You are on page 1of 10

TOTAL DOC 176

VOP 4
CRS 168
RFC 0
Wednesday, August 11, 2021 DRN 8
FICHTNER
Latest Transmission Date Doc Code Title SEPCO-III Transmittal code Revision Discipline FICHTNER Reviewers DOC TYPE RequiredReplyDate. LOD/NON-LOD
DAYS
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Cc Pocostales Buenavida, Juan
Saturday, July 31, 2021
R00GAF-KE0-06-100021
P&ID - SEAWATER INTAKE
005221
00L PCS
Pablo, FI
CRS -1 10-Aug-2021 LOD

- Cc Arias, Leandro, FI
- Pocostales Buenavida, Juan
FIRE FIGHTING PUMPS
Pablo, FI
19SWCG30204-1-200- ARRANGEMENT- P&ID , PIPING 19SWCG30204-1-200-TX-
Saturday, July 31, 2021
R00SGA-1FF-05-690014 LAYOUT, SECTION & ISOMETRIC 005227
001 FF - Cc Dammann, Jens-Uwe, FI CRS -1 10-Aug-2021 LOD
- Cc Abdelaal, Mohamed, FI
DRAWINGS
- Cc Arias, Leandro, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID OIL DRAINING SYSTEM 19SWCG30204-1-200-TX- Pablo, FI
Saturday, July 31, 2021
R01UBH-KE0-06-100001 WORKSHOP 005240
00D PCS
- Dammann, Jens-Uwe, FI
CRS -1 10-Aug-2021 LOD

- Cc Arias, Leandro, FI
19SWCG30204-1-200- P&ID - DAF SLUDGE TRANSFER& AIR 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Sunday, August 1, 2021
R00GEB-KE0-06-300112 COMPRESSOR SYSTEM - STREAM 1 005245
003 PCS
- Nayyar, Abu Mohammad, FI
CRS 0 11-Aug-2021 LOD

19SWCG30204-1-200- P&ID - DAF SLUDGE TRANSFER& AIR 19SWCG30204-1-200-TX- - Hammad, Sherif, FI


Sunday, August 1, 2021
R00GEB-KE0-06-300113 COMPRESSOR SYSTEM - STREAM 2 005246
002 PCS
- Nayyar, Abu Mohammad, FI
CRS 0 11-Aug-2021 LOD

19SWCG30204-1-200- FILTRATED TANK 19SWCG30204-1-200-TX- - Hammad, Sherif, FI


Sunday, August 1, 2021
R1100G-KED-00-100000 INSTRUMENTATION LAY-OUT 005250
001 I&C
- Cc Arias, Leandro, FI
CRS 0 11-Aug-2021 LOD

19SWCG30204-1-200- PRODUCT TANK CABLE TRAY 19SWCG30204-1-200-TX- - Hammad, Sherif, FI


Sunday, August 1, 2021
R26BXC-KED-18-100000 ROUTINGS 005251
001 I&C
- Cc Arias, Leandro, FI
CRS 0 11-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- GIS BUILDINGS FIRE-FIGHTING 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R36UBA-1FF-19-690000 SYSTEM DRAWING 005253
001 FF FI CRS 0 11-Aug-2021 LOD
- Cc Abdelaal, Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DRAINING PUMPS DATASHEET - 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R010GM-KEM-DS-100001 PVDF VERTICAL CENTRIFUGAL PUMP 005261
000 MEC FI CRS 0 11-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- FILTRATED TANK CABLE TRAY 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Sunday, August 1, 2021
R11BXC-KED-18-100000 ROUTINGS 005262
001 I&C
- Cc Arias, Leandro, FI
CRS 0 11-Aug-2021 LOD

PIPING ARRANGEMENT DRAWING - Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R14GET-KEM-04-331018
FOR SODIUM BISULFITE DOSING
005265
002 MEC FI CRS 0 11-Aug-2021 LOD
SYSTEM - Cc Dammann, Jens-Uwe, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- PRODUCT TANK INSTRUMENTATION 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R26GEW-KED-00-100000 LAY-OUT 005267
001 I&C - Cc Arias, Leandro, FI CRS 0 11-Aug-2021 LOD
- Cc Nayyar, Abu Mohammad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING GENERAL ARRANGEMENT DR 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R09GEB-KEM-00-300101 AWING FOR DAF SYSTEM 005270
00F MEC - Cc Abdullahi Abdulle, CRS 0 11-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R01BXA-1J0-IT-300059
ITP of INSTRUMENTATION CABLES
005271
000 I&C - Cc Arias, Leandro, FI CRS 0 11-Aug-2021 NON-LOD
- Cc Nayyar, Abu Mohammad, FI

