 LOD

METHOD STATEMENT FOR THE


INSTALLATION OF PIPES, - Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R00ZAA-1FF-MS-000083
FITTING,SPRINKLER, DELUG SYSTEM
004970
000 FF Mohamed, FI CRS 7 22-Jul-2021 NON-LOD
AND PRESSURE TEST OF GIS FIRE - Cc Muhammed, Sajjad, FI
FIGHTING PROTECTION SYSTEM
METHOD STATEMENT FOR THE
INSTALLATION OF PIPES, FITTING, - Abdullahi Abdulle,
19SWCG30204-1-200- SPRINKLER, DELUGE, NOVEC, 19SWCG30204-1-200-TX- Mohamed, FI
Monday, July 12, 2021
R00ZAA-1FF-MS-000084 PORTABLE SYSTEM & PRESSURE TEST 004971
000 MEC
- Cc Muhammed, Sajjad, FI
CRS 7 22-Jul-2021 NON-LOD

FOR "JSWR02" OF FIRE FIGHTING - Cc Dammann, Jens-Uwe, FI


PROTECTION SYSTEM
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&I DIAGRAM FOR 19SWCG30204-1-200-TX- Pablo, FI
Monday, July 12, 2021
R06PUS-KE0-06-900620 ELECTROCHLORINATION PLANT 004973
00F PCS
- Arias, Leandro, FI
CRS 7 22-Jul-2021 LOD

- Dammann, Jens-Uwe, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - PRE- 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R14GES-KEM-00-100000 TREATMENT CHEMICAL TANKS 004974
00B MEC - Cc Abdullahi Abdulle, CRS 7 22-Jul-2021 LOD
Mohamed, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R20GEK-KEM-00-100000
PIPING LAYOUT DRAWINGS - RO CIP
004975
000 MEC Mohamed, FI CRS 7 22-Jul-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR PASS-1 19SWCG30204-1-200-TX- Mohamed, FI
Monday, July 12, 2021
R00GEH-KE0-07-300122 SWRO INTERCONNECTING PIPING 004976
000 MEC
- Cc Muhammed, Sajjad, FI
CRS 7 22-Jul-2021 NON-LOD

- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- ISOMETRIC DRAWING FOR 19SWCG30204-1-200-TX- Mohamed, FI
Monday, July 12, 2021
R25GKA-KE0-07-332003 LIMESTONE SYSTEM 004976
000 MEC
- Cc Muhammed, Sajjad, FI
CRS 7 22-Jul-2021 NON-LOD

- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DRN_SE-1 ELECTRICAL BUILDING & 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Monday, July 12, 2021
R38UBY-KEE-CN-100081 TRANSFORMER YARD LAYOUT 004978
000 ELE
- Cc Azimuddin, Warsi, FI
DRN 7 22-Jul-2021 NON-LOD

METHOD STATEMENT FOR


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Monday, July 12, 2021
R00ZAA-1E0-MS-000017
GROUNDING AND LIGHTNING
004980
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 22-Jul-2021 NON-LOD
PROTECTION SYSTEM
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Monday, July 12, 2021
R10GEC-KEM-PR-300029
Test procedure for penstock
004981
001 MEC
- Cc Muhammed, Sajjad, FI
CRS 7 22-Jul-2021 NON-LOD

- Cc Dammann, Jens-Uwe, FI
- Senthilkumar, V, FI
19SWCG30204-1-200- ELECTRICAL AND CONTROL 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R0000U-KEC-00-100000 TRENCHES AND GALLERIES 004982
000 CIV - Purushothan, Jayaraman, FI CRS 7 22-Jul-2021 LOD
- Cc Wani, Muneer, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R28GKC-KEM-00-100000 POTABLE WATER TANK 004983
000 MEC Mohamed, FI CRS 7 22-Jul-2021 LOD
- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- ELECTRICAL AND CONTROL 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Monday, July 12, 2021
R00UGZ-KEC-05-100000 TRENCHES AND PITS DETAILS 004984
000 CIV
- Cc Wani, Muneer, FI
CRS 7 22-Jul-2021 LOD

- Azimuddin, Warsi, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R330AS-KEE-DS-100000
6,6 KV SWITCHGEARS DATASHEET
004985
00A ELE - Cc Purushothan, Jayaraman, CRS 7 22-Jul-2021 LOD
FI
DRN -P&ID - PRETREATMENT
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Monday, July 12, 2021
R00GEB-KE0-CN-100083
DISSOLVED AIR FLOTATION - BASIN
004987
001 PCS
- Nayyar, Abu Mohammad, FI
DRN 7 22-Jul-2021 NON-LOD
B1
DRN - P&ID - PRETREATMENT
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Monday, July 12, 2021
R00GEB-KE0-CN-100082
DISSOLVED AIR FLOTATION - BASIN
004987
001 PCS
- Nayyar, Abu Mohammad, FI
DRN 7 22-Jul-2021 NON-LOD
A1
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - DAF AIR SATURATION 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R00GEB-KE0-CN-100084 SYSTEM - STREAM 1 004988
001 PCS - Nayyar, Abu Mohammad, FI DRN 7 22-Jul-2021 NON-LOD
- Cc Arias, Leandro, FI

