Package / Equipment Name: PIPES , FITTINGS AND FLANGES THIRD LOT
Place of Inspection: ARABIAN PIPELINE SUPPLY FZCO DUBAI UAE Date/ Period of Inspection: 18th Nov and 20th Nov Person met: MR. ABBAS Scope of Inspection: VISUAL DIMENSION AND MTC REVIEW AND SIGN BY TPI