- Hammad, Sherif, FI
19SWCG30204-1-200- Test procedure of 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R01BXA-1J0-PR-300059 INSTRUMENTATION CABLES 005272
000 I&C - Cc Arias, Leandro, FI CRS 0 11-Aug-2021 NON-LOD
- Cc Nayyar, Abu Mohammad, FI
SODIUM HYPOCHLORITE
- Abdullahi Abdulle, Mohamed,
GENERATION SYSTEM
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R06PUS-1OS-SA-900604
COMMISSIONING AND 2 YEARS OF
005274
001 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD
OPERATION SPARE PARTS LIST FOR
- Cc Muhammed, Sajjad, FI
EC PLANT
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- PERFORMANCE CURVES FOR 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R06PUS-KEM-19-900643 ELECTROCHLORINATION PLANT 005275
001 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - KEY 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R0000G-KEM-00-100010 PLAN 005278
000 MEC - Cc Abdullahi Abdulle, CRS 1 12-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID - SULFURIC ACID DOSING 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R00GEM-KE0-06-300181 SYSTEM 005280
002 PCS - Cc Arias, Leandro, FI CRS 1 12-Aug-2021 LOD
- Cc Nayyar, Abu Mohammad, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID – CHEMICAL NEUTRALIZATION 19SWCG30204-1-200-TX- Pablo, FI
Monday, August 2, 2021
R00GEO-KE0-06-300181 SYSTEM (65%) 005281
00G PCS
- Cc Arias, Leandro, FI
CRS 1 12-Aug-2021 LOD

- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R38UBY-1MH-00-695000
SE-1 HVAC SYSTEM LAYOUT
005284
000 HVC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- DRAWING AND DATA SHEET FOR 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Monday, August 2, 2021
R180GE-KEM-DS-340002 GROOVED COUPLING 005289
004 MEC
- Cc Wani, Muneer, FI
CRS 1 12-Aug-2021 LOD

- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R20GEL-KEM-00-100000 NEUTRALIZATION 005296
00A MEC - Cc Abdullahi Abdulle, CRS 1 12-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R13UDS-KE0-00-100001
CARTRIDGE FILTERS LAYOUT
005298
002 MEC FI CRS 1 12-Aug-2021 LOD
- Cc Azimuddin, Warsi, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R00UZD-KEC-19-100000
CAR PARK STRUCTURES
005305
00A CIV
- Cc Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD

PIPING LAYOUT DRAWINGS - NORTH - Dammann, Jens-Uwe, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R0100G-KEM-00-110000
PERIMETER ROAD
005306
00B MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
INTERCONNECTIONS Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R28GKC-KEM-00-100000 POTABLE WATER TANK 005309
001 MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- GENERAL ARRANGEMENT FOR DIRTY 19SWCG30204-1-200-TX- FI
Tuesday, August 3, 2021
R15GED-1C0-00-100002 BACKWASH TANK 005310
003 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 2 13-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R25GUA-KEM-00-100000 OVERFLOW 005311
003 MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- SE-4 HVAC EQUIPMENTS TECHNICAL 19SWCG30204-1-200-TX- FI
Tuesday, August 3, 2021
R07UBY-1MH-EF-695002 SUBMITTAL 005312
000 HVC
- Cc Zeidan, Siraj, FI
CRS 2 13-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R11GEU-KEM-00-100000 FILTERED WATER TANK 005313
00D MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R170UQ-KEC-19-100000
OUTFALL CHAMBER
005314
00H CIV
- Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD

POST TREATMENT CHEMICALS


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R22UXM-KEC-19-102205
STORAGE BUILDING ARCHITECTURE
005317
00A CIV
- Cc Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD
DRAWINGS
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - RIYADH 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R26GEW-KEM-00-100010 WATER TRANSMISSION SYSTEM 005318
00B MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
PRE TREATMENT CHEMICALS
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R31UXM-KEC-19-103105
STORAGE BUILDING ARCHITECTURE
005319
00A CIV
- Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD
DRAWINGS
SOIL IMPROVEMENT DESIGN
19SWCG30204-1-200- REPORT FOR STP-TANK 1, STP-TANK 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R01UGV-1CA-TE-400000 2, EQUIPMENT CONTAINER & FILTER 005321
00B CIV Stange, Tina, FI CRS 2 13-Aug-2021 LOD

WATER TANK FOUNDATION

- Hammad, Sherif, FI
19SWCG30204-1-200- FIRE & GAS DETECTION AND ALARM 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R00CYE-1FA-19-690185 SYSTEM OVERALL MIMIC LAYOUT 005323
000 FF - Cc Nayyar, Abu Mohammad, FI CRS 2 13-Aug-2021 LOD
- Cc Arias, Leandro, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R170UQ-KE0-CL-100000
OUTFALL CHAMBER CALCULATION
005325
00C CIV
- Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD

CONNECTION DETAIL DESIGN FOR


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Wednesday, August 4, 2021
R19GKK-KEC-20-450001
LIME STONE FILTERS OF STEEL
005329
002 CIV
- Cc Wani, Muneer, FI
CRS 3 14-Aug-2021 LOD
STRUCTURES
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- ELECTRICAL HEATER DATASHEET OF 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R20GEK-KEE-DS-331013 RO CIP TANK 005330
003 ELE - Cc Azimuddin, Warsi, FI CRS 3 14-Aug-2021 LOD
- Cc Purushothan, Jayaraman, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - ROAD 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Wednesday, August 4, 2021
R0100G-KEM-00-110008 A INTERCONNECTIONS 005331
001 MEC
- Senthilkumar, V, FI
CRS 3 14-Aug-2021 LOD

PIPING LAYOUT DRAWINGS - WEST


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Wednesday, August 4, 2021
R0100G-KEM-00-110005
PERIMETER ROAD
005331
002 MEC
- Senthilkumar, V, FI
CRS 3 14-Aug-2021 LOD
INTERCONNECTIONS
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- CHEMICALS AND OILY WATER 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R01GEO-KEM-EF-100010 PUMPS SPECIFICATION 005332
001 MEC - Cc Abdullahi Abdulle, CRS 3 14-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- EQUIPMENT DATE SHEET FOR FIRE 19SWCG30204-1-200-TX- FI
Wednesday, August 4, 2021
R36CYE-1FA-08-750504 DETECTION SYSTEM 005333
001 FF
- Hammad, Sherif, FI
CRS 3 14-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Wednesday, August 4, 2021
R000BB-KEM-IT-501213
ITP FOR API TANK
005339
00A MEC
- Cc Dammann, Jens-Uwe, FI
CRS 3 14-Aug-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Wednesday, August 4, 2021
R000BB-KEM-PR-501213
QUALITY MANUAL FOR API TANK
005340
00A MEC
- Cc Azimuddin, Warsi, FI
CRS 3 14-Aug-2021 NON-LOD

19SWCG30204-1-200- Intermediate Pump, Pump 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Wednesday, August 4, 2021
R12GEC-1US-PR-900017 Performance Test Procedure 005340
001 MEC
- Cc Azimuddin, Warsi, FI
CRS 3 14-Aug-2021 NON-LOD

- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - DMF BACKWASH 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R00GEC-KE0-CN-100094 EFFLUENT TREATMENT SYSTEM 005341
000 PCS - Abdullahi Abdulle, Mohamed, DRN 3 14-Aug-2021 NON-LOD
FI
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - DMF BACKWASH TANK 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R00GEC-KE0-CN-100093 & PUMP 005341
001 PCS - Abdullahi Abdulle, Mohamed, DRN 3 14-Aug-2021 NON-LOD
FI
PIPING ARRANGEMENT DRAWING - Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R14GES-KEM-04-331020
FOR SODIUM HYDROXIDE DOSING
005343
00D MEC - Cc Abdullahi Abdulle, CRS 3 14-Aug-2021 LOD
SYSTEM Mohamed, FI
- Hammad, Sherif, FI
- Cc Abdullahi Abdulle,
19SWCG30204-1-200- P&ID FERRIC CHLORIDE STORAGE 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R08GEN-KE0-06-100000 TANK 005348
001 PCS Mohamed, FI CRS 4 15-Aug-2021 LOD
- Cc Pocostales Buenavida, Juan
Pablo, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- GENERAL ARRANGEMENT DRAWING 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R0000G-KEM-00-501207 FOR POTABLE VESSEL 005353
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 4 15-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Arias, Leandro, FI
Thursday, August 5, 2021
R00GER-KE0-06-100186
P&ID ANTISCALANT STORAGE TANK
005354
00G PCS
- Pocostales Buenavida, Juan
CRS 4 15-Aug-2021 LOD

Pablo, FI
19SWCG30204-1-200- PIPING ARRANGEMENT DRAWING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Thursday, August 5, 2021
R08GEM-KEM-04-331021 FOR SULFURIC ACID DOSING SYSTEM 005355
003 MEC
- Cc Wani, Muneer, FI
CRS 4 15-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


PIPING ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R08GEN-KEM-04-331023
FOR FERRIC CHLORIDE DOSING
005356
000 MEC
- Cc Muhammed, Sajjad, FI
CRS 4 15-Aug-2021 LOD
SYSTEM
- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- CARTRIDGE FILTERS CALCULATION 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Thursday, August 5, 2021
R13UGZ-KEC-CL-100000 REPORT 005357
001 CIV
- Wani, Muneer, FI
CRS 4 15-Aug-2021 LOD

WATER DELUGE SYSTEM - P&ID,


19SWCG30204-1-200- LAYOUT, SECTION, ISOMETRIC & 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Thursday, August 5, 2021
R31SGC-1FS-05-690203 DETAIL DRAWING FOR CENTRAL 005360
001 FF
- Cc Abdelaal, Mohamed, FI
CRS 4 15-Aug-2021 LOD

CHEMICAL STORAGE BUILDING


DRAWINGS - PORTABLE FIRE
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Thursday, August 5, 2021
R33SGM-1FF-05-690120
EXTINGUISHER FOR ELECTRICAL
005361
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 4 15-Aug-2021 LOD
BUILDINGS SE-2
SEWAGE TREATMENT PLANT
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Thursday, August 5, 2021
R37BXL-KEE-CL-100000
LIGHTING AND SMALL POWER
005362
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 4 15-Aug-2021 LOD
CALCULATION REPORT
NOVEC1230 FIRE SUPPRESSION
- Hammad, Sherif, FI
19SWCG30204-1-200- SYSTEM , LAYOUT, SECTIONS, 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R38SGJ-1FP-05-690088 ISOMETRIC ,P&ID, DETAILS - 005363
003 FF - Cc Abdullahi Abdulle, CRS 4 15-Aug-2021 LOD
Mohamed, FI
ELECTRICAL BUILDINGS SE-1
19SWCG30204-1-200- SE-1 ELECTRICAL BUILDINGS 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Thursday, August 5, 2021
R38UBY-KEC-CL-100000 CALCULATION REPORT 005364
002 CIV
- Wani, Muneer, FI
CRS 4 15-Aug-2021 LOD