- Hammad, Sherif, FI
19SWCG30204-1-200- DRN -P&ID - DAF AIR SATURATION 19SWCG30204-1-200-TX-
Monday, July 12, 2021
R00GEB-KE0-CN-100085 SYSTEM - STREAM 2 004988
001 PCS - Nayyar, Abu Mohammad, FI DRN 7 22-Jul-2021 NON-LOD
- Cc Arias, Leandro, FI
DRN - P&ID - DAF SLUDGE
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Monday, July 12, 2021
R00GEB-KE0-CN-100086
TRANSFER& AIR COMPRESSOR
004989
001 PCS
- Nayyar, Abu Mohammad, FI
DRN 7 22-Jul-2021 NON-LOD
SYSTEM - STREAM 1
DRN -P&ID - DAF SLUDGE
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Monday, July 12, 2021
R00GEB-KE0-CN-100087
TRANSFER& AIR COMPRESSOR
004989
001 PCS
- Nayyar, Abu Mohammad, FI
DRN 7 22-Jul-2021 NON-LOD
SYSTEM - STREAM 2
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, July 13, 2021
R25GUA-KEM-00-100000 OVERFLOW 004986
002 MEC - Cc Abdullahi Abdulle, CRS 8 23-Jul-2021 LOD
Mohamed, FI
- Dammann, Jens-Uwe, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, July 13, 2021
R13GEV-KEM-00-100001 CARTRIDGE FILTERS 004991
00C MEC Pablo, FI CRS 8 23-Jul-2021 LOD
- Cc Abdullahi Abdulle,
Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- Volume IX– Technical specification – 19SWCG30204-1-200-TX-
Tuesday, July 13, 2021
R00ZAA-KE0-TQ-000060 B.13 – “Water Spray Deluge Systems 004992
00C MEC - Cc Abdullahi Abdulle, RFC 8 23-Jul-2021 NON-LOD
Mohamed, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, July 13, 2021
R00BXC-KEE-18-100001
HV INCOMING LINE ROUTING
004993
003 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 23-Jul-2021 LOD
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWING - 19SWCG30204-1-200-TX-
Tuesday, July 13, 2021
R21GED-KEM-00-100000 PERMEATE WATER TANK 004994
00B MEC - Cc Abdullahi Abdulle, CRS 8 23-Jul-2021 LOD
Mohamed, FI
19SWCG30204-1-200- PRE-TREATMENT CHEMICAL TANKS 19SWCG30204-1-200-TX- - Azimuddin, Warsi, FI
Tuesday, July 13, 2021
R01BXE-KEE-19-100100 GROUNDING LAYOUT 004995
000 ELE
- Purushothan, Jayaraman, FI
CRS 8 23-Jul-2021 LOD

19SWCG30204-1-200- POST-TREATMENT CHEMICAL TANKS 19SWCG30204-1-200-TX- - Azimuddin, Warsi, FI


Tuesday, July 13, 2021
R22BXE-KEE-19-100200 GROUNDING LAYOUT 004995
000 ELE
- Purushothan, Jayaraman, FI
CRS 8 23-Jul-2021 LOD

PRE-TREATMENT CHEMICAL - Senthilkumar, V, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, July 13, 2021
R31BXE-KEE-19-100501
STORAGE LIGHTNING PROTECTION
004996
000 CIV - Azimuddin, Warsi, FI CRS 8 23-Jul-2021 LOD
LAYOUT - Cc Wani, Muneer, FI
- Dammann, Jens-Uwe, FI
PIPING LAYOUT DRAWINGS - WEST
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, July 13, 2021
R0100G-KEM-00-110005
PERIMETER ROAD
004997
001 MEC
- Cc Abdullahi Abdulle,
CRS 8 23-Jul-2021 LOD
INTERCONNECTIONS
Mohamed, FI
19SWCG30204-1-200- PERIMETER FENCE CALCULATION 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, July 13, 2021
R000UZ-KEC-CL-100000 REPORT 004998
00B CIV
- Cc Wani, Muneer, FI
CRS 8 23-Jul-2021 LOD

- Abdullahi Abdulle,
DRN - OUTFALL PIPELINE ALIGNMENT
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Tuesday, July 13, 2021
R17UPA-KE0-CN-100088
DRAWINGS INCLUDING PLAN,
005001
001 MEC
- Muhammed, Sajjad, FI
DRN 8 23-Jul-2021 NON-LOD
SECTION AND ELEVATION
- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- CARTRIDGE FILTERS FOUNDATION 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R00BXC-KEC-18-100001 DRAWING 004999
001 CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 LOD

