Professional Documents
Culture Documents
VOP 4
CRS 168
RFC 0
Wednesday, August 11, 2021 DRN 8
FICHTNER
Latest Transmission Date Doc Code Title SEPCO-III Transmittal code Revision Discipline FICHTNER Reviewers DOC TYPE RequiredReplyDate. LOD/NON-LOD
DAYS
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Cc Pocostales Buenavida, Juan
Saturday, July 31, 2021
R00GAF-KE0-06-100021
P&ID - SEAWATER INTAKE
005221
00L PCS
Pablo, FI
CRS -1 10-Aug-2021 LOD
- Cc Arias, Leandro, FI
- Pocostales Buenavida, Juan
FIRE FIGHTING PUMPS
Pablo, FI
19SWCG30204-1-200- ARRANGEMENT- P&ID , PIPING 19SWCG30204-1-200-TX-
Saturday, July 31, 2021
R00SGA-1FF-05-690014 LAYOUT, SECTION & ISOMETRIC 005227
001 FF - Cc Dammann, Jens-Uwe, FI CRS -1 10-Aug-2021 LOD
- Cc Abdelaal, Mohamed, FI
DRAWINGS
- Cc Arias, Leandro, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID OIL DRAINING SYSTEM 19SWCG30204-1-200-TX- Pablo, FI
Saturday, July 31, 2021
R01UBH-KE0-06-100001 WORKSHOP 005240
00D PCS
- Dammann, Jens-Uwe, FI
CRS -1 10-Aug-2021 LOD
- Cc Arias, Leandro, FI
19SWCG30204-1-200- P&ID - DAF SLUDGE TRANSFER& AIR 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Sunday, August 1, 2021
R00GEB-KE0-06-300112 COMPRESSOR SYSTEM - STREAM 1 005245
003 PCS
- Nayyar, Abu Mohammad, FI
CRS 0 11-Aug-2021 LOD
- Hammad, Sherif, FI
19SWCG30204-1-200- Test procedure of 19SWCG30204-1-200-TX-
Sunday, August 1, 2021
R01BXA-1J0-PR-300059 INSTRUMENTATION CABLES 005272
000 I&C - Cc Arias, Leandro, FI CRS 0 11-Aug-2021 NON-LOD
- Cc Nayyar, Abu Mohammad, FI
SODIUM HYPOCHLORITE
- Abdullahi Abdulle, Mohamed,
GENERATION SYSTEM
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R06PUS-1OS-SA-900604
COMMISSIONING AND 2 YEARS OF
005274
001 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD
OPERATION SPARE PARTS LIST FOR
- Cc Muhammed, Sajjad, FI
EC PLANT
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- PERFORMANCE CURVES FOR 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R06PUS-KEM-19-900643 ELECTROCHLORINATION PLANT 005275
001 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - KEY 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R0000G-KEM-00-100010 PLAN 005278
000 MEC - Cc Abdullahi Abdulle, CRS 1 12-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID - SULFURIC ACID DOSING 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R00GEM-KE0-06-300181 SYSTEM 005280
002 PCS - Cc Arias, Leandro, FI CRS 1 12-Aug-2021 LOD
- Cc Nayyar, Abu Mohammad, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID – CHEMICAL NEUTRALIZATION 19SWCG30204-1-200-TX- Pablo, FI
Monday, August 2, 2021
R00GEO-KE0-06-300181 SYSTEM (65%) 005281
00G PCS
- Cc Arias, Leandro, FI
CRS 1 12-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 2, 2021
R38UBY-1MH-00-695000
SE-1 HVAC SYSTEM LAYOUT
005284
000 HVC
- Cc Dammann, Jens-Uwe, FI
CRS 1 12-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- DRAWING AND DATA SHEET FOR 19SWCG30204-1-200-TX- - Dammann, Jens-Uwe, FI
Monday, August 2, 2021
R180GE-KEM-DS-340002 GROOVED COUPLING 005289
004 MEC
- Cc Wani, Muneer, FI
CRS 1 12-Aug-2021 LOD
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R20GEL-KEM-00-100000 NEUTRALIZATION 005296
00A MEC - Cc Abdullahi Abdulle, CRS 1 12-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 2, 2021
R13UDS-KE0-00-100001
CARTRIDGE FILTERS LAYOUT
005298
002 MEC FI CRS 1 12-Aug-2021 LOD
- Cc Azimuddin, Warsi, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R00UZD-KEC-19-100000
CAR PARK STRUCTURES
005305
00A CIV
- Cc Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R25GUA-KEM-00-100000 OVERFLOW 005311
003 MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- SE-4 HVAC EQUIPMENTS TECHNICAL 19SWCG30204-1-200-TX- FI
Tuesday, August 3, 2021
R07UBY-1MH-EF-695002 SUBMITTAL 005312
000 HVC
- Cc Zeidan, Siraj, FI
CRS 2 13-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R11GEU-KEM-00-100000 FILTERED WATER TANK 005313
00D MEC - Cc Abdullahi Abdulle, CRS 2 13-Aug-2021 LOD
Mohamed, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R170UQ-KEC-19-100000
OUTFALL CHAMBER
005314
00H CIV
- Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD
- Hammad, Sherif, FI
19SWCG30204-1-200- FIRE & GAS DETECTION AND ALARM 19SWCG30204-1-200-TX-
Tuesday, August 3, 2021
R00CYE-1FA-19-690185 SYSTEM OVERALL MIMIC LAYOUT 005323
000 FF - Cc Nayyar, Abu Mohammad, FI CRS 2 13-Aug-2021 LOD
- Cc Arias, Leandro, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Tuesday, August 3, 2021
R170UQ-KE0-CL-100000
OUTFALL CHAMBER CALCULATION
005325
00C CIV
- Wani, Muneer, FI
CRS 2 13-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Wednesday, August 4, 2021
R000BB-KEM-IT-501213
ITP FOR API TANK
005339
00A MEC
- Cc Dammann, Jens-Uwe, FI
CRS 3 14-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Wednesday, August 4, 2021
R000BB-KEM-PR-501213
QUALITY MANUAL FOR API TANK
005340
00A MEC
- Cc Azimuddin, Warsi, FI
CRS 3 14-Aug-2021 NON-LOD
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - DMF BACKWASH 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R00GEC-KE0-CN-100094 EFFLUENT TREATMENT SYSTEM 005341
000 PCS - Abdullahi Abdulle, Mohamed, DRN 3 14-Aug-2021 NON-LOD
FI
- Hammad, Sherif, FI
19SWCG30204-1-200- DRN - P&ID - DMF BACKWASH TANK 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R00GEC-KE0-CN-100093 & PUMP 005341
001 PCS - Abdullahi Abdulle, Mohamed, DRN 3 14-Aug-2021 NON-LOD
FI
PIPING ARRANGEMENT DRAWING - Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Wednesday, August 4, 2021
R14GES-KEM-04-331020
FOR SODIUM HYDROXIDE DOSING
005343
00D MEC - Cc Abdullahi Abdulle, CRS 3 14-Aug-2021 LOD
SYSTEM Mohamed, FI
- Hammad, Sherif, FI
- Cc Abdullahi Abdulle,
19SWCG30204-1-200- P&ID FERRIC CHLORIDE STORAGE 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R08GEN-KE0-06-100000 TANK 005348
001 PCS Mohamed, FI CRS 4 15-Aug-2021 LOD
- Cc Pocostales Buenavida, Juan
Pablo, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- GENERAL ARRANGEMENT DRAWING 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R0000G-KEM-00-501207 FOR POTABLE VESSEL 005353
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 4 15-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Arias, Leandro, FI
Thursday, August 5, 2021
R00GER-KE0-06-100186
P&ID ANTISCALANT STORAGE TANK
005354
00G PCS
- Pocostales Buenavida, Juan
CRS 4 15-Aug-2021 LOD
Pablo, FI
19SWCG30204-1-200- PIPING ARRANGEMENT DRAWING 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Thursday, August 5, 2021
R08GEM-KEM-04-331021 FOR SULFURIC ACID DOSING SYSTEM 005355
003 MEC
- Cc Wani, Muneer, FI
CRS 4 15-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- PIPING SUPPORT LAYOUT FOR 19SWCG30204-1-200-TX- FI
Thursday, August 5, 2021