NOVEC1230 FIRE SUPPRESSION


- Hammad, Sherif, FI
19SWCG30204-1-200- SYSTEM , LAYOUT, SECTIONS, 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R39SGJ-1FP-05-690092 ISOMETRIC ,P&ID, DETAILS - 005365
001 FF - Cc Abdullahi Abdulle, CRS 4 15-Aug-2021 LOD
Mohamed, FI
ELECTRICAL BUILDINGS SE-3
19SWCG30204-1-200- ADMINSITRATION BUILDING MEP 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R350SA-1MP-BQ-100000 BILL OF QUANTITIES 005369
001 MEC Caratiquet, Elmer, FI CRS 4 15-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- PIPING LAYOUT FOR 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R06PUS-KEM-19-900649 ELECTROCHLORINATION PLANT 005373
00A MEC
- Cc Muhammed, Sajjad, FI
CRS 4 15-Aug-2021 LOD

- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- PIPING SUPPORT LAYOUT FOR 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R06PUS-KEM-19-900650 ELECTROCHLORINATION PLANT 005373
00A MEC
- Cc Muhammed, Sajjad, FI
CRS 4 15-Aug-2021 LOD

- Cc Dammann, Jens-Uwe, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DMF STRESS ANALYSIS REPORT (GRE 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R10GED-KEM-TE-500702 PIPE) 005374
000 MEC - Cc Abdullahi Abdulle, CRS 4 15-Aug-2021 LOD
Mohamed, FI
Method Statement For Fire Fighting - Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R00ZAA-1FF-MS-000079
Main Ring UG HDPE Pipes
005375
001 FF FI CRS 4 15-Aug-2021 NON-LOD
Installation and Pressure Test - Cc Hammad, Sherif, FI
METHOD STATEMENT FOR MV
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Thursday, August 5, 2021
R00ZAA-1E0-MS-000088
SWITCHGEAR TESTING &
005376
00A ELE
- Cc Azimuddin, Warsi, FI
CRS 4 15-Aug-2021 NON-LOD
COMMISSIONING SYSTEM
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- LIMESTONE FILTERS DATASHEET 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R25UGZ-KEC-DS-300000 AND DRAWINGS 005377
000 MEC FI CRS 4 15-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R0000C-KEM-EF-100001
EXPANSION JOINTS SPECIFICATION
005378
006 MEC FI CRS 4 15-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R16GNB-1M0-IT-501703
ITP FOR OIL SEPARATOR
005379
00A MEC FI CRS 4 15-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI
LAYOUTS & SLD FOR RO BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R18CYE-1FA-08-690138
(1ST PASS) - FIRE DETECTION &
005380
004 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
TECHNICAL SUBMITTAL FOR RO
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R18CYE-1FA-CL-690137
BUILDING (1ST PASS) - FIRE
005381
004 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
DETECTION & ALARM SYSTEM
LAYOUTS & SLD FOR RO BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R19CYE-1FA-08-690136
(2ND PASS) - FIRE DETECTION &
005382
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
LAYOUTS & SLD FOR ELECTRICAL
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R39CYE-1FA-08-690142
BUILDING (SE-3) - FIRE DETECTION &
005383
002 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
TECHNICAL SUBMITTAL FOR
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R39CYE-1FA-CL-690141
ELECTRICAL BUILDING (SE-3) - FIRE
005384
002 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
DETECTION & ALARM SYSTEM
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R01BXE-KEE-19-100001 LIGHTNING PROTECTION LAYOUT 005385
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD

19SWCG30204-1-200- SE-4 ELECTRICAL BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI


Saturday, August 7, 2021
R07UBY-KEC-CL-100000 CALCULATION REPORT 005387
001 CIV
- Cc Wani, Muneer, FI
CRS 6 17-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- DATASHEET & DRAWINGS FOR 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R08GEM-KEM-DS-331030 CHEMICAL NEUTRALIZATION PUMP 005388
001 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- ECTRICAL CABLE LAYOUT DRAWING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R16GNB-1M0-04-501703 FOR OIL SEPARATOR 005389
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD

O&M OPERATION & MAINTENANCE


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R00CYE-1FA-OM-690191
MANUAL - FIRE ALARM &
005390
000 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
DETECTION SYSTEM
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R12GEC-1US-00-900026
Intermediate Pump Motor Drawings
005391
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD

INTERMEDIATE PUMP WIRING


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R12GEC-1US-16-900032
DIAGRAM AND DRAWING OF PUMP
005392
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD
JUNCTION BOXES
INTERMEDIATE PUMP WIRING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R12GEC-1US-16-900033
DIAGRAM AND DRAWING OF
005392
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD
EMERGENCY STOP PANEL
GENERAL ARRANGEMENT DRAWING - Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R18GEX-KEM-00-300501
FOR PASS1 SWRO ELEMENT TESTING
005393
000 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
SYSTEM Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R090GE-KEM-00-300000
DAF SUPPORT LAY-OUT
005394
001 MEC - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
19SWCG30204-1-200- LOOP DIAGRAM_PRETREATMENT 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R000GE-1JF-15-350023 AREA 005395
000 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 6 17-Aug-2021 LOD

INDOOR FIRE HOSE CABINETS -P&ID,


19SWCG30204-1-200- LAYOUT, SECTION, ISOMETRIC 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R13SGB-1FF-05-690033 DRAWING FOR CARTRIDGE FILTERS 005396
000 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD

STRUCTURE
INDOOR FIRE HOSE CABINETS -
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R13SGB-1FF-CL-690034
TECHNICAL SUBMITTAL FOR
005397
000 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
CARTRIDGE FILTERS STRUCTURE
WWTP EQUIPMENT BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Saturday, August 7, 2021
R16GEF-KEC-19-100013
CONCRETE STRUCTURE
005399
002 CIV
- Cc Wani, Muneer, FI
CRS 6 17-Aug-2021 LOD
REINFORCEMENT DRAWING
- Abdullahi Abdulle, Mohamed,
PIPING ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R19GEJ-KEM-00-342010
OF PASS 2 BWRO ELEMENT TESTING
005400
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 LOD
SYSTEM
- Cc Muhammed, Sajjad, FI
GENERAL ARRANGEMENT DRAWING - Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R19GEX-KEM-00-300507
FOR PASS2 BWRO ELEMENT TESTING
005401
000 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
SYSTEM Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID SODIUM HYDROXIDE STORAGE 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R22GES-KE0-06-100000 TANK 005402
005 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
PIPING ARRANGEMENT DRAWING - Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R25GKP-KEM-04-332020
FOR CHLORINE DIOXIDE
005403
00D MEC - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
GENERATION AND DOSING SYSTEM Mohamed, FI
NOVEC1230 FIRE SUPPRESSION
19SWCG30204-1-200- SYSTEM , LAYOUT, SECTIONS, 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R33SGJ-1FP-05-690090 ISOMETRIC ,P&ID, DETAILS - 005405
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD

ELECTRICAL BUILDINGS SE-2


- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- SE-1 HVAC EQUIPMENTS TECHNICAL 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R38UBY-1MH-EF-695002 SUBMITTAL 005406
000 HVC FI CRS 6 17-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Senthilkumar, V, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R210UG-KEC-00-100030
PERMEATE WATER TANK LAYOUT
005407
001 CIV - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - PRETREATMENT DUAL 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R00GEC-KE0-CN-100095 MEDIA FILTER - STREAM 1 005408
000 PCS - Cc Abdullahi Abdulle, DRN 6 17-Aug-2021 NON-LOD
Mohamed, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DMF STRESS ANALYSIS REPORT (GRP 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R10GED-KEM-TE-500701 PIPE) 005409
001 MEC - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
NOVEC1230 FIRE SUPPRESSION
19SWCG30204-1-200- SYSTEM , LAYOUT, SECTIONS, 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R07SGJ-1FP-05-690094 ISOMETRIC ,P&ID, DETAILS - 005411
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD

ELECTRICAL BUILDINGS SE-4


GENERAL ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Saturday, August 7, 2021
R25GKP-KE0-00-332011
FOR CHLORINE DIOXIDE
005412
00E PCS
- Cc Senthilkumar, V, FI
CRS 6 17-Aug-2021 LOD
GENERATION AND DOSING SYSTEM
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R15GEG-KEM-IT-300061
ITP for Treated water Effluent pumps
005414
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- Test procedure for treated water 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R15GEG-KEM-PR-300061 effluent pumps 005415
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- CIVIL WORKSHOP LIGHTING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R37BXL-KEE-19-100001 DRAWINGS 005416
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD

- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID-FERRIC CHLORIDE DOSING 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R00GEN-KE0-06-300174 SYSTEM FOR DMF INLET 005417
002 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
19SWCG30204-1-200- PERMEATE TANK CABLE TRAY 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R21BXC-KED-18-100000 ROUTINGS 005418
001 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 6 17-Aug-2021 LOD

19SWCG30204-1-200- PENSTOCKS AND STOPLOGS 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI


Saturday, August 7, 2021
R0000G-KEM-EF-300007 SPECIFICATION 005419
003 MEC
- Cc Hammad, Sherif, FI
CRS 6 17-Aug-2021 LOD

- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID FOR SEAWATER SCREEN 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R03GAA-KE0-06-900502 SYSTEM 005420
000 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
SE-1 UNINTERRUPTED POWER
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Sunday, August 8, 2021
R380BR-KEE-08-100000
SUPPLY SYSTEM (UPS) SINGLE LINE
005421
002 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD
DIAGRAM(400/230V)
- Abdullahi Abdulle, Mohamed,
PIPING ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R18GEH-KEM-00-342010
OF PASS 1 SWRO ELEMENT TESTING
005422
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD
SYSTEM
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- POST-TREATMENT CHEMICAL TANKS 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, August 8, 2021
R22UXM-1A0-19-100210 BUILDING ARCHITECTURE DRAWINGS 005423
00A CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD

19SWCG30204-1-200- PRODUCT WATER TANK LIGHTING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Sunday, August 8, 2021
R26BXL-KEE-16-100000 DRAWINGS 005424
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD

POTABLE WATER TANK


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Sunday, August 8, 2021
R29BXC-KED-18-100000
INSTRUMENTATION CABLE TRAY
005425
001 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 7 18-Aug-2021 LOD
ROUTINGS
WET PIPE SPRINKLER SYSTEM- P&ID,
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- LAYOUT, SECTION, ISOMETRIC & 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R29SGE-1FS-05-690061 DETAIL DRAWING FOR FIRE 005426
000 FF FI CRS 7 18-Aug-2021 LOD
- Cc Hammad, Sherif, FI
FIGHTING PUMP HOUSE BUILDING

19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Azimuddin, Warsi, FI


Sunday, August 8, 2021
R0000A-KEE-RP-100003
TRANSIENT STABILITY STUDIES
005428
000 ELE
- Cc Purushothan, Jayaraman, FI
CRS 7 18-Aug-2021 LOD

19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Sunday, August 8, 2021
R0000A-KEE-RP-100004
HARMONIC STUDY
005429
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R0000G-KEM-DS-501206
DATASHEET FOR POTABLE VESSEL
005430
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID - SODIUM BISULFITE DOSING 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GET-KE0-06-300184 SYSTEM (65%) 005431
000 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DESIGN CALCULATIONS FOR INTAKE 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R0000G-KEM-CL-501204 VESSEL 005432
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DESIGN CALCULATIONS FOR 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R0000G-KEM-CL-501210 POTABLE VESSEL 005432
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD

- Cc Muhammed, Sajjad, FI
STANDPIPE SYSTEM
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID,LAYOUT,SECTION,ISOMATRIC 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R35SGB-1FF-05-690126 &DETAIL DRAWING FOR ADMIN 005433
001 FF - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
BUILDING
19SWCG30204-1-200- OVERFLOW NETWORK PIT 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, August 8, 2021
R0000U-KEC-CL-100001 STRUCTURES CALCULATION REPORT 005434
001 CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD

EQUIPMENT DATASHEET - - Hammad, Sherif, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00SGB-1FF-DS-690006
HYDRANTS,VALVES, OUTDOOR &
005435
001 FF - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
INDOOR CABINETS Mohamed, FI
FIRE FIGHTING PUMP HOUSE &
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, August 8, 2021
R29USG-KE0-CL-100000
POTABLE WATER TANK
005436
001 CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD
FOUNDATION CALCULATION REPORT
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Sunday, August 8, 2021
R3600A-KEE-06-700020
LCC SCHEMATICS FOR D11
005437
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD

19SWCG30204-1-200- CHLORINE DIOXIDE BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI


Sunday, August 8, 2021
R25UXP-1A0-19-101010 ARCHITECTURE DRAWINGS 005438
00A CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DRN - P&ID - SERVICE WATER 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R00GEA-KE0-CN-100039 NETWORK SYSTEM 005441
001 MEC
- Cc Dammann, Jens-Uwe, FI
DRN 7 18-Aug-2021 NON-LOD

- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- DRN - P&ID - POTABLE WATER TANK 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GEC-KE0-CN-100096 & PUMPS 005442
000 PCS Hammad, Sherif, FI DRN 7 18-Aug-2021 NON-LOD

- Abdullahi Abdulle, Mohamed,


DRN - WATERHAMMER
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R00GEC-KE0-CN-100097
CALCULATION REPORT FOR INTAKE
005443
000 MEC
- Cc Dammann, Jens-Uwe, FI
DRN 7 18-Aug-2021 NON-LOD
PUMP DIS CHARGE PIPING
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Sunday, August 8, 2021
R330AS-KEE-DS-100000
6,6 KV SWITCHGEARS DATASHEET
005444
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD

19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI


Sunday, August 8, 2021
R01BMV-1A0-19-100001 ARCHITECTURE DRAWINGS 005445
00A CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD

- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DAF SYSTEM - DISPERSION PIPES 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R09GEB-KEM-DS-300204 DATASHEET AND DRAWINGS 005447
005 MEC - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- MANUAL VALVE LIST FOR DUAL 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R10GEC-KEM-DS-300344 MEDIA FILTER (DMF) SYSTEM 005448
001 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GEL-KE0-06-300146
P&ID - NEUTRALIZATION TANK
005449
004 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
TECHNICAL SUBMITTAL FOR RO
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 9, 2021
R19CYE-1FA-CL-690135
BUILDING(2ND PASS) - FIRE
005440
004 FF
- Cc Hammad, Sherif, FI
CRS 8 19-Aug-2021 LOD
DETECTION & ALARM SYSTEM
- Cc Muhammed, Sajjad, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID FOR ELECTROCHLORINATION PL 19SWCG30204-1-200-TX- Pablo, FI
Monday, August 9, 2021
R06PUS-KE0-06-900620 ANT 005450
00G PCS
- Dammann, Jens-Uwe, FI
CRS 8 19-Aug-2021 LOD

- Cc Arias, Leandro, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - ROAD 3 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R0100G-KEM-00-110006 INTERCONNECTIONS 005451
002 MEC Dammann, Jens-Uwe, FI CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- PROCESS CONTROL PHILOSOPHY 19SWCG30204-1-200-TX- - Hammad, Sherif, FI


Monday, August 9, 2021
R16GNB-1M0-MN-501700 FOR OIL SEPARATOR 005452
000 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 8 19-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- EQUIPMENTS & INSTRUMENTS LIST 19SWCG30204-1-200-TX- FI
Monday, August 9, 2021
R16GNB-1M0-BQ-501701 FOR OIL SEPARATOR 005453
001 MEC
- Cc Muhammed, Sajjad, FI
CRS 8 19-Aug-2021 LOD

- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DATA SHEETS FOR LV DRY TYPE 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Monday, August 9, 2021
R01BFT-1E0-DS-702200 TRANSFORMERS 005454
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 LOD

INDOOR FIRE HOSE CABINETS - - Abdullahi Abdulle, Mohamed,


19SWCG30204-1-200- TECHNICAL SUBMITTAL FOR 19SWCG30204-1-200-TX- FI
Monday, August 9, 2021
R05SGB-1FF-CL-690042 SEWAGE TREATMENT PLANT 005455
000 FF
- Cc Hammad, Sherif, FI
CRS 8 19-Aug-2021 LOD

BUILDING/ AREA - Cc Muhammed, Sajjad, FI


19SWCG30204-1-200- ELECTROCHLORINATION STEEL 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Monday, August 9, 2021
R06USE-KEC-CL-100000 STRUCTURE CALCULATION 005456
001 CIV
- Cc Wani, Muneer, FI
CRS 8 19-Aug-2021 LOD

- Abdullahi Abdulle, Mohamed,


INDOOR FIRE HOSE CABINETS -P&ID,
FI
19SWCG30204-1-200- LAYOUT, SECTION, ISOMETRIC 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R05SGB-1FF-05-690041 DRAWING FOR SEWAGE 005457
000 FF - Cc Hammad, Sherif, FI CRS 8 19-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
TREATMENT PLANT BUILDING/ AREA
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- PRETREATMENT NEUTRALIZATION 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Monday, August 9, 2021
R16GEO-KEC-19-100002 TANK STEEL STRUCTURE DRAWINGS 005458
000 CIV
- Cc Wani, Muneer, FI
CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- INSTRUMENTATION BILL OF 19SWCG30204-1-200-TX- - Caratiquet, Elmer, FI


Monday, August 9, 2021
R010UC-KED-BQ-100000 QUANTITIES 005459
000 I&C
- Cc Hammad, Sherif, FI
CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- DATA SHEETS OF EQUIPMENTS FOR 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Monday, August 9, 2021
R16GNB-1M0-DS-501701 OIL SEPARATOR 005460
000 MEC
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 LOD
19SWCG30204-1-200- OUTLINE DRAWING FOR SODIUM 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R14GES-KEM-04-331010 HYDROXIDE DOSING TANK 005461
00G MEC Dammann, Jens-Uwe, FI CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- O&M MANUALS FOR 230KV SURGE A 19SWCG30204-1-200-TX-


Monday, August 9, 2021
R3600A-1E0-OM-700003 RRESTER 005462
000 ELE CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- O&M MANUALS FOR 230KV DISCON 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Monday, August 9, 2021
R3600A-1E0-OM-700004 NECTOR 005463
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 LOD

19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI


Monday, August 9, 2021
R000GE-1JF-PR-300045
Test procedure of DCS system
005464
001 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 8 19-Aug-2021 NON-LOD

19SWCG30204-1-200- CATHODIC COMPONENTS LAYOUT 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Monday, August 9, 2021
R05BXF-KEE-05-703200 SEA WATER INTAKE SOIL SIDE 005465
002 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 NON-LOD

19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R3600A-KEE-05-900801
HV TRANSFORMER RATING PLATE
005466
001 - Purushothan,
ELE Jayaraman, FI- Cc Azimuddin, Warsi,
CRS FI 8 19-Aug-2021 LOD

19SWCG30204-1-200- SE-1 ELECTRICAL BUILDING & 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI


Monday, August 9, 2021
R38UBY-KEE-00-100000 TRANSFORMER YARD LAYOUT 005467
005 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 LOD