DIESEL GENERATOR BUILDING


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Wednesday, July 14, 2021
R01BXL-KEE-19-100000
LIGHTING AND SMALL POWER
005000
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 24-Jul-2021 NON-LOD
DRAWINGS
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R00ZAA-KE0-19-100003
URBAN DEVELOPMENT
005002
003 CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 LOD

- Pocostales Buenavida, Juan


Pablo, FI
19SWCG30204-1-200- OUTLINE DRAWING FOR TEST 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R18GEH-KEM-04-331028 CLEANING TANKS FOR RO PASS-1 005003
001 MEC - Cc Dammann, Jens-Uwe, FI CRS 9 24-Jul-2021 LOD
- Cc Abdullahi Abdulle,
Mohamed, FI
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R01BMV-KEC-00-100000 LAYOUT 005004
001 CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD

- Pocostales Buenavida, Juan


Pablo, FI
19SWCG30204-1-200- OUTLINE DRAWING FOR TEST 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R19GEH-KEM-04-331029 CLEANING TANKS FOR RO PASS-2 005005
001 MEC - Cc Dammann, Jens-Uwe, FI CRS 9 24-Jul-2021 LOD
- Cc Abdullahi Abdulle,
Mohamed, FI
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R01BMV-KEC-19-100001 SUPERSTRUCTURE DRAWINGS 005006
00A CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD

19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI


Wednesday, July 14, 2021
R01BMV-KEC-CL-100001 SUPERSTRUCTURE CALCULATION 005007
00A CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD

19SWCG30204-1-200- STORM WATER RETENTION POND 19SWCG30204-1-200-TX- - Senthilkumar, V, FI


Wednesday, July 14, 2021
R01GUA-KEC-19-100021 STRUCTURE REINFORCEMENT 005008
00A CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD

INTAKE AND PRODUCT WATER


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R01UQG-KEC-19-100000
AREAS - SURGE VESSELS
005009
00A CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD
FOUNDATION DRAWINGS
INTAKE AND PRODUCT WATER
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, July 14, 2021
R01UQG-KEC-CL-100000
AREAS - SURGE VESSELS
005010
00A CIV
- Cc Wani, Muneer, FI
CRS 9 24-Jul-2021 NON-LOD
FOUNDATION CALCULATION REPORT
- Abdullahi Abdulle,
19SWCG30204-1-200- VENDOR DOCUMENT LIST FOR 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 14, 2021
R35STG-KE0-RG-501400 LABORATORY EQUIPMENT 005011
002 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 9 24-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 14, 2021
R00BMV-KE0-IT-901703
ITP FOR EXPANSION JOINT
005012
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 9 24-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 14, 2021
R00BMV-KE0-PR-901704
Test Procedure for Expansion Joint
005013
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 9 24-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- Mohamed, FI
Wednesday, July 14, 2021
R01GEH-KEM-PR-300030
Test Procedure for Expansion Bellows
005013
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 9 24-Jul-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
ADMINISTRATION BUILDING - Wani, Muneer, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R35UYC-KEC-20-457701
ALUIMINUM WINDOW SHOP
005014
001 CIV - Cc Senthilkumar, V, FI CRS 9 24-Jul-2021 NON-LOD
DRAWING - Cc Shafi, Mohammad, FI
- Wani, Muneer, FI
19SWCG30204-1-200- WORKSHOP ALUIMINUM WINDOW 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R32UST-KEC-20-457700 SHOPDRAWING 005014
001 CIV - Cc Senthilkumar, V, FI CRS 9 24-Jul-2021 NON-LOD
- Cc Shafi, Mohammad, FI
- Wani, Muneer, FI
19SWCG30204-1-200- CIVIL WORKSHOP ALUIMINUM 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R37UST-KEC-20-457700 WINDOW SHOPDRAWING 005014
002 CIV - Cc Senthilkumar, V, FI CRS 9 24-Jul-2021 NON-LOD
- Cc Shafi, Mohammad, FI
- Senthilkumar, V, FI
- Cc
19SWCG30204-1-200- TECHNICAL SPECIFICATIONS - 19SWCG30204-1-200-TX- Muneer.Wani@fma.fichtner.
Wednesday, July 14, 2021
R04GAC-KE0-EF-100000 MARINE WORKS INTAKE 005015
00F CIV
de *
CRS 9 24-Jul-2021 LOD

- Cc Bertram, David, FI
- Cc Zeidan, Siraj, FI
- Azimuddin, Warsi, FI
19SWCG30204-1-200- O&M MANUALS FOR 230KV SURGE A 19SWCG30204-1-200-TX-
Wednesday, July 14, 2021
R3600A-1E0-OM-700003 RRESTER 005017
000 ELE - Cc Purushothan, Jayaraman, CRS 9 24-Jul-2021 NON-LOD
FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Wednesday, July 14, 2021
R3600A-KDR-RG-700000
SPARE PARTS LIST FOR GIS
005018
001 PRO
- Cc Hammad, Sherif, FI
CRS 9 24-Jul-2021 LOD