R06PUS-KEM-19-900650 ELECTROCHLORINATION PLANT 005373
00A MEC
- Cc Muhammed, Sajjad, FI
CRS 4 15-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DMF STRESS ANALYSIS REPORT (GRE 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R10GED-KEM-TE-500702 PIPE) 005374
000 MEC - Cc Abdullahi Abdulle, CRS 4 15-Aug-2021 LOD
Mohamed, FI
Method Statement For Fire Fighting - Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R00ZAA-1FF-MS-000079
Main Ring UG HDPE Pipes
005375
001 FF FI CRS 4 15-Aug-2021 NON-LOD
Installation and Pressure Test - Cc Hammad, Sherif, FI
METHOD STATEMENT FOR MV
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Thursday, August 5, 2021
R00ZAA-1E0-MS-000088
SWITCHGEAR TESTING &
005376
00A ELE
- Cc Azimuddin, Warsi, FI
CRS 4 15-Aug-2021 NON-LOD
COMMISSIONING SYSTEM
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- LIMESTONE FILTERS DATASHEET 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R25UGZ-KEC-DS-300000 AND DRAWINGS 005377
000 MEC FI CRS 4 15-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R0000C-KEM-EF-100001
EXPANSION JOINTS SPECIFICATION
005378
006 MEC FI CRS 4 15-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Thursday, August 5, 2021
R16GNB-1M0-IT-501703
ITP FOR OIL SEPARATOR
005379
00A MEC FI CRS 4 15-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI
LAYOUTS & SLD FOR RO BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R18CYE-1FA-08-690138
(1ST PASS) - FIRE DETECTION &
005380
004 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
TECHNICAL SUBMITTAL FOR RO
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R18CYE-1FA-CL-690137
BUILDING (1ST PASS) - FIRE
005381
004 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
DETECTION & ALARM SYSTEM
LAYOUTS & SLD FOR RO BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R19CYE-1FA-08-690136
(2ND PASS) - FIRE DETECTION &
005382
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
LAYOUTS & SLD FOR ELECTRICAL
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R39CYE-1FA-08-690142
BUILDING (SE-3) - FIRE DETECTION &
005383
002 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
ALARM SYSTEM
TECHNICAL SUBMITTAL FOR
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R39CYE-1FA-CL-690141
ELECTRICAL BUILDING (SE-3) - FIRE
005384
002 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
DETECTION & ALARM SYSTEM
19SWCG30204-1-200- DIESEL GENERATOR BUILDING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R01BXE-KEE-19-100001 LIGHTNING PROTECTION LAYOUT 005385
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- ECTRICAL CABLE LAYOUT DRAWING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R16GNB-1M0-04-501703 FOR OIL SEPARATOR 005389
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD
STRUCTURE
INDOOR FIRE HOSE CABINETS -
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R13SGB-1FF-CL-690034
TECHNICAL SUBMITTAL FOR
005397
000 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
CARTRIDGE FILTERS STRUCTURE
WWTP EQUIPMENT BUILDING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Saturday, August 7, 2021
R16GEF-KEC-19-100013
CONCRETE STRUCTURE
005399
002 CIV
- Cc Wani, Muneer, FI
CRS 6 17-Aug-2021 LOD
REINFORCEMENT DRAWING
- Abdullahi Abdulle, Mohamed,
PIPING ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R19GEJ-KEM-00-342010
OF PASS 2 BWRO ELEMENT TESTING
005400
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 LOD
SYSTEM
- Cc Muhammed, Sajjad, FI
GENERAL ARRANGEMENT DRAWING - Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R19GEX-KEM-00-300507
FOR PASS2 BWRO ELEMENT TESTING
005401
000 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
SYSTEM Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID SODIUM HYDROXIDE STORAGE 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R22GES-KE0-06-100000 TANK 005402
005 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
PIPING ARRANGEMENT DRAWING - Dammann, Jens-Uwe, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R25GKP-KEM-04-332020
FOR CHLORINE DIOXIDE
005403
00D MEC - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
GENERATION AND DOSING SYSTEM Mohamed, FI
NOVEC1230 FIRE SUPPRESSION
19SWCG30204-1-200- SYSTEM , LAYOUT, SECTIONS, 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R33SGJ-1FP-05-690090 ISOMETRIC ,P&ID, DETAILS - 005405
003 FF
- Cc Abdelaal, Mohamed, FI
CRS 6 17-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- Test procedure for treated water 19SWCG30204-1-200-TX- FI
Saturday, August 7, 2021
R15GEG-KEM-PR-300061 effluent pumps 005415
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 6 17-Aug-2021 NON-LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- CIVIL WORKSHOP LIGHTING 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Saturday, August 7, 2021
R37BXL-KEE-19-100001 DRAWINGS 005416
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 6 17-Aug-2021 LOD
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID-FERRIC CHLORIDE DOSING 19SWCG30204-1-200-TX-
Saturday, August 7, 2021
R00GEN-KE0-06-300174 SYSTEM FOR DMF INLET 005417
002 PCS - Cc Abdullahi Abdulle, CRS 6 17-Aug-2021 LOD
Mohamed, FI
19SWCG30204-1-200- PERMEATE TANK CABLE TRAY 19SWCG30204-1-200-TX- - Hammad, Sherif, FI
Saturday, August 7, 2021
R21BXC-KED-18-100000 ROUTINGS 005418
001 I&C
- Cc Nayyar, Abu Mohammad, FI
CRS 6 17-Aug-2021 LOD
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID FOR SEAWATER SCREEN 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R03GAA-KE0-06-900502 SYSTEM 005420
000 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
SE-1 UNINTERRUPTED POWER
19SWCG30204-1-200- 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Sunday, August 8, 2021
R380BR-KEE-08-100000
SUPPLY SYSTEM (UPS) SINGLE LINE
005421
002 ELE
- Cc Azimuddin, Warsi, FI
CRS 7 18-Aug-2021 LOD
DIAGRAM(400/230V)
- Abdullahi Abdulle, Mohamed,
PIPING ARRANGEMENT DRAWING
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R18GEH-KEM-00-342010
OF PASS 1 SWRO ELEMENT TESTING
005422
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD
SYSTEM
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- POST-TREATMENT CHEMICAL TANKS 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, August 8, 2021
R22UXM-1A0-19-100210 BUILDING ARCHITECTURE DRAWINGS 005423
00A CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID - SODIUM BISULFITE DOSING 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GET-KE0-06-300184 SYSTEM (65%) 005431
000 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DESIGN CALCULATIONS FOR INTAKE 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R0000G-KEM-CL-501204 VESSEL 005432
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- DESIGN CALCULATIONS FOR 19SWCG30204-1-200-TX- FI
Sunday, August 8, 2021
R0000G-KEM-CL-501210 POTABLE VESSEL 005432
000 MEC
- Cc Dammann, Jens-Uwe, FI
CRS 7 18-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
STANDPIPE SYSTEM
- Hammad, Sherif, FI
19SWCG30204-1-200- P&ID,LAYOUT,SECTION,ISOMATRIC 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R35SGB-1FF-05-690126 &DETAIL DRAWING FOR ADMIN 005433
001 FF - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
BUILDING
19SWCG30204-1-200- OVERFLOW NETWORK PIT 19SWCG30204-1-200-TX- - Senthilkumar, V, FI
Sunday, August 8, 2021
R0000U-KEC-CL-100001 STRUCTURES CALCULATION REPORT 005434
001 CIV
- Cc Wani, Muneer, FI
CRS 7 18-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- DRN - P&ID - POTABLE WATER TANK 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GEC-KE0-CN-100096 & PUMPS 005442
000 PCS Hammad, Sherif, FI DRN 7 18-Aug-2021 NON-LOD
- Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DAF SYSTEM - DISPERSION PIPES 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R09GEB-KEM-DS-300204 DATASHEET AND DRAWINGS 005447
005 MEC - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- MANUAL VALVE LIST FOR DUAL 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R10GEC-KEM-DS-300344 MEDIA FILTER (DMF) SYSTEM 005448
001 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Hammad, Sherif, FI
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Sunday, August 8, 2021
R00GEL-KE0-06-300146
P&ID - NEUTRALIZATION TANK
005449
004 PCS - Cc Abdullahi Abdulle, CRS 7 18-Aug-2021 LOD
Mohamed, FI
- Abdullahi Abdulle, Mohamed,
TECHNICAL SUBMITTAL FOR RO
19SWCG30204-1-200- 19SWCG30204-1-200-TX- FI
Monday, August 9, 2021
R19CYE-1FA-CL-690135
BUILDING(2ND PASS) - FIRE
005440
004 FF
- Cc Hammad, Sherif, FI
CRS 8 19-Aug-2021 LOD
DETECTION & ALARM SYSTEM
- Cc Muhammed, Sajjad, FI
- Pocostales Buenavida, Juan
19SWCG30204-1-200- P&ID FOR ELECTROCHLORINATION PL 19SWCG30204-1-200-TX- Pablo, FI
Monday, August 9, 2021
R06PUS-KE0-06-900620 ANT 005450
00G PCS
- Dammann, Jens-Uwe, FI
CRS 8 19-Aug-2021 LOD
- Cc Arias, Leandro, FI
19SWCG30204-1-200- PIPING LAYOUT DRAWINGS - ROAD 3 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R0100G-KEM-00-110006 INTERCONNECTIONS 005451
002 MEC Dammann, Jens-Uwe, FI CRS 8 19-Aug-2021 LOD
- Cc Dammann, Jens-Uwe, FI
19SWCG30204-1-200- DATA SHEETS FOR LV DRY TYPE 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Monday, August 9, 2021
R01BFT-1E0-DS-702200 TRANSFORMERS 005454
000 ELE
- Cc Azimuddin, Warsi, FI
CRS 8 19-Aug-2021 LOD
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Monday, August 9, 2021
R3600A-KEE-05-900801
HV TRANSFORMER RATING PLATE
005466
001 - Purushothan,
ELE Jayaraman, FI- Cc Azimuddin, Warsi,
CRS FI 8 19-Aug-2021 LOD
Pablo, FI
19SWCG30204-1-200- CATHODIC ANODE LAYOUT SEA 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, August 10, 2021
R05BXF-KEE-05-703201 WATER INTAKE SOIL SIDE 005481
002 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 20-Aug-2021 NON-LOD
- Abdullahi Abdulle, Mohamed,
19SWCG30204-1-200- 19SWCG30204-1-200-TX-
Tuesday, August 10, 2021
R00BMV-KE0-00-901700
DRAWINGS FOR EXPANSION JOINT
005482
002 MEC FI CRS 9 20-Aug-2021 LOD
- Cc Muhammed, Sajjad, FI
19SWCG30204-1-200- LOCAL PANEL DRAWINGS FOR 19SWCG30204-1-200-TX- - Purushothan, Jayaraman, FI
Tuesday, August 10, 2021
R16GEF-KEE-05-300316 WASTE WATER TREATMENT SYSTEM 005483
001 ELE
- Cc Azimuddin, Warsi, FI
CRS 9 20-Aug-2021 LOD