PIPING LAYOUT DRAWINGS - PRE-


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R31UXM-KEC-00-100001
TREATMENT CHEMICAL STORAGE
005468
00B MEC Dammann, Jens-Uwe, FI CRS 8 19-Aug-2021 LOD
TANKS
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - PRETREATMENT DUAL 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R00GEC-KE0-CN-100098 MEDIA FILTER - STREAM 2 005469
000 PCS - Cc Abdullahi Abdulle, DRN 8 19-Aug-2021 NON-LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - POLYMER DOSING 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R00GEP-KE0-CN-100099 SYSTEM 005469
000 PCS - Cc Abdullahi Abdulle, DRN 8 19-Aug-2021 NON-LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R20GEK-KEM-00-300001
PIPING GA DRAWING FOR CIP AREA
005470
00A MEC FI CRS 8 19-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- ADMINISTRATION HVAC LAYOUT 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R35BXC-KE0-06-100000 AND DUCTS ROUTING DRAWING 005471
002 HVC FI CRS 8 19-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- CO2 PRODUCTION PLANT AND 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R240GE-KEM-00-300000 STORAGE SUPPORT LAY-OUT 005472
00A MEC - Cc Abdullahi Abdulle, CRS 8 19-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- ADMIN BUILING HVAC EQUIPMENTS 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R35UYC-KE0-EF-100000 TECHNICAL SUBMITTAL 005473
002 HVC FI CRS 8 19-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
FOAM-WATER SYSTEM- P&ID,
LAYOUT, SECTION, ISOMETRIC & - Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R00SGF-1FS-05-690081
DETAIL DRAWING FOR DIESEL
005474
000 FF FI CRS 9 20-Aug-2021 LOD
GENERATOR & DIESEL STORAGE - Cc Hammad, Sherif, FI
TANK AREA
- Shafi, Mohammad, FI
19SWCG30204-1-200- CIVIL LAYOUT DRAWING FOR OIL 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R16GNB-1M0-00-501701 SEPARATOR 005476
000 CIV - Wani, Muneer, FI CRS 9 20-Aug-2021 LOD
- Cc Senthilkumar, V, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R20GEK-KEM-00-100000
PIPING LAYOUT DRAWINGS - RO CIP
005477
001 MEC Dammann, Jens-Uwe, FI CRS 9 20-Aug-2021 LOD

19SWCG30204-1-200- PIPING LAYOUT DRAWING - 19SWCG30204-1-200-TX-


Tuesday, August 10, 2021
R21GED-KEM-00-100000 PERMEATE WATER TANK 005478
00C MEC Dammann, Jens-Uwe, FI CRS 9 20-Aug-2021 LOD

FOAM-WATER SYSTEM- P&ID,


- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- LAYOUT, SECTION, ISOMETRIC & 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R23SGF-1FS-05-690205 DETAIL DRAWING FOR CO2 005479
000 FF FI CRS 9 20-Aug-2021 LOD
- Cc Hammad, Sherif, FI
PRODUCTION PLANT
- Arias, Leandro, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Tuesday, August 10, 2021
R000GE-1J0-DI-300181
CONTROL PHILOSOPHY
005480
00D I&C
- Pocostales Buenavida, Juan
CRS 9 20-Aug-2021 LOD

Pablo, FI
19SWCG30204-1-200- CATHODIC ANODE LAYOUT SEA 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, August 10, 2021
R05BXF-KEE-05-703201 WATER INTAKE SOIL SIDE 005481
002 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 20-Aug-2021 NON-LOD
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R00BMV-KE0-00-901700
DRAWINGS FOR EXPANSION JOINT
005482
002 MEC FI CRS 9 20-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- LOCAL PANEL DRAWINGS FOR 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, August 10, 2021
R16GEF-KEE-05-300316 WASTE WATER TREATMENT SYSTEM 005483
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 20-Aug-2021 LOD

19SWCG30204-1-200- PIPING ARRANGEMENT DRAWING 19SWCG30204-1-200-TX-


Tuesday, August 10, 2021
R08GEP-KEM-04-331022 FOR POLYMER DOSING SYSTEM 005484
00F MEC Dammann, Jens-Uwe, FI CRS 9 20-Aug-2021 LOD

SEAWATER FEED PUMP WIRING


19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, August 10, 2021
R05GAF-1US-16-900033
DIAGRAM AND DRAWING OF
005485
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 20-Aug-2021 LOD
EMERGENCY STOP PANEL
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R00ZAA-1MH-13-100000
HVAC CONTROL ARCHITECTURE
005487
003 HVC Hammad, Sherif, FI CRS 9 20-Aug-2021 LOD

CONNECTION DETAIL DESIGN FOR AI - Shafi, Mohammad, FI


19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R30UTF-KEC-20-450000
R COMPRESSOR BUILDING STEEL
005488
001 CIV - Wani, Muneer, FI CRS 9 20-Aug-2021 LOD
STRUCTURE - Cc Senthilkumar, V, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Cc Abdullahi Abdulle,
Tuesday, August 10, 2021
R00GEP-KE0-06-100183
P&ID POLYMER STORAGE TANK
005489
000 PCS
Mohamed, FI
CRS 9 20-Aug-2021 LOD

- Cc Nayyar, Abu Mohammad, FI


- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- Test procedure for manual check 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R01GCK-KEM-PR-300064 valves and globe valves 005490
00A MEC FI CRS 9 20-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI

You might also like