Professional Documents
Culture Documents
Registration Locomotive
Loco Number Plan Actual Location Notes
Loco#1 am/pm am/pm TO509 – TO511 (4)
Loco#2 am/pm am/pm US601 Departure
Loco#3 am/pm am/pm US601 Departure
Loco#4 am/pm am/pm TO509 – TO511 (5)
Loco#5 am/pm am/pm TO509 – TO511 (3)
Loco#6 am/pm am/pm Upgrade 45T
Loco#7 am/pm am/pm TO509 – TO511 (2)
Loco#8 am/pm 07.38 am/pm Shop road west Car Shop with Wagon
Loco#9 am/pm am/pm Car Shop with Wagon
Loco#10 am/pm am/pm Loco Shop
Loco#11 am/pm am/pm US602 Departure
Loco#12 am/pm am/pm TO509 – TO511 (1)
Superintendent Shift (DS) Superintendent Shift (NS) GBC PROD MANADER VP GBC OPERATION
GBC DOWNDAY CRITICAL JOB LIST CHECKLIST
Actual
NO Activity HRS Actual Start Notes
Complete
Oreflow System
Changing Mantle and Concave
1 06.00 am/pm am/pm
CR601 84
2 06.00 am/pm am/pm
Changing Mantle CR602 24 US 602 still not ready, no estimation yet
3 am/pm am/pm
4 am/pm am/pm
5 am/pm am/pm
6 am/pm am/pm
7 am/pm am/pm
8 am/pm am/pm
9 am/pm am/pm
Actual
NO Activity HRS Actual Start Notes
Complete
Haulage Level
1 Rail Repair CG45 Exit 32 07.15 am/pm 23.00 am/pm Pouring on Aug 15th 03.00 PM
5 Epoxy US602 Arrival 18 07.15 am/pm am/pm Pouring on Aug 15th 01.00 PM
6 Refurbish Chute 44-3 35 07.15 am/pm am/pm
7 am/pm am/pm
8 am/pm am/pm
9 am/pm am/pm
2 am/pm am/pm
3 am/pm am/pm
4 am/pm am/pm
5 am/pm am/pm
6 am/pm am/pm
7 am/pm am/pm
8 am/pm am/pm
9 am/pm am/pm
2 am/pm am/pm
am/pm am/pm
3
4 am/pm am/pm
5 am/pm am/pm
6 am/pm am/pm
7 am/pm am/pm
8 am/pm am/pm
9 am/pm am/pm
AK
Down day Meeting Coord Superintendent Shift (DS) Superintendent Shift (NS)
Name: Andrew Kumala
ID: 80010810
Name: Name:
ID: ID:
VP GBC Operation
Name:
